PreBidSlides_W911YN17B1001.pdf
PDF 272 KB Posted
- Attached to
- Multi Area Renovation Federal contract opportunity
- Solicitation number
- W911YN-17-B-1001
About this file
Pre-Bid Briefing Slides
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911YN-17-B-1001
Multi-Area Renovation Project
PRE-BID CONFERENCE
DATE: Aug 9, 2017
LOCATION OF PROJECT:
125th FW, Multi Building
INTRODUCTION
• SMSgt Dawn Loyd-McCrary-Contracting
Officer
• Maj Brandon Pruitt- Base Civil Engineer, 125TH FW, Contracting Officer’s
Representative (COR)
INTRODUCTION
• Ensure you sign in on the attendance roster
• Your Name
• Company
• Your Position in Company
• Are you a Prime or a Subcontractor/supplier
SYNOPSIS
• Project: Multi Area Renovation Project -
Between $100,000- $250,000.00
• A single firm-fixed price contract will be awarded.
• Award will be to a Small Business
SOLICITATION
• On the web: www.fbo.gov
• https://www.fbo.gov/index?mode=form&id=0eac588309caa46eb26474697ed5ba84&tab=ntype
• Solicitation
– Attachments
– Questions & Answers Document (if any)
– Amendments (SF 30) (if any)
– check regularly & refresh web page
– Wage Determination FL170246 current ( checked & updated within 10 days of bid opening if a new WD applies) http://www.fbo.gov/ https://www.fbo.gov/index?mode=form&id=0eac588309caa46eb26474697ed5ba84&tab=ntype
IMPORTANT ITEMS
• Please curtail questions to the solicitation document.
• A site visit will follow this presentation.
• Please stay together as a group for security and accountability
• Any questions you have during the site visit should be followed up in writing for an official response in accordance with the solicitation.
• A secondary organized site visit is not scheduled but might be if necessary
INVITATION FOR BID (IFB)
BASICS
• In the invitation for bid (IFB), FAR Part 14, process, a public bid opening occurs when the bids are due and the prices are read to the public
– There will be no discussion
– No correction of mistakes in most cases
– Award is always to the low, responsive, responsible bidder
BASIS FOR AWARD
• FAR 14.101(e) After bids are publicly opened, an award will be made with reasonable promptness to that responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the
Government, considering only price and the price-related factors included in the invitation.
• Must bid all items
• A bidder is determined to be responsible in accordance with FAR 9.104
WHAT IS THE CONTRACT
PERIOD?
Construction period is 90 calendar days after receiving the Notice to
Proceed.
This does not mean you have to take the entire period if the work can be accomplished in a shorter schedule.
DISCLAIMER
The following is a brief overview of the bid requirements
BIDDERS ARE STRONGLY
CAUTIONED TO CAREFULLY
READ THE REQUIREMENTS OF
THE SOLICITATION AND
COMPLY ACCORDINGLY
WHAT YOU MUST SUBMIT
(see section 00010)
• SF 1442, (Blocks 14-20c)
– Do not enter less than 60 days in Block 17
• Section 00010, Bid Schedule
• Section 00600, Reps and Certs
• Acknowledge all Amendments (SF 30)
• Bid Bond/Guarantee, 20% (Standard Form
24)
BID SCHEDULE
ITEM NO SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
1 Renovate Bldg. 1008 Restrooms and Windows 1 Job
Firm Fixed Price
Services Non-Personal: The contractor shall provide all parts, tools, labor, personnel, materials, equipment, travel and expertise necessary to renovate restrooms and remove and replace windows in accordance with the Statement of Work.
NET AMT $
ITEM NO SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
0002 Renovate Bldg. 1005 Safety Office 1 Job
Services Non- Personal: The contractor shall provide all parts, tools, labor, personnel, materials, equipment, travel and expertise necessary to renovate the safety office in Bldg. 1005 in accordance with the Statement of Work.
NET AMT
ITEM NO SUPPLIES/SERVICES QTY UNIT UNIT PRICE
AMOUNT
0003 1 Remove/Replace Bldg. 1009 Awning & Stairs 1 Job
Services Non Personal: The contractor shall provide all parts, tools, labor, personnel, materials, equipment, travel and expertise necessary to remove and replace the stairs and awning on Bldg.
1009 in accordance with the Statement of Work.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 Contractor Manpower 1 Job
Reporting
CONTRACTOR MUST INCLUDE A PRICE OR
MARK "NOT SEPARATELY PRICED"
Firm Fixed Price
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Air Force via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address:
http://www.ecmra.mil/. Reporting inputs will be for the labor executed during the period of performance during each Government Fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2014. Contractors may direct questions to the help desk at: http://www.ecmra.mil.
FOB: Destination
NET AMT $
http://www.ecmra.mil/
ADDITIONAL REQUIREMENTS
Complete Page 2 of the SF 1442
- Enter Cage Code and DUNS Number in Block 14
THE SOLICITATION
• Section 00600 - Complete and insert representations and certifications (return those in Section 00600)
– Complete Electronic Representations and Certifications in SAM– website provided in Section 00600
BID SUBMISSION
-Send to address in Block 7 of SF 1442
-Hand Carried Bids
- Deliver to address in Block 7, SF 1442 prior to bid due date
- Deliver to place of bid opening if hand carrying and attending the bid opening (125th FW, Bldg. 1006, LRS
Class Room)
Mark the front of the envelope with, “Bid No. W911YN-17-B-
1000”, Name and Address of Bidder
-Due Date/Time: August 30, 2017, 2:00 PM Eastern (subject to change through Amendment)
WHAT TO EXPECT AT
OPENING
• Official Time based on www.time.gov, bid opening officer (BOO) will announce exact time bids are due and that no more bids will be accepted
• Bids are opened and read out loud with no comment on responsiveness (FAR 14.301) of bids, and recorded
• BOO opens Government estimate, records
• Abstract will be certified and posted to www.fbo.gov as soon as practical. Low bidder determined in accordance with DFARS 252.236-7007 http://www.time.gov/ http://www.fbo.gov/
IMPORTANT REMINDERS,
NOTICES, CONDITIONS
• Prospective bidders must bid on all items to be considered for award.
TECHNICAL INFORMATION
• Working hours on the Base (section 01000)
•Availability of Utilities
• Water and Electric (section 01000)
HOW QUESTIONS WILL BE
HANDLED
• ALL QUESTIONS AND ANSWERS SHALL BE
IN WRITING AND SHALL BE AN
ATTACHMENT TO THE SOLICITATION
• See solicitation section 00100. Questions must be submitted in writing only via email
• Submit questions NLT 5th business day prior to bid opening (currently 25 Aug).
• Questions and Answers will be posted on a non-attribution basis with solicitation information at www.fbo.gov
• May result in revisions to solicitation if warranted
QUESTIONS ???
Email your questions (if it’s not in writing, it didn’t happen)
Site Visit Follows This Briefing
File details come from the government source that posted it. Updated .