Attachment_3,_Reference_to_Certified_Plans.pdf

PDF 15 MB Posted

Attached to
Middle Wall Crack Stabilization, Montgomery Locks and Dam
Solicitation number
W911WN18B8001
Issued by

About this file

Reference to Plans (Reference to Drawings)

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IP

P W

P :d m s

L M

O O

V .d g n

H

T S

D R

S T

J

U N

:4

L M

O O

V .d g n

.0

:1

V-6111

U P

P E

R P

O O

L S

T A

G E H

Y D

R O

G R

A P

H S

E L

E V

A T

IO

N

E L

E V

A T

IO

N

E L

E V

A T

IO

N

E L

E V

A T

IO

N

E L

E V

A T

IO

N

1997 1998

S

P O

L A

K O

W S

K I

R

T Y

S Z

K

IE

W J

K

S K

Y

-1

I

N C

L U

S

IV

E

IN MEASURED POOL ELEVATIONS.

OPERATIONS THAT CAN CAUSE MINOR FLUCTUATIONS

UPPER POOL (ELEV 682.0) ARE DUE TO GATE

HYDROGRAPH POINTS SLIGHTLY BELOW PROJECT 6.

HIGHER THAN NAVD88.

THE NGVD29 DATUM, AS SHOWN, IS 0.39 FEET 5.

WERE CORRECTED.

WAS SCREENED AND INACCURATE DATA VALUES

DATA. THE RAW NAVIGATION DATA FROM THE FIELD

BREAKS IN THE HYDROGRAPH INDICATE MISSING 4.

670.0 FEET NGVD29.

ZERO ELEVATION OF THE UPPER POOL GAGE IS

AND AN ELEVATION OF 682.0 FEET NGVD29. THE

PROJECT UPPER POOL IS A STAGE OF 12.0 FEET 3.

THE ACTUAL PEAK ELEVATION IS NOTED.

FOR PEAK ELEVATIONS AT OR ABOVE 686 FEET, 2.

AND DAM.

OF ENGINEERS RECORDS AT MONTGOMERY LOCKS

DAILY AVERAGE VALUES COMPUTED FROM CORPS

HISTORICAL STAGE HYDROGRAPHS ARE BASED ON 1.

NOTES:

F E

B s

M A

Z A

IT

S O

F

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

NUMBER

IDENTIFICATION

SHEET

OF ENGINEERS

US ARMY CORPS

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N A

P P

R

D A

T E

C O

N T

R A

C T N

O

C O

R P

S O

F E

N G

IN

E E

R S

U S

A R

M Y E

N G

IN

E E

R D

IS

T R

IC

PITTSBURGH DISTRICT

H

IO

R

IV

E R

M O

N T

G O

M E

R Y L

O C

K S A

N D D

A M

D A

M G

A T

E I

N S

T A

L L

A T

IO

N

P

IT

T S

B U

R G

H P

A W

W N

B

AS-AWARDED CERTIFIED FINAL

W

W N

C

P W

P :d m s

L M

O O

V .d g n

H

T S

D R

S T

J

U N

:4

L M

O O

V .d g n

.0

:1

U P

P E

R P

O O

L S

T A

G E H

Y D

R O

G R

A P

H S

V-6112

-2

IN

C L

U S

IV

E

E L

E V

A T

IO

N E

L E

V A

T

IO

N E

L E

V A

T

IO

N

E L

E V

A T

IO

N E

L E

V A

T

IO

N

2002 2003

L A

K O

W S

K

S Z

K

IE

S K

Y

IN MEASURED POOL ELEVATIONS.

OPERATIONS THAT CAN CAUSE MINOR FLUCTUATIONS

UPPER POOL (ELEV 682.0) ARE DUE TO GATE

HYDROGRAPH POINTS SLIGHTLY BELOW PROJECT 6.

HIGHER THAN NAVD88.

THE NGVD29 DATUM, AS SHOWN, IS 0.39 FEET 5.

WERE CORRECTED.

WAS SCREENED AND INACCURATE DATA VALUES

DATA. THE RAW NAVIGATION DATA FROM THE FIELD

BREAKS IN THE HYDROGRAPH INDICATE MISSING 4.

670.0 FEET NGVD29.

ZERO ELEVATION OF THE UPPER POOL GAGE IS

AND AN ELEVATION OF 682.0 FEET NGVD29. THE

PROJECT UPPER POOL IS A STAGE OF 12.0 FEET 3.

THE ACTUAL PEAK ELEVATION IS NOTED.

FOR PEAK ELEVATIONS AT OR ABOVE 686 FEET, 2.

AND DAM.

OF ENGINEERS RECORDS AT MONTGOMERY LOCKS

DAILY AVERAGE VALUES COMPUTED FROM CORPS

HISTORICAL STAGE HYDROGRAPHS ARE BASED ON 1.

NOTES:

F E

B

Z A

IT

S O

F F

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

NUMBER

IDENTIFICATION

SHEET

OF ENGINEERS

US ARMY CORPS

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N A

P P

R

D A

T E

C O

N T

R A

C T N

O

C O

R P

S O

F E

N G

IN

E E

R S

U S

A R

M Y E

N G

IN

E E

R D

IS

T R

H

IO

R

IV

E R

M O

N T

G O

M E

R Y L

O C

K S A

N D D

A M

D A

M G

A T

E I

N S

T A

L L

A T

IO

N

P

IT

T S

B U

R G

H P

A W

W N

B

AS-AWARDED CERTIFIED FINAL

W

W N

C

P W

P :d m s

L M

O O

V .d g n

H

T S

D R

S T

J

U N

:4

L M

O O

V .d g n

.0

:1

U P

P E

R P

O O

L S

T A

G E H

Y D

R O

G R

A P

H S

V-6113

-2

IN

C L

U S

IV

E

E L

E V

A T

IO

N E

L E

V A

T

IO

N E

L E

V A

T

IO

N

E L

E V

A T

IO

N E

L E

V A

T

IO

N

2007 2008

L A

K O

W S

K

S Z

K

IE

S K

Y

IN MEASURED POOL ELEVATIONS.

OPERATIONS THAT CAN CAUSE MINOR FLUCTUATIONS

UPPER POOL (ELEV 682.0) ARE DUE TO GATE

HYDROGRAPH POINTS SLIGHTLY BELOW PROJECT 6.

HIGHER THAN NAVD88.

THE NGVD29 DATUM, AS SHOWN, IS 0.39 FEET 5.

WERE CORRECTED.

WAS SCREENED AND INACCURATE DATA VALUES

DATA. THE RAW NAVIGATION DATA FROM THE FIELD

BREAKS IN THE HYDROGRAPH INDICATE MISSING 4.

670.0 FEET NGVD29.

ZERO ELEVATION OF THE UPPER POOL GAGE IS

AND AN ELEVATION OF 682.0 FEET NGVD29. THE

PROJECT UPPER POOL IS A STAGE OF 12.0 FEET 3.

THE ACTUAL PEAK ELEVATION IS NOTED.

FOR PEAK ELEVATIONS AT OR ABOVE 686 FEET, 2.

AND DAM.

OF ENGINEERS RECORDS AT MONTGOMERY LOCKS

DAILY AVERAGE VALUES COMPUTED FROM CORPS

HISTORICAL STAGE HYDROGRAPHS ARE BASED ON 1.

NOTES:

F E

B

Z A

IT

S O

F F

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

NUMBER

IDENTIFICATION

SHEET

OF ENGINEERS

US ARMY CORPS

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N A

P P

R

D A

T E

C O

N T

R A

C T N

O

C O

R P

S O

F E

N G

IN

E E

R S

U S

A R

M Y E

N G

IN

E E

R D

IS

T R

H

IO

R

IV

E R

M O

N T

G O

M E

R Y L

O C

K S A

N D D

A M

D A

M G

A T

E I

N S

T A

L L

A T

IO

N

P

IT

T S

B U

R G

H P

A W

W N

B

AS-AWARDED CERTIFIED FINAL

W

W N

C

P W

P :d m s

L M

O O

V .d g n

H

T S

D R

S T

J

U N

:4

L M

O O

V .d g n

.0

:1

U P

P E

R P

O O

L S

T A

G E H

Y D

R O

G R

A P

H S

V-6114

-2

IN

C L

U S

IV

E

E L

E V

A T

IO

N E

L E

V A

T

IO

N

E L

E V

A T

IO

N

2010 2011

E L

E V

A T

IO

N

L A

K O

W S

K

S Z

K

IE

S K

Y

IN MEASURED POOL ELEVATIONS.

OPERATIONS THAT CAN CAUSE MINOR FLUCTUATIONS

UPPER POOL (ELEV 682.0) ARE DUE TO GATE

HYDROGRAPH POINTS SLIGHTLY BELOW PROJECT 6.

HIGHER THAN NAVD88.

THE NGVD29 DATUM, AS SHOWN, IS 0.39 FEET 5.

WERE CORRECTED.

WAS SCREENED AND INACCURATE DATA VALUES

DATA. THE RAW NAVIGATION DATA FROM THE FIELD

BREAKS IN THE HYDROGRAPH INDICATE MISSING 4.

670.0 FEET NGVD29.

ZERO ELEVATION OF THE UPPER POOL GAGE IS

AND AN ELEVATION OF 682.0 FEET NGVD29. THE

PROJECT UPPER POOL IS A STAGE OF 12.0 FEET 3.

THE ACTUAL PEAK ELEVATION IS NOTED.

FOR PEAK ELEVATIONS AT OR ABOVE 686 FEET, 2.

AND DAM.

OF ENGINEERS RECORDS AT MONTGOMERY LOCKS

DAILY AVERAGE VALUES COMPUTED FROM CORPS

HISTORICAL STAGE HYDROGRAPHS ARE BASED ON 1.

NOTES:

E L

E V

A T

IO

N

F E

B

Z A

IT

S O

F F

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

NUMBER

IDENTIFICATION

SHEET

OF ENGINEERS

US ARMY CORPS

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N A

P P

R

D A

T E

C O

N T

R A

C T N

O

C O

R P

S O

F E

N G

IN

E E

R S

U S

A R

M Y E

N G

IN

E E

R D

IS

T R

H

IO

R

IV

E R

M O

N T

G O

M E

R Y L

O C

K S A

N D D

A M

D A

M G

A T

E I

N S

T A

L L

A T

IO

N

P

IT

T S

B U

R G

H P

A W

W N

B

AS-AWARDED CERTIFIED FINAL

W

W N

C

P W

P :d m s

L M

O O

V .d g n

H

T S

D R

S T

J

U N

:4

L M

O O

V .d g n

.0

:1

L O

W E

R P

O O

L S

T A

G E H

Y D

R O

G R

A P

H S

V-6115

-1

IN

C L

U S

IV

E

L

E V

A T

IO

N

E L

E V

A T

IO

N

E L

E V

A T

IO

N

E L

E V

A T

IO

N

E L

E V

A T

IO

N

1995 1996

1997 1998

L A

K O

W S

K

S Z

K

IE

S K

Y

IN MEASURED POOL ELEVATIONS.

OPERATIONS THAT CAN CAUSE MINOR FLUCTUATIONS

LOWER POOL (ELEV 664.5) ARE DUE TO GATE

HYDROGRAPH POINTS SLIGHTLY BELOW PROJECT 6.

HIGHER THAN NAVD88.

THE NGVD29 DATUM, AS SHOWN, IS 0.39 FEET 5.

WERE CORRECTED.

WAS SCREENED AND INACCURATE DATA VALUES

DATA. THE RAW NAVIGATION DATA FROM THE FIELD

BREAKS IN THE HYDROGRAPH INDICATE MISSING 4.

652.5 FEET NGVD29.

ZERO ELEVATION OF THE LOWER POOL GAGE IS

AND AN ELEVATION OF 664.5 FEET NGVD29. THE

PROJECT LOWER POOL IS A STAGE OF 12.0 FEET 3.

THE ACTUAL PEAK ELEVATION IS NOTED.

FOR PEAK ELEVATIONS AT OR ABOVE 682 FEET, 2.

AND DAM.

OF ENGINEERS RECORDS AT MONTGOMERY LOCKS

DAILY AVERAGE VALUES COMPUTED FROM CORPS

HISTORICAL STAGE HYDROGRAPHS ARE BASED ON 1.

NOTES:

F E

B

Z A

IT

S O

F F

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

NUMBER

IDENTIFICATION

SHEET

OF ENGINEERS

US ARMY CORPS

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N A

P P

R

D A

T E

C O

N T

R A

C T N

O

C O

R P

S O

F E

N G

IN

E E

R S

U S

A R

M Y E

N G

IN

E E

R D

IS

T R

H

IO

R

IV

E R

M O

N T

G O

M E

R Y L

O C

K S A

N D D

A M

D A

M G

A T

E I

N S

T A

L L

A T

IO

N

P

IT

T S

B U

R G

H P

A W

W N

B

AS-AWARDED CERTIFIED FINAL

W

W N

C

P W

P :d m s

L M

O O

V .d g n

H

T S

D R

S T

J

U N

:4

L M

O O

V .d g n

.0

:1

L O

W E

R P

O O

L S

T A

G E H

Y D

R O

G R

A P

H S

V-6116

-2

IN

C L

U S

IV

E

E L

E V

A T

IO

N E

L E

V A

T

IO

N

E L

E V

A T

IO

N E

L E

V A

T

IO

N E

L E

V A

T

IO

N

2002 2003

L A

K O

W S

K

S Z

K

IE

S K

Y

IN MEASURED POOL ELEVATIONS.

OPERATIONS THAT CAN CAUSE MINOR FLUCTUATIONS

LOWER POOL (ELEV 664.5) ARE DUE TO GATE

HYDROGRAPH POINTS SLIGHTLY BELOW PROJECT 6.

HIGHER THAN NAVD88.

THE NGVD29 DATUM, AS SHOWN, IS 0.39 FEET 5.

WERE CORRECTED.

WAS SCREENED AND INACCURATE DATA VALUES

DATA. THE RAW NAVIGATION DATA FROM THE FIELD

BREAKS IN THE HYDROGRAPH INDICATE MISSING 4.

652.5 FEET NGVD29.

ZERO ELEVATION OF THE LOWER POOL GAGE IS

AND AN ELEVATION OF 664.5 FEET NGVD29. THE

PROJECT LOWER POOL IS A STAGE OF 12.0 FEET 3.

THE ACTUAL PEAK ELEVATION IS NOTED.

FOR PEAK ELEVATIONS AT OR ABOVE 682 FEET, 2.

AND DAM.

OF ENGINEERS RECORDS AT MONTGOMERY LOCKS

DAILY AVERAGE VALUES COMPUTED FROM CORPS

HISTORICAL STAGE HYDROGRAPHS ARE BASED ON 1.

NOTES:

F E

B

Z A

IT

S O

F F

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

NUMBER

IDENTIFICATION

SHEET

OF ENGINEERS

US ARMY CORPS

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N A

P P

R

D A

T E

C O

N T

R A

C T N

O

C O

R P

S O

F E

N G

IN

E E

R S

U S

A R

M Y E

N G

IN

E E

R D

IS

T R

H

IO

R

IV

E R

M O

N T

G O

M E

R Y L

O C

K S A

N D D

A M

D A

M G

A T

E I

N S

T A

L L

A T

IO

N

P

IT

T S

B U

R G

H P

A W

W N

B

AS-AWARDED CERTIFIED FINAL

W

W N

C

P W

P :d m s

L M

O O

V .d g n

H

T S

D R

S T

J

U N

:4

L M

O O

V .d g n

.0

:1

L O

W E

R P

O O

L S

T A

G E H

Y D

R O

G R

A P

H S

V-6117

-2

IN

C L

U S

IV

E

E L

E V

A T

IO

N E

L E

V A

T

IO

N E

L E

V A

T

IO

N

E L

E V

A T

IO

N E

L E

V A

T

IO

N

2007 2008

L A

K O

W S

K

S Z

K

IE

S K

Y

IN MEASURED POOL ELEVATIONS.

OPERATIONS THAT CAN CAUSE MINOR FLUCTUATIONS

LOWER POOL (ELEV 664.5) ARE DUE TO GATE

HYDROGRAPH POINTS SLIGHTLY BELOW PROJECT 6.

HIGHER THAN NAVD88.

THE NGVD29 DATUM, AS SHOWN, IS 0.39 FEET 5.

WERE CORRECTED.

WAS SCREENED AND INACCURATE DATA VALUES

DATA. THE RAW NAVIGATION DATA FROM THE FIELD

BREAKS IN THE HYDROGRAPH INDICATE MISSING 4.

652.5 FEET NGVD29.

ZERO ELEVATION OF THE LOWER POOL GAGE IS

AND AN ELEVATION OF 664.5 FEET NGVD29. THE

PROJECT LOWER POOL IS A STAGE OF 12.0 FEET 3.

THE ACTUAL PEAK ELEVATION IS NOTED.

FOR PEAK ELEVATIONS AT OR ABOVE 682 FEET, 2.

AND DAM.

OF ENGINEERS RECORDS AT MONTGOMERY LOCKS

DAILY AVERAGE VALUES COMPUTED FROM CORPS

HISTORICAL STAGE HYDROGRAPHS ARE BASED ON 1.

NOTES:

682.0

F E

B

Z A

IT

S O

F F

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

NUMBER

IDENTIFICATION

SHEET

OF ENGINEERS

US ARMY CORPS

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N A

P P

R

D A

T E

C O

N T

R A

C T N

O

C O

R P

S O

F E

N G

IN

E E

R S

U S

A R

M Y E

N G

IN

E E

R D

IS

T R

H

IO

R

IV

E R

M O

N T

G O

M E

R Y L

O C

K S A

N D D

A M

D A

M G

A T

E I

N S

T A

L L

A T

IO

N

P

IT

T S

B U

R G

H P

A W

W N

B

AS-AWARDED CERTIFIED FINAL

W

W N

C

P W

P :d m s

L M

O O

V .d g n

H

T S

D R

S T

J

U N

:4

L M

O O

V .d g n

.0

:1

L O

W E

R P

O O

L S

T A

G E H

Y D

R O

G R

A P

H S

V-6118

-2

IN

C L

U S

IV

E

E L

E V

A T

IO

N

E L

E V

A T

IO

N

E L

E V

A T

IO

N

2010 2011

E L

E V

A T

IO

N

L A

K O

W S

K

S Z

K

IE

S K

Y

IN MEASURED POOL ELEVATIONS.

OPERATIONS THAT CAN CAUSE MINOR FLUCTUATIONS

LOWER POOL (ELEV 664.5) ARE DUE TO GATE

HYDROGRAPH POINTS SLIGHTLY BELOW PROJECT 6.

HIGHER THAN NAVD88.

THE NGVD29 DATUM, AS SHOWN, IS 0.39 FEET 5.

WERE CORRECTED.

WAS SCREENED AND INACCURATE DATA VALUES

DATA. THE RAW NAVIGATION DATA FROM THE FIELD

BREAKS IN THE HYDROGRAPH INDICATE MISSING 4.

652.5 FEET NGVD29.

ZERO ELEVATION OF THE LOWER POOL GAGE IS

AND AN ELEVATION OF 664.5 FEET NGVD29. THE

PROJECT LOWER POOL IS A STAGE OF 12.0 FEET 3.

THE ACTUAL PEAK ELEVATION IS NOTED.

FOR PEAK ELEVATIONS AT OR ABOVE 682 FEET, 2.

AND DAM.

OF ENGINEERS RECORDS AT MONTGOMERY LOCKS

DAILY AVERAGE VALUES COMPUTED FROM CORPS

HISTORICAL STAGE HYDROGRAPHS ARE BASED ON 1.

NOTES:

E L

E V

A T

IO

N

F E

B

Z A

IT

S O

F F

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

NUMBER

IDENTIFICATION

SHEET

OF ENGINEERS

US ARMY CORPS

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N A

P P

R

D A

T E

C O

N T

R A

C T N

O

C O

R P

S O

F E

N G

IN

E E

R S

U S

A R

M Y E

N G

IN

E E

R D

IS

T R

H

IO

R

IV

E R

M O

N T

G O

M E

R Y L

O C

K S A

N D D

A M

D A

M G

A T

E I

N S

T A

L L

A T

IO

N

P

IT

T S

B U

R G

H P

A W

W N

B

AS-AWARDED CERTIFIED FINAL

W

W N

C

P W

P :d m s

L M

O O

V .d g n

H

T S

D R

S T

J

U N

:4

L M

O O

V .d g n

.0

:1

D U

R A

T

IO

N A

N D D

IS

C H

A R

G E C

U R

V

V-6119

2. PERIOD OF RECORD - WY1995 THRU WY2013.

RECORDS AT MONTGOMERY LOCKS AND DAMS.

VALUES, COMPUTED FROM CORPS OF ENGINEERS

1. ELEVATION DURATIONS ARE BASED ON DAILY AVERAGE

NOTES:

PERCENT OF TIME EXCEEDED

E L

E V

A T

IO

N

F

E

N G

V D

MONTGOMERY LOCKS AND DAM UPPER AND LOWER POOL DURATION

UPPER POOL

LOWER POOL

E L

E V

A T

IO

N

F

E

N G

V D

DISCHARGE (1000’S CFS)

MONTGOMERY LOCKS AND DAM RATING CURVE

UPPER POOL

LOWER POOL

UPPER POOL

LOWER POOL

RESTRICTED

LOWER POOL

GATES FULL OPEN

UPPER POOL ALL

TWO GATES RESTRICTED

ONE GATE CLOSED

UPPER POOL

POOL ELEV. 682.0

PROJECT UPPER

0 100 200 300 400 500 600

0 10 20 30 40 50 60 70 80 90 100

L A

K O

W S

K I

R

T Y

S Z

K

IE

S K

Y

ELEV 664.5

PROJECT LOWER POOL

F E

B

Z A

IT

S O

F F

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

NUMBER

IDENTIFICATION

SHEET

OF ENGINEERS

US ARMY CORPS

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N A

P P

R

D A

T E

C O

N T

R A

C T N

O

C O

R P

S O

F E

N G

IN

E E

R S

U S

A R

M Y E

N G

IN

E E

R D

IS

T R

H

IO

R

IV

E R

M O

N T

G O

M E

R Y L

O C

K S A

N D D

A M

D A

M G

A T

E I

N S

T A

L L

A T

IO

N

P

IT

T S

B U

R G

H P

A W

W N

B

AS-AWARDED CERTIFIED FINAL

W

W N

C

LMOO_314_V-6111
LMOO_314_V-6112
LMOO_314_V-6113
LMOO_314_V-6114
LMOO_314_V-6115
LMOO_314_V-6116
LMOO_314_V-6117
LMOO_314_V-6118
LMOO_314_V-6119
0-LMO_20-18.2
0-LMO_20-19.3
0-LMO_20-20.1
0-LMO_20-21.2
0-LMO_20-22.2
0-LMO_20-23.1
0-LMO_20-24.2
0-LMO_20-27.2
0-LMO_20-28.2
0-LMO_20-32.1
0-LMO_20-33.1
0-LMO_20-39.2
0-LMO_20-40.2
0-LMO_20-50
ORB-2-1 Sheet 1
ORB-2-1 Sheet 2
ORB-2-1 Sheet 3
ORB-2-1 Sheet 4
ORB-2-1 Sheet 5
ORB-2-1 Sheet 6
ORB-2-1 Sheet 8
ORB-2-1 Sheet 9
ORB-2-1 Sheet 10
ORB-2-1 Sheet 11
ORB-2-1 Sheet 12
ORB-2-1 Sheet 13
ORB-2-1 Sheet 14
ORB-2-1 Sheet 15
ORB-2-1 Sheet 25
ORB-2-1 Sheet 26

File details come from the government source that posted it.