AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0001 is issued to provide the follow ing:

1. Modify the construction duration from 365 days to 540 days.

All other term and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Mar-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123621B2011

X 9B. DATED (SEE ITEM 11)

25-Feb-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Mar-2021

CODE

USACE, NORFOLK DISTRICT OFFICE

CONTRACTING OFFICE

803 FRONT STREET

NORFOLK VA 23510-1011

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123621B2011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The Issued By organization has changed from

USA ENGINEER DISTRICT, NORFOLK

803 FRONT STREET

NORFOLK VA 23510-1011

to

USACE, NORFOLK DISTRICT OFFICE

CONTRACTING OFFICE

803 FRONT STREET

NORFOLK VA 23510-1011

The contractor period of performance end date has increased by 175 days from 365 days to 540 days.

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

365 dys. ANP 1 US ARMY CORPS OF ENGINEERS, NORFOLK

STEVE MITCHELL

803 FRONT STREET

NORFOLK VA 23510-1011

(757) 201-7635 FOB: Destination

W26GLG

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

540 dys. ANP 1 US ARMY CORPS OF ENGINEERS, NORFOLK

STEVE MITCHELL

803 FRONT STREET

NORFOLK VA 23510-1011

(757) 201-7635

The following Delivery Schedule item for CLIN 0002 has been changed from:

CAGE

365 dys. ANP 1 US ARMY CORPS OF ENGINEERS, NORFOLK

STEVE MITCHELL

803 FRONT STREET

NORFOLK VA 23510-1011

(757) 201-7635

CAGE

540 dys. ANP 1 US ARMY CORPS OF ENGINEERS, NORFOLK

STEVE MITCHELL

803 FRONT STREET

NORFOLK VA 23510-1011

(757) 201-7635

The following Delivery Schedule item for CLIN 0003 has been changed from:

CAGE

365 dys. ANP 1 US ARMY CORPS OF ENGINEERS, NORFOLK

STEVE MITCHELL

803 FRONT STREET

NORFOLK VA 23510-1011

(757) 201-7635

CAGE

540 dys. ANP 1 US ARMY CORPS OF ENGINEERS, NORFOLK

STEVE MITCHELL

803 FRONT STREET

NORFOLK VA 23510-1011

(757) 201-7635

The following Delivery Schedule item for CLIN 0004 has been changed from:

CAGE

365 dys. ANP 1 US ARMY CORPS OF ENGINEERS, NORFOLK

STEVE MITCHELL

803 FRONT STREET

NORFOLK VA 23510-1011

(757) 201-7635

CAGE

540 dys. ANP 1 US ARMY CORPS OF ENGINEERS, NORFOLK

STEVE MITCHELL

803 FRONT STREET

NORFOLK VA 23510-1011

(757) 201-7635

The following Delivery Schedule item for CLIN 0005 has been changed from:

CAGE

365 dys. ANP 1 US ARMY CORPS OF ENGINEERS, NORFOLK

STEVE MITCHELL

803 FRONT STREET

NORFOLK VA 23510-1011

(757) 201-7635

CAGE

540 dys. ANP 1 US ARMY CORPS OF ENGINEERS, NORFOLK

STEVE MITCHELL

803 FRONT STREET

NORFOLK VA 23510-1011

(757) 201-7635

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 540 days. The overall completion duration shall not exceed 540 calendar days as long as the option is exercised within 180 days of the Notice to Proceed.

(End of clause)

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 180 Days after Notice to Proceed. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree. The overall completion duration shall not exceed 540 calendar days as long as the option is exercised within 180 days of the Notice to Proceed.

(End of clause)

(End of Summary of Changes)