AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incoporate the follow ing changes:
1. This amendment w ill modify the Instructions to Offerors.
2. Update the solicitation w ith the correct Wage Rates.
3. Extend the Bid Due Date.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 14
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Apr-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123621B2011
X 9B. DATED (SEE ITEM 11)
25-Feb-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Apr-2021
CODE
USACE, NORFOLK DISTRICT OFFICE
CONTRACTING OFFICE
803 FRONT STREET
NORFOLK VA 23510-1011
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123621B2011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 13-Apr-2021 02:00 PM to 20-Apr-2021 02:00 PM.
The following have been added by full text:
AMENDMENT 0005
Amendment 0005 is issued to provide the following:
1. To modify the Instructions to Offerors.
2. Update the solicitation with the correct Wage Rates.
3. Extend the Bid Due Date.
All other terms and conditions remain unchanged.
NOTICE TO OFFERORS
1. Modify the Instructions to Offerors to include additional information.
2. Update the Davis Bacon Wage Rates from VA20210011 to VA20210015.
3. The Bid Submittal Due Date is extended to 20th April 2021.
** Important Note: Attachment 4 Furnitures Fixtures and Equipment has been removed from beta.sam ; however, the attachment will be posted at a later date. Please continue to monitor beta.sam for all updates.
The following have been modified:
INFORMATION FOR BIDDERS
1. DESCRIPTION OF PROJECT
The MARSOC Assessment & Selection Training Facility a single story facility that consists of an approximately 7,134 Gross Square Foot (GSF) Pre-engineered Building structure with reinforced concrete foundation and floor slabs, slab on grade raised above 100 year flood plain, masonry veneer on 14 gauge cold formed metal studs. Roof shall be standing steam metal roof with a 2:12 slope secured directly to PEMB with cold formed metal roof purlins, HVAC high efficiency package located overhead interior of building supported by equipment platform, and automatic sprinkler protection. 130 personnel classroom high bay space separated from instructors and candidate quarters combined with utilities and 3 interview rooms. And, MARSOC Ops Building a single story facility that consists of an approximately 4,017 Gross Square Foot (GSF) one story Pre-engineered Building structure with reinforced concrete foundation and floor slabs, slab on grade raised above 100 year flood plain, masonry veneer on 14 gauge cold formed metal studs. Roof shall be standing steam metal roof with a 2:12 slope secured directly to PEMB with cold formed metal roof purlins, HVAC high efficiency package located overhead interior of building supported by equipment platform, and automatic sprinkler protection. 30 personnel workstations, two private offices in high bay space. Utilities, site improvements, landscaping, and other site and building related criteria are described in other chapters.
2. SPECIAL BID SUBMISSION INSTRUCTIONS DUE TO COVID-19
The Norfolk District anticipates the possibility that its building will be closed during the time for bid submission due to the evolving requirements arising in response to COVID-19. Accordingly, the Norfolk District will NOT accept bids my mail, hand-carry, or commercial courier (that is, no physical bids will be accepted in response to this solicitation). All bids must be submitted by electronic commerce only (that is, by submission via DoD SAFE, as discussed below, only).
Bid Submission
Due to the current COVID-19 pandemic, all bids shall be submitted electronically through the DoD SAFE website. Offerors are limited to five (5) maximum files per upload (total size cannot exceed 2GB). If an offeror attempts to transmit a large number of files, recommend that combining or ZIP files before uploading to the DoD SAFE site. Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission. It is Offerors’ responsibility to check with DoD SAFE to ensure successful submission. Offerors are responsible for allowing sufficient time for the bid to be received in accordance with the instructions provided.
Accordingly, the Norfolk District will NOT accept bids by mail, hand-carry, or commercial courier (that is, no physical bids will be accepted in response to this solicitation). All bids must be submitted by electronic commerce only (that is, by submission through DoD SAFE, as discussed below, only).
The Government will not be responsible for bids delivered to any location or to anyone other than those designated to receive bids on its behalf. Offerors are responsible for ensuring that bids are submitted so as to reach the designated recipient of bids. Offerors are responsible for allowing sufficient time for the bid to be received in accordance with the instructions provided.
Electronic Bid Submission in DoD SAFE
In accordance with (IAW) FAR 52.214-7, LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS, all bids must be received at the initial point of entry to the Government infrastructure not later than 2:00 p.m. Eastern Standard Time (EDT) on April 13, 2021 April 20, 2021. Bids will be submitted through DoD Secure Access File Exchange (DoD SAFE) (https://safe.apps.mil/). DoD SAFE is the Government infrastructure utilized to secure bid bids and IAW FAR 14.202-8, citing FAR 4.5, and as limited by the requirements of the AFARS, 5104.502-90.
All bids must be uploaded into DoD SAFE infrastructure not earlier than April 8, 2021 April 15, 2021, and not later than (NLT) April 13, 2021 April 20, 2021, at 2:00 p.m. Eastern Standard Time (EDT). Bidders will require a unique “request code” to upload bids into DoD SAFE, which must obtained by email only to POCs: Synease McArthur at Synease.S.McArthur@usace.army.mil, Dianne Grimes at dianne.k.grimes@usace.army.mil, and cc:
PPMDContracts@usace.army.mil. The POC must receive the email for the “request code” NLT April 13, 2021 April 20, 2021, at 1:00 p.m. EDT. The electronic bid submittal contents shall conform to the details of the solicitation and subsequent amendments.
Receipt of Submissions For the purposes of establishing whether a bid submission is considered timely, the government considers the date and time the submission is completely uploaded in the DoD SAFE website. For bids larger than the 2GB capacity of the DoD SAFE website and require multiple submissions, the Government will consider the date and time the last submission is completely uploaded into the DoD SAFE website. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases. The electronic bid submittal contents shall conform to the details of the solicitation and subsequent amendments.
Electronic Bid Opening
There will be a “public” bid opening conducted by the Government via teleconference on April 14, 2021 April 21, 2021, at 10:00 a.m. EDT for participating bidders. The teleconference phone number, and access codes will be emailed to participants once bid submission due date and time have lapsed. Bidders will be able to participate in the reading of the bids through this teleconference.
In the event the Norfolk District building is closed at the time of bid opening, a bid abstract containing bid results will be distributed to participating bidders within twenty-fours (24) hours of the bid opening. Upon request, the Norfolk District will make the opened bids available for examination.
A copy of the duly executed bid guarantee (signed by principal and surety with raised seal) must also be included in the attachment labeled “Bid.21B2011_”Bidder Name”.” A physical copy of the bid guarantee in proper form with evident raised seal must be submitted within seventy-two (72) hours to the Government upon request from the apparent low bidder. Additionally, the bid submission shall provide signed BID by letter to include SF1442 and SF 30 acknowledgement of all Amendments.
Electronic Bid Uploading Bidders are responsible for ensuring electronic copies are virus-free and shall run an anti-virus scan before upload into DoD SAFE. Electronic copies shall be compatible with the following software products: Adobe Acrobat Reader 11 and Microsoft Office Suite (Excel and Project) 2010. The electronic copies shall be in Adobe Acrobat (except for Microsoft Excel documents) portable document file (pdf) searchable text format. Electronic files shall be clearly identified for each section and item as detailed in the solicitation. It is the Bidder’s responsibility to obtain written confirmation of receipt of all electronic files of the bid submitted into DoD SAFE. Please email SAM DoD Safe confirmation to Synease McArthur at synease.s.mcarthur@usace.army.mil, cc’ Dianne K Grimes at dianne.k.grimes@usace.army.mil.
Any questions regarding bid submission should be directed to Mrs. Synease McArthur in ProjNet.
SPECIAL PROVISION IN RESPONSE TO CORONOVIRUS DISEASE 2019 (COVID19) ON
ACCEPTANCE OF BONDS AND OTHER FINANCIAL PROTECTIONS
Please be advised that in accordance with FAR Deviation 2020-o0016, Class Deviation – Original Documents, Signatures, Seals And Notarizations, Electronic signatures and electronic, mechanically-applied or printed dates may be used and shall be considered original signatures and dates, without regard to the order in which they are affixed for all of part 28, as required by the solicitation.
3. AWARD TO RESPONSIBLE BIDDERS (FAR 9.1)
Responsibility will be determined, prior to award, by the Contracting Officer, either by performing a pre-award survey or conclusions based on a previous pre-award survey and/or any performance data available. A pre-award survey maybe performed in determining the bidder’s responsibility in accordance with FAR 9.104 and 9.106. The bidder will be required to show that he has the necessary capital, experience, and owns or can procure the necessary plant or other resources to commence the work at the time prescribed in the specifications and thereafter to prosecute and complete the work safely and satisfactorily within the time specified. If the bidder is unable to comply with the request for pre-award survey, the bidder will no longer be considered for award.
To be determined responsible, a bidder must demonstrate the following –
a. Have adequate financial resources to perform the contract, or the ability to obtain them;
b. Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments;
c. Have a satisfactory performance record. A prospective contractor shall not be determined responsible or non-responsible solely on the basis of a lack of relevant performance history;
d. Have a satisfactory record of integrity and business ethics;
e. Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors);
f. Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them;
and
g. Be otherwise qualified and eligible to receive an award under applicable laws and regulations
Additionally, in accordance with FAR Part 9.1, prior to awarding a contract, the Government will conduct a Responsibility Determination of the firm selected for award. The below information will be requested of the apparent low bidder. This information is required to be responsive to the Invitation for Bid. To efficiently and expeditious award the resultant contract, it is required that bidders provide the below information with their bid. If bidders wish to shield this information from public view at the bid opening, the information may be placed in an envelope with the following legend:
PRE-AWARD SURVEY INFORMATION
SOLICITATION NO. W91236-21-B-2011
YOUR FIRM’s NAME
BANK: Branch/Location Point of Contact Telephone Number/Fax Number/Email Address
This information may be requested to be responsive to the Invitation for Bid.
a) Current commitments and expected dates of completion.
b) One (1) signed bank reference demonstrating adequate financial resources. If bidder’s firm has a line of credit – provide information on how many figures bidder can borrow against the line of credit (i.e. medium 6 figures – exact line of credit is not required).
c) The bidder shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization.
Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the bidder.
IMPORTANT NOTE, the DRC is required at time of bid. The DRC criteria as defined below:
DEFINITIVE RESPONSIBILITY CRITERIA (DRC)
The apparent successful bidder shall be required to submit sufficient documentation to the Contracting Officer to enable an affirmative determination of responsibility with respect to the general standards of responsibility.
In addition to the general standards of responsibility, the Government has developed special standards of responsibility for this procurement in accordance with FAR 9.104-2 (Definitive Responsibility Criteria). The apparent successful bidder shall submit prior construction experience to demonstrate it possesses the specialized experience to perform the requirements if awarded the contract.
Submission Requirements. The apparent successful bidder must submit one project (i.e., a qualifying project), which demonstrates experience for the following specialized construction element.
A construction project that involved vertical construction of commercial office or classroom space.
The project must have involved a minimum of 5,000 total square feet of new construction.
A submitted project must include a project synopsis that includes the following elements:
a. Project title
b. Square footage addressing the above specialized construction element
c. Date completed or anticipated completion date. Include percent complete if currently under construction.
d. A brief description of the project, to include how the project demonstrates experience in relation to the criterion.
A submitted project must have been completed within the five (5) years preceding the date of the Solicitation. For ongoing construction projects, the project must be at least 85% complete as measured by the invoiced value as of the date of the solicitation.
Each submitted project synopsis is limited to one 8 ½ x 11 inch single-sided page, single-spaced, Times New Roman, Font 12.
The Government reserves the right to validate the matters responsive to all responsibility criteria through review of CPARS and other DOD or Government appraisal systems.
BIDDERS WILL BE REQUIRED TO SUBMIT MATTERS RESPONSIVE TO THE GENERAL AND
DEFINITIVE RESPONSIBILITY CRITERIA AT THE TIME OF BID SUBMISSION.
4. EVIDENCE OF AUTHORITY TO SIGN BID
Evidence of the authority of individuals signing bids to submit firm bids on behalf of the bidder is required except where the bid is signed, and shows that it is so signed, by: the President, Vice-President, or Secretary of an incorporated bidder; a partner in the case of a partnership; or the owner in the case of a sole proprietorship. Failure to submit with the bid satisfactory evidence of the authority of all other persons may be cause for rejection of the bid as invalid or nonresponsive.
5. PRE-AWARD SAFETY CONFERENCE
a. Where an apparent low bidder, in performance of contracts during the previous three-year period, incurred one or more accidents, or where, in the opinion of the Contracting Officer, there is any question regarding this compliance with any safety or accident prevention requirement, such bidder, on request of the Contracting Officer prior to any award under this solicitation, shall attend a conference with representatives of the Contracting Officer to discuss any such accidents or non-compliance, the reason for their occurrence, and measures which will be taken to preclude any recurrence thereof.
b. Information elicited at this conference will be used by the Contracting Officer, in conjunction with other information obtained in a pre-award survey, in determining the bidder's responsibility.
c. The items discussed, the preventive measures considered, and any conclusions reached in this conference shall be recorded in minutes of the meeting, which shall be authenticated by the signatures of representatives of the bidder and the Contracting Officer, and any procedures noted therein as agreed upon shall become an obligation of the bidder, along with all other safety and accident prevention requirements of the contract, if award is made to him.
6. INSPECTION OF THE SITE
Prospective bidders are invited to visit the site of the work in order to acquaint themselves as to site conditions and other problems incident to the prosecution of the work. Arrangements for inspection of the site shall be made through the Office the Area Engineer identified in the clause 52.236-27, entitled "SITE VISIT
(CONSTRUCTION)."
7. BASIS OF AWARD
All blanks must be filled in by the bidder. (In order for the bidder to be considered responsive all CLINS must provide pricing in order to be considered. A single award will be made to the lowest responsible, responsive bidder on the basis of the total price bid. The Government will evaluate bids for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s). Prior to making an award, a pre-award survey will be made and the low bidder will be required to show that he has the necessary capital, experience, and owns or can procure the necessary plant to commence the work at the time prescribed in the specifications and thereafter to prosecute and complete the work safely and satisfactorily within the time specified.
8. UNBALANCED BIDS
Any bid which is materially unbalanced as to prices for the Contract Line Item Schedule (as defined in FAR 14.408) may be rejected as non-responsive or otherwise not considered for award. An unbalanced bid is one which is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
9. UNAUTHORIZED INSTRUCTIONS FROM GOVERNMENT OR OTHER PERSONNEL
The contractor shall not accept instructions issued by any person, employed by the U.S. Government or otherwise, other than the Contracting Officer or the Authorized Representative of the Contracting Officer acting within the limits of his/her authority as defined in the Designation of Authority letter. A copy of the Designation of Authority letter will be furnished to the contractor at time of contract award.
10. MAGNITUDE OF CONSTRUCTION
The magnitude of construction is between $1,000,000 to $5,000,000 per FAR 36.204.
11. BIDDER'S QUESTIONS AND COMMENTS
Note: All questions and/or comments for this solicitation need to be submitted throught the Bidder Inquiry system (ProjNet) as shown below. All submitted questions will be responded to via ProjNet and an amendment issued prior to the closing date. ProjNet will close 10 days prior to the solicitation closing date.
1.5.1 Bidder Inquiry
1.5.1.1 Technical inquiries and questions relating to bidprocedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet.
1.5.1.1.1 To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
1.5.1.1.2 From this page you may view all bidder inquiries or add inquiry.
1.5.1.1.3 Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
1.5.1.1.4 The Solicitation Number is: W91236-21-B-2011
1.5.1.1.5 The Bidder Inquiry Key is: 6B6H5S-PU24QE
1.5.1.2 The Bidder Inquiry System will be unavailable for new inquires 10 days prior to bid submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
1.5.1.3 Bidders are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
1.5.1.4 The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
12. Socio Economic Status Validation
This is a Small Business Set-Aside IFB, in order to verify the bidder’s socio-economic status, the System for Award Management (SAM) website will be used to verify.
Bidders must represent that they are a small business.
If you are submitting a bid as a Joint Venture (JV) you need to submit your JV Agreement with your bid.
13. FAR 52.204-7 SAM
In accordance with FAR 52.204-7 SAM Registration please ensure that your Unique Identifier Code (Cage Code or DUNS) is on page 1 of your bid in order to be responsive.
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been added by full text:
WAGE RATES VA20210015
"General Decision Number: VA20210015 04/02/2021
Superseded General Decision Number: VA20200015 State: Virginia Construction Type: Building County: Caroline County in Virginia.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/01/2021 1 01/08/2021 2 04/02/2021
ASBE0024-006 04/01/2020
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 38.01 17.37+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.
BOIL0045-003 01/01/2017
Rates Fringes
BOILERMAKER......................$ 32.72 25.26
* ELEC0666-004 03/01/2021
Rates Fringes
ELECTRICIAN (Includes Low Voltage Wiring)..................$ 32.44 50.45%
ELEV0051-007 01/01/2021
Rates Fringes
ELEVATOR MECHANIC................$ 43.55 35.825+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving and Christmas Day.
b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ENGI0147-019 11/01/2013
Rates Fringes
POWER EQUIPMENT OPERATOR
Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100
ft. above ground............$ 28.30 8.69%+8.15 Cranes under 90 tons........$ 27.38 8.69%+8.15
IRON0079-012 05/01/2020
Rates Fringes
IRONWORKER, STRUCTURAL AND ORNAMENTAL.......................$ 26.18 16.37
PLUM0010-007 09/01/2020
Rates Fringes
PLUMBER..........................$ 31.00 17.52
SUVA2013-028 01/11/2016
Rates Fringes
BRICKLAYER.......................$ 20.00 1.00
CARPENTER........................$ 21.10 1.11
CEMENT MASON/CONCRETE FINISHER...$ 17.23 0.00
GLAZIER..........................$ 18.43 3.71
HVAC MECHANIC (HVAC Duct Installation Only)...............$ 20.60 2.93
IRONWORKER, REINFORCING..........$ 27.18 4.13
LABORER: Common or General, Including Pipelaying.............$ 14.58 0.00
LABORER: Mason Tender - Brick...$ 13.41 3.15
LABORER: Mason Tender - Cement/Concrete..................$ 12.96 3.12
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 19.74 1.43
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.95 4.03
OPERATOR: Bulldozer.............$ 17.50 0.00
OPERATOR: Forklift..............$ 19.40 7.00
OPERATOR: Loader................$ 21.28 3.17
OPERATOR: Roller................$ 16.25 4.88
PAINTER (Brush and Roller).......$ 16.87 0.00
PAINTER: Spray..................$ 16.58 0.00
PIPEFITTER: Includes HVAC Pipe, Unit and Temperature Controls Installations...........$ 29.45 13.95
ROOFER...........................$ 17.40 1.55
SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 19.72 1.83
SPRINKLER FITTER (Fire Sprinklers)......................$ 20.50 2.93
TILE FINISHER....................$ 23.40 0.00
TILE SETTER......................$ 27.80 10.25
TRUCK DRIVER: Dump Truck........$ 14.88 0.00
WATERPROOFER.....................$ 21.17 3.41
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH- 0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
The following have been modified:
AWARD INFORMATION
CONTRACTING OFFICERS REPRESENTIVE: CORY PUGH
CONTACT INFORMATION: cory.w.pugh@usace.army.mil , Phone: (804) 349-8017
ADMINISTRATIVE CONTRACTING OFFICER: TBD
CONTACT INFORMATION:
Only a warranted Contracting Officer (either PCO or ACO) acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.
1. DEPARTMENT OF LABOR WAGE DECISION (CONSTRUCTION)
Any contract awarded as a result of this solicitation will be subject to the U.S. Department of Labor Wage General Decision(s) Number that will be issued with the VA20210011 VA20210015 04/02/2021
2. REQUIRED INSURANCE
The contractor shall procure and maintain during the entire period of performance under this contract, the following minimum insurance:
TYPE AMOUNT
Workers Compensation As required by State law Employer's Liability $100,000 per person General Liability $500,000 per occurrence
Motor Vehicle Liability (for each motor vehicle):
Bodily injury or death $200,000 per person $500,000 per occurrence Property damage $20,000 per occurrence
Prior to commencement of work hereunder, the contractor shall furnish to the Contracting Officer a certificate or written statement of the above required insurance. The policies evidencing required insurance shall contain an endorsement to the effect that cancellation or any material change in the policies adversely affecting the interests of the Government in such insurance shall not be effective for such period as may be prescribed by the laws of the State in which this contract is to be performed and in no event less than 30 days after written notice thereof to the Contracting Officer.
3. INVOICES: Invoices shall be submitted and billing inquiries shall be directed to:
U.S. Army Engineer District, Norfolk CENAO.ECAEInvoicing@usace.army.mil
4. PERFORMANCE EVALUATION OF CONTRACTOR
As a minimum, the Contractor's performance will be evaluated upon final acceptance of the work. However, interim evaluations may be prepared at any time during contract performance when determined to be in the best interest of the Government. In compliance with DOD FAR Supplement 236.201, Performance Evaluation Reports will be available to all DOD Contracting Offices for their future use in determining contractor responsibility.
Agencies shall monitor their compliance with the past performance evaluation requirements (see 42.1502), and use the Contractor Performance Assessment Reporting System (CPARS) and Past Performance Information Retrieval System (PPIRS) metric tools to measure the quality and timely reporting of past performance information.
Past performance information shall be entered into CPARS, the Government wide evaluation reporting tool for all past performance reports on contracts and orders. Instructions for submitting evaluations into CPARS are available at http://www.cpars.gov/. Contractors are required to register with the system to respond and view their reports.
Please provide your company’s CPARS POC; this person will be responsible for CPARS evaluation assessments:
Contractors POC Phone number Email
5. LOCATION OF SITE ON A GOVERNMENT RESERVATION
The site of the work is on a government reservation and all rules and regulations issued by the Commanding Officer covering general safety, security, and sanitary requirements, etc., shall be observed by the contractor.
6. ACCIDENT PREVENTION PLAN
In accordance with the clause entitled "Accident Prevention," the contractor will not be allowed to commence work on the job site until an acceptable accident prevention plan has been submitted. The contractor will receive official notification of the acceptance of his accident prevention plan.
7. IDENTIFICATION OF CORRESPONDENCE
All correspondence and data submitted by the contractor under this contract shall reference the contract number.
The following have been deleted:
WAGE RATES
(End of Summary of Changes)