Reference_Drawings.pdf
PDF 24 MB Posted
- Attached to
- FY16 Poe Lock Electrical Modernization
- Solicitation number
- W911XK-16-R-0005
About this file
Reference Drawings
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHIEF ENGINEERING SECTION
PREPARED BY:
DRAWN BY:
CHECKED BY:
APPROVAL RECOMMENDED
AREA ENGINEER, SOO AREA
SCALE:
DRAWING NUMBER
DATE:
U. S. ARMY ENGINEER DISTRICT, DETROIT
CORPS OF ENGINEERS
DETROIT, MICHIGAN
ST. MARYS RIVER, MICHIGAN
ST. MARYS FALLS CANAL
SHEET OF
KAR
CAP
CAP
NONE
1 1
SCHEMATIC DIAGRAM
POWER CONTROL & LIGHTING SYSTEM
DESCRIPTION OF OPERATION LEGEND:
NOTES:
CHIEF, ELECTRICAL BRANCH
DE-ENERGIZE CRR
DE-ENERGIZE SSO
D I
R E
C T I
O N
A1
B1
C1
D1
E1
F2
G2
J1
J2
H1
G1
F1
D2
C2
B2
A2
BOOM POSITION
61BLS 62BLS 71BLS 72BLS
CIRCUIT FUNCTION DIRECTION
SOCKET POSITION
HANDLE POSITION
61TOSB 62TOSB 71TOSB 72TOSB
CONTACTS
LOWEROFF
X
X X
X
X
X
X
X
SPARE
1 2
5 6
7 8
9 10
CONTROL TRANSFER SWITCH
71CTS61CTS 72CTS
HANDLE POSITION
CONTACTS
X
X
X
DESK
CONTROL
LOCAL
X c
SWITCH DEVELOPMENTS
W
V
** CONTACT DESIGNATION
* NUMERICAL SUFFIX FOR PARTICULAR ITEM
3 PHASE
480V
CIRCUIT FUNCTION
FENDERS NO. 11 AND NO. 14
AUGUST 1998
ACB
TOLB
F2
120V.
c c
F1 c c105V
T
W R G R
W R G R
BLSG1 BLSA1 CR11 2
CTS
UVR
30 32 34
TOLS
PCB
PCS
DP1
MOTOR
BOOM
MOTOR
SOCKET
DP2
W R G R
A
A
CRO
A
DOWN
BOOM
UP
BOOM
IN
SOCKET
OUT
SOCKET
CD1 FOR FENDER #11
CD2 FOR FENDER #14
BOOM END
PUMP ROOM
PUMP ROOM
SOCKET END
OK
CIRCUIT
DETAIL "A"
SEE
INTERLOCK
40 41
49 50
52 5351
CRO
CRI
SLS1
UVR
TOLB TOLS
SLS2
CTSUVR
TRL
CRR
CRL-A
CRL-B
OCS ER
TB
X
BL
CRL
CRR
PCB
CRR
UVR
CRI
57 62
TRL
TO
5.0 SEC
c
CRL
BLSA2
CRL
2 CRR
BLSC1 BLSD1TR
RUNNING
BOOM MOTOR
X
CRL
3 CRR
PCS
RUNNING
SOCKET MOTOR
CRI
CRO
TOSB
68 66
BLSB2
BLSG2
TOSS
TRB
TRS
SBM
V
PCB
TRB
PCS
TC
3.0 SEC
c6
PBB
7 PBS
SSM
V
SBL
V
TRS
TC
2.0 SEC
c
CRO
BLSF1
848382
CRL
CRL
BLSF2
CRR
BLSE1
SSO
V
CRBR
BLSB1
CRO
CRBR
CRR
ER
SBR
V
CRBR
CRL
91 92
TR
BLSD2
BLSC2
T
TYPICAL FENDER
(OUTSIDE GATES)
FENDER N0.14 - CIRCUIT NO.72
FENDER NO.11 - CIRCUIT NO.61
DETAIL "A"
FENDER NO.11 FENDER NO.14
61CRL
121CRI
81CRO
83CRO
61CRR
61CRL
121CRI
81CRO
83CRO
61CRR
42 55
82CRO
84CRO
92CRO
94CRO
72CRR
72CRL
122CR2
82CRO
84CRO
92CRO
94CRO
72CRR
72CRL
122CR2
BOOM LIMIT SWITCH
C O
N T
A C
T
C A
M
A N
D
(UP)
87 10
(DOWN)
TURN ON "UP" IND. LIGHT
DE-ENERGIZE PCB
DE-ENERGIZE PCB
DE-ENERGIZE SBR
DE-ENERGIZE PCB
DE-ENERGIZE SBR
DE-ENERGIZE SSO
DE-ENERGIZE SBL
TURN ON "DOWN" IND. LIGHT
DE-ENERGIZE PCB
INTERLOCK
TURN ON RED TRAFFIC LIGHT
TURN ON WARNING LIGHT
DE-ENERGIZE CRBR
UP
UP
UP
UP
UP
UP
UP
DOWN
DOWN
DOWN
DOWN
DOWN
DOWN
DOWN
DOWN
DOWN
SOCKET LIMIT SWITCH
61SLS2 62SLS2 71SLS2 72SLS2
61SLS1 62SLS1 71SLS1 72SLS1
ENERGIZE CRI
ENERGIZE CRO
IN
OUT
NO.
SWITCH
OUT IN
HANDLE POSITION
61OCS 62OCS1 62OCS2 71OCS1 71OCS2 72OCS
CONTACTS
LOWER (STOP)
IN
(NORMAL)
OUT
X
X
SPARE
c c c
1 2
3 4
OPERATION CONTROL SWITCH
X
RAISE NEUTRAL
RAISE (STOP MOTOR)
IN
(MOTOR ONLY)
OUT
X*
X
X
11 12 c c
X
X
SPARE
HANDLE POSITION
61TOSS 62TOSS 71TOSS 72TOSS
CONTACTS
X
X
SPARE
c c
X
62CTS
X
X
SPARE
SOCKET TRYOUT SWITCH
SOCKET IN OFF SOCKET OUT (STOP MOTOR)
IN
(MOTOR ONLY)
OUT
1 2
5 6
7 8
X*
8 X
X
10 SPARE
1 2
5 6
7 8
9 10
X
X
X
X
SEE DWG.29/68
IS RELEASED.
RETURN WHEN HANDLE
DIRECTION OF SPRING
AS DESIRED BY MFR
CAM OVERTRAVEL
CONTACT OPEN
CONTACT CLOSED
2. NOTES 1 THRU 8 ON DWG.29/64 APPLY
1. FOR SOLENOID VALVE SCHEDULE, SEE DWG.29/64
FOR OTHER "R" & "L"
SEE INTERL. DWG
(SEE NOTE 4 DWG.29/64)
SLS1
SLS2
BOOM TRYOUT SWITCH
GATE LEAF IS STOPPED.
RAISING SEQUENCE FOR A FENDER WILL CONTINUE TO COMPLETION EVEN IF THE
GATE LEAF PROTECTED BY THAT FENDER. ONCE IT HAS BEEN STARTED, THE
A FENDER TO BE RAISED AS SOON AS THE OPENING CYCLE IS STARTED FOR ANY
IN DETAIL "A" WILL TEMPORARILY BYPASS THE INTERLOCK RELAYS TO ALLOW
5. TO EXPEDITE FENDER OPERATION DURING NORMAL LOCKAGES, THE CIRCUITRY
LOCATION.
EACH LOCATION WILL INDICATE WHETHER EQUIPMENT IS OPERABLE FROM THAT
INDICATE THE POSITION OF BOOM AND SOCKET. "CIRCUIT OK" LIGHTS IN
4. INDCATING LIGHTS ON THE CONTROL DESK AND IN EACH PUMP ROOM WILL
AS IN STEP 2.5, USING PBS IN LIEN OF PBB.
3.4 TO OPERATE THE MOTOR ONLY, PULL OUT TOSS. OPERATION WILL BE
ENERGIZED, THE SOCKET WILL BE DRIVEN IN.
ENERGIZE THE MOTOR AND IN TURN TRS AND SSM. SINCE SSO WILL NOT BE
3.3 TO DRIVE THE SOCKET IN, TURN TO TOSS "SOCKET IN". CONTACT 5 WILL
SSO, DRIVING THE SOCKET OUT.
WILL ENERGIZE PCS AND IN TURN TRS AND SSM. CONTACT 7 WILL ENERGIZE
3.2 TO DRIVE THE SOCKET OUT, TURN TOSS TO "SOCKET OUT". CONTACT 6
AS IN STEP 2.1.
3.1 TURN CTS (IN BOOM END PUMP ROOM) FROM "CONTROL DESK" TO "LOCAL"
3. OPERATION FROM SOCKET END PUMP ROOM
CONTINUOUS MANUAL PRESSURE.
THE BRAKING PISTON, PBB MAY BE LATCHED IN, SO AS TO NOT REQUIRE
SED TO ENERGIZE SBM. FOR EXTENDED OPERATION, SUCH AS RESTORING
ENERGIZED. THE PUMP WILL THEN OPERATE UNLOADED UNTIL PBB IS PRES-
ENERGIZE PCB AND CONTACT 1 WILL OPEN TO PREVENT SBM FROM BECOMING
2.5 TO OPERATE THE MOTOR ONLY, PULL OUT ON TOSB. CONTACT 3 WILL
TOSB, RESTORING ALL ITS CONTACTS TO THE NORMAL OR "OFF" POSITION.
2.4 TO STOP THE BOOM AT ANY POINT BELOW THE TOP 3 DEGREES, RELEASE
TO RAISE THE BOOM WITHIN THE TOP 3 DEGREES.
2.3.3 CONTACT 11 WILL OPEN TO PREVENT BLSC2 AND BLSD2 FROM TRYING
2.3.2 CONTACT 9 WILL ENERGIZE SSO TO INSURE THAT THE SOCKET IS OUT.
2.3.1 CONTACT 8 WILL ENERGIZE SBL TO LOWER THE BOOM.
STEP 1.1.1.
ENERGIZE PCB AND PCS. TRB, TRS, SBM, AND SSM WILL OPERATE AS IN
2.3 TO LOWER THE BOOM, TURN TOSB TO "LOWER". CONTACTS 6 AND 7 WILL
CRO BECOMES ENERGIZED, AS IN STEP 1.1.3.
2.2.2 CONTACT 10 WILL ENERGIZE CRBR AND ALLOW THE BOOM TO RAISE WHEN
IS OUT.
2.2.1 CONTACT 9 ON TOSB WILL ENERGIZE SSO TO INSURE THAT THE SOCKET
STEP 1.1.1.
ENERGIZE PCB AND PCS. TRB, TRS, SBM, AND SSM WILL OPERATE AS IN
2.2 TO RAISE THE BOOM, TURN TOSB TO "RAISE". CONTACTS 5 AND 7 WILL
TOSB FOR LOCAL OPERATION.
CONTROL (EXEPT PUSH TO STOP) FROM THE CONTROL DESK AND ALLOW USE OF
2.1 TURN CTS FROM "CONTROL DESK" TO "LOCAL". THIS WILL REMOVE ALL
2. OPERATION FROM BOOM END PUMP ROOM
POSITIONS, THE FENDER WILL STAY WHERE IS WAS STOPPED.
BLSC1, BLSC2, AND BLSD2 WHEN OCS IS RELEASED. AT ALL OTHER
THE TOP POSITION, IT WILL MOVE TO THE TOP POSITION BY ACTION OF
BOTH MOTORS AND ALL SOLENOIDS. IF THE FENDER IS WITHIN 3 DEGREES OF
GIZE UVR TO DE-ENERGIZE CRL OR CRR AS APPLICABLE, THUS DE-ENERGIZING
LEASING OCS TO OPEN ITS CONTACT 1. THIS WILL MOMENTARILY DE-ENER-
1.3 THE FENDER MAY BE STOPPED AT ANY POSITION BY PUSHING IN AND RE-
DE-ENERGIZING CRL TO STOP BOTH MOTORS AND DE-ENERGIZE ALL SOLENOIDS.
AND CRI WILL AGAIN BECOME ENERGIZED, OPENING ITS CONTACT 1 AND SO
1.2.6 WHEN SSO BECOMES DE-ENERGIZED, THE SOCKET WILL BE DRIVEN IN
DE-ENERGIZE SBL AND SSO RESPECTIVELY.
WILL LOWER. AT END OF BOOM TRAVEL, BLSF1 AND BLSF2 WILL OPEN TO
1.2.5 CONTACTS 5 ON CRL AND 1 ON CRO THEN ENERGIZE SBL AND THE BOOM
CLOSE, THE TO CONTACT OF TRL WILL OPEN.
1.2.4 AFTER A TIME DELAY SUFFICIENT TO ALLOW CONTACT 1 OF CRI TO
CRI AND SLS2 WILL CLOSE TO ENERGIZE CRO.
1.2.3 AS THE SOCKET IS DRIVEN OUT, SLS1 WILL OPEN TO DE-ENERGIZE
TO BE DRIVEN OUT.
1.2.2 CONTACT 4 ON CRL WILL CLOSE TO ENERGIZE SSO CAUSING THE SOCKET
SWITCH ACTION DURING THE TOP THREE DEGREES.
1.2.1 CONTACT 6 ON CRL WILL OPEN TO PREVENT ENERGIZING SBR BY LIMIT
SOLENOID VALVES WILL THEN OPERATE SIMILIAR TO STEP 1.1.1 ABOVE.
WILL CLOSE TO ENERGIZE CRL AND TRL. MOTOR CONTACTORS AND MAIN
1.2 TO LOWER THE FENDER, TURN OCS TO "LOWER" AND RELEASE. CONTACT 3
BELOW THE TOP 3 DEGREES.
TO THE TOP 3 DEGREES, ALLOWING THE BOOM TO BE STOPPED AT ANY POINT
RAISE THE BOOM AGAIN. BLSD1 AND BLSD2 LIMIT THIS AUTOMATIC RAISING
BLSC1 AND BLSC2, THE BOOM MOTORS SBM AND SBR WILL BE ENERGIZED TO
WARD DUE TO WIND PRESSURE. WHEN IT HAS DRIFTED FAR ENOUGH TO RESET
1.1.5 WHILE THE FENDER IS IN THE RAISED POSITION, IT MAY DRIFT DOWN-
AND DE-ENERGIZING ALL SOLENOID VALVES.
BLSA2 WILL ALSO OPEN, DE-ENERGIZING CRR AND SO STOPPING BOTH MOTORS
UNTIL BLSB1 OPENS AT THE FULLY RAISED POSITION. AT THIS POSITION
GIZE CRO, BUT CONTACT 2 ON CRBR WILL MAINTAIN THE CIRCUIT TO CRBR
GIZING SSO AND THE SOCKET WILL BE DRAWN IN. THIS WILL DE-ENER-
1.1.4 AS THE BOOM RAISES ABOUT 10 DEGREES, BLSE1 WILL OPEN, DE-ENER-
TO ENERGIZE SBR, RAISING THE BOOM.
IS ENERGIZED, CRBR WILL BE ENERGIZED. CONTACT 1 ON CRBR WILL CLOSE
1.1.3 SIMULTANEOUSLY, CONTACT 5 ON CRR WILL CLOSE AND AS SOON AS CRO
OUT. WHEN THE SOCKET IS FULLY OUT, SLS2 WILL CLOSE, ENERGIZING CRO.
1.1.2 CONTACT 4 ON CRR WILL CLOSE TO ENERGIZE SSO, DRIVING THE SOCKET
THE PUMPS.
TRS WILL TIME CLOSE TO ENERGIZE SBM AND SSM RESPECTIVELY, TO LOAD
PCS WILL ENERGIZE TRB AND TRS, RESPECTIVELY. CONTACTS ON TRB AND
AND THE PUMPS WILL START UNLOADED. AUXILIARY CONTACTS ON PCB AND
1.1.1 CONTACT 2 AND 3 ON CRR WILL ENERGIZE PCB AND PCS RESPECTIVELY
TO MAINTAIN CRR ENERGIZED WHEN OCS IS RELEASED, OPENING CONTACT 4.
OCS WILL CLOSE TO ENERGIZE CRR. CONTACT 1 ON CRR WILL THEN CLOSE
1.1 TO RAISE FENDER, TURN OCS TO "RAISE" AND RELEASE. CONTACT 4 ON
1. OPERATION FROM CONTROL DESK
DC-78-5 /
D
C
E L
E C
T S
Y S
D C
D G
N
NEW SECOND LOCK
401-3
401-2
R-RED, G-GREEN, A-AMBER)
INDICATING LIGHT (W-WHITE,
VALVE SOLENOID
OPERATING COIL
LIMIT SWITCH CONTACT OPEN
LIMIT SWITCH CONTACT CLOSED
THERMAL OVERLOAD RELAY ELEMENT
THERMAL OVERLOAD RELAY CONTACT
MANUAL CONTACT, OPEN BY PULLING HANDLE
MANUAL CONTACT, OPEN BY PUSHING HANDLE
MANUAL CONTACT, CLOSE BY PULLING HANDLE
MANUAL CONTACT, CLOSE BY PUSHING HANDLE
OPEN BY TURNING HANDLE
MANUAL CONTACT, NORMALLY CLOSED,
CLOSE BY TURNING HANDLE
MANUAL CONTACT, NORMALLY OPEN,
CLOSED WHEN COIL DE-ENERGIZED
RELAY OR CONTACTOR CONTACT,
WHEN COIL DE-ENERGIZED
RELAY OR CONTACTOR CONTACT, OPEN
UVR UNDER VOLTAGE RELAY
TRAFFIC SIGNAL BOOM UPTSBU
TRS TIMING RELAY, SOCKET SIDE
TRL TIMING RELAY, LOWERING
TRB TIMING RELAY, BOOM SIDE
TR TIMING RELAY
TOSS TRYOUT SWITCH, SOCKET SIDE
TOSB TRYOUT SWITCH, BOOM SIDE
TOLS THERMAL OVERLOAD RELAY, SOCKET
TOLB THERMAL OVERLOAD RELAY, BOOM
TO TIME DELAY OPEN
TC TIME DELAY CLOSE
T TRANSFORMER
SSO SOLENOID VALVE, SOCKET, MOVE OUT
SSM SOLENOID VALVE, SOCKET, MAIN
SLS** SOCKET LIMIT SWITCH
SBR SOLENOID VALVE, BOOM, RAISE
SBM SOLENOID VALVE, BOOM, MAIN
SBL SOLENOID VALVE, BOOM, LOWER
PCS POWER CONTACTOR, SOCKET MOTOR
PCB POWER CONTACTOR, BOOM MOTOR
PBS PUSH BUTTON, SOCKET SIDE
PBB PUSH BUTTON, BOOM SIDE
OCS* OPERATION CONTROL SWITCH
IS ISOLATING SWITCH
F* FUSE
ER EMERGENCY RAISE SWITCH
DP* DISCONNECT PLUG
CTS CONTROL TRANSFER SWITCH
CRR CONTROL RELAY, RAISING
CRO CONTROL RELAY, SOCKET OUT
CRI CONTROL RELAY, SOCKET IN
CRL CONTROL RELAY, LOWERING
CRBR CONTROL RELAY, BOOM RAISE
BLS* BOOM LIMIT SWITCH
BL BOOM LOWER
ACB AIR CIRCUIT BREAKER
NO. DATE REVISION BY
1 JULY 6, 2007 C.A.P.ADDED TRAFFIC SIGNAL BOOM UP
TSBU
DRAWN BY:
CHECKED BY:
APPROVAL RECOMMENDED
AREA ENGINEER, SOO AREA
SCALE:
DRAWING NUMBER
DATE:
U. S. ARMY ENGINEER DISTRICT, DETROIT
CORPS OF ENGINEERS
DETROIT, MICHIGAN
ST. MARYS RIVER, MICHIGAN
ST. MARYS FALLS CANAL
SHEET OF
KAR
CAP
CAP
NONE
1 1
SCHEMATIC DIAGRAM
POWER CONTROL & LIGHTING SYSTEM
DESCRIPTION OF OPERATION
LEGEND:
NOTES:
CHIEF, ELECTRICAL BRANCH
HANDLE POSITION
CONTACTS
X
X
X
1 2
5 6
7 8
9 10
SWITCH DEVELOPMENTS
3 PHASE
480V
FENDERS NO. 12 AND NO. 13
AUGUST 1998
ACB
TOLB
F2
120V.
c c
F1 c c105V
T
W R G R
W R G R
BLSG1 BLSA1 CRI1 2
CTS
UVR
30 32 34
TOLS
PCB
PCS
DP1
MOTOR
BOOM
MOTOR
SOCKET
DP2
W R G R
A
A
CRO
A
DOWN
BOOM
UP
BOOM
IN
SOCKET
OUT
SOCKET
BOOM END
PUMP ROOM
PUMP ROOM
SOCKET END
OK
CIRCUIT
DETAIL "A"
SEE
INTERLOCK
40 41
49 50
52 5351
CRO
CRI
SLS1
UVR
TOLB TOLS
SLS2
CTS
UVR
TRL
CRR
CRL-A
CRL-B
ER
TB
X
BL
CRL
CRR
PCB
CRR UVRCRI
57 62
TRL
TO
5.0 SEC
c
CRL
BLSA2
CRL
2 CRR
BLSC1 BLSD1TR
RUNNING
BOOM MOTOR
X
CRL
3 CRR
PCS
RUNNING
SOCKET MOTOR
CRI
CRO
TOSB
68 66
BLSB2
BLSG2
TOSS
TRB
TRS
SBM
V
PCB
TRB
PCS
TC
3.0 SEC
c6
PBB
7 PBS
SSM
V
SBL
V
TRS
TC
2.0 SEC
c
CRO
BLSF1
848382
CRL
CRL
BLSF2
CRR
BLSE1
SSO
V
CRBR
BLSB1
CRO
CRBR
CRR
ER
SBR
V
CRBR
CRL
91 92
TR
BLSD2
BLSC2
T
TYPICAL FENDER
(BETWEEN GATES)
FENDER N0.13 - CIRCUIT NO.62
FENDER NO.12 - CIRCUIT NO.71
DETAIL "A"
FENDER NO.12 FENDER NO.13
71CRL
121CR2
81CRO
83CRO
71CRR
71CRL
121CR2
81CRO
83CRO
71CRR
42 55
82CRO
84CRO
92CRO
94CRO
62CRR
62CRL
122CR1
82CRO
84CRO
92CRO
94CRO
62CRR
62CRL
122CR1
NORMAL
X
11 12
X
X
ISOLATE.
REMOTE CONTROL DESK MAY BE CUT OUT OF THE CIRCUIT BY TURNING IS TO
3. FOR TESTING AND MAINTENANCE ALL INDICATION AND CONTROL AT THE
FROM EITHER CONTROL DESK.
DESK AT THE OPPOSITE END OF THE LOCK FROM THE FENDER ALLOW OPERATION
2. AN ADDITIONAL CONTROL SWITCH AND INDICATING LIGHTS ON THE CONTROL
SAME AS FOR FENDERS #11 AND #14, AS DESCRIBED ON DWG.29/63.
1. EXCEPT AS DESCRIBED BELOW, OPERATION OF FENDERS #12 AND #13 IS THE
SOLENOID VALVE SCHEDULE
SOLENOID
DESIGNATION ON HYDRAULIC CIRCUIT
STOPPED
BOOM DOWN, SOCKET GOING IN
BOOM LOWERING *
BOOM DOWN, SOCKET GOING OUT
BOOM RAISING - FIRST 10
BOOM RAISING - ABOVE FIRST 10
BOOM RAISING DUE TO ANTI-DRIFT
SOCKET GOING IN *
SOCKET GOING OUT *
RESTORING BRAKE CYLINDER (BOOM)
RESTORING BRAKE CYLINDER (SOCKET)
BA C F G
SBM SBL SBR SSM SSO
X
X
X
X
X
X
X
X
X X X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
XBOOM RAISING (ALL POINTS) *
- UNDER CONTROL OF OCS
* - UNDER CONTROL OF TOS X - SOLENOID ENERGIZED
ISOLATING SWITCH
X
X
X
X
X
X
ISOLATE
62IS 71IS
FOR OTHER SWITCH DEVELOPMENTS, SEE DWG.29/63
X - CONTACT CLOSED
SEE DWG.29/63
W R G R A
97 8 10 11 12
REMOTE CD
IS
2939 31 33 35 37
CD1 FOR FENDER #13
CD2 FOR FENDER #12{
CD1 FOR FENDER #12
CD2 FOR FENDER #13{NEAR CD
6 4
IS
OCS2-CIRCUIT NO.62
OCS1-CIRCUIT NO.71 { {
c
OCS2-CIRCUIT NO.71
OCS1-CIRCUIT NO.62
c
SEE DWGS. 29/65, 29/68 AND 29/70.
8. FOR ADDITIONAL CONTACTS ON CRI, CRL, CRR, PCB AND PCS,
AS BEING ON CRL AND MAY BE PART OF EITHER RELAY.
7. CONTACTS ON RELAYS CRL-A AND CRL-B ARE ALL INDENTIFIED
UNDER THIS CONTRACT.
INSTALLED UNDER A PREVIOUS CONTRACT, ARE TO BE CONNECTED
6. MOTORS, LIMIT SWITCHES AND VALVE SOLENOIDS WILL BE
DWG.29/68.
5. FOR CONNECTIONS TO CONTACT 4 IN TRY-OUT SWITCHES, SEE
3-POSITION, CENTER OFF, LIMIT SWITCH.
4. SOCKET LIMIT SWITCH (1 PER FENDER) CONSISTS OF
INDENTIFIED AS SHOWN.
AS LISTED. FOR EACH FENDER, INTERLOCK RELAYS TO BE
INTERLOCK RELAYS) TO BE PRECEDED BY PROPER CIRCUIT NUMBER
3. ALL WIRE NUMBERS AND COMPONENT DESIGNATION (EXCEPT
SOCKET IN.
2. LIMIT SWITCH CONTACTS SHOWN FOR FENDER LOWERED AND
("OFF") POSITION ONLY.
1. TOSB AND TOSS TO HAVE AXIAL (IN-OUT) MOVEMENT IN CENTER
OTHER "R" & "L" CONTACTS
SEE INTERL. DWG. FOR
DC-78-6 D
C
E L
E C
T S
Y S
D C
D G
N
NEW SECOND LOCK
DRAWN BY:
CHECKED BY:
APPROVAL RECOMMENDED
AREA ENGINEER, SOO AREA
DRAWING NUMBER
DATE:
U. S. ARMY ENGINEER DISTRICT, DETROIT
CORPS OF ENGINEERS
DETROIT, MICHIGAN
ST. MARYS RIVER, MICHIGAN
ST. MARYS FALLS CANAL
SHEET OF
KAR
CAP
CAP
1 1
SCHEMATIC DIAGRAMS
POWER CONTROL & LIGHTING SYSTEM
ACB
T
DESCRIPTION OF OPERATION LEGEND:
NOTES:
CHIEF, ELECTRICAL BRANCH GATES
PCM1 PCM2 MOLM1
MOLM2
4A
5A
6A
DPM1
DPM2
10A
11A
12A
7A
8A
9A
MOTOR
MAIN
F1
PCAPCD
INTERLOCK
DPC
MOLC
MOTOR
CONTROL
COILS
BRAKE
F3
W R G R
W R G R
CD
PUMP ROOM
105V c c
GLSG2 GLSA1 OLS21 2
31 32
CTS
UVR
F2
33 34 35 120V c c
CLOSED OPEN ANCHORAGE OVERLOAD LIMITCIRCUIT OK
AT RIGHT
DETAIL"A"
SEE
INTERLOCK
c
CRIS
61CRL
121CR3
71CRL
61CRL
121CR3
71CRL
62CRL
122CR3
72CRL
62CRL
122CR3
72CRL
36A 37A 37A36A
F#13
F#14
F#13
F#14
"A"
DETAIL
c c
G1N AND G1S G2N, G2S, G3N AND G3S
CTS
UVR
43 44
MOLM1 {
46 47
MOLM2
49 5048
MOLC
UVR
CRIGLSB1
OCS
TOS
UVR
UVR
CRJ
CRIS
GLSF1
GLSD2
JSS
SOUTH LEAF
NORTH LEAF
CRJ
57A
CRT
CRT
CMLS1
CRD
CRT
GLSA2
CRC
CRO-A
CRO-B
CRC
TR1
PCM1
CRO
CRC
OLS1
GLSH1
VLS
VLS CRO
CRJ
1 53
PCM1 PCM2
TC(TR1)3.0 SEC
c
CRJ PCM1
TR2CRD
CRD TR3
TR2
TR3
PCDCRD
PCA
CRT
CRT
GLSD1
GLSE2
CRO
CRC
CRT
CRT
10 10
SPARES
CRJ
CRD
5PCA
TR2
3TR3
TC
TC
c c
84 85 86
CRO GLSC2
GLSE1
PCAPCDCMLS2
89 90 91
CRV
SVM
V
SV0
V
SVC
V
SVL
CRV
CRD
TR2
2TC TR3
2TC
c c
CRV
PCM2 AUX
CRO
CRC 2
TYPICAL GATE LEAF
G3S - DOWNSTREAM SOUTH LEAF - CIRCUIT NO. 94
G3N - DOWNSTREAM NORTH LEAF - CIRCUIT NO. 92
G2S - INTERMEDIATE SOUTH LEAF - CIRCUIT NO. 84
G2N - INTERMEDIATE NORTH LEAF - CIRCUIT NO. 82
G1S - UPSTREAM SOUTH LEAF - CIRCUIT NO. 83
G1N - UPSTREAM NORTH LEAF - CIRCUIT NO. 81
TURN ON "OPEN" IND. LIGHT
DE-ENERGIZE CRO
ENERGIZE CR1
TURN OFF GATE WARNING LIGHTS
SPARE
DE-ENERGIZE PCA
ENERGIZE PCD
DE-ENERGIZE CRJ
DE-ENERGIZE PCA
ENERGIZE PCD
DE-ENERGIZE CRJ
SPARE
SPARE
SPARE
TURN ON "CLOSED" IND. LIGHT
DE-ENERGIZE CRC
OPENING
OPENING
OPENING
OPENING
OPENING
OPENING
OPENING
OPENING
CLOSING
CLOSING
CLOSING
CLOSING
CLOSING
CLOSING
CLOSING
CLOSING
D I
R E
C T I
O N
C O
N T
A C
T
A N
D
E L
E M
E N
T
A1
B1
C1
D1
E1
F1
G1
H1
H2
G2
F2
E2
D2
C2
B2
A2
GATE POSITION
CLOSEDOPEN
OPEN
NEAR
CLOSED
NEAR
81GLS 82GLS 83GLS 84GLS 92GLS 94GLS
CIRCUIT FUNCTION
DE-ENERGIZE CRC
TURN ON "OVERLOAD" IND. LIGHT
DIRECTION CONTACT
ANCHORAGE STRESS
OVERLOAD NORMAL
81OLS 82OLS 83OLS 84OLS 92OLS 94OLS
ANCHORAGE OVERLOAD LIMIT SWITCH
CIRCUIT FUNCTION
DE-ENERGIZE CRD
DIRECTION
CONTROL MOTOR LIMIT SWITCHES
81CMLS1
81CMLS2
82CMLS1
82CMLS2
83CMLS1
83CMLS2
84CMLS1
84CMLS2
92CMLS1
92CMLS2
94CMLS1
94CMLS2
HANDLE POSITION
OPERATION CONTROL SWITCH & TRY-OUT SWITCH
81OCS 82OCS 83OCS 84OCS 92OCS 94OCS
81TOS 82TOS 83TOS 84TOS 92TOS 94TOS
CONTACTS
CLOSEOPEN OFF (SLOW)
IN
(NORMAL)
OUT
X
X*
X X
X*
X
X
X
X
SPARE
SPARE3
1 2
5 6
7 8
9 10
JOGGING SELECTOR SWITCH
82JSS81JSS 92JSS
HANDLE POSITION
JOG NEUTRAL STOP JOG
CONTACTS
1 2
3 4
X
X
X
X X
X
CONTROL TRANSFER SWITCH
84CTS83CTS 94CTS
HANDLE POSITION
CONTACTS
1 2
3 4
X
X
X
X
82CTS81CTS 92CTS
DESK
CONTROL
LOCAL
5 6
X
SPARE
* CONNECT FOR OCS SWITCHES ONLY
c c c c c
ANY POSITION OF GATE.
NOW POSSIBLE FROM
CONTROL OF GATES IS
INSTALLED. MANUAL
L.S. HAS BEEN
REVISED & VANE TYPE
37 & 37A HAS BEEN
CONTROL BUS CONNEC.
NOT DESIREABLE SINCE
12. AUTO CLOSING FOUND
OF GATES.
TO STOP AUTO CLOSING
11. DEPRESS OCS OR TOS
RETURN WHEN RELEASED.
DIRECTION OF HANDLE
CONTACT OPEN
CONTACT CLOSED
c
SWITCH DEVELOPMENTS
VALVE SOLENOID SCHEDULE
X
VALVE SOLENOID
DESIGNATION ON HYDRAULIC CIRCUIT
GATE STOPPED
GATE OPENING
GATE CLOSING
SVM SVC SVO
A B C
X X
X
X - DENOTES SOLENOID ENERGIZED
W
V
** CONTACT DESIGNATION
* NUMERICAL SUFFIX FOR PARTICULAR ITEM
3 PHASE
480V
STARTER, SEE NOTE 6
PART WINDING
c
SEE NOTE 5
GATE POSITION LIMIT SWITCH
CIRCUIT FUNCTION
OVERLOADING
OVERLOADING 2
DECREASING
INCREASING
CMLS1
CMLS2
SWITCH
PUMP OUTPUT
MAX. MIN.
DE-ENERGIZE PCA
#11 c
X
MOTOR
CONTROL
FOR
THUS ELIMINATING TR1.
INCLUDE A TIME DELAY CONTACT IN PCM1,
3-3 POLE OR 4-2 POLE OPERATION, AND MAY
6. PART WINDING STARTER MAY HAVE EITHER
MAY BE PART OF EITHER RELAY.
ARE ALL IDENTIFIED AS BEING ON CRO, AND
5. CONTACTS ON RELAYS CRO-A AND CRO-B
CONTRACT.
CONTRACT ARE TO BE CONNECTED UNDER THIS
SOLENOID VALVES INSTALLED UNDER A PREVIOUS
4. MOTORS, BRAKES, LIMIT SWITCHES, AND
TO BE IDENTIFIED AS SHOWN.
AS LISTED FOR EACH LEAF. INTERLOCK RELAYS
BE PRECEDED BY PROPER CIRCUIT DESIGNATION
DESIGNATIONS (EXCEPT INTERLOCK RELAYS) TO
3. ALL WIRE NUMBERS AND COMPONENT
ANCHORAGE LOAD.
PUMP AT MINIMUM DISPLACEMENT, AND NORMAL
2. LIMIT SWITCHES SHOWN FOR GATE CLOSED,
29/63, 29/64, AND 29/68.
CONTACTS ON CRC AND CRO, SEE DWGS.
1. FOR CONTACTS ON CR1, AND ADDITIONAL
AUGUST 1998
DC-78-7
NEW SECOND LOCK
SCALE: NONE
CADD FILE NAME: DC-78-07R2.DGN
SYMBOL DESCRIPTION DATE
1 MINOR REVISIONS 31MAR08
CRGO
CRO-C
CRGC
CRC-A
c c
CRAL
R-RED, G-GREEN)
INDICATING LIGHT (W-WHITE,
SOLENOID VALVE
OPERATING COIL
LIMIT SWITCH CONTACT OPEN
LIMIT SWITCH CONTACT CLOSED
OVERLOAD RELAY ELEMENT
OVERLOAD RELAY CONTACT
OPEN BY PUSHING HANDLE
MANUAL CONTACT, NORMALLY CLOSED,
CLOSE BY PUSHING HANDLE
MANUAL CONTACT, NORMALLY OPEN,
OPEN BY TURNING HANDLE
MANUAL CONTACT, NORMALLY CLOSED,
CLOSE BY TURNING HANDLE
MANUAL CONTACT, NORMALLY OPEN,
CLOSED WHEN COIL DE-ENERGIZED
RELAY OR CONTACTOR CONTACT,
WHEN COIL DE-ENERGIZED
RELAY OR CONTACTOR CONTACT, OPEN
UVR UNDER VOLTAGE RELAY
TR* TIMING RELAY
TOS TRYOUT SWITCH
TC TIME DELAY CLOSE
T TRANSFORMER
SVO SOLENOID VALVE, OPENING
SVM SOLENOID VALVE, MAIN
SVC SOLENOID VALVE, CLOSING
SVL SOLENOID VALVE LATCH
PCM2 - SECOND HALF WINDING)
(PCM1 - FIRST HALF WINDING
PCM POWER CONTACTOR, MAIN MOTOR
PCD POWER CONTACTOR, DECELERATING
PCA POWER CONTACTOR, ACCELERATING
OLS** ANCHORAGE OVERLOAD LIMIT SWITCH
OCS OPERATION CONTROL SWITCH
MAIN MOTOR
MOLM MAGNETIC OVERLOAD RELAY,
CONTROL MOTOR
MOLC MAGNETIC OVERLOAD RELAY,
JSS JOGGING SELECTOR SWITCH
GLS** GATE POSITION LIMIT SWITCH
F* FUSE
DPM DISCONNECT PLUG, MAIN MOTOR
DPC DISCONNECT PLUG, CONTROL MOTOR
CTS CONTROL TRANSFER SWITCH
CRV CONTROL RELAY, VALVES
CRT CONTROL RELAY, TRANSFER
CRO CONTROL RELAY, OPENING
CRJ CONTROL RELAY JOG
CRIS CONTROL RELAY, INTERLOCK SEALING
CRI CONTROL RELAY, INTERLOCKS
CGGO CONTROL RELAY GATE, OPENING
CRGC CONTROL RELAY GATE, CLOSING
CRD CONTROL RELAY, DECELERATING
CRC CONTROL RELAY, CLOSING
CRAL CONTROL RELAY ACTIVATION LATCH
CMLS* CONTROL MOTOR LIMIT SWITCH
ACB AIR CIRCUIT BREAKER
CRCA CONTROL RELAY CLOSING AUTOMATIC
63A
67A
2 MINOR REVISIONS 08JUL08
SYMBOL DESCRIPTION DATE
3 11JAN11
DESCRIPTION OF OPERATION
REVISED GLSO2 TO READ GLSD2 IN PARAGRAPH 9,
OPERATING REGARDLESS OF FENDER POSITION.
CONTACTS ON CRIS WILL ENABLE THE LEAF TO CONTINUE
THAT GATE. WHEN THE BYPASS OPERATION IS STARTED,
THE LOWERING CYCLE IS STARTED FOR BOTH FENDERS PROTECTING
INTERLOCK RELAYS TO ALLOW A LEAF TO BE CLOSED AS SOON AS
THE CIRCUITRY IN DETAIL "A" WILL TEMPORARILY BYPASS THE
10. TO EXPEDITE GATE OPERATION DURING NORMAL LOCKAGE,
THAT ONE JSS APPLIES TO BOTH LEAVES OF THE SAME GATE).
TIME BY TURNING JSS TO "STOP JOG" AND RELEASING. (NOTE
OCS HANDLE, AS IN STEP 6. CRJ MAY BE DE-ENERGIZED AT ANY
IS ENERGIZED, SLOW SPEED MAY BE OBTAINED BY PUSHING IN ON
APPLICABLE, AND NORMAL OPERATION WILL PREVAIL. WHILE CRJ
POINT, CRJ WILL BE DE-ENERGIZED BY GLSD2 OR GLSF1 AS
AS DESIRED. AS THE LEAF REACHES THE NORMAL DE-CELERATION
JOGGED AT FULL SPEED IN EITHER DIRECTION BY OPERATING OCS
WILL REMAIN AT MAXIMUM OUTPUT. EITHER LEAF MAY THEN BE
ENERGIZE PCA, SUBJECT TO NORMAL CMLS CONTROL, AND PUMP
LEAVES. CONTACTS ON CRJ WILL DE-ENERGIZE PCD AND
TO "JOG" AND RELEASE. THIS WILL ENERGIZE CRJ FOR BOTH
9. IF ICE CONDITIONS REQUIRE JOGGING THE GATE, TURN JSS
OPERABLE FROM THAT LOCATION.
CONDITION OF ANCHORAGE OVERLOAD, AND WHETHER THE LEAF IS
PUMP ROOM WILL INDICATE THE POSITION OF THE LEAF,
8. INDICATING LIGHTS ON THE CONTROL DESK AND IN THE
OR TOS AS DESIRED.
RE-ENERGIZE UVR. TO OPERATE THE LEAF AGAIN, OPERATE OCS
WILL HAVE TO BE TURNED OFF TO CLOSE CONTACT 7 TO
OVERLOAD RELAYS), ITS CONTACT 1 WILL OPEN, AND OCS OR TOS
BECOMES EVEN MOMINTARILY DE-ENERGIZED (AS BY OPERATION OF
7. WHILE EITHER OCS OR TOS IS BEING OPERATED, IF UVR
OUTPUT.
WILL CLOSE TO ENERGIZE PCD TO SET THE PUMP AT MINIMUM
CONTACT 3 WILL OPEN TO DE-ENERGIZE PCA, AND CONTACT 1
HANDLE OF OCS OR TOS, AND TURN IN THE DESIRED DIRECTION.
6. IF SLOW SPEEN OPERATION IS DESIRED, PUSH IN THE
"LOCAL", AND OPERATE TOS INT HE SAME MANNER AS OCS.
5. TO OPERATE THE LEAF FROM THE PUMP ROOM, TURN CTS TO
AFTER DECELERATION.
WILL TRAVEL FURTHER THAN NORMAL AT MINIMUM SPEED
PCD TO BE ENERGIZED. UNDER THIS CONDITION, THE LEAF
IS CLOSING) WILL OPEN TO DE-ENERGIZE PCA AND ALLOW
(GLSC2 IF THE LEAF IS OPENING OR GLSE1 IF THE LEAF
DECREASING OUTPUT IS REQUIRED, LIMIT SWITCH CONTACTS
MAXIMUM PUMP OUTPUT WILL NOT BE OBTAINED BEFORE
4.3 IF THE LEAF IS STOPPED AT A POSITION SUCH THAT
AS DESIRED.
4.2 TO RESTART THE LEAF, OPERATE OCS AS IN STEP 2 OR 3
ENERGIZING PCD AS STATED IN STEP 1.
4.1 AS PCM BECOMES DE-ENERGIZED, CONTACT 1 WILL CLOSE,
THE LEAF.
MAIN MOTOR AND DE-ENERGIZING ALL SOLENOID VALVES TO STOP
WILL DE-ENERGIZE CRO OR CRC AS APPLICABLE, STOPPING THE
4. TO STOP THE LEAF AT ANY POINT, RELEASE OCS. THIS
TO THAT DESCRIBED ABOVE FOR OPENING THE LEAF.
ENERGIZE CRC, AND CIRCUIT OPERATION WILL THEN BE SIMILAR
AS OPERATION IS DESIRED. CONTACT 6 WILL CLOSE TO
3. TO CLOSE LEAF, TURN OCS TO "CLOSE" AND HOLD AS LONG
AT END OF TRAVEL TO DE-ENERGIZE CRO.
LEAF WILL CONTINUE AT SLOW SPEED UNTIL GLSA2 OPENS
AND CONTACT 1 ON CRD OPENS TO DE-ENERGIZE PCD. THE
MINIMUM SPEED AS THE PUMP OUTPUT REACHES A MINIMUM
THEN DECREASE AND THE LEAF WILL DECELERATE TO
GLSD1 CLOSES TO ENERGIZE PCD. THE PUMP OUTPUT WILL
MAXIMUM SPEED UNTIL, NEAR THE OPEN END OF TRAVEL,
DE-ENERGIZE PCA. THE LEAF WILL CONTINUE TO OPEN AT
ACCELERATE UNTIL, AT MAXIMUM OUTPUT, CMLS2 OPENS TO
THE PUMP OUTPUT WILL INCREASE AND THE LEAF WILL
ENERGIZE PCA THROUGH CONTACT 3 ON CRO AND GLSC2.
CRD AND CONTACT 3 ON TR2 OR TR3 WILL TIME CLOSE TO
2.5 SIMULTANEOUSLY WITH STEPS 2.3 & 2.4, CONTACT 5 ON
THE LEAF.
2.4 CONTACT 2 ON CRO WILL CLOSE TO ENERGIZE SVO TO OPEN
TO REACH MINIMUM DISPLACEMENT.
REQUIRES MORE THAN THE TIME SETTING OF THESE RELAYS
UNNECESSARY WAITING TIME IF THE PUMP CONTROL
THE USE OF THE TWO TIMING RELAYS PREVENTS
CRV IS ENERGIZED TO ENERGIZE THE MAIN SOLENOID SVM.
TIME CLOSE TO INSURE A MINIMUM RUNNING TIME BEFORE
ON CRD WILL CLOSE. CONTACT 2 ON TR2 OR TR3 WILL
2.3 WHEN THE PUMP IS AT MINIMUM DISPLACEMENT, CONTACT 4
IN THE CIRCUIT AS CRD CHANGES CONDITION.
APPROPRIATE CRD CONTACT TO MAINTAIN TR2 OR TR3
AS APPLICABLE, WILL CLOSE TO SEAL AROUND THE
BE CLOSED TO ENERGIZE TR3. CONTACT 1 ON TR2 OR TR3,
NOT AT MINIMUM DISPLACEMENT, CONTACT 3 ON CRD WILL
CRD WILL BE CLOSED TO ENERGIZE TR2. IF THE PUMP IS
2.2 IF THE PUMP IS AT MINIMUM DISPLACEMENT, CONTACT 2 ON
ENERGIZE PCM2 TO RUN THE PUMP MOTOR ON BOTH WINDINGS.
ENERGIZED AND ITS CONTACT WILL TIME CLOSE TO
PUMP MOTOR ON ONE WINDING. TR1 WILL THEN BE
2.1 CONTACT 1 ON CRO WILL ENERGIZE PCM1 TO START THE
ENERGIZE CR0.
AS LEAF MOTION IS DESIRED. CONTACT 5 WILL CLOSE TO
2. TO OPEN A LEAF, TURN OCS TO "OPEN" AND HOLD AS LONG
TO DE-ENERGIZE CRD, THUS DE-ENERGIZING PCD.
DISPLACEMENT. AT MINIMUM DISPLACEMENT, CMLS1 WILL OPEN
WILL BE ENERGIZED TO SET THE PUMP AT MINIMUM
BE CLOSED, AND IF CONTACT 1 ON CRD IS ALSO CLOSED, PCD
1. AS THE CIRCUIT IS ENERGIZED, CONTACT 1 ON PCM WILL
10.0 SEC10.0 SEC
CRC
04 APR 14
CHANGED CRO TO CRC AT WIRE 88; DELETED WIRE ABOVE WIRE 53
CHANGED TIMING AT TERMINAL RELAYS FROM 5.0 TO 10.0 SEC;
DRAWN BY:
CHECKED BY:
APPROVAL RECOMMENDED
AREA ENGINEER, SOO AREA
SCALE:
DRAWING NUMBER
DATE:
U. S. ARMY ENGINEER DISTRICT, DETROIT
CORPS OF ENGINEERS
DETROIT, MICHIGAN
ST. MARYS RIVER, MICHIGAN
CAP
NONE
1 1
SCHEMATIC DIAGRAMS
POWER CONTROL & LIGHTING SYSTEM
480V
ACB PC
DPMOL
MOTOR
F2
120V.
c c
F1 c c105V
W R G
T
PUMP ROOM
UVR
17 1
CTS
CD1
CD2
IS
W R G
W R G
CRO CRC
21 23
PR1
PR2
PT
OK OPENING CLOSING
c c c c
101PB1
101PB2
101-35 101-38
101-39
101-40
103CR0
101CRG0
3 1
1 1
101UVR 101CRT 103CRT 103UVR
101-41 101-42101-41A 101-41B
101CRG0
101UVR
101-48 101-49 101-50
101M0L
101OCS2
101-47
101-51
101-52
101OCS1
101-46
101CTS
101-44
101UVR
101-45
101TOS
101-53
101CRT
101UVR
101-54
101CRT
101-58
101CRT
101-55
101-56
101SCS
101-59
101-65
101-66
101-77
101-78
101-60
102SCS
101-57
101CRO
101CRC
101UVR
101-63
101-68
101CRC
101CRO
101-67
101LSA1
101LSE2
101-64
103TD1
101CRO
101CRGO
101CRC
c
101TR1
101PC
101CRS
101CRC
101CRO
101-69
101-70
2101LSB1
101-54
101SV4
101SV3
101SV1
101SV2
101CRFO
V
V
V
V
101-76
101-84
101CRS
101-81
101-83
101-85
101-86
101CRC
101CRS
101CRO
101CRT
101-80
101-75
101-89
101-88
101TR1
TO
101CRT
101CRT
101-82
101CR0
101CRT
103TR1
TC
101-79
101-73
101CRGO
101TR1
TC
c
TIME DELAY
3.0 SEC.
c c c
103UVR
103-48 103-49 103-50
103M0L
103OCS2
103-47
103-51
103-52
103OCS1
103-46
103CTS
103-44
103UVR
103-45
103TOS
103-53
103CRT
103UVR
103-54
103CRT
103-58
103CRT
103-55
103-56
101SCS
103-59
103-65
103-66
103-77
103-78
103-60
102SCS
103-57
103CRO
103CRC
103UVR
103-63
103-68
103CRC
103CRO
103-67
103LSA1
103LSE2
103-64
103TD2
103CRO103-61
101CRGO
103CRC
103TR1
103PC
103CRS
103CRC
103CRO
103-69
103-70
2103LSB1
103-54
103SV4
103SV3
103CRFO
V
V
103-76
103-84
103CRS
103-81
103-83
103-85
103-86
103CRC
103CRS
103CRO
103CRT
103-80
103-75
103-88
103TR1
TO
103CRT
103CRT
103-82
103CR0
103CRT
101TR1
TC
103-79
103-73
101CRGO
103TR1
TC
c
TIME DELAY
3.0 SEC.
c c c c c
103-35
103IS
103-36
TD
103-74
104-54
ON CD1c c
ON CD2
c c
101-74
101CRFO
ON CD1
ON CD2
c c c c c c
101-43
BELOW FOR APPLICABLE VALVE
NOTE: ABOVE APPLIES TO ALL VALVES - CONTINUE
9 10 11 12 13 14
28 32
15 16 17
TRYOUT SWITCH
1 2
3 4
5 6
7 8
CONTACTS
HANDLE POSTION
(SEE NOTE 3)
CLOSE
FAST
CLOSE
SLOW
OFF
OPEN
SLOW
OPEN
FAST
X
X
X
X
X
X
X
X
X
101TOS 103TOS
DESCRIPTION OF OPERATION
OPERATION
TIME
VALVE
FILLING SOLENOID
SV1 SV2 SV3 SV4
FAST OPEN
SLOW OPEN
FAST CLOSE
SLOW CLOSE
STOPPED
4 MIN.
2 MIN.
12 MIN.
X
X
X
X
SOLENOID VALVE SCHEDULE
NOTES:
CHIEF, ELECTRICAL BRANCH FILLING VALVES
101CR0
101CRP
101-72
101LSC1
101-71
101LSD1
NORTH FILLING VALVE - V1N - CIRCUIT #101
101-87
101-91
101CRFO
101CRP
101CRP101CRFO
101-90
103-64
103CRP
103-72
103LSC1
103-71
103LSD1103CRFO
103SV1
103SV2
V
V
103CRFO
103CRP
103CRP103CRFO
103-90
103-91
SOUTH FILLING VALVE - V1S - CIRCUIT #103
24 MIN.
CONTACT CLOSED
- SOLENOID ENERGIZED OR X
OPEN
PROGRAM
X
X
NOTE: FOR OTHER DEVELOPMENTS SEE DWG. 29/67
LEGEND
MOL
V
PT }
UVR
TR*
TOS
TO
TC
TD
* NUMERICAL SUFFIX FOR PARTICULAR ITEM + CONTACT DESIGNATION
101-86
103-87
103-89
BE REMOVED FORM THE CIRCUIT BY TURNING ISOLATING SWITCH (IS) TO "ISOLATE".
8. TO FACILITATE MAINTENANCE AND TESTING, ALL CONTROL AND INDICATION AT THE REMOTE CONTROL DESK CAN
7.4 IF THE VALVE IS OPERATING WHEN CTS IS TURNED TO THE OPPOSITE POSITION, THE VALVE WILL STOP.
DESK.
7.3 ANY VALVE STARTED FROM THE PUMP ROOM MAY BE STOPPED BY PUSHING IN ON ITS OCS ON EITHER CONTROL
7.2 TO STOP THE VALVE, TURN TOS TO "OFF".
NORMAL CLOSING ENDING AT SLOW SPEED, OR SLOW CLOSING, BY TURNING TOS TO THE DESIRED FUNCTION.
7.1 THE VALVE MAY THEN BE OPERATED AT EITHER PROGRAMMED OPENING, FAST OPENING, SLOW OPENING, CONTROL DESKS TO TOS.
OPERATION. CONTACT 5 WILL ENERGIZE CRT TO TRANSFER ALL CONTROL, EXCEPT PUSH TO STOP, FROM THE
WILL TRANSFER UVR SO THAT UNDER-VOLTAGE PROTECTION IS PROPERLY PROVIDED FOR MAINTAINED CONTACT
AND 2 WILL TRANSFER THE "OK" LIGHTS FROM THE CONTROL DESKS TO THE PUMP ROOM. CONTACTS 3 AND 4
7. TO OPERATE A VALVE FROM THE PUMP ROOM, TURN CTS FROM "CONTROL DESKS" TO "LOCAL". CONTACTS 1
PROVIDE SLOW SPEED FOR A CUSHIONED VALVE SEATING.
SPEED. NEAR END OF TRAVEL, LSB1 WILL ENERGIZE CRS, DE-ENERGIZING SV1 AND ENERGIZING SV4 TO
6.1 TC CONTACT ON TR1 WILL TIME CLOSE TO ENERGIZE SV3, AND THE VALVE WILL CLOSE AT MAXIMUM
TR1 TO START THE MOTOR AND TIME THE SOLENOIDS.
WILL ENERGIZE CRC, WHICH WILL REMAIN ENERGIZED BY ITS CONTACT 1. CONTACT 2 WILL ENERGIZE PC AND
6. TO CLOSE A VALVE FROM EITHER CONTROL DESK, TURN THE DESIRED OCS TO "CLOSE", AND RELEASE. THIS
APPROACH EQUAL LEVELS, THE VALVE OR VALVES WILL CLOSE AS DESCRIBED IN STEP 3.6.
OPERATION WILL BE AT THE PROGRAMMED SEQUENCE UNLESS STEP 5 IS AGAIN PERFORMED. AS WATER LEVELS
END OF TRAVEL, LSE2 WILL OPEN, DE-ENERGIZING CRO, THUS DE-ENERGIZING CRFO, AND THE NEXT OPENING
DE-ENERGIZED BY CONTACT 3 OF CRFO, AND THE VALVE WILL OPEN AT MAXIMUM SPEED UNTIL FULLY OPEN AT
REGARDLESS OF LIMIT SWITCH ACTION, SV1 WILL BE ENERGIZED BY CONTACT 2 OF CRFO, AND SV2 WILL BE
WILL CLOSE TO ENERGIZE CRFO, WHICH WILL REMAIN ENERGIZED BY ACTION OF ITS CONTACT 1. THEN, OPEN", THEN OPERATE EITHER AN OCS OR A PB AS DESIRED, THEN RELEASE ALL CONTROLS. CONTACT 4 ON CRO
5. TO OPEN VALVES AT FAST OPEN SPEED, FROM EITHER CONTROL DESK, TURN 101SCS OF 102SCS TO "FAST
VALVE WILL CLOSE AS DESCRIBED IN STEP 3.6.
STOPPING THE MOTOR AND DE-ENERGIZING ALL SOLENOIDS AS WATER LEVELS APPROACH EQUAL LEVELS, THE
SOLENOIDS WILL BE ENERGIZED AS IN STEP 3.3. AT END OF TRAVEL, LSE2 WILL OPEN TO DE-ENERGIZE CRO, WILL CLOSE TO ENERGIZE PC TO START THE MOTOR, AND TR1 TO TIME THE SOLENOIDS. WHEN TR1 TIMES OUT, WHICH WILL REMAIN ENERGIZED THROUGH ITS CONTACT 3 AND CONTACT 6 AND 7 OF CRGO. CONTACT 2 ON CRO
VALVE", THEN TURN OCS FOR DESIRED VALVE TO "OPEN", THEN RELEASE BOTH. THIS WILL ENERGIZE CRO,
4. TO OPEN EITHER VALVE INDEPENDENTLY, FROM EITHER CONTROL DESK, TURN 101SCS OF 102SCS TO "SINGLE
FALSE OPERATION OF WDS.
LEVELS BECOME EQUAL. IF AIR PRESSURE REQUIRED TO OPERATE WDS DROPS, 131CR WILL OPEN TO PREVENT
THE SETTING OF 101WDS SHOULD BE SUCH THAT THE VALVES WILL BE FULLY CLOSED AS THE TWO WATER
(IF STILL ENERGIZED) AND ENERGIZE BOTH CRC RELAYS TO CLOSE BOTH VALVES, AS IN STEP 6 BELOW.
CRWD TO SIMULATE PUSH BUTTON OPERATION. CONTACTS ON CRWD WILL DE-ENERGIZE BOTH CRO RELAYS
UPPER POOL LEVEL, ENERGIZING TR2 AND CRWD. CONTACT OF TR2 WILL TIME OPEN TO DE-ENERGIZE
3.6 TO PREVENT OVERFILLING WHEN THE VALVES ARE OPENED, 101WDS WILL CLOSE AS CHAMBER LEVEL NEARS
2 OF CRGO OPEN, BOTH CRO RELAYS MUST BE DE-ENERGIZED, STOPPING THE SECOND VALVE.
CONTACTS 6 AND 7 ON CRGO HAVE BEEN OPEN TO PREVENT SEALING OF CRO, AND WHEN CONTACTS 1 AND
ENERGIZE UVR TO STOP ONE VALVE DIRECTLY. CONTACT 1 ON UVR WILL OPEN TO DE-ENERGIZE CRGO.
3.5 TO STOP THE VALVES AT ANY POINT, PUSH IN ON ONE OF THE FOUR OCS HANDLES. THIS WILL DE-
CONTACTS 1 WILL BOTH BE OPEN, AND CRGO WILL BECOME DE-ENERGIZED.
ENERGIZE PC AND TR1, AND THE VALVE WILL STOP. WHEN CRO ON BOTH VALVES BECOME DE-ENERGIZED,
3.4 AT END OF TRAVEL, LSE2 WILL OPEN TO DE-ENERGIZE CRO. CONTACT 2 ON CRO WILL OPEN TO DE-
SV3 AND THE VALVE WILL CONTINUE OPENING AT FAST OPENING SPEED.
LSD1 WILL OPEN TO DE-ENERGIZE CRP. CONTACTS ON CRP WILL THEN DE-ENERGIZE SV4 AND ENERGIZE
FOR A SLOW OPENING SPEED. WHEN THE VALVE OPENS TO ABOUT 10.5 FEET (ABOUT 4.75 MIN. LATER), CONTACT 1 ON CRP WILL OPEN TO DE-ENERGIZE SV1, AND CONTACT 2 WILL CLOSE TO ENERGIZE SV2
THE VALVE OPENS TO ABOUT 7.0 FEET (ABOUT 2.25 MIN.) LSC1 WILL CLOSE TO ENERGIZE CRP.
3.3 AS SOLENOID SV1 IS ENERGIZED, THE VALVE WILL START TO OPEN AT FAST OPENING SPEED. WHEN
OPPOSITE VALVE THROUGH CRGO CONTACT 4 OR 5.
ONE TO CLOSE WILL ENERGIZE THE SOLENOIDS IN ITS CIRCUIT DIRECTLY, AND THOSE IN THE
TIME THE SOLENOID VALVES. BOTH TR1 RELAYS MAY NOT BE TIMED EXACTLY ALIKE, BUT THE FIRST
3.2 AT EACH VALVE, CONTACT 2 ON CRO WILL CLOSE TO ENERGIZE PC TO START THE MOTOR, AND TR1 TO
TIMING IN STEP 3.2 BELOW.
OR PB2 IS RELEASED. CONTACTS 4 AND 5 ON CRGO WILL CLOSE TO ALLOW SIMULTANEOUS SOLENOID
3 ON CRGO, AND CONTACTS 1 ON 101CRO AND 103CRO WILL CLOSE TO KEEP CRGO ENERGIZED WHEN PB1
3.1 CONTACTS 1 AND 2 ON CRGO WILL CLOSE TO ENERGIZE 101CRO AND 103CRO, RESPECTFULLY. CONTACT
AND CRGO WILL BECOME ENERGIZED.
AND RELEASE. IF BOTH VALVES ARE OPERABLE, CONTACTS 1 OF 101UVR AND 103UVR WILL BE CLOSED,
3. TO SIMULTANEOUSLY OPEN THE VALVES FROM EITHER CONTROL DESK, PUSH PB1 OR PB2, AS APPLICABLE,
2.2.2 A ROTATING DIAL AND FIXED POINTER TO SHOW THE POSITION OF THE VALVE.
BE OPERATED FROM THE PUMP ROOM.
2.2.1 LIGHTS TO SHOW WHETHER THE VALVE IS OPENING OR CLOSING AND TO SHOW THAT THE VALVE CAN
2.2 IN THE PUMP ROOM:
2.1.2 A DIAL INDICATOR WITH TWO POINTERS, SHOWING THE POSITIONS OF BOTH VALVES.
BE OPERATED FROM THAT DESK.
2.1.1 LIGHTS TO SHOW WHETHER THE VALVE IS OPENING OR CLOSING AND TO SHOW THAT THE VALVE CAN
2.1 AT EACH CONTROL DESK:
2. INDICATORS WILL OPERATE AS FOLLOWS:
1.2.3 IMMEDIATE STOPPING OF THE VALVE.
1.2.2 CLOSING OF THAT VALVE AT EITHER SLOW CLOSE, OR AT FAST CLOSE ENDING AT SLOW CLOSE.
THE SPEEDS IN THE SEQUENCE.
1.2.1 OPENING OF THAT VALVE AT EITHER THE PROGRAMMED THREE-STEP SEQUENCE, OR AT EITHER OF
1.2 FROM THE PUMP ROOM FOR EITHER VALVE:
STOPPED.
1.1.5.1 IF BOTH VALVES ARE OPENING SIMULTANEOUSLY, BOTH VALVES WILL STOP IF ONE IS
STARTED.
1.1.5 IMMEDIATE STOPPING OF EITHER VALVE REGARDLESS OF WHERE THE VALVE OPERATION WAS
CUSHIONED SEAL.
1.1.4 INDEPENDENT CLOSING OF BOTH VALVES AT FAST CLOSE, ENDING AT SLOW CLOSE FOR A
SEQUENCE, AS OPTIONS.
1.1.3 INDEPENDENT OPENING OF EITHER VALVE AT EITHER FAST OPEN SPEED OF THE PROGRAMMED
1.1.2 SIMULTANEOUS OPENING OF BOTH VALVES AT FAST OPEN SPEED, AS AN OPTION.
OPERATION.
1.1.1 SIMULTANEOUS OPENING OF BOTH VALVES IN A PROGRAMMED THREE-STEP SEQUENCE FOR NORMAL
1.1 FROM EITHER CONTROL DESK:
1. CONTROLS ARE ARRANGED TO PROVIDE:
CRWD
WDS
T
SV*
SCS
PT
PR*
PC
PB
OCS*
LS+
IS
F*
DP
CTS
CRT
CRS
CRP
CRO
CRGO
CRFO
CRC
ACB
CONTROL RELAY, WATER DIFFERENTIAL
WATER LEVEL DIFFERENTIAL SWITCH
TRANSFORMER
SOLENOID VALVE
SPEED CONTROL SWITCH
POSITION TRANSMITTER
POSITION RECEIVER
POWER CONTACTOR
PUSH BUTTON
OPERATION CONTROL SWITCH
MAGNETIC OVERLAD RELAY CONTACT
MAGNETIC OVERLOAD RELAY ELEMENT
LIMIT SWITCH
ISOLATING SWITCH
FUSE
DISCONNECT PLUG
CONTROL TRANSFER SWITCH
CONTROL RELAY, TRANSFER
CONTROL RELAY, SLOW
CONTROL RELAY, PROGRAMMING
CONTROL RELAY, OPEN
CONTROL RELAY, GROUP OPEN
CONTROL RELAY, FAST OPEN
CONTROL RELAY, CLOSE
AIR CIRCUIT BREAKER
AFTER ENERGIZING
TIME DELAY-CLOSING
G-GREEN)
(W-WHITE, R-RED,
INDICATING LIGHT
OPERATING COIL
CONTACT
LIMIT SWITCH OPEN
CONTACT
LIMIT SWITCH CLOSED
TO OPEN
MANUAL CONTACT, PUSH
TO CLOSE
MANUAL CONTACT, PUSH
BY TURNING HANDLE
MANUAL CONTACT, OPEN
BY TURNING HANDLE
MANUAL CONTACT, CLOSE
GIZED
WHEN COIL DE-ENER-
RELAY CONTACT CLOSED
COIL DE-ENERGIZED.
CONTACT - OPEN WHEN
RELAY OR CONTACTOR
UNDER VOLTAGE RELAY
TIMING RELAY
TRY-OUT SWITCH
TIME DELAY OPEN
TIME DELAY CLOSE
7. FOR BUBBLER SYSTEM, SEE DWG.29/67.
INSTALLATION AND CONNECTION UNDER THIS CONTRACT.
6. POSITION RECEIVERS WILL BE GOVERNMENT FURNISHED FOR
AND ARE TO BE CONNECTED UNDER THIS CONTRACT.
TRANSMITTERS WILL BE INSTALLED UNDER A PREVIOUS CONTRACT,
5. MOTORS, LIMIT SWITCHES, SOLENOID VALVES, AND POSITION
4. ALL WIRE NUMBERS TO BE PRECEDED BY PROPER CIRCUIT NUMBER.
VALVE TRAVEL WILL BE AT THE SLOW SPEED.
3. WHEN FAST CLOSING IS SELECTED, THE LAST FEW INCHES OF
UNUSED CONTACTS WILL BE SPARES FOR POSSIBLE FUTURE USE.
2. ISOLATING SWITCHES TO BE FURNISHED WITH CONTACTS AS SHOWN,
1. LIMIT SWITCHES SHOWN FOR VALVES CLOSED.
AUGUST 1998
DC-78-8
D
C
E L
E C
T S
Y S
D C
R
D G
N
103-62
101-62
101-61
TD
101TD1 4.0 SEC.
POE LOCK
NO. DATE REVISION BY
1 MINOR MODS TO CIRCUIT #101 & #103
C.A.P.
B.D.C.9/13/02
101-61 c
JULY 6, 2007 CLARIFIED WIRE SIZE AT NORTH FILLING VALVE - V1N- CIRCUIT #101
DRAWN BY:
CHECKED BY:
APPROVAL RECOMMENDED
AREA ENGINEER, SOO AREA
SCALE:
DRAWING NUMBER
DATE:
U. S. ARMY ENGINEER DISTRICT, DETROIT
CORPS OF ENGINEERS
DETROIT, MICHIGAN
ST. MARYS RIVER, MICHIGAN
CAP
EMPTYING VALVES
NONE
1 1
SCHEMATIC DIAGRAMS
POWER CONTROL & LIGHTING SYSTEM
480V
ACB PC
DPMOL
MOTOR
F2
120V.
c c
F1 c c105V
W R G
T
PUMP ROOM
UVR
17 1
CTS
CD2
CD1
IS
W R G
W R G
CRO CRC
21 23
PR2
PR1
PT
OK OPENING CLOSING
c c c c
102PB2
102PB1
102-35 102-38
102-39
102-40
102CR0
104CR0
102CRG0
3 1
1 1
102UVR 102CRT 104CRT 104UVR
102-41 102-42102-41A 102-41B
102CRG0
102UVR
102-48 102-49 102-50
102M0L
102OCS1
102-47
102-51
102-52
102OCS2
102-46
102CTS
102-44
102UVR
102-45
102TOS
102-53
102CRT
102UVR
102-54
102CRT
102-58
102CRT
102-55
102-56
102SCS
102-59
102-65
102-66
102-77
102-78
102-60
101SCS
102-57
102CRO
102CRC
102UVR
102-63
102-68
102CRC
102CRO
102-67
102LSA1
102LSE2
102-64
104TD1
102CRO
102CRGO
102CRC
c
102TR1
102PC
102CRS
102CRO
102CRC
102-69
102-70
2102LSB1
102-54
102SV4
102SV3
102SV1
102SV2
102CRFO
V
V
V
V
102-76
102-84
102CRS
102-81
102-83
102-85
102-86
102-90
102CRC
102CRS
102CRFO
102CRFO 3
102CRO
102CRT
102-80
102-75
102-89
102-88
102TR1
TO
102CRT
102CRT
102-82
102CR0
102CRT
104TR1
TC
102-79
102-73
102CRGO
102TR1
TC
c
TIME DELAY
3.0 SEC.
c c c
104UVR
104-48 104-49 104-50
104M0L
104OCS1
104-47
104-51
104-52
104OCS2
104-46
104CTS
104-44
104UVR
104-45
104TOS
104-53
104CRT
104UVR
104-54
104CRT
104-58
104CRT
104-55
104-56
102SCS
104-59
104-65
104-66
104-77
104-78
104-60
101SCS
104-57
104CRO
104CRC
104UVR
104-63
104-68
104CRC
104CRO
104-67
104LSA1
104LSE2
104-64
104TD2
104CRO104-61
102CRGO
104CRC
104TR1
104PC
104CRS
104CRO
104CRC
104-69
104-70
2104LSB1
104-54
104SV4
104SV3
104SV1
104SV2
104CRFO
V
V
V
V
104-76
104-84
104CRS
104-81
104-83
104-85
104-86
104-90
104CRC
104CRS
104CRFO
104CRFO 3
104CRO
104CRT
104-80
104CRO
104-75
104-89
104-88
104TR1
TO
104CRT
104CRT
104-82
104CR0
104CRT
102TR1
TC
104-79
104-73
102CRGO
104TR1
TC
c
TIME DELAY
3.0 SEC.
c c c c c
104-35
104IS
104-36
TD
NORTH EMPTYING VALVE - V2N - CIRCUIT #102
SOUTH EMPTYING VALVE - V2S - CIRCUIT #104
104-74
104-54
ON CD2c c
ON CD1
c c
104-62
102-74
102CRFO
102-91
102-62
ON CD2
ON CD1
c c c c c c
102-43
BELOW FOR APPLICABLE VALVE
NOTE: ABOVE APPLIES TO ALL VALVES - CONTINUE
9 10 11 12 13 14
28 32
15 16 17
CIRCUIT FUNCTION
DE-ENERGIZE CRC
DE-ENERGIZE CRO
SPARE
ENERGIZE CRS
SPARE
DIRECTION
VALVE
CLOSING
CLOSING
CLOSING
OPENING
OPENING
OPENING
OPENING
CONTACT
AND
CAM
A1
A2
B1
C1
D1
E1
E2
VALVE OPENING IN FEET
0.00
CLOSED
0.25 7.8 10.6
14.8
OPEN
ENERGIZE CRP *
DE-ENERGIZE CRP *
* CONTACTS C1 AND D1 NOT CONNECTED FOR CIRCUITS 102 AND 104
LIMIT SWITCH
101LS 102LS 103LS 104LS
TRYOUT SWITCH
1 2
3 4
5 6
7 8
CONTACTS
HANDLE POSTION
(SEE NOTE 3)
CLOSE
FAST
CLOSE
SLOW
OFF
OPEN
SLOW
OPEN
FAST
X
X
X
X
X
X
X
X
X
SPARE
102TOS 104TOS
1 2
3 4
5 6
CONTACTS
X
X
X
X
DESKS
CONTROL
LOCAL
X
SPARE
HANDLE POSTION
101CTS
CONTROL TRANSFER SWITCH
102CTS 103CTS 104CTS
1 2
3 4
5 6
7 8
CONTACTS
HANDLE POSTION
X
X
X
102SCS 104SCS
X
X
X
X
X
X
X
X
X
OPEN
FAST
NORMAL
OPENING
VALVE
SINGLE
SPEED CONTROL SWITCH
DESCRIPTION OF OPERATION
(VALVES)
DESCRIPTION OF OPERATION
(AIR SYSTEM)
BUBBLER EQUIPMENT.
PURGING OF THE BUBBLER SYSTEM WITHOUT DAMAGING THE
5. THREE WAY MANUAL VALVES WILL PERMIT HIGH PRESSURE
EQUIPMENT.
ENOUGH VALUE TO ALLOW WATER TO ENTER THE BUBBLER
THE BUBBLER TUBES IF AIR PRESSURE FALLS TO A LOW
4. BPS WILL DE-ENERGIZE BSV1 AND BSV2 TO CLOSE OFF
CRANKCASE OIL IS LOW.
3. OLS WILL PREVENT OPERATION OF THE COMPRESSOR IF
THE COMPRESSOR.
2. SS WILL ALLOW MANUAL OR AUTOMATIC OPERATION OF
BETWEEN 125 AND 150 PSI.
1. RPS WILL OPERATE MOTOR TO KEEP RECEIVER PRESSURE
LEGEND: (ALSO, SEE DWG.29/66)
SS
RPS
OLS
M
C
BSV
BPS
SELECTOR SWITCH
RECEIVER PRESSURE SWITCH
OIL LEVEL SWITCH
MOTOR
COMPRESSOR
BUBBLER SOLENOID VALVE
BUBBLER PRESSURE SWITCH
THREE WAY VALVE
BUBBLER REGULATOR
DIFFERENTIAL MEASURING DEVICE
PRESSURE REDUCER
FILTER
RECEIVER
OPERATION
TIME
VALVE
EMPTYING SOLENOID
SV1 SV2 SV3 SV4
FAST OPEN
SLOW OPEN
FAST CLOSE
SLOW CLOSE
STOPPED
2 MIN.
4 MIN.
2 MIN.
12 MIN.
X
X
X
X
SOLENOID VALVE SCHEDULE
1 2
3 4
19 20
5 6
7 8
9 10
11 12
13 14
15 16
17 18
21 22
CONTACTS
HANDLE POSTION
NORMAL ISOLATE
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
101IS 102IS 103IS 104IS
(SEE NOTE #2, DWG.29/66)
ISOLATING SWITCH
CONTACTS
HANDLE POSITION
CLOSE NEUTRAL OPEN
(IN)
STOP
(OUT)
NORMAL
1 2
3 4
X
X
X
SPARE
OPERATION CONTROL SWITCH
101OCS2
101OCS1
102OCS2
102OCS1
103OCS2
103OCS1
104OCS2
104OCS1
ACB PC
TOL
T
MOTOR
COMP.
F
RPS
BPS
SS
OLS }
TOL
PC
CR
BSV3
BSV4
CR
1716151413
ON
AUTO
OFF
V
V
BUBBLER COMPRESSED AIR SYSTEM
DOWNSTREAM - CIRCUIT 132
UPSTREAM - CIRCUIT 131
CIRCUIT 132
OMIT FOR
c
NOTES:
1. NOTES ON DWG. 29/66 APPLY.
M C I
RPS
OLS
2 3 4
BPS 5
WDS
BSV-3
BSV-4
GATE
ABOVE
GATE
BELOW
TUBES
BUBBLER
c c
SYSTEM
OMIT FOR DOWNSTREAM
c
WALL
LOCK
OF
FACE
PNEUMATIC SCHEMATIC DIAGRAM
c c c c c c
X
RELEASED.
DIRECTION OF HANDLE RETURN WHEN
LIMIT SWITCH CONTACT CLOSED.
SOLENOID ENERGIZED OR CONTACT CLOSED.
CHIEF, ELECTRICAL BRANCH
VALVES.
9. ISOLATION SWITCHES CAN BE OPERATED AS IN STEP 8 FOR FILLING
FILLING VALVES.
WILL THEN BE SIMILAR TO THE RE-CLOSING OPERATION FOR THE
WILL CLOSE AS CHAMBER LEVEL NEARS LOWER POOL LEVEL. OPERATION
8. TO PREVENT OVER-EMPTYING WHEN THE VALVES ARE OPENED, 102WDS
STEP 7 FOR FILLING VALVES.
"FAST OPEN" AS DESIRED. OPERATION WILL THEN BE AS DESCRIBED IN
THEN TURN TOS TO "FAST CLOSE", "SLOW CLOSE", "SLOW OPEN", OR
7. TO OPERATE A VALVE FROM ITS PUMP ROOM, TURN CTS TO "LOCAL",
IN STEP 6 FOR THE FILLING VALVES.
OCS TO "CLOSE", AND RELEASE. OPERATION WILL THEN BE AS DESCRIBED
6. TO CLOSE A VALVE FROM EITHER CONTROL DESK, TURN THE DESIRED
WILL OPEN AT FAST OPEN SPEED.
ENERGIZE SV1 AND CONTACT 3 WILL DE-ENERGIZE SV2, AND THE VALVE
ENERGIZED AS IN STEP 5 FOR FILLING VALVES. CONTACT 2 WILL
PB AS DESIRED, THEN RELEASE ALL CONTROLS. CRFO WILL BE
101SCS OR 102SCS TO "FAST OPEN", THEN OPERATE EITHER AN OCS OR A
5. TO OPEN VALVES AT FAST OPEN, FROM EITHER CONTROL DESK, TURN
BY MEANS OF SV2.
BE SIMILAR TO STEP 4 FOR FILLING VALVES, AND THE VALVE WILL OPEN
DESIRED VALVE TO "OPEN", THEN RELEASE BOTH. OPERATION WILL THEN
TURN EITHER 101SCS OR 102SCS TO "SINGLE VALVE", THEN OCS FOR THE
4. TO OPEN EITHER VALVE INDEPENDENTLY, FROM EITHER CONTROL DESK,
AT CONSTANT SLOW OPEN SPEED BY MEANS OF SV2.
THAT LSC1 AND LSD1 ARE NOT CONNECTED, AND THE VALVE WILL OPEN
THEN OPERATE SIMILAR TO STEP 3 FOR THE FILLING VALVES, EXCEPT
PUSH PB1 OR PB2 AS APPLICABLE, AND RELEASE. THE EQUIPMENT WILL
3. TO SIMULTANEOUSLY OPEN THE VALVES FROM EITHER CONTROL DESK,
VALVES.
2. INDICATORS WILL OPERATE AS DESCRIBED IN STEP 2 FOR THE FILLING
1.2.3 IMMEDIATE STOPPING OF THE VALVE.
CLOSE ENDING AT SLOW CLOSE FOR A CUSHIONED SEAL.
1.2.2 CLOSING OF THAT VALVE AT EITHER SLOW CLOSE, OR AT FAST
1.2.1 OPENING OF THAT VALVE AT EITHER SLOW OR FAST OPEN.
1.2 FROM THE PUMP ROOM FOR EITHER VALVE:
VALVES WILL STOP IF ONE IS STOPPED.
1.1.5.1 IF BOTH VALVES ARE OPENING SIMULTANEOUSLY, BOTH
THE VALVE OPERATION WAS STARTED.
1.1.5 IMMEDIATE STOPPING OF EITHER VALVE, REGARDLESS OF WHERE
AT SLOW CLOSE FOR A CUSHIONED SEAL.
1.1.4 INDEPENDENT CLOSING OF BOTH VALVES AT FAST CLOSE, ENDING
OPTIONS.
1.1.3 INDEPENDENT OPENING OF EITHER VALVE AT EITHER SPEED, AS
AS AN OPTION.
1.1.2 SIMULTANEOUS OPENING OF BOTH VALVES AT FAST OPEN SPEED,
1.1.1 SIMULTANEOUS OPENING OF BOTH VALVES AT SLOW OPEN SPEED.
1.1 FROM EITHER CONTROL DESK:
1. CONTROLS ARE ARRANGED TO PROVIDE:
AUGUST 1998
DC-78-9
NEW SECOND LOCK
TD
102-61
D
C
E L
E C
T S
Y S
D C
R
D G
N
REVISIONS
DATESYMBOL DESCRIPTION APPROVED
1 9/13/02MINOR MODS TO CIRCUIT #102 & #104
102TDI 4.0 SEC.
| Reference Drawings |
| SMR-L2-0_001 |
| SMR-L2-0_010 |
| SMR-L2-20_039 |
| SMR-L2-20_040 |
| SMR-L2-20_041 |
| SMR-L2-20_042 |
| SMR-L2-20_043 |
| SMR-L2-20_045 |
| SMR-L2-20_050 |
| SMR-L2-20_051 |
| SMR-L2-20_057 |
| SMR-L2-20_058 |
| SMR-L2-20_059 |
| SMR-L2-20_060 |
| SMR-L2-20_064 |
| SMR-L2-20_076 |
| SMR-L2-20_084 |
| SMR-L2-29_001 |
| SMR-L2-29_002 |
| SMR-L2-29_003 |
| SMR-L2-29_004 |
| SMR-L2-29_005 |
| SMR-L2-29_006 |
| SMR-L2-29_007 |
| SMR-L2-29_008 |
| SMR-L2-29_009 |
| SMR-L2-29_010 |
| SMR-L2-29_011 |
| SMR-L2-29_012 |
| SMR-L2-29_013 |
| SMR-L2-29_014 |
| SMR-L2-29_015 |
| SMR-L2-29_016 |
| SMR-L2-29_017 |
| SMR-L2-29_018 |
| SMR-L2-29_019 |
| SMR-L2-29_020 |
| SMR-L2-29_022 |
| SMR-L2-29_052 |
| SMR-L2-29_061 |
| SMR-L2-29_062 |
| SMR-L2-29_069 |
| SMR-L2-29_070 |
| SMR-L2-29_072 |
| SMR-L2-29_074 |
| SMR-L2-29_075 |
| SMR-L2-29_081 |
| SMR-L2-29_082 |
| SMR-L2-29_083 |
| SMR-L2-29_084 |
| SMR-L2-29_085 |
| SMR-L2-29_086 |
| SMR-L2-29_087 |
| SMR-L2-29_088 |
| SMR-L2-29_089 |
| SMR-L2-29_090 |
| SMR-L2-29_091 |
| SMR-L2-29_093 |
| SMR-L2-29_094A |
| SMR-L2-29_094B |
| SMR-L2-29_094C |
| SMR-L2-29_094D |
| SMR-L2-29_094E |
| SMR-L2-29_094F |
| SMR-L2-29_094G |
| SMR-L2-29_094H |
| SMR-L2-29_094J |
| SMR-L2-29_094K |
| SMR-L2-29_094L |
| SMR-L2-29_094M |
| SMR-L2-29_094N |
| SMR-L2-29_094P |
| SMR-L2-29_094R |
| SMR-L2-29_106 |
| SMR-L2-29_108A |
| SMR-L2-29_108B |
| SMR-L2-29_108C |
| SMR-L2-29_121 |
| SMR-L2-29_122 |
| SMR-L2-29_131 |
| SMR-L2-29_132 |
| SMR-L2-29_133 |
| SMR-L2-29_134 |
| SMR-L2-29_135 |
| SMR-L2-29_136 |
| SMR-L2-29_137 |
| SMR-L2-29_138 |
| SMR-L2-29_139 |
| SMR-L2-29_140 |
| SMR-L2-29_141 |
| SMR-L2-29_142 |
| SMR-L2-29_143 |
| SMR-L2-29_144 |
| SMR-L2-29_145 |
| SMR-L2-29_146 |
| SMR-L2-29_147 |
| SMR-L2-29_148 |
| SMR-L2-29_149 |
| SMR-L2-29_150 |
| SMR-L2-29_151 |
| SMR-L2-29_152 |
| SMR-L2-29_153 |
| SMR-L2-29_154 |
| SMR-L2-29_155 |
| SMR-L2-29_156 |
| SMR-L2-29_157 |
| SMR-L2-29_158 |
| SMR-L2-29_159 |
| SMR-L2-29_160 |
| SMR-L2-29_161 |
| SMR-L2-29_162 |
| SMR-L2-29_163 |
| SMR-L2-29_164 |
| SMR-L2-29_165 |
| SMR-L2-29_166 |
| SMR-L2-29_167 |
| SMR-L2-29_170 |
| SMR-L2-29_171 |
| SMR-L2-29_172 |
| SMR-L2-29_173 |
| SMR-L2-29_174 |
| SMR-L2-36_001 |
| SMR-L2-36_002 |
| SMR-L2-36_003 |
| SMR-L2-36_004 |
| SMR-L2-36_005 |
| SMR-L2-39_001 |
| SMR-L2-39_002 |
| DC-78-005R1 |
| DC-78-006 |
| DC-78-007R4 |
| DC-78-008R2 |
| DC-78-009R1 |
| DC-78-156R1 |
| SP1 NO. 1344 |
File details come from the government source that posted it. Updated .