Technical_Specification_(Revised)_Section_03_01_30.72_08.pdf

PDF 65 KB Posted

Attached to
Middle Wall Crack Stabilization, Montgomery Locks and Dam
Solicitation number
W911WN18B8001
Issued by

About this file

Revised language for anchor corrosion protection requirements.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mont gomer y Mi ddl e Wal l Cr ack St abi l i zat i on

SECTI ON TABLE OF CONTENTS

DI VI SI ON 03 - CONCRETE

SECTI ON 03 01 30. 72 08

COLD JOI NT ANCHORS

PART 1 GENERAL

1. 1 SCOPE

1. 2 RELATED WORK SPECI FI ED ELSEWHERE

1. 3 REFERENCES

1. 4 SUBMI TTALS

1. 5 ANCHOR I NSTALLATI ON PLAN

1. 6 DELI VERY, STORAGE, AND HANDLI NG

1. 7 QUALI TY ASSURANCE

1. 7. 1 Fabr i cat or Qual i f i cat i ons

1. 7. 2 I nst al l er Qual i f i cat i ons

1. 7. 3 Cer t i f i cat i on of Pr est r essi ng Techni c i ans

1. 7. 4 I nst al l at i on Dr awi ngs

1. 8 CONTROL OF CONCRETE DEBRI S

PART 2 PRODUCTS

2. 1 MATERI ALS

2. 1. 1 Mechani cal Expansi on Anchor s

2. 1. 1. 1 Cent r al i zer s

2. 1. 1. 2 Vent Tubes

2. 1. 1. 3 Gr out Tubes

2. 1. 1. 4 Encapsul at ed End Anchor age

2. 1. 2 Non- Shr i nk Gr out f or Anchor Dr i l l Hol es

2. 1. 3 Non- Shr i nk Gr out f or Anchor Recesses

2. 2 EQUI PMENT

2. 2. 1 Dr i l l i ng Equi pment

2. 2. 2 St r essi ng Equi pment

2. 2. 3 Test i ng Equi pment

2. 2. 4 Gr out Mi xer s

2. 2. 5 Power Saw and Hand- Hel d Chi ppi ng Hammer

2. 2. 6 I nspect i on Camer a

PART 3 EXECUTI ON

3. 1 I NSTALLATI ON

3. 1. 1 Dr i l l i ng

3. 1. 2 Al i gnment

3. 1. 3 Anchor Recesses

3. 1. 4 Sur f ace Pr epar at i on

3. 1. 5 Rod Pl acement

3. 1. 6 Anchor age I nst al l at i on

3. 1. 7 Pr est r essi ng Met hod and Equi pment

3. 1. 8 St r essi ng

3. 1. 8. 1 Gener al Requi r ement s

3. 1. 8. 2 Lock- of f

SECTI ON 03 01 30. 72 08 Page 1 Cer t i f i ed Fi nal - W911WN18B8001 Revi sed by Amendment 2

3. 1. 9 Envi r onment al Requi r ement s f or Gr out i ng

3. 1. 10 Gr out Pl acement f or Anchor Dr i l l Hol es

3. 1. 11 Gr out Pl acement f or Anchor Recesses

3. 2 I NSPECTI ON

3. 3 FI ELD QUALI TY CONTROL

3. 3. 1 Pr oof Test

3. 3. 2 Dr i l l er Logs

3. 3. 3 Anchor Recor ds

3. 4 ACCEPTANCE

3. 4. 1 Gener al

3. 4. 1. 1 Movement

3. 4. 1. 2 I ni t i al Li f t - Of f Readi ng

3. 4. 2 Repl acement of Rej ect ed Anchor s

3. 5 MATERI ALS DI SPOSI TI ON RECORDS

3. 6 PHOTOGRAPHY

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 03 01 30. 72 08 Page 2

SECTI ON 03 01 30. 72 08

COLD JOI NT ANCHORS

PART 1 GENERAL

1. 1 SCOPE

The wor k descr i bed i n t hi s sect i on consi st s of f ur ni shi ng al l pl ant , l abor , equi pment , and mat er i al s f or t he i nst al l at i on of col d j oi nt anchor s acr oss t he ver t i cal concr et e col d j oi nt / cr ack i n Monol i t h M- 6, M8 and M17.

1. 2 RELATED WORK SPECI FI ED ELSEWHERE

Sect i on 03 01 32 CONCRETE REHABI LI TATI ON FOR CI VI L WORKS.

1. 3 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

ASTM I NTERNATI ONAL ( ASTM)

ASTM A123/ A123M ( 2015) St andar d Speci f i cat i on f or Zi nc ( Hot - Di p Gal vani zed) Coat i ngs on I r on and St eel Pr oduct s

ASTM A153/ A153M ( 2016) St andar d Speci f i cat i on f or Zi nc Coat i ng ( Hot - Di p) on I r on and St eel Hardware

ASTM A722/ A722M ( 2015) St andar d Speci f i cat i on f or Uncoat ed Hi gh- St r engt h St eel Bar f or Pr est r essi ng Concrete

ASTM C1107/ C1107M ( 2014a) St andar d Speci f i cat i on f or Packaged Dr y, Hydr aul i c- Cement Gr out (Nonshrink)

POST- TENSI ONI NG I NSTI TUTE ( PTI )

PTI DC35. 1 ( 2014) Recommendat i ons f or Pr est r essed Rock and Soi l Anchor s

U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)

29 CFR 1926. 1153 Respi r abl e Cr yst al l i ne Si l i ca

1. 4 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SECTI ON 03 01 30. 72 08 Page 3

SD- 01 Pr econst r uct i on Submi t t al s

Anchor I nst al l at i on Pl an; G, DO

Gr out Seepage Remedi at i on Pl an; G, DO

I nst al l er Qual i f i cat i ons; G, DO

Fabr i cat or Qual i f i cat i ons; G, DO

SD- 02 Shop Dr awi ngs

I nst al l at i on Dr awi ngs; G, DO

SD- 03 Pr oduct Dat a

Mechani cal Expansi on Anchor s; G, DO Non- Shr i nk Gr out f or Anchor Dr i l l Hol es; G, DO Non- Shr i nk Gr out f or Anchor Recesses; G, DO Bondi ng Agent ; G, DO Dr i l l i ng Equi pment ; G, RO Pr est r essi ng Met hod and Equi pment ; G, DO Gr out Mi xer s; G, RO Power Saw and Hand- Hel d Chi ppi ng Hammer ; G, RO St r essi ng Equi pment Test i ng Equi pment Encapsul at ed End Anchor age Plugs

SD- 06 Test Repor t s St r essi ng Recor ds; G, DO St r essi ng Equi pment Cal i br at i on Recor ds; G, DO

SD- 07 Cer t i f i cat es

Cer t i f i cat i on of Pr est r essi ng Techni c i ans; G, RO

Mechani cal Expansi on Anchor s; G, DO Non- Shr i nk Gr out f or Anchor Dr i l l Hol es; G, DO Non- Shr i nk Gr out f or Anchor Recesses; G, DO Bondi ng Agent ; G, DO

Cer t i f i cat es of compl i ance st at i ng t hat t he mat er i al s conf or m t o t he speci f i ed r equi r ement s.

SD- 08 Manuf act ur er ' s I nst r uct i ons

Anchor i ng Syst em

SD- 09 Manuf act ur er ' s Fi el d Repor t s

Pr est r essi ng Oper at i ons Recor ds; G, DO

SD- 11 Cl oseout Submi t t al s

Mat er i al s Di sposi t i on Recor ds Phot ogr aphs of Anchor s Dr i l l er Logs

SECTI ON 03 01 30. 72 08 Page 4

Anchor Recor ds

1. 5 ANCHOR I NSTALLATI ON PLAN

The Cont r act or shal l devel op and submi t a pl an f or t he i nst al l at i on and gr out i ng of t he anchor s. The i ni t i al pl an shal l assume t hat t he anchor s shown on t he dr awi ngs wi l l be i nst al l ed. The pl an shal l i ncl ude a speci f i c sect i on t hat addr esses t he equi pment and met hods per t ai ni ng t o gr out i ng i n addi t i on t o t hat r equi r ed f or anchor i nst al l at i on. The st r essi ng sequence i s as shown on t he const r uct i on pl ans.

1. 6 DELI VERY, STORAGE, AND HANDLI NG

Mat er i al s shal l be del i ver ed t o t he j ob i n t he manuf act ur er ' s or i gi nal pr ot ect i ve mat er i al . The package l abel or accompanyi ng dat a sheet shal l i ncl ude t he f ol l owi ng i nf or mat i on as appl i cabl e: manuf act ur er , mi l l r un speci f i cat i on number , l ot number , and dat e of manuf act ur e. Mat er i al s shal l be handl ed and st or ed t o pr event damage. Mat er i al s st or ed at t he s i t e shal l be pl aced above gr ound on el evat ed, cover ed pl at f or ms.

1. 7 QUALI TY ASSURANCE

1. 7. 1 Fabr i cat or Qual i f i cat i ons

The anchor s shal l be f abr i cat ed by a manuf act ur er t hat has been i n t he pr act i ce of desi gni ng and f abr i cat i ng r ock anchor s s i mi l ar i n s i ze and scope t o t hi s pr oj ect f or at l east 10 year s.

1. 7. 2 I nst al l er Qual i f i cat i ons

The anchor s shal l be i nst al l ed by a f i r m whi ch i s r egul ar l y engaged i n t he i nst al l at i on of r ock anchor s and has at l east 10 year s exper i ence i n t he i nst al l at i on of s i mi l ar anchor s. The super i nt endent shal l have i nst al l ed anchor s on at l east f i ve pr oj ect s of s i mi l ar scope and si ze.

1. 7. 3 Cer t i f i cat i on of Pr est r essi ng Techni c i ans

Submi t cer t i f i cat i on of Pr est r essi ng Techni c i ans who wi l l use t he pr oposed syst em i n t he wor k. Cer t i f y by name t hat t hese t echni c i ans ar e t hor oughl y t r ai ned and ski l l ed i n t he use of t he syst em pr i or t o st ar t of pr est r essi ng operations.

1. 7. 4 I nst al l at i on Dr awi ngs

Submi t det ai l ed i nst al l at i on dr awi ngs f or st r essi ng col d j oi nt anchor s and accessor i es appr oved pr i or t o commenci ng t he wor k and showi ng t he t ype and si ze of anchor s and anchor ages, er ect i on met hods, sequence of st r essi ng and st r essi ng cal cul at i ons. The manuf act ur er ' s i nst r uct i ons shal l be submi t t ed f or t he pr oposed Anchor i ng Syst em.

1. 8 CONTROL OF CONCRETE DEBRI S

Concr et e and debr i s shal l not be al l owed t o f al l i nt o t he r i ver . Concr et e and debr i s shal l be cont r ol l ed, col l ect ed and r et ai ned near t o i t s poi nt of r emoval . The Cont r act or ' s met hod of debr i s cont r ol and r emoval shal l be descr i bed i n t he wor k pl an and must meet t he appr oval of t he Cont r act i ng Of f i cer . Concr et e or debr i s t hat f al l s i nt o t he r i ver shal l be col l ect ed by t he Cont r act or at hi s own expense.

SECTI ON 03 01 30. 72 08 Page 5

PART 2 PRODUCTS

2. 1 MATERIALS

2. 1. 1 Mechani cal Expansi on Anchor s

Col d j oi nt anchor s shal l be mechani cal expansi on t ype anchor s compr i sed of st eel r ods and mechani cal expansi on shel l head assembl i es. Al l component s shal l have Cl ass 1 cor r osi on pr ot ect i on i n accor dance wi t h PTI DC35. 1.

The anchor desi gn l oad, per t he manuf act ur er ' s pr oduct dat a, shal l be 72 ki ps +/ - 2 k i ps and shal l have a 2: 1 saf et y f act or . St eel r ods shal l conf or m t o ASTM A722/ A722M. St eel r ods shal l meet t he di amet er and l engt h shown on t he dr awi ngs. Expansi on shel l head assembl i es shal l be z i nc pl at ed and shal l not exceed 10. 5 i nches i n l engt h. Anchor har dwar e ( i . e.

hex nut s, washer s, bear i ng pl at es, gr out / vent t ubes) shal l be i n accor dance wi t h t he anchor manuf act ur er ' s r ecommendat i ons. Anchor r ods shal l be hot di p gal vani zed i n accor dance wi t h ASTM A123/ A123M. Anchor har dwar e shal l be hot di p gal vani zed i n accor dance wi t h ASTM A153/ A153M.

2. 1. 1. 1 Centralizers

Cent r al i zer s shal l be f abr i cat ed f r om pl ast i c, st eel or ot her appr oved mat er i al whi ch i s nondet r i ment al t o t he pr est r essi ng st eel . Wood shal l not be used. The cent r al i zer shal l be abl e t o suppor t t he t endon i n t he dr i l l hol e and posi t i on t he t endon so a mi ni mum of 0. 5 i nch of gr out cover i s pr ovi ded. Cent r al i zer s and spacer s shal l per mi t gr out t o f r eel y f l ow up t he dr i l l hol e.

2. 1. 1. 2 Vent Tubes

Vent t ubes used dur i ng gr out i ng oper at i ons, i f necessar y, shal l be any appr opr i at e t ype f or t he j ob, as r ecommended by t he suppl i er of t he anchors.

2. 1. 1. 3 Gr out Tubes

Gr out t ubes shal l be pol yet hyl ene t ubi ng or as r ecommended by t he anchor manuf act ur er and appr oved by t he Cont r act i ng Of f i cer . I nsi de di amet er of gr out t ubes shal l be adequat e t o f ul l y gr out t he ent i r e hol e.

2. 1. 1. 4 Encapsul at ed End Anchor age

Pr ovi de a cor r osi on i nhi bi t i ng encapsul at ed end anchor age sui t abl e f or per manent aggr essi ve cor r osi on condi t i ons i n accor dance wi t h t he manuf act ur er ' s r ecommendat i ons.

2. 1. 2 Non- Shr i nk Gr out f or Anchor Dr i l l Hol es

Non- shr i nk cement gr out f or anchor dr i l l hol es shal l be i n accor dance wi t h t he anchor manuf act ur er ' s r ecommendat i ons. Gr out shal l be sui t abl e f or condi t i ons exposed t o t he at mospher e and under wat er .

2. 1. 3 Non- Shr i nk Gr out f or Anchor Recesses

Non- shr i nk cement gr out f or anchor r ecesses at f ace of wal l shal l conf or m to ASTM C1107/ C1107M, shal l be a commer ci al f or mul at i on sui t abl e f or t he pr oposed appl i cat i on, and shal l be non- met al l i c . Gr out shal l be sui t abl e f or under wat er pl acement . Use bondi ng agent as r ecommended by t he manuf act ur er . I f t he Cont r act or wi shes t o gr out t he r ecesses wi t h t he

SECTI ON 03 01 30. 72 08 Page 6 same non- shr i nk gr out used f or anchor dr i l l hol e gr out i ng, wr i t t en appr oval shal l be pr ovi ded by t he anchor gr out manuf act ur er st at i ng t hat t he gr out pr oduct i s appl i cabl e f or t he speci f i c s i t uat i on and shal l i ncl ude an expl anat i on of any addi t i onal r equi r ement s ( i . e. addi t i on of sand, pea gr avel , et c. ) f or mi xi ng and pl aci ng t he gr out f or t he anchor recesses.

2. 2 EQUIPMENT

2. 2. 1 Dr i l l i ng Equi pment

Hol es shal l be cor e dr i l l ed. Cont r act or shal l ver i f y wi t h anchor manuf act ur er t hat met hod and equi pment used meet s t he r equi r ement s of t he manuf act ur er . Submi t a l et t er f r om t he manuf act ur er st at i ng t hat t he met hods and equi pment ar e accept abl e and t hat t he bond of t he gr out t o t he sur f ace of t he hol e i s adequat e. Dr i l l i ng equi pment shal l be i n accor dance wi t h t he anchor manuf act ur er ' s r ecommended i nst al l at i on pr ocedur es. Use r ot ar y dr i l l i ng equi pment of a t ype sui t abl e f or t he dept h, di amet er , and mat er i al t o be dr i l l ed. Use equi pment capabl e of mai nt ai ni ng t he r equi r ed al i gnment .

2. 2. 2 St r essi ng Equi pment

St r essi ng equi pment shal l be hydr aul i cal l y oper at ed and shal l have a capaci t y suf f i c i ent t o st r ess t he anchor s t o t he speci f i ed Test Loads wi t hi n t he r at ed capaci t y i n one st r oke. Pumps shal l be capabl e of appl y i ng each l oad i ncr ement i n l ess t han 60 seconds and shal l be capabl e of mai nt ai ni ng t he hydr aul i c pr essur e wi t hi n 50 psi . The equi pment shal l per mi t st r essi ng of t he anchor i n i ncr ement s and r ai s i ng or l ower i ng t he l oad i n t he t endon. The equi pment shal l be cal i br at ed wi t h an accur acy of +2 per cent and t he cal i br at i on cer t i f i cat e and gr aphs shal l be avai l abl e at t he s i t e. The pr oduct i on gage shal l have gr aduat i ons of 100 psi or l ess. A second cer t i f i ed gage shal l be mai nt ai ned f or per i odi c ver i f i cat i on of t he pr oduct i on gage. A di al gage or appr oved devi ce shal l be pr ovi ded t o measur e t ot al t endon el ongat i on at each l oad i ncr ement t o t he near est 0. 001 i nch. The di al gage shal l be capabl e of measur i ng t he ent i r e anchor movement wi t hout bei ng r eset . Cal i br at i on of gages shal l be ver i f i ed no mor e t han 30 cal endar days pr i or t o commenci ng wor k under t hi s cont r act and at s i x- mont h i nt er val s t hr oughout t he per i od of use.

2. 2. 3 Test i ng Equi pment

Pr ovi de t est i ng equi pment consi st i ng of a hydr aul i c j ack wi t h cal i br at ed pr essur e gage f or appl y i ng t he l oad and a di al gage or ver ni er scal e t o measur e anchor movement . The r am t r avel of t he st r essi ng equi pment shal l be not l ess t han t he t heor et i cal el ast i c el ongat i on of t he t ot al anchor l engt h at t he maxi mum Test Load. The pr essur e gage shal l be gr aduat ed i n 100 psi i ncr ement s. The st r essi ng equi pment and pr essur e gage must have been cal i br at ed as a uni t no mor e t han 30 cal endar days pr i or t o commenci ng wor k under t hi s cont r act and at s i x- mont h i nt er val s t hr oughout t he per i od of use. The movement measur i ng devi ce shal l have a mi ni mum t r avel equal t o t he t heor et i cal el ast i c el ongat i on of t he t ot al anchor l engt h at t he maxi mum Test Load wi t hout r eset t i ng t he devi ce.

2. 2. 4 Gr out Mi xer s

Mi xi ng equi pment f or anchor gr out shal l be i n accor dance wi t h t he gr out manuf act ur er ' s r ecommendat i ons. Use a hi gh- speed, hi gh- shear , col l oi dal t ype gr out mi xer capabl e of cont i nuous mechani cal mi xi ng t hat wi l l pr oduce

SECTI ON 03 01 30. 72 08 Page 7 uni f or m and t hor oughl y mi xed gr out whi ch i s f r ee of l umps and undi sper sed cement . The mi xer shal l be equi pped wi t h sui t abl e wat er and admi xt ur e measur i ng devi ces cal i br at ed t o r ead i n cubi c f eet and t ent hs.

2. 2. 5 Power Saw and Hand- Hel d Chi ppi ng Hammer

Power saws and hand- hel d chi ppi ng hammer s r equi r ed f or anchor r ecesses at f ace of wal l shal l meet t he r equi r ement s descr i bed i n Sect i on 03 01 32 CONCRETE REHABI LI TATI ON FOR CI VI L WORKS, wi t h t he except i on t hat t he power saw f or anchor r ecesses shal l be s i zed f or sawcut t i ng t o a 1 i nch dept h.

2. 2. 6 I nspect i on Camer a

Camer a f or i nspect i on of hol es pr i or t o i nser t i on of anchor s shal l be a down- t he- hol e camer a si mi l ar or equal t o GeoVi si on Del uxe Dual Scan wi t h hi gh r esol ut i on col or v i deo, hi gh i nt ensi t y LED l i ght s, 350 degr ee ver t i cal and hor i zont al t i l t and pan, l i ve v i deo r eadout of camer al dept h, di gi t al r ecor di ng of v i deo and user audi o dat e, and a col or obser vat i on scr een wi t h a mi ni mum di agonal di mensi on of 12" f or adequat e scal e of obser vat i on i n r eal t i me dur i ng v i deo r ecodi ng oper at i ons.

PART 3 EXECUTI ON

3. 1 INSTALLATION

3. 1. 1 Drilling

Dr i l l i ng met hods must compl y wi t h 29 CFR 1926. 1153. Advance hol es f r om t he l and chamber s i de of t he monol i t h t o appr oxi mat el y 12 i nches f r om t he f ace of t he r i ver chamber s i de of t he monol i t h. Reduce pr oduct i on r at e as r equi r ed as t he hol e becomes wi t hi n 12 t o 18 i nches of t he wal l f ace. The hol es shal l be l ocat ed as shown on t he dr awi ngs. The dr i l l hol e di amet er shown on t he dr awi ngs i s appr oxi mat e. The act ual dr i l l hol e di amet er shal l be as r ecommended by t he anchor manuf act ur er and shal l be of suf f i c i ent s i ze t o accommodat e cent r al i z i ng r i ngs, r od, and gr out . Hol es t hr ough exi st i ng st r uct ur es shal l be dr i l l ed i n accor dance wi t h par agr aph " Dr i l l i ng Equi pment " , her ei n, and shal l not cause damage t o t he sur r oundi ng st r uct ur e. The Cont r act or i s advi sed t hat f or ei gn mat er i al , i ncl udi ng r ei nf or ci ng st eel , f or m t i es, met al s and ot her mat er i al r emai ni ng f r om t he or i gi nal const r uct i on of t he exi st i ng st r uct ur e, may be encount er ed dur i ng dr i l l i ng t hr ough exi st i ng st r uct ur es. Hol es shal l be t empor ar i l y pl ugged t o pr event debr i s and wat er f r om ent er i ng t he hol es.

The pl ugs shal l r emai n i n pl ace f r om t he t i me dr i l l i ng i s compl et ed f or t he hol e unt i l i mmedi at el y pr i or t o i nst al l i ng t he anchor .

3. 1. 2 Alignment

The hol es shal l be l ocat ed wi t h or i ent at i ons as i ndi cat ed on t he dr awi ngs.

Lengt h, di amet er , di r ect i on, and i ncl i nat i on of al l anchor hol es shal l be checked and ver i f i ed by t he Cont r act or ever y 5 f eet t hr ough t he concr et e.

Pl umbness of t he dr i l l hol e shal l be checked wi t h a l evel i n t wo di r ect i ons ever y 5 f eet of dr i l l i ng. The devi at i on f r om t he speci f i ed i ncl i nat i on shal l not exceed 1. 0 degr ee i n t he appr oxi mat el y 23- f oot anchor hol e l engt h. The st r ai ght ness shal l be such t hat over t he 23- f oot hol e l engt h, t he maxi mum devi at i on f r om a st r ai ght l i ne bet ween t he ends of t he hol e shal l not exceed 0. 50 i nches. Each bar shal l have a mi ni mum of t hr ee cent r al i zer s. Cent r al i zer s shal l be pr ovi ded on t he bar s at a maxi mum 10- f oot cent er t o cent er spaci ng.

SECTI ON 03 01 30. 72 08 Page 8

3. 1. 3 Anchor Recesses

The anchor bear i ng pl at e shal l be r ecessed bel ow f ace of wal l as shown on t he dr awi ngs. Appr oxi mat e r ecess di mensi ons ar e pr ovi ded on t he dr awi ngs, however , t he s i ze of t he r ecess i n pl an shal l be per t he anchor manuf act ur er ' s r ecommendat i ons t o ensur e adequat e c l ear ance f or anchor st r essi ng. The r ecess dept h shal l pr ovi de 3 i nches of cover f r om end of anchor , mi ni mum. The r ecess per i met er shal l be del i neat ed wi t h a saw cut at l east 1 i nch deep. The per i met er saw cut shal l have no angl es l ess t han 90 degr ees. Removal of r emai ni ng concr et e wi t hi n r ecess per i met er not r emoved dur i ng dr i l l i ng shal l be accompl i shed usi ng hand- hel d chi ppi ng hammer s. Concr et e r emoval bel ow t he per i met er saw cut shal l cr eat e a dovet ai l ef f ect f or t he ver t i cal wal l s of t he r ecess, as shown on t he drawings.

3. 1. 4 Sur f ace Pr epar at i on

The sur f ace of t he hol e or r ecess t o r ecei ve gr out shal l be f r ee of al l f r ost , di r t , par t i c l es of concr et e dust , and ot her f or ei gn subst ances.

The hol e shal l be c l eaned by " bl owi ng" t he hol e wi t h wat er , ai r , or a combi nat i on t her eof . Pr i or t o anchor i nst al l at i on shal l be i nspect ed wi t h a camer a t o ver i f y t hat no voi d, cavi t i es or ot her def or mi t y exi st t hat al l ow f or a l oss of gr out dur i ng t he gr out oper at i on. The camer a shal l compl y wi t he t he r equi r ement s of par agr aph I nspect i on Camer a.

3. 1. 5 Rod Pl acement

Rods shal l be pl aced i n t he cent er of t he hol e and shal l be suppl i ed wi t h cent r al i z i ng r i ngs of pr oper s i ze and spaci ng t o mai nt ai n r od l ocat i on al i gnment i n accor dance wi t h par agr aph " Al i gnment " her ei n.

3. 1. 6 Anchor age I nst al l at i on

The bear i ng pl at e and nut shal l be i nst al l ed per pendi cul ar t o t he t endon, wi t hi n 3 degr ees, and cent er ed on t he t endon wi t hout bendi ng of t he st r essi ng st eel . Cor r osi on pr ot ect i on shal l be mai nt ai ned i nt act at t he anchor age and any damage shal l be r epai r ed pr i or t o st r essi ng.

3. 1. 7 Pr est r essi ng Met hod and Equi pment

Submi t St r essi ng Equi pment Cal i br at i on Recor ds f or r evi ew and appr oval by t he Cont r act i ng Of f i cer pr i or t o t he st ar t of pr est r essi ng oper at i ons.

Submi t descr i pt i ons of t he pr oposed pr est r essi ng met hods and equi pment i ndi cat i ng t he manuf act ur er of al l pr est r essi ng equi pment , i ncl udi ng t ensi oni ng j acks, st r ess measur ement gages, dynamomet er s, and l oad cel l s or ot her devi ces f or measur i ng st r essi ng l oads. Descr i pt i ons shal l i ncl ude cer t i f i ed cal i br at i on r ecor ds f or each set of j acki ng equi pment and t est i ng cur ves f or st r ess measur ement gages whi ch show t hat t he gages have been cal i br at ed wi t hi n t he l ast 60 cal endar days, and have been cal i br at ed f or t he j acks f or whi ch t hey ar e t o be used. Pr est r essi ng Oper at i ons Recor ds shal l be document ed by t he Cont r act or ' s QCM and shal l be submi t t ed t o t he Cont r act i ng of f i cer f or appr oval .

3. 1. 8 Stressing

3. 1. 8. 1 Gener al Requi r ement s

Anchor i nst al l at i on shal l be i n accor dance wi t h t he anchor manuf act ur er ' s pr ocedur es and r ecommendat i ons. Pr i or t o st r essi ng, sur f aces upon whi ch

SECTI ON 03 01 30. 72 08 Page 9 t he st r essi ng equi pment i s r est i ng must be cl ean and t he st r essi ng equi pment shal l be al i gned as near l y wi t h t he cent er of t he hol e as possi bl e. St r ess t he anchor i n accor dance wi t h t he anchor manuf act ur er ' s r ecommendat i on, subj ect t o t he appr oval of t he Cont r act i ng Of f i cer .

Desi gn and Lock- of f l oads ar e gi ven on t he dr awi ngs. Det er mi ne t he l ock- of f pr ocedur e so t hat t he l i f t - of f r esul t s meet t he accept ance cr i t er i a speci f i ed i n par agr aph Accept ance. The maxi mum st r ess shal l never exceed 80 per cent of t he guar ant eed ul t i mat e st r engt h of anchor st eel . The pr ocess of st r essi ng t he anchor s shal l be so conduct ed t hat accur at e el ongat i on of t he anchor st eel can at al l t i mes be r ecor ded and compar ed wi t h t he comput at i ons submi t t ed t o, and accept ed by t he Cont r act i ng Of f i cer . Saf et y pr ecaut i ons shal l be t aken t o pr event wor ker s f r om bei ng behi nd t he st r essi ng equi pment dur i ng st r essi ng. St r essi ng of t he anchor s shal l be per f or med i n t he sequence shown on t he dr awi ngs. Al l st r essi ng shal l be done i n t he pr esence of a r epr esent at i ve of t he Cont r act i ng Of f i cer . At no t i me dur i ng t he st r essi ng and t est i ng of an anchor shal l t he st r essi ng equi pment be di sconnect ed f r om t he t empor ar y st r essi ng head or anchor .

3. 1. 8. 2 Lock-off

Af t er compl et i on of t he al l r equi r ed t est s, t he l oad shal l be r et ur ned t o t he Al i gnment Load and t he speci f i ed Lock- of f Load shal l be appl i ed t o t he anchor . A l i f t - of f t est shal l be made t o ver i f y t he l oad i n t he anchor t endon bef or e t he t endon i s l ocked- of f and t he st r essi ng equi pment i s r emoved. The l i f t - of f r eadi ng shal l be wi t hi n f i ve per cent of t he speci f i ed l ock- of f l oad. I f t he l i f t - of f r eadi ng i s not wi t hi n f i ve per cent of t he speci f i ed l ock- of f l oad, t he anchor age shal l be r eset and anot her l i f t - of f r eadi ng shal l be made. Thi s pr ocedur e shal l be r epeat ed unt i l a sat i sf act or y l i f t - of f r eadi ng i s obt ai ned. Af t er l ock- of f and accept ance of t he anchor , t he anchor age r ecess shal l be f ul l y gr out ed f l ush wi t h t he adj acent sur f aces.

3. 1. 9 Envi r onment al Requi r ement s f or Gr out i ng

See Sect i on 03 01 32 CONCRETE REHABI LI TATI ON FOR CI VI L WORKS, par agr aph PROJECT/ SI TE CONDI TI ONS, subpar agr aph Envi r onment al Requi r ement s f or r equi r ement s f or pl aci ng cement - based gr out .

3. 1. 10 Gr out Pl acement f or Anchor Dr i l l Hol es

Pr i or t o gr out i ng hol es shal l be i nspect ed wi t h a camer a t o ver i f y t hat no voi d, cavi t i es or ot her def or mi t y exi st t hat al l ow f or a l oss of gr out dur i ng t he gr out oper at i on. The camer a shal l compl y wi t he t he r equi r ement s of par agr aph I nspect i on Camer a. Gr out f or anchor dr i l l hol es shal l not be pl aced unt i l t he Pr est r essi ng Oper at i ons Recor ds submi t t al i s appr oved by t he Cont r act i ng Of f i cer . Gr out shal l be mi xed and i nst al l ed i n accor dance wi t h t he manuf act ur er ' s wr i t t en i nst r uct i ons. The set t i me shal l be adj ust ed t o pr ovi de a uni f or m seal al ong t he t ot al l engt h of t he hol e wi t hout f l ash- set al ong any por t i on of t he hol e. Dur i ng t he gr out i ng oper at i ons, gr out i ng shal l begi n at t he bot t om of t he hol e ( i . e. pl acement v i a gr out t ube) and shal l cont i nue unt i l al l wat er and di l ut ed gr out has f l owed out of t he end of t he dr i l l ed hol e and compet ent gr out f l ows f r eel y f r om t he hol e. Af t er t he hol e has been gr out ed f or at l east 24 hour s, t he dr i l l ed hol e shal l be " t opped of f " wi t h addi t i onal gr out i f any set t l ement of t he gr out i n t he hol e has occur r ed. Compet ent gr out shal l ext end t he ent i r e l engt h of t he dr i l l ed hol e.

The Cont r act or shal l be awar e t hat t he condi t i on of t he cr ack i nt er f ace i s

SECTI ON 03 01 30. 72 08 Page 10 unknown and gr out deposi t i on may occur al ong t he cr ack j oi nt i nt er f ace.

Thi s condi t i on may r esul t i n pl acement of l ar ger gr out vol umes t han t hose det er mi ned. I t i s ant i c i pat ed t hat an addi t i onal 10% of gr out wi l l be r equi r ed due t o t hi s condi t i on. Moni t or t he vol ume of gr out bei ng pl aced and not i f y t he Cont r act i ng Of f i ce i mmedi at el y i n t he event t hat t he gr out exceeds t he ant i c i pat ed amount .

Dur i ng anchor dr i l l hol e gr out pl acement , Gover nment per sonnel wi l l be on si t e. I f gr out seepage i s encount er ed, al l anchor gr out i ng shal l be hal t ed Cont r act or shal l submi t a gr out seepage r emedi at i on pl an t o t he Cont r act i ng Of f i ce f or appr oval . Upon appr oval of t he pl an by t he Cont r act i ng Of f i cer , t he Cont r act or shal l per f or m t he necessar y wor k t o r emedy t he gr out seepage. Payment f or r equi r ed gr out seepage r emedi at i on wi l l be made i n accor dance wi t h Sect i on 00 70 00 CONDI TI ONS OF THE

CONTRACT, FAR 52. 243- 4 CHANGES.

3. 1. 11 Gr out Pl acement f or Anchor Recesses

Gr out f or t he anchor r ecesses shal l not be pl aced unt i l t he Cont r act i ng Of f i cer has appr oved gr out pl acement f or anchor dr i l l hol es. Revi ew of t he st r essi ng r ecor ds shal l be compl et ed and appr oved by t he Gover nment Cont r act i ng Of f i cer Pr i or t o gr out i ng of t he anchor r ecesses. Anchor r ecesses shal l be f i l l ed wi t h non- shr i nk gr out . Use bondi ng agent as r ecommended by t he manuf act ur er . Fi ni shed sur f aces shal l be f l ush wi t h exi st i ng f ace of wal l and shal l be br oom f i ni shed as descr i bed i n Sect i on

03 01 32 CONCRETE REHABI LI TATI ON FOR CI VI L WORKS.

3. 2 INSPECTION

The Cont r act or ' s f aci l i t i es shal l be open f or i nspect i on by t he Cont r act i ng Of f i cer at any t i me.

3. 3 FI ELD QUALI TY CONTROL

Dur i ng t he st r essi ng of each anchor , a r ecor d shal l be kept of gage pr essur e and of anchor el ongat i on at each st age of st r essi ng t o t he speci f i ed Lock- of f Load. Pr ovi de a qual i f i ed engi neer t o eval uat e t he anchor t est r esul t s and det er mi ne t he accept abi l i t y of t he anchor s i n accor dance wi t h t he cr i t er i a i ndi cat ed her eunder . Fi nal accept ance of each anchor wi l l be made by t he Cont r act i ng Of f i cer . Al l t est s shal l be r un i n t he pr esence of t he Cont r act i ng Of f i cer or hi s r epr esent at i ve.

3. 3. 1 Pr oof Test

Pr oof t est shal l consi st of i ncr ement al l y l oadi ng t he anchor and shal l be conduct ed i n accor dance wi t h PTI DC35. 1, Par agr aph 8. 3. 3. Dur i ng t he t est i ng of each anchor , a r ecor d shal l be kept of gage pr essur e and of anchor el ongat i on at each st age of st r essi ng t o t he Test Load r equi r ed by PTI DC35. 1. Measur ement s of t he el ongat i on of pr est r essi ng st eel shal l be made i n accor dance wi t h PTI DC35. 1. I f t he t ot al movement at t he end of 10 mi nut es at t he Test Load exceeds 0. 040 i nch, t he Test Load shal l be hel d an addi t i onal 50 mi nut es and t he movement r eadi ngs shal l be t aken at t he i nt er val speci f i ed i n PTI DC35. 1, Par agr aph 8. 3. 3. Test r ecor ds, i ncl udi ng pl ot s and gr aphi cal anal ysi s of t est dat a, shal l be f ur ni shed upon accept ance of each pr oof t est ed anchor i n accor dance wi t h par agr aph SUBMI TTALS. The pr oof t est r esul t s shal l be compar ed wi t h s i mi l ar anchor s i n whi ch per f or mance t est s have been per f or med. I f any s i gni f i cant var i at i on f r om t he pr oof t est s occur s, t he Cont r act i ng Of f i cer may r equi r e addi t i onal per f or mance t est s.

SECTI ON 03 01 30. 72 08 Page 11

3. 3. 2 Dr i l l er Logs

Submi t t he or i gi nal handwr i t t en l og and t hr ee ( 3) copi es i n t yped f or mat wi t hi n t wo wor k days of t he compl et i on of each hol e. Keep accur at e dr i l l er l ogs and r ecor ds of al l wor k accompl i shed under t hi s cont r act and del i ver compl et e, l egi bl e copi es of t hese l ogs and r ecor ds t o t he Cont r act i ng Of f i cer upon compl et i on of t he wor k or at such ot her t i me or t i mes as he may be di r ect ed. Al l such r ecor ds shal l be pr eser ved i n good condi t i on and or der by t he Cont r act or unt i l t hey ar e del i ver ed and accept ed, and t he Cont r act i ng Of f i cer shal l have t he r i ght t o exami ne such r ecor ds at any t i me pr i or t o t hei r del i ver y. Separ at e l ogs shal l be made f or each hol e. Use DRI LLI NG LOG, ENG FORM 1836 and 1836A or ot her appr oved f or m whi ch pr ovi des t he r equi r ed i nf or mat i on. The f ol l owi ng i nf or mat i on shal l be i ncl uded on t he l ogs or i n t he r ecor ds f or each hol e:

a. Hol e number or desi gnat i on and el evat i on of hol e.

b. Make and manuf act ur er ' s model desi gnat i on of dr i l l i ng equi pment .

c. Dat es and t i me when dr i l l i ng oper at i ons wer e per f or med.

d. Ti me r equi r ed f or dr i l l i ng each r un.

3. 3. 3 Anchor Recor ds

Upon compl et i on of i nst al l at i on of each anchor , t he anchor r ecor ds shal l be f ur ni shed t o t he Cont r act i ng Of f i cer . The l i f t - of f r esul t s shal l i ncl ude measur ed l engt hs of dr i l l hol es and anchor s, t he l oads and el ongat i ons r ecor ded dur i ng t est i ng, moni t or i ng and st r essi ng of t he anchor s, and gr aphs of t est r esul t s as speci f i ed i n par agr aph SUBMI TTALS.

I n addi t i on as- bui l t dr awi ngs showi ng t he compl et ed i nst al l at i on of t he anchor s shal l be f ur ni shed upon compl et i on of i nst al l at i on of al l anchor s.

3. 4 ACCEPTANCE

3. 4. 1 General

Accept ance of anchor s shal l be det er mi ned by t he Cont r act i ng Of f i cer . The f ol l owi ng cr i t er i a wi l l be used i n det er mi nat i on of t he accept abi l i t y of each anchor :

3. 4. 1. 1 Movement

Appar ent f r ee l engt h shal l be cal cul at ed f r om t he obser ved el ast i c movement i n accor dance wi t h PTI DC35. 1, Sect i on 8. 3. 2.

3. 4. 1. 2 I ni t i al Li f t - Of f Readi ng

The i ni t i al l i f t - of f r eadi ng shal l be wi t hi n 5 per cent of t he speci f i ed Lock- of f Load. I f t he anchor does not meet t hi s cr i t er i a, t he anchor shal l be adj ust ed as necessar y and t he l i f t - of f r eadi ng shal l be r epeat ed.

3. 4. 2 Repl acement of Rej ect ed Anchor s

Any anchor t hat f ai l s t he pr oof t est or i s r ej ect ed by t he Cont r act i ng Of f i cer shal l be r epl aced. A r epl acement anchor , i ncl udi ng a new anchor hol e, shal l be pr ovi ded by t he Cont r act or at no expense t o t he Gover nment . The l ocat i on of t he r epl acement anchor shal l be as di r ect ed

SECTI ON 03 01 30. 72 08 Page 12 by t he Cont r act i ng Of f i cer . Pr ovi de al l mat er i al s, suppl i es, equi pment , and l abor necessar y t o pr ovi de a new anchor assembl y t o t he sat i sf act i on of t he Cont r act i ng Of f i cer . No dr i l l i ng shal l be per f or med f or a r epl acement anchor unt i l t he gr out i ng of al l r ock anchor s wi t hi n 50 f eet of t he r epl acement anchor l ocat i on has been al l owed t o set f or at l east 24 hour s. Payment wi l l not be made f or r ej ect ed or f ai l ed anchor s. Ei t her r emove f ai l ed anchor s and t hor oughl y r eam and cl ear t he anchor hol e or r emove t he l oad and cut t he anchor and casi ng f l ush.

3. 5 MATERI ALS DI SPOSI TI ON RECORDS

Compi l e accur at e mat er i al s di sposi t i on r ecor ds, i dent i f y i ng al l mat er i al s i ncor por at ed i nt o t he wor k and showi ng t he di sposi t i on of speci f i c l ot s of appr oved t est ed mat er i al s. Submi t r ecor ds whi ch i dent i f y t he i ncor por at i on of appr oved mat er i al s i nt o t he wor k bef or e compl et i on of t he cont r act .

3. 6 PHOTOGRAPHY

The Cont r act or shal l , dur i ng t he pr ogr ess of t he wor k, f ur ni sh t he Cont r act i ng Of f i cer di gi t al l y pr oduced Phot ogr aphs of Anchor s. The camer a shal l have a CCD r esol ut i on no l ess t han 7. 0 mi l l i on pi xel s per i mage ( 3072 by 2304) whi ch wi l l pr ovi de enough det ai l t o pr i nt an 8" by 10" hi gh- r esol ut i on phot ogr aph. The camer a shal l pr oduce f i l es t hat al l ows t he user t o downl oad t he i mages ont o an I BM- compat i bl e per sonal comput er r unni ng Wi ndows 7, and al l ow t he i mages t o be saved i n one of t he f ol l owi ng gr aphi c f or mat s: JPG ( Joi nt Phot ogr aphi c Exper t s Gr oup) , TI FF ( Tagged I mage Fi l e For mat ) or BMP ( Wi ndows Bi t map) . The i mages shal l be submi t t ed as t wo ( 2) set s pr i nt ed i n col or i n 8" by 10" f or mat , and ( 1) el ect r oni c set i n one of t he di gi t al f or mat s st at ed above. The phot ogr aphs shal l i ncl ude:

1. Phot o of each anchor pr i or t o i nst al l at i on

2. Phot o of each anchor af t er gr out i ng and st r essi ng, pr i or t o backf i l l i ng anchor r ecesses

- - End of Sect i on - -

SECTI ON 03 01 30. 72 08 Page 13

03 01 30.72 08 - COLD JOINT ANCHORS
03 01 30.72 08 - COLD JOINT ANCHORS
PART 1 GENERAL
1.1 SCOPE
1.2 RELATED WORK SPECIFIED ELSEWHERE
1.3 REFERENCES
1.4 SUBMITTALS
1.5 ANCHOR INSTALLATION PLAN
1.6 DELIVERY, STORAGE, AND HANDLING
1.7 QUALITY ASSURANCE
1.7.1 Fabricator Qualifications
1.7.2 Installer Qualifications
1.7.3 Certification of Prestressing Technicians
1.7.4 Installation Drawings

1.8 CONTROL OF CONCRETE DEBRIS

PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Mechanical Expansion Anchors
2.1.1.1 Centralizers
2.1.1.2 Vent Tubes
2.1.1.3 Grout Tubes
2.1.1.4 Encapsulated End Anchorage
2.1.2 Non-Shrink Grout for Anchor Drill Holes
2.1.3 Non-Shrink Grout for Anchor Recesses
2.2 EQUIPMENT
2.2.1 Drilling Equipment
2.2.2 Stressing Equipment
2.2.3 Testing Equipment
2.2.4 Grout Mixers
2.2.5 Power Saw and Hand-Held Chipping Hammer
2.2.6 Inspection Camera
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Drilling
3.1.2 Alignment
3.1.3 Anchor Recesses
3.1.4 Surface Preparation
3.1.5 Rod Placement
3.1.6 Anchorage Installation
3.1.7 Prestressing Method and Equipment
3.1.8 Stressing
3.1.8.1 General Requirements
3.1.8.2 Lock-off
3.1.9 Environmental Requirements for Grouting
3.1.10 Grout Placement for Anchor Drill Holes
3.1.11 Grout Placement for Anchor Recesses
3.2 INSPECTION
3.3 FIELD QUALITY CONTROL
3.3.1 Proof Test
3.3.2 Driller Logs
3.3.3 Anchor Records
3.4 ACCEPTANCE
3.4.1 General
3.4.1.1 Movement
3.4.1.2 Initial Lift-Off Reading

3.4.2 Replacement of Rejected Anchors

3.5 MATERIALS DISPOSITION RECORDS
3.6 PHOTOGRAPHY

File details come from the government source that posted it.