Amendment_0001_-_Solicitation_W911XK-16-R-0005.pdf

PDF 56 KB Posted

Attached to
FY16 Poe Lock Electrical Modernization
Solicitation number
W911XK-16-R-0005
Issued by

About this file

Form SF30 Solicitation Amendment No. 0001

View the file

Other files

File Type Posted
Amendment_0004_-_Updated_Drawing_M-601.pdf PDF
Amendment_0004_-_Solicitation_W911XK-16-R-0005.pdf PDF
Amendment_0003_-__Updated_Drawings_E-601_Through_E-610.pdf PDF
Amendment_0003_-_Solicitation_W911XK-16-R-0005.pdf PDF
Amendment_0002_-_Solicitation_W911XK-16-R-0005.pdf PDF
Pre-Proposal_Meeting_Presentation_Slides_W911XK-16-R-0005.pdf PDF
Pre-Proposal_Site_Visit_Sign-In_Sheets.pdf PDF
Justification_for_Brand_Name_Specification_of_MCCs.pdf PDF
Section_26_24_19.00_40_Motor_Control_Centers_-_Amendment_0001.pdf PDF
Table_of_Contents_for_Specification_-_Amendment_0001.pdf PDF
EXHIBIT_D_-_Small_Business_Participation_Plan.docx DOCX document
EXHIBIT_A_-_Performance_Relevancy_Questionnaire.docx DOCX document
EXHIBIT_D_-_Small_Business_Participation_Plan.pdf PDF
EXHIBIT_B_-_Subcontractor_Experience_and_Consent_Form.docx DOCX document
EXHIBIT_A_-_Performance_Relevancy_Questionnaire.pdf PDF
Solicitation_W911XK-16-R-0005_FY16_Poe_Lock_Electrical.pdf PDF
Drawings_-__FY16_Poe_Lock_Electrical_Modernization.pdf PDF
EXHIBIT_C_-_Reference_Questionnaire_Package.docx DOCX document
Reference_Drawings.pdf PDF
EXHIBIT_C_-_Reference_Questionnaire_Package.pdf PDF
Index_of_Drawings.pdf PDF
SPECIFICATIONS_-_FY16_Poe_Lock_Electrical_Modernization.pdf PDF
EXHIBIT_B_-_Subcontractor_Experience_and_Consent_Form.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W56MES52898041

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Title: FY16 Poe Lock Electrical Modernization

See the attached SECTION SF 30 BLOCK 14 CONTINUATION PAGE for a complete description of document changes.

All other requirements, provisions, and clauses remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Jun-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-16-R-0005

X 9B. DATED (SEE ITEM 11)

16-Jun-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Jun-2016

CODE

CONTRACTING BRANCH

USACE DETROIT DISTRICT

477 MICHIGAN AVENUE, 7TH FLOOR

DETROIT MI 48226-4523

W911XK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911XK-16-R-0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The following have been added by full text:

AMENDMENT NO. 0001

CHANGES TO THE SPECIFICATION

1. REPLACE the "Project Table of Contents" Section from the original Specification with the "Project Table of Contents" Section from the attached file, “Table of Contents for Specification ‐ Amendment 0001.pdf". This change corrects erroneous section listings.

2. REPLACE Specification Section 26 24 19.00 40 "Motor Control Centers" from the original Specification with Specification Section 26 24 19.00 40 "Motor Control Centers – Amendment 0001” from the attached file, "Section 26 24 19.00 40 Motor Control Centers ‐ Amendment 0001.pdf". This change corrects Section Part 2.1.1 “Specified Products” and adds “Section 26 24 19.00 40 Motor Control Centers Attachment” to this section.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .