AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to incorporate the follow ing changes:

1. Provide addtional documents.

2. Provide responses to RFI's.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-May-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123621B2011

X 9B. DATED (SEE ITEM 11)

25-Feb-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-May-2021

CODE

USACE, NORFOLK DISTRICT OFFICE

CONTRACTING OFFICE

803 FRONT STREET

NORFOLK VA 23510-1011

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123621B2011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The following have been added by full text:

AMENDMENT 0009

Amendment 0009 is issued to provide the following:

1. To provide additional attachments.

2. To provide responses to ProjNet inquiries.

All other terms and conditions remain unchanged.

ATTACHMENTS:

1. The following attachments is incoporated into this amendment:

Attachment 6: 887_MARSOC Amendment 0001 April 2021 dated 13 April 2021, 37 pages Attachment 7: 887_MARSOC_SPEC Section 08 51 13_Rev 2021.05.06, 11 pages Attachment 8: 887_MARSOC_Specifications_Revised Section 28 31 76_2021.04.30, 33 pages Attachment 9: 887_MARSOC_Specifications_Revised TOC_2021.04.30, 3 pages Attachment 10: 877_MARSOC_Amendment 001_DWGS_APRIL2021, 5 pages

ProjNet Inquiries:

ID 9116345

There does not appear to be a FF&E package in the documents posted to Beta SAM. Can you please provide bid documents for the furniture package?

Government Response

Amendment 0009 will be posted no later than Tuesday May 11th.

ID 9117181

Regarding the requirement to provide a fully-furnished Resident Engineer's Office on the site: a. How many people will be occupying the temporary facility? b. Can the Resident Engineer's office be removed as soon as construction is substantially complete or will it need to remain for some time after?

Government Response

Number of people unknown. Office required for duration of project. See specification 01 50 00 Section 3.6 "Government Field Office."

ID 9117248

There is a specification included for acoustical wall panels. There does not appears to be any AWP indicated in the drawings. Please indicate locations and sizes for Acoustical Wall Panels.

Government Response

AWP is not a requirement. Updated drawings and specifications will be provided with Amendment 0009.

ID 9117261

Please provide specifications for the furniture to be provided per the furniture plans.

Government Response

Please reference the FF&E package that has been added with Amendment 0009.

ID 9117283

Regarding the 1,000gal underground LP Tank: a. Please provide specifications for the tank. b. Please provide installation details. c. Is there already an established LP Gas provider that serves Ft. AP Hill?

Government Response

a. The tank should meet all applicable requirements of NFPA 58 as well as standards, codes, and regulations for underground use and it's intended use. b. The tank depth should meet all applicable standards, codes, and regulations as required to accommodate vehicle traffic over the tank location. c. Fort A.P. Hill competitively contracts the supply & delivery of propane on an annual basis. The current supplier is Quarles, 1701 Fall Hill Avenue, Fredericksburg, VA 22401.

ID 9117292

Regarding entry mats: Please provide locations and dimensions.

Government Response

All mats have been tagged on the furniture plans. There are furniture sheets with the corresponding tag in the FF&E binder that provide each floor mat dimension that can be added with Amendment 0009, no later than Tuesday May 11th.

ID 9117334

Please confirm that the windows must meet ATFP guidelines. It does not appear the the rest of the building envelope is designed for ATFP guidelines.

Government Response

Windows are not required to be designed or constructed for blast resistance. Glazing must meet the following requirements:

Provide no less than ¼" laminated glass. The 1/4 in. (6 mm) laminated glass consists of two nominal 1/8 in. (3 mm) glass panes bonded together with a minimum of a 0.030 in. (0.75 mm) interlayer of a material \1\ that has typically been used in blast resistant window applications. For insulated glass units (IGU), use the polycarbonate or laminated glass for the innermost pane as a minimum. For laminated glass, the laminated pane shall be adhered to its supporting frame using structural silicone sealant or adhesive glazing tape. The structural silicone sealant bite shall be equal to the larger of 3/8-in. (10-mm) or the thickness of the laminated glass to which it adheres. The minimum thickness of the structural silicone bead shall be 3/16-in. (5-mm). The glazing tape bite shall be equal to two times the thickness of the laminated glass to which it adheres. The structural silicone bead or glazing tape shall be applied to both sides of single pane laminated glass but need only be applied to the inboard (protected) side of an IGU.

ID 9117337

The specifications for the ladders appear to be for a fixed installation. Please provide specification for roll-out ladders.

Please see attachment 5 guide for specification that has been added in amendment 0004.

ID 9117382

Regarding window samples, the requirement calls for a full-size, complete window sample that meets all the requirements...essentially a complete, ATFP compliant, functional window. a. Please confirm the intent. b. Is the sample to be incorporated into the wall mock-up to be disposed of at the end of the project?

Government Response

See revised specification in the amendments.

1.Windows are not required to be designed or constructed for blast resistance. Glazing must meet the following requirements:

Provide no less than ¼" laminated glass. The 1/4 in. (6 mm) laminated glass consists of two nominal 1/8 in. (3 mm) glass panes bonded together with a minimum of a 0.030 in. (0.75 mm) interlayer of a material \1\ that has typically been used in blast resistant window applications. For insulated glass units (IGU), use the polycarbonate or laminated glass for the innermost pane as a minimum. For laminated glass, the laminated pane shall be adhered to its supporting frame using structural silicone sealant or adhesive glazing tape. The structural silicone sealant bite shall be equal to the larger of 3/8-in. (10-mm) or the thickness of the laminated glass to which it adheres. The minimum thickness of the structural silicone bead shall be 3/16-in. (5-mm). The glazing tape bite shall be equal to two times the thickness of the laminated glass to which it adheres. The structural silicone bead or glazing tape shall be applied to both sides of single pane laminated glass but need only be applied to the inboard (protected) side of an IGU.

2a. Intent is to show head, jamb and sill detail in mock-up.

2b. Yes

ATFP is a required. In addition, Section 08 51 13 of the Specification has been revised and provided with Amendment 0009.

ID 9119497

For the definitive responsibility criteria, is the intent for the bidder to only submit a single project? Or should we submit multiple projects that meet the DRC?

Government Response

Per the solicitation (please read the solicitation for full details) - Page 6

Submission Requirements. The apparent successful bidder must submit one project (i.e., a qualifying project), which demonstrates experience for the following specialized construction element.

A construction project that involved vertical construction of commercial office or classroom space.

The project must have involved a minimum of 5,000 total square feet of new construction.

A submitted project must include a project synopsis that includes the following elements:

a. Project title

b. Square footage addressing the above specialized construction element

c. Date completed or anticipated completion date. Include percent complete if currently under construction.

d. A brief description of the project, to include how the project demonstrates experience in relation to the criterion

ID 9120596

In the RFP it states "The below information will be requested of the apparent low bidder. This information is required to be responsive to the Invitation for Bid. To efficiently and expeditious award the resultant contract, it is required that bidders provide the below information with their bid: 1) current commitments and expected dates of completion, 2)one signed bank reference, 3)and the latest three complete fiscal year financial statements for the prime contractor."

Are all bidders required to submit those three items with their proposal? Is just the apparent lower bidder required to provide those three items during award?

Government Response

Information regarding responsibility (financial) will be requested from the apparent low bidder. The DRC are required at time of bid submission.

ID 9128035

Does the Govt. have Detailed Specifications as to Materials and Standards by Manufacturers for the Furniture, Furnishings, and Décor Items? Division 12 of the Specs. does not have anything. Plans IF001 thru IF121 has good

Legends and Layouts, but no insight to Specifications. Is it the Govt's intention that Contractors. Recommend through it's Suppliers what to use?

Please see Amendment 0009 which will be posted no later than 11 May 2021.

ID 9128184

Please clarify...Will the government provide temporary utilities (water & electric) or will utility consumption charges apply to be paid by the prime contractor?

Please see FAR 52.217-5 regarding price evaluation. All temporary utility costs to be paid by the contractor.

ID 9117357

Regarding required project staffing: The wording related to SSHO & QCM between different spec. section appears to possible conflict. Please clarify: a. Is the project superintendent allowed to function as SSHO or is the SSHO to be a separate person? b. If the Supt. cannot also function as SSHO, is the QCM allowed to be SSHO or is a 3rd person required?

Government Response Yes, the superintendent can also be SSHO (01 35 26 paragraph 1.6.1.2); QC is a separate individual with no other duties (01 45 00.00 10 paragraph 3.4.2) – 2 prime contractor personnel on site "at all times during construction."

ID 9117365

Exterior signage is specified. Please indicate sign locations, sizes, etc.

Government Response There are signage plans in the drawing sets including sign type, sign size and location along with sign type specifications in the Master Spec.

ID 9128173

What is the ht. required for the corner guards CG-1?

Corner guards shall be 96" standard typ.

ID 9128198

We need a suitable Contractor Laydown Area for materials and jobsite trailers. Please specify a location.

Government Response Space will be available for laydown and jobsite trailers. Location will need to be coordinated with KO at time of project award.

ID 9128319

The detail appears to indicated that the bottom flange of the W8x21 floor beam be field welded to the top of the wall. Welding to the galvanized top channel of the wall framing is not recommended. Should there be a detail to provide a mechanically attached transition member?

Government Response The following information can be found in the specifications. "Contractor may substitute the following equivalent alternate connection of cont. W8 beam to load bearing CFS top tracks: (2) A325 bolts with nuts and hardened washers, 1/2" dia, through top track and W8 bottom flanges, maximum spacing between pairs of 1'-4" OC. Use of either the alternate bolted or of the original welded W8 to top track connection is at the discretion of the contractor."

ID 9135229

Are all roof drains 6"? C8 detail states refer to plan but there is no detail?

See sheet A-114 and A-124 for gutter and downspout sizes.

ID 9135385

There is an LP tank slab with bollards then under that they are saying it is buried? Which is it?' Government Response Propane tank to be buried; slab with bollards to be placed above tank. Clarifying note added to sheet C-104 in the drawings in Amendment 0009.

ID 9142196

The equipment pads and stoops are 6" concrete slabs but there is no stone detail? Are we to assume 4" 21B?

"STRUCTURAL"

VDOT #21B, 4" Depth.

ID 9142226

On the drawings IF001-IF121, you have numerous furniture shown but no specifications provided. Is this furniture part of the bid? If so please provide specifications to allow pricing.

Please reference the FF&E documentation that is provided within Amendment 0009.

ID 9146311

Is the intent to award Items 01, 02, & 03 as a package, regardless of pricing on those 3 items? I can't imagine you could award Item 01 & 02 but not 03? Or is it possible that you could award Item 01 & 03 but not award Item 02?

Government Response

Please see FAR 52.217-5 regarding evaluation of options. As CLINs 0001, 0002 and 0003 are the base CLINs they will all be award at the same time.

ID 9146325

Is the price evaluation going to be based on all CLINS added together or will low price be based off items 01, 02, and 03 combined only?

All bids will be evlauted based on the entire bid submission as described within FAR 52.217-5.

ID 9149228

The wood door specs (081400) indicate 3 potential door cores: Hollow Core Doors (2.1.1), Stave Core (2.1.1.10) and STC 35 Rated (2.1.2).

There are no STC Ratings provided on the Door Schedules. On the Partition Schedule on Drawing A-002 there are a few partitions used on the Partitions that require walls (S6A, S6Q, and S8E) that are shown to be constructed per some kind of STC Test requirements but no STC Ratings for the doors are specified. Lastly, there are 4 doors shown to receive Louvers (Training Bldg 109-110 and Ops Bldg 105-106) and they also have partitions noted to perhaps be sound rated (S6Q). It is not possible to have a sound rated door with a louver. So, please clarify the following:

What door cores will be used on which doors? Which doors have STC Ratings (specify the SPECIFIC STC Rating Required)?

Government Response Please see 08 14 00 of the Specifications "Wood door".

What door cores will be used on which doors?* See sheet A-611 and A-621 for door core material located under column Door Schedule, Door, Material.

*Which doors have STC Ratings (specify the SPECIFIC STC Rating Required)?* Doors with louvers are not required to have STC rating, Wall type: CW3, Provide STC rating of 60 and all doors in walls rated CW3 to match STC rating at minimum 0 doors Wall type: S3A, Provide STC rating of 47 and all doors in walls rated S3A to match STC rating at minimum 0 doors Wall type: S3K, Provide STC rating of 50 and all doors in walls rated S3K to match STC rating at minimum 0 doors Wall type: S8E, Provide STC rating of 47 and all doors in walls rated S8E to match STC rating at minimum

ASSESSMENT & SELECTION TRAINING

door 111B Wall type: S8X, Provide STC rating of 49 and all doors in walls rated S8X to match STC rating at minimum 0 doors

Wall type: S6A, Provide STC rating of 47 and all doors in walls rated S6A to match STC rating at minimum

MARSOC OPS BLDG

Door 104, 103, 102, 201

Wall type: S6Q, Provide STC rating of 48 and all doors in walls rated S6Q to match STC rating at minimum

MARSOC OPS BLDG

Door 105, 106 (Have louvers, STC not required)

ASSESSMENT & SELECTION TRAINING

Door 109, 110 (Have louvers, STC not required)

ID 9149694

According to Virginia tax laws, no sale to a Contractor is exempt from sales tax on the ground that the other party to the contract is a governmental agency. However, sales can be exempt from tax if the purchases are pursuant to required official purchase orders. Please confirm whether the Contractor awarded this project will be subject to sales tax or whether the required purchase orders will be provided.

Government Response The Government will issue the prime contract for construction and any required modifications. The processing of purchases of items required for performance will be the exclusive responsibility of the general contractor and its team – in other words, the Government will not issue any additional contract vehicles such as individual purchase orders. For more information on the provisions regarding taxes, you are directed to FAR 52.229-3 which is incorporated in the solicitation by reference. Providing specific tax advice is beyond the authority of the Government.

ID 9151923

1.10.1 Building System Warranty

Furnish manufacturer's no-dollar-limit warranty for the metal building system. The warranty period is to be no less than 20 years from the date of acceptance of the work and be issued directly to the Government. The warranty must provide that if within the warranty period, the metal building system shows evidence of deterioration resulting from defective materials and/or workmanship, correcting of any defects is the responsibility of the metal building system manufacturer. Repairs that become necessary because of defective materials and workmanship while metal building system is under warranty are to be performed within 32hours after notification, unless additional time is approved by the Contracting Officer. Failure to perform repairs within 32 hours of notification will constitute grounds for having emergency repairs performed by others and will not void the warranty.

There is only ONE maybe TWO manufacturers that offer this. This spec eliminates 99% of all MBNA Buildings.

Can this be removed. Otherwise we and many others cannot bid. AND the one that does offer it; it is not a NDL Warranty really.

Government Response

The specification will be amended to state a 5 year warranty instead of a 20 year warranty. Specification will be provided in Amendment 0009.

ID 9151924

The Solicitation states the completion time will be 365 days from NTP. This project will require a SWPPP which can take 120 days. Also, at this time, PEMB deliveries are running at 180 days from the date ordered. The time involved with permits and the delivery of the PEMB, 365 days is not adequate. Can the CCD be extended to 455 days after NTP?

Amendment 0001, changed the period of performance from 365 days to 540 days.

ID 9151925

On page 4 of the Solicitation under "Electronic Bid Uploading", it states to email the "SAM confirmation". What SAM confirmation is this referring to?

Amendment 0005 was issued to incorporate the change regarding the SAM confirmation.

ID 9153452

Discrepancy noted between Specification 283176, page 1176, item 2.5.3 and plans page FP001 "LED EMERGENCY MESSAGE DISPLAY SIGN" detail.

The specification calls for signs which are programmable and capable of displaying the same content of the voice message being played. The plans detail calls out a sign which only illuminates "ANNOUNCEMENT" or "EVACUATE" depending on the appropriate input from the fire system.

Please advise which type of sign is desired.

Government Response

Utilize the Announcement/Evacuation signs as indicated on the plans. Programmable scrolling text type of signs not required. Specifications have been changed and clouded and will be provided within Amendment 0009.

ID 9153602

SECTION 01 14 00 Page 1, 1.2 CONTRACTOR ACCESS AND USE OF PREMISES Mandatory training, is there a fee for this training and if yes who pays for it ?

Any cost is the contractor's responsibility.

ID 9153742

SECTION 01 91 00.15 10 page 1, TOTAL BUILDING COMMISSIONING, 1.1 SUMMARY Employ the services of an independent Commissioning Firm. The Commissioning Firm must be a 1st tier subcontractor of the GC. Normally the Mech s/c hires the Commissioning company, but your requiring the GC to hire them direct ?

Government Response Yes; commissioning firm must be a 1st tier subcontractor of the contractor in accordance with specification 01 91

00.15 10.

ID 9154864

There is sealed concrete being used for a number of rooms. However, there are no specifications or manufacturers listed. Could you please confirm?

Information regarding sealed concrete can be found within the Section 03 30 00 of the Specification.

ID 9155836

SECTION 03 30 00 Page 9, SD-07 Certificates Reinforcing Bars Welder Qualifications. Rebar is normally not welded but just tied. Are you requiring it to be welded ? Very expensive.

Government Response No. The Specifications do not require nor prohibit welding; however, if the contractor chooses to weld the rebar, then the Certificates Reinforcing Bars Welder Qualification must be met.

ID 9155878

1.6.1.1 Common Excavation, Does all excavated material have to be removed from AP Hill, or can it be disposed of inside the Fort ?

Excavated material must be properly removed from AP Hill as necessary.

ID 9155881

PART 3 EXECUTION, 3.1 STRIPPING OF TOPSOIL, or at locations indicated or specified Does all topsoil material have to be removed from AP Hill, or can it be disposed of inside the Fort ?

Topsoil must be properly removed from AP Hill as necessary.

ID 9155885

SECTION 32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS Page 3, 1.4 ENVIRONMENTAL REQUIREMENTS, 1.4.1 Placing During Cold Weather, 1.4.2 Placing During Warm Weather Please confirm the start date for this project so we know if either of the two weather conditions will apply ?

Start date can be reasonably anticipated to be around 60-90 days after bids are due.

ID 9155892

SECTION 32 92 23 Sodding Page 2, 1.5 TIME RESTRICTIONS AND PLANTING CONDITIONS, 1.5.1 Restrictions, Please confirm the start date for this project so we know if either of the two weather conditions will apply ?

Start date can be reasonably anticipated to be around 60-90 days after bids are due.

ID 9155905

Bid Submission, Page 4 of 47, Can the bid date be moved to Aril 20th ?

Government Response Please see amendment 0005.

ID 9155914

Page 43 of 47, "General Decision Number: VA20210011 01/08/2021: Building County: Albemarle County in Virginia. Includes the independent city of Charlottesville* AP Hill is in Caroline County.

Government Response Amendment 0005 was issued to incorporate the correct Wage Rates.

ID 9155932

SECTION 13 34 19 METAL BUILDING SYSTEMS

Is there a certain supplier the Owner is requesting we use, as many of the items are not standard.

Specs are calling for the PEMB manufacturer to be a member of the MBMA.

Specs are calling for a 20-year building system warranty. Most standard warranties are 3-years.

Specs call for red-oxide primer. Most suppliers use gray primer on primary framing with galvanized secondaries.

Most suppliers do not manufacture or provide 12" wide perforated concealed fastener soffit panel.

Government Response

Is there a certain supplier the Owner is requesting we use, as many of the items are not standard.

NO

Specs are calling for the PEMB manufacturer to be a member of the MBMA.

Correct

Specs are calling for a 20-year building system warranty. Most standard warranties are 3-years.

The specification has been amended to state 5 years for the building system warranty. This information will be noted in an upcoming Amendment.

Specs call for red-oxide primer. Most suppliers use gray primer on primary framing with galvanized secondaries.

Gray primer is acceptable.

ID 9155935

Owner's pricing form, Please confirm the pricing for clin 004 and 005 Furniture needs to be held for up to 180 cal days from NTP.

Yes.

ID 9156061

Spec 13 34 19, section 2.8.2 on page #22, Dwg pg A-312, Wall Section 1 It is Not advisable to have Two Air/Vapor Barrier liners as shown. The 5/8" glass mat shown between the purlin and roof clip is not constructible. The industry standard "Skyliner" type system is similar as shown and recognized by the PEMB industry to provide both the Air & Vapor Barriers required. Is a Skyliner type system acceptable? We have no way of installing and working on the roof with a 5/8" sheathing covering the purlins. It will not support itself, the top layer of insulation will get compressed and it's dangerous. I will exclude this detail regardless.

Government Response Products and/or systems must be approved; however, air barrier must be a continuous transition from exterior walls to roof structure. A product is determined to be acceptable as long is it needs the criteria outlined within the Specifications.

ID 9156233

Amendment No. 02 was release, however box item no. 02 states "AMENDMENT/MODIFICATION NO. 0003".

Please verify this i still Amendment No. 02.

Government Response Amendment 0002 does not exist. Amendment 0003 is the second Amendment under this solicitation.

ID 9166129

Since none of the RFI questions has been answered, will this bid be extended?

We need to send all the responses to subs and they will need at least a week to process it.

The IFB (solicitation) will be closing on 17 May 2021. Amendment 0009 will be posted no later than 11 May 2021.

ID 9170867

Is this a stand-alone project or is there some central control for HVAC? I do not see a preferred manufacturer/contractor for the control work associated with this.

Government Response Stand-alone. Division 23 specifications "AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS" describe the requirements for the HVAC system, including the networking associated.

ID 9128195

Is the RMS Mode software available for download or is there a software purchase required?

RMS Mode software is available for download at no cost.

ID 9155844

1.6.7.1 Quality Manager Qualifications

The quality manager must hold a current license as a professional engineer. How long on site do you require the QM be on site and they need to be a PE ?

Government Response Quality Control Manager shall be on site at all times. Quality Control Manager must be a registered architect or licensed engineer.

ID 9155910

3. AT Level I Training, How long does this training take ?

Per the website guidance, the average individual normally takes approximately 2.50 hours to complete the training.

Training will be provided at the contractor's expense.

ID 9117248

There is a specification included for acoustical wall panels. There does not appears to be any AWP indicated in the drawings. Please indicate locations and sizes for Acoustical Wall Panels.

AWP is not a requirement. Updated drawings and specifications will be provided with Amendment 0009.

ID 9135385

There is an LP tank slab with bollards then under that they are saying it is buried? Which is it?' Government Response Propane tank to be buried; slab with bollards to be placed above tank. Clarifying note added to sheet C-104 in the drawings within Amendment 0009.

ID 9153452

Discrepancy noted between Specification 283176, page 1176, item 2.5.3 and plans page FP001 "LED EMERGENCY MESSAGE DISPLAY SIGN" detail.

The specification calls for signs which are programmable and capable of displaying the same content of the voice message being played. The plans detail calls out a sign which only illuminates "ANNOUNCEMENT" or "EVACUATE" depending on the appropriate input from the fire system.

Please advise which type of sign is desired.

Government Response Utilize the Announcement/Evacuation signs as indicated on the plans. Programmable scrolling text type of signs not required.Specifications have been changed and clouded and will be provided within Amendment 0009.

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been modified:

ATTACHMENTS

Attachment 1: MARSOC_RTA_DWGS dated December 2020, 129 pages Attachment 2: MARSOC_SUPPORT FACILITIES_SPECIFICATIONS_RTA dated DECEMBER 2020, 1354 pages Attachment 3: Structural Interior Design (SID) RTA Submittal dated December 2020, 31 pages Attachment 4: Furniture, Fixtures, and Equipment (FF&E) RTA Submittal dated December 2020, 61 pages Attachment 5: MARSOC Folding Ladder Specifications, 3 pages Attachment 6: 887_ MARSOC Amendment 0001 April 2021 dated 13 April 2021, 37 pages Attachment 7: 887_MARSOC_SPEC Section 08 51 13_Rev 2021.05.06, 11 pages Attachment 8: 887_MARSOC_Specifications_Revised Section 28 31 76_2021.04.30, 33 pages Attachment 9: 887_MARSOC_Specifications_Revised TOC_2021.04.30, 3 pages

Attachment 10: 887_MARSOC_Amendment 0001_DWGS_APRIL2021, 5 pages

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title File Drawing No.

Attachment 1: MARSOC_RTA_DWGS dated December 2020, 129 pages Attachment 2: MARSOC_SUPPORT FACILITIES_SPECIFICATIONS_RTA dated DECEMBER 2020, 1354 pages Attachment 3: Structural Interior Design (SID) RTA Submittal dated December 2020, 31 pages Attachment 4: Furniture, Fixtures, and Equipment (FF&E) RTA Submittal dated December 2020, 61 pages Attachment 5: MARSOC Folding Ladder Specifications, 3 pages Attachment 6: 887_MARSOC Amendment 0001 April 2021 dated 13 April 2021, 37 pages Attachment 7: 887_MARSOC_SPEC Section 08 51 13_Rev 2021.05.06, 11 pages Attachment 8: 887_MARSOC_Specifications_Revised Section 28 31 76_2021.04.30, 33 pages Attachment 9: 887_MARSOC_Specifications_Revised TOC_2021.04.30, 3 pages Attachment 10: 887_MARSOC_Amendment 0001_DWGS_APRIL2021, 5 pages

(End of clause)