W911SD-23-R-0064 0001-Elevator Maintenance and Repair Amendment.pdf
PDF 283 KB Posted
- Solicitation number
- W911SD-23-R-0064
About this file
This document provides details for a federal contract solicitation for elevator maintenance and repair services at West Point, New York. The solicitation is unrestricted under NAICS code 811310 with a size standard of $11 million. The base period of performance is from April 13, 2023 to April 12, 2024 with four one-year option periods. Quotes are due by April 5, 2023 and must include past performance questionnaires and license/certification copies. A mandatory site visit will be held on March 15, 2023 for interested contractors to observe elevators, dumbwaiters and other equipment. Requests for information are due by March 21, 2023. The Mission and Installation Contracting Command at Fort Eustis will award a contract to provide preventative maintenance, safety inspections, repairs and on-call services for approximately 75 elevators and other conveyances at the U.S. Military Academy.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911SD23R0064
MICC - WEST POINT PCO
681 HARDEE PLACE
TARA.M.DAMICO.CIV@ARMY.MIL
845-938-5102
WEST POINT NY 10996
0011908124
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to update the Performance Work Statement (PWS) w ith changes to 3.6, 5.3.1 and 5.9; add FAR 52.237-1, Site Visit and FAR 52.216-4, Economic Price Adjustment-Labor and Material. The other changes included the updated 52.212-2 Addendum, Instructions to Offerors w ith instructions for the Performance Assessment Questionnaire in reference to the Past Performance Factor and the site visit date change from 15 March 2023 to 16 March 2023 w ith a list of buildings for the site visit. There are no other changes to this amendment and all terms and conditions are in full effect.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 15
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Mar-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911SD23R0064
X 9B. DATED (SEE ITEM 11)
07-Mar-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Mar-2023
CODE
MICC - WEST POINT
681 HARDEE PLACE
WEST POINT NY 10996-1514
W911SD 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W911SD
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
52.212-2 ADDENDUM
ADDENDUM TO FAR 52.212-2
52.212-2 Addendum EVALUATION--COMMERCIAL ITEMS (OCT 2014)
Evaluation Factors for Award
a. Basis for Contract Award. This is a Lowest Price Technically Acceptable source selection conducted in accordance with Federal Acquisition Regulation (FAR) 13, Simplified Acquisition Procedures, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Army Federal Acquisition Regulation Supplement (AFARS). The test program authorized under FAR Subpart 13.5 is applicable to this acquisition. Award will be made to a single offeror who is deemed responsible in accordance with the Federal Acquisition Regulation (FAR), whose quote is technically acceptable, conforms to the solicitation requirements, and whose quote, judged by an overall assessment of the evaluation criteria and other considerations specified in this solicitation, represents the lowest price.
b. Award for All of the Work. The Government intends to award one (1) contract as a result of this solicitation. Quotes received for less than the stated number of items listed in the Price Schedule will be considered ineligible for award. As set forth in FAR 52.212-1 (g), the Government intends to evaluate quotes and award a contract without discussions with quoters. Therefore, the quoter’s initial quote should contain the quoter’s best terms from a price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. The Government may reject any or all quotes if such action is in the public interest; accept other than the lowest quote and waive informalities and minor irregularities in quotes received.
c. Evaluation Criteria. Evaluation criteria consists of factors. The quotes will be evaluated under three (3) evaluation factors: Technical Capability, Past Performance and Price.
Factor 1 – Technical Factor. The Technical Factor will receive one of the ratings defined below.
Table 1. Technical Capability Acceptable/Unacceptable Ratings Rating Description
Acceptable Quote clearly meets the minimum requirements of the solicitation.
Unacceptable Quote does not clearly meet the minimum requirements of the solicitation.
In order to receive an acceptable rating, the technical factor submissions must demonstrate technical capability in the same or similar magnitude and complexity outlined in the Performance Work Statement. As per the Performance Work Statement, in Section 2.7, Elevator Inspector, the Elevator Inspector must have the certification for the ASME A17 QEI-Q Standard for the Qualification of Elevator Inspectors Certified.
Every interested quoter must send a copy of their certification/licenses, in order to be considered for award.
Please make (2) two or (3) three copies of the attached Performance Assessment Questionnaire and send to the companies that you performed work in the past for Elevator Maintenance and Repair Service. The companies will need to complete the Performance Assessment Questionnaires. The Performance Assessment Questionnaires will be evaluated in the Past Performance Factor.
Additionally, every interested quoter must send copies of their Performance Assessment Questionnaires with their quotes, certifications/licenses, in order to be considered for award.
All interested offerors must e-mail their quotes, certifications/licenses,Performance Assessment Questionnaires and completed Solicitation W911SD-23-R-0064 to Ms.
Tara D’Amico at: Tara.M.Damico.civ@army.mil by the close of the Solicitation Date of 5 April 2023 at 12:00 pm. Eastern Time.
Factor 2 – Past Performance. The Past Performance Factor will receive one of the ratings defined below.
Table 1. Past Performance Evaluation Ratings Rating Description Acceptable Based on the quoter’s performance record, the Government has a reasonable expectation that the quoter will successfully perform the required effort, or the quoter’s performance record is unknown.
Unacceptable Based on the quoter’s performance record, the Government has no reasonable expectation that the mailto:Tara.M.Damico.civ@army.mil quoter will be able to successfully perform the required effort.
In order to receive an acceptable rating, the Past Performance submissions must show evidence of successfully performing work same or similar to the work outlined in the PWS or meet the criteria for “unknown” record of past performance. Quoters without a record of relevant past performance, the quoter may not be evaluated favorably or unfavorably on past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.” Past Performance must be both recent and relevant. To be recent, the effort must be ongoing or must have been performed during the past three (3) years from the date of issuance of this solicitation. To be relevant, the effort must be similar in nature of work, size, and complexity.
Factor 3 – Price. Price will not be scored or rated. Evaluation of price will be performed using one or more of the price analysis techniques in FAR 13.106- 3(a). Through these techniques the Government will determine whether prices are reasonable.
The Government will evaluate its Option to Extend Services (see FAR Clause 52.217-8) by adding six (6) months of the Quoter’s final option period price.
Evaluation of 52.217-8 shall not obligate the Government to exercise the option(s) to extend the services, unless the Contracting Officer determines it to be necessary.
Quoters responding to this solicitation are advised that, prior to award, the Government may request Quoters to submit substantiating information/data to support price reasonableness if it is warranted.
Options. The Government will evaluate quotes for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that a quote is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s). Evaluation of Option to Extend Services under 52.217-
8. For the purposes of the award of this Contract, the Government intends to evaluate the option to extend services, provided under FAR 52.217-8, as follows:
by adding one-half of the Quoter’s final 12-month period prices to the total proposed price. Thus, the Quoter’s total price for the purpose of evaluation will include the 60-month term plus an additional six-month period. Quoters will not quote a price for this additional six-month period. The evaluation will consider the possibility that the option can be exercised at any time during any contract performance period and can be exercised in increments of one to six months, but for no more than a total of six months during the life of the contract.
d. A written notice of award or acceptance of a quote, mailed or otherwise furnished to the successful quoter within the time for acceptance specified in the quote, shall result in a binding contract without further action by either party. Before the quote’s specified expiration time, the Government may accept a quote, whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
PERFORMANCE WORK STATEMENT
ELEVATOR
MAINTENANCE POST WIDE
US Military Academy At West Point NY
05-Nov-2022
Table of Contents
1. Scope of Work: The Contractor shall provide the necessary management, supervision, administration, personnel, transportation, supplies, material, repair parts, tools and test equipment necessary to perform complete preventive maintenance service (PM), full load safety testing and inspection, emergency call-back service, service calls and all other repairs (example, lighting) to approximately( 75) elevators, (10) chair lifts, (5) dumbwaiters, (1) Sidewalk lift and related equipment (see appendix 1 group A thru D). Services shall be performed at the U.S.
Military Academy (USMA), United States Military Academy Preparatory School USMAPS Bldg 950, Motor Pool Bldg 1940, West Point New York 10996.
1.1 NORMAL DUTY HOURS / WORK DAYS: All work, with the exception of emergency call-back service as indicated on Appendix 1, Groups A thru D shall be performed during normal duty hours from 8:00am through 4:30pm hours Monday through Friday (excluding federal holidays). A service tech is required to be on site daily (excluding federal holidays) by 8:00am.
1.1.2 Acceptance of Existing Equipment: In accordance with this contract the contractor shall accept all elevators, chairlifts and dumbwaiters “as is”.
1.2 CONTRACTOR’S PERSONNEL: The Contractor shall provide sufficient personnel possessing the skills, knowledge and training to satisfactorily perform the services required by this contract. Personnel performing under this contract shall remain employees of the Contractor and shall not be considered employees of the Government.
1.2.1 Deficiencies in performance will be reported to the Contractor, including employee misconduct, and left to the Contractor for resolution. If not resolved satisfactorily, the Government may take action to terminate and/or reflect on the Contractor’s Performance Record.
1.2.2 The Contractor’s personnel shall comply with Clause 52.204-0911 MEVA Personnel Access Control be required to conspicuously display on their person, a photo identification badge containing company and employee name and shall be furnished by the Contractor in such a manner as to be plainly visible at all times while the workmen are on the job site. The Contractor shall collect identification badges from employees due to a change in personnel prior to release and notify the Contracting Officer within 24 hours.
l.3 VEHICLE IDENTIFICATION: The Contractor shall have painted or magnetic type signs with a minimum of 18” high by 24” wide with 2” lettering the company name on the vehicle(s) used under this contract.
1.3.1 The Contractor shall have the appropriate USMA parking passes displayed on windshields of the vehicles.
All Contractors’ personnel shall observe all applicable rules pertaining to parking, vehicle speeds, and designated parking areas for service vehicles. Parking on sidewalks anywhere on West Point is prohibited.
1.3.2 PARKING FACILITIES: There is limited parking available for the Contractor’s privately owned vehicles in and around work sites. Parking is available on a “first come first served” basis at public parking areas. All vehicles can be parked in the following areas:
Buffalo Solider H-lot Clinton Field
1.4 QUALITY CONTROL: The objective of this contract is to insure that quality equal to or exceeding industrial standards and workmanship is provided to maintain safe and efficient elevator operation. Quality control is a function within the Contractor’s scope of responsibility. The Contractor shall establish a Quality Control Program to ensure the requirements of the contract are provided as specified. The Contractor’s Quality Control Program Plan shall be provided to the Contracting Officer for review and approval within seven (7) calendar days from date of award. The Contractor will be notified of acceptance or rejection within five (5) calendar days from receipt in the Contracting Office. The program shall include, but not be limited to, the following:
a. An inspection system covering all the services to be performed under the contract.
b. A method for identifying deficiencies in the quality of services performed to prevent the level of performance from becoming unacceptable.
c. A method of documenting and enforcing quality control standards including in process inspection and testing.
d. A complete permanent file record of inspections, safety tests, maintenance, and all emergency call back and service calls shall be maintained. The documentation of all records shall be available at all times to the Contracting Officer and Contracting Officer Representative. (COR)
1.4.1 The Contractor shall notify the Contracting Officer in writing of any proposed change to the Contractor’s quality control system.
1.4.2 The contractors QC Rep shall meet with the COR once a month to review maintenance records, service call reports and do a joint inspection / QC check on at least two elevators and four service calls .
1.5 Key Control- See 2.27 Below
1.6 DOCUMENTS: The Contractor shall maintain drawings, maintenance manuals and specifications within each building in machine rooms.
1.6.1 The Contractor shall maintain a computer generated spread sheet file in tabular form compatible with Microsoft Excel software of all tests, maintenance and repairs done under this contract and provide a monthly updated computer CD to the COR.
l .7 SAFETY: The Contractor shall be responsible for instructing his employees in safety measures considered appropriate by him. The Contractor shall provide and maintain barriers and warning devices designed for the intended use. Contractor shall conduct his operations in strict conformance with the safety requirements of the Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1and insure compliance with requirements as out lined in Occupational Safety and Health Act (OSHA).
1.7.1 FIRE REGULATIONS: The Contractor shall comply with all USMA Fire Regulations.
2. DEFINITIONS: As used throughout this specification; the following terms shall have the meaning set forth below.
2.1 PREVENTIVE MAINTENANCE: Preventive Maintenance (PM) includes a systematic examination to determine the serviceability of elevators, dumbwaiters and chairlifts, all components and related items
2.2 PREVENTIVE MAINTENANCE SCHEDULE: Frequency (i.e. quarterly, semiannual, annual) that PM is performed.
2.3 SERVICE CALLS: A “Service Call” is a report of an elevator malfunction made by Government representative to the Contractor and the Contractor’s subsequent response to, and correction of, the problem.
2.5.1 APPENDIX GROUP A –Elevators in Buildings group A require emergency repair service after normal duty hours and weekends and holidays because they are in use 24 hours a day 7 days per week (example, mess hall, single officer quarters). Response shall be in accordance with 5.8.1.
2.5.2 APPENDIX GROUP B –Elevators in Buildings group B require emergency repair service after normal duty hours and weekends and holidays because they are in use 16 hours a day 7 days per week (Example, academic buildings, administration buildings, sports complex, theater, library). Response shall be in accordance with 5.8.1.
2.5.3 APPENDIX GROUP C –Elevators in Building group C require emergency repair service after normal duty hours and weekends and holidays because they are in use 10 hours a day 7 days a week. Response shall be in accordance with 5.8.1.
2.5.4 APPENDIX GROUP D- Elevators in Building group D do not have emergency repair service after normal working hours. Response shall be in accordance with 5.8.1.
2.6 CONTRACTING OFFICER REPRESENTATIVE (COR): That Government person responsible for monitoring and accepting Contractor performance.
2.7 ELEVATOR INSPECTOR: ASME A17 QEI-1 Standard for the Qualification of Elevator Inspectors Certified.
2.8 QUALITY CONTROL: Those actions taken by a Contractor to control services so they meet the requirements of this contract.
2.9 VANDALISM: The malicious destruction of Government owned property.
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES:
3.1 The Government reserves the right to add and remove elevators, chair lifts and dumbwaiters from this contract at any time. The Government will inform the Contractor as far in advance as possible of any changes.
Any changes in the terms and conditions of this contract may be made only by written agreement of the parties.
If such change causes an increase or decrease in the cost or time required for performance, the Contracting Officer will make an equitable adjustment in the contract price.
3.2 OWNERSHIP OF BLUEPRINTS AND KEYS: All blue prints, specifications, memoranda, access keys to mechanical and elevator motor rooms relating to work being performed are the property of the Government. The items are to be carefully used and returned to the Contracting Officer Representative at completion of contract, or permanent termination of work for any cause. Items mentioned above shall be signed for on a Government Issued form.
3.3 The Government will provide parking passes to the Contractor. The Contractor shall display these passes on the windshields of the vehicles while performing under this contract. All Contractors’ personnel shall observe all applicable Army rules and regulations given by the USMA, pertaining to parking, vehicle speeds, and vehicle inspections and designated parking areas for service vehicles.
3.4 Government will provide all parts in the existing inventory of spare parts in “as is” condition. No inventory of these parts exists. No inventory will be prepared or maintained. These parts are considered incidental and shall be used for the sole purpose of performing this contract.
3.5 HOT WORK PERMITS. The Contractor shall obtain a hot work permits from the West Point Fire Department, by calling 845-938-7848/ 2043. Hot work permits shall be posted at the work site.
3.6 Contractor may store limited parts in selected building machine rooms as designated by the COR. The Government is not liable for loss, damage, or destruction of any contractor owned property stored in Government buildings. Any areas provided to the contractor are to be designated under the contract and contractor materials are not to be maintained by the government.
4. CONTRACTOR FURNISHED ITEMS:
4.1 The Contractor shall provide fire code approved and labeled steel containers suitable for the storage of oily rags and a 5 lb ABC Fire Extinguisher dry chemical. The Contractor shall provide the steel containers and fire extinguishers in every elevator machine room.
4.2 The Contractor shall provide Safety Data Sheets (SDS) to the Contracting Officer Representative for all materials it uses under this contract. The Contractor shall submit the SDS copies within seven (7) calendar days from notice of award.
4.3 All parts and components used shall be from the original manufacturer or original manufacturer specifications or equivalent.
4.4 The Contractor shall furnish and replace elevator fire recall and equipment keys and keys that operate all elevator cab control panels, Peelle door locks, hallway panels, dumbwaiters, chairlifts and any other elevator devices as needed.
4.5 The Contractor shall provide a cellular telephone to the Contractor’s personnel so that the Government may contact the mechanics by telephone on an immediate basis.
5. SPECIFIC TASKS:
5.1 PREVENTIVE MAINTENANCE SCHEDULE: The Contractor shall prepare schedules of Quarterly, Semi-Annual, and Annual Preventive Maintenance services which lists by building, elevator, dumbwaiter and chairlift number and type, to include the date on which the Contractor plans to perform preventive maintenance.
Three (3) copies of each schedule shall be submitted to the Contracting Officer for review and approval fifteen
(15) days prior to preventative maintenance being performed. The Government will approve / disapprove within ten (10) days.
5.2 PREVENTIVE MAINTENANCE SERVICES: Based upon the approved schedule, the Contractor shall perform preventive maintenance in accordance with manufacturer’s specifications, safety factors and applicable safety codes for elevators, dumbwaiters and chairlifts, and all related equipment of the entire system. The Contractor shall maintain the entire system at the contract specified speed, under all conditions of loading; and shall adjust and maintain car leveling to within 1/16 of an inch level, at all floors, under all conditions of loading.
Subject to the capability of the equipment, the Contractor shall ensure that the original operating criteria is maintained at all times for each elevator:
(a) Maximum capacity in pounds.
(b) Rated speed in feet per minute.
(c) Performance time measured brake to brake.
(d) Door operation.
(e) Traffic handling capabilities.
(f) Response times.
(g) Ride quality.
5.2.1 The Contractor shall prepare and submit PM records to the Contracting Officer Representative within ten
(10) days after award, as a minimum, those items included on the sample sheets (appendix 2) to serve as a record of work performed. The Contractor’s completed PM records shall be furnished to the Contracting Officer’s Representative within five (5) workdays after PM is completed.
5.2.2 The Contractor shall be responsible to take necessary action to correct any defects of operation noted during the PM service performed at no additional cost. It includes replacing parts that are defective or show excess signs of wear, cleaning door tracks, securing handrails, replacing floor tiles, etc. Repairs shall be made within 5 working days of noted defects.
5.2.3 The following items are specifically excluded from the preventive maintenance portion of this contract. If it is deemed necessary by the Contracting Officer to perform these items of work, a cost proposal will be requested from the Contractor.
1. The replacement of the elevator cab.
2. Alignment of guide rails.
3. Furnishing replacement of elevator system line disconnect switches and line side power feeders to the line disconnect switches.
4. Buried piping.
5. Hoist way enclosures.
5.3 The Contractor shall be responsible for all repairs to elevators, dumbwaiters and chair lift systems at no additional cost to the Government unless qualified under Sections 5.2.3 or 5.3.1.
5.3.1 If vandalism is suspected to be the cause for the breakdown, immediately notify the COR. An equitable adjustment for parts may be requested and assessed based on the determination of vandalism. The Vandalism CLIN is estimated at a not to exceed $10,000.00 amount for bid purposes only. No historical data exists.
5.4 The Contractor shall keep the exterior of the machinery and other parts of the equipment subject to rust properly painted and presentable at all times, and shall keep machine rooms clean and floors painted.
5.5 Before any welding is undertaken, the Contractor shall submit to the Contracting Officer, three (3) copies of the name(s) of the welder(s), welding operator(s), and tacker(s), with their up to date certification, the code and procedure under which the individual(s) are qualified, the date qualified, the name of the firm, and person certifying the qualification tests. The Contractor shall maintain and furnish up to date certifications and it shall be kept current for the duration of the contract.
5.6 SAFETY TESTS: The Contractor shall perform periodic Full Load Safety Tests of elevators and chairlifts in accordance with ASME A17.1. The full load safety testing includes all hydraulic elevators that will be tested at full load. The Contractor shall submit a schedule, and safety test report within thirty days in advance of cars to be safety tested. This schedule shall be approved / disapproved by the Contracting Officer’s Representative.
This schedule shall list the dates on which such periodic tests will be performed. This shall be based on elevators and chairlifts that have reached the expiration year of its last performed full load safety test. The duration of these tests is to be made every five- (5) years for electric elevators and chairlifts and every three- (3) years for hydraulic elevators or shorter intervals if periodic inspection indicates this to be necessary.
5.6.1 The Contractor’s personnel who are not responsible for preventative maintenance shall perform the safety tests.
5.6.2 The Contractor shall notify the Contracting Officers Representative verbally upon identifying any defects or safety test failures that may occur or occurred during the testing and in writing within 5 days. This notification shall include corrective action to be taken and annotated on safety test report.
5.6.3. The Contractor’s safety test report forms shall contain as a minimum; those item included on the sample form (appendix 3).
5.6.4 The Contractor shall utilize an independent Q.E.I. certified inspector to validate all elevators and chairlifts for full load safety tests and verify, in writing, that the tests were performed and passed as per code. Prior to performing safety tests, the Contractor shall submit to the Contracting Officer Representative, in writing a copy, showing up to date certification and licenses of the inspector.
5.6.5 Upon completion of each safety test, the Contractor shall obtain the signature of the QEI inspector on the approved safety test form showing that the tests was performed as specified including the date and provide to the COR.
5.6.6 The Contractor shall post a signed and dated safety test inspection certificates in all elevator machine rooms in a standard frame.
5.6.7 The Contracting Officers Representative has the option to witness all safety tests.
5.7 INSPECTIONS OF ELEVATORS: The Contractor shall perform annually inspections of elevators, chair lifts, dumbwaiters and related equipment. The Contractor’s personnel performing the inspections of elevators shall be personnel not assigned to duty as a mechanic on the USMA premises. The Contractor shall prepare inspection form sheets, based upon the Government’s approval, to serve as a record of inspections performed.
These inspection form sheets submitted by the Contractor shall be furnished to the Contracting Officer’s Representative within five (5) workdays. The Contractor shall be responsible to take necessary action to correct any defects noted during the inspections performed and restore the elevator to a satisfactory safe operation.
5.8. SERVICE CALLS: Service calls shall be limited to restore an elevator to a safe and reliable service. The Contractor shall affix an “Out Of Order” sign near the elevator doors on all floors if service can’t be restored within sixty (60) minutes of response. All service calls have a 30 minute telephonic response to the service call and an on- site response time of 2 hours from initial notification based on the times stated for service hours in paragraph
5.8.1. For service calls received after the service call hours, the contractor shall have their mechanic report at 8:00 am on the next service time/day.
5.8.1 SERVICE CALL HOURS: shall be available as indicated by the Appendix 1group schedule, listed below:
GROUP A - 24 hours per day; 7 days per week GROUP B – 8:00 a.m. to 12:00 midnight; 7 days per week GROUP C – 8:00 am to 6:00 pm; 7days per week GROUP D – No service after normal working hours; Monday – Friday, 8:00 am – 4:30 pm.
5.8.2 After normal USMA working hours (after 4:30 P.M.), weekends and holidays, the Contractor, upon receiving a call from the Power Plant that an elevator is out of order, shall have his standby emergency elevator mechanic report within two (2) hours from the time of receipt of request for service. After each service call is completed, the elevator mechanic shall call the Power Plant and give status of the elevator. The Contractor shall obtain keys from the West Point Fire Department for those areas where building access is required and services shall be provided during non-duty hours (1630-0800) and weekends. If the Contractor fails to arrive within two
(2) hours thereof; $150.00 shall be deducted from the Contractor’s monthly payment for each hour increment beyond said two hours.
5.9 SERVICE CALL MONITORING BY CONTRACTOR: The Contractor shall call the service desk (938-2316) promptly each morning at 08:00 AM to receive any service calls. Near the end of each normal duty work day, at (16:15) hours, (4:15 PM), Contractor shall report back to the service desk, giving information on status of elevators and notification of any overnight shut downs or priority elevators in need of service repairs after normal duty hours.
5.9.1 For each service call, the Contractor shall provide to the Contracting Officers Representative, documentation that contains the following minimum information.
(1) A description of the problem.
(2) The location of the problem, building# & elevator #
(3) A description of the action taken to resolve the problem.
(4) The time and date corrective action was completed.
(5) The name of the person who corrected the problem.
(6) Customers Name & Phone #
5.9.2 The Contractor shall respond on site to each service call within two (2) hours and complete all repairs within 24 hours after discovering the problem or of receiving notification that corrective action is required. If the Contractor cannot complete the repairs within 24 hours, they shall submit in detail, a plan for completing the work to the Contracting Officer or Contracting Officers representative. Prior to removing an elevator from service, the Contractor shall coordinate and notify the Service Desk Dispatcher, and the Contracting Officers Representative.
If the service call is received outside of the Appendix 1, required service response times for that Group, the Contractor shall respond on site at 8:00 am on the next service time/day.
5.9.3 In the case where longer lead time for manufacturing of a major repair item is necessary. The Contractor shall notify the Contracting Officer Representative in writing within twenty four (24) hours giving the reason for extended time and exact time frame the item will be shipped to West Point.
5.10 ACCEPTABLE PERFORMANCE. The Contractor’s performance shall be based on performance of all items delineated in 5. SPECIFIC TASKS.
5.11 COMMUNICATION DEVICES: The Contractor shall be responsible for maintaining the emergency telephone lines and emergency telephones. The boundaries are from elevator cab station control panel or cabinet to the junction box, located in the elevator machine room.
5.12 GENERAL AND EMERGENCY LIGHTING. The Contractor shall be responsible for lighting installed in the elevator, machine room, hoistway, pit, car top, car bottom and emergency lighting, including emergency light batteries. The Contractor shall repair, furnish and install all lighting fixtures and components, including ballasts, bulbs, lamps, and fluorescent tubes.
5.13 STANDARD OF SANITATION AND CLEANLINESS: The Contractor shall take into account the special public, military and academic nature of the United States Military Academy and its prominence as a tourist attraction. The Contractor shall, at all times furnish a sufficient force to carry out the housekeeping and cleanup requirements on both exterior and interior areas affected by his contract operations on a day to day basis throughout the life of the contract. The Contractor shall, at all times, leave the work site in a clean orderly condition, and shall dispose of unusable materials. At a minimum each work area shall be cleaned up at the end of each day and trash removed from the site.
5.13.1 The Contractor shall take all necessary precautions, to safeguard and protect all Government property with which the Contractor comes in contact while performing the contract work.
5.13.2 All used oily wiping cloths and flammable materials shall be removed from each elevator machine room, in fire code approved containers, labeled, properly disposed of, and removed from the West Point premises. This shall be done on a monthly basis.
5.14 CONTRACT CLOSEOUT INSPECTION. Prior to the expiration of the contract, the Contractor in coordination with the Contracting Officer or Contracting Officers Representative shall inspect all elevators. Based on the survey, a copy of the Existing Deficiency Report that lists the deficiencies found by the Contracting Officers Representative shall be given to the Contractor for corrective action. The Contractor shall correct all the listed deficiencies that fall within the scope of this contract. The Contractor is also responsible for deficiencies that are discovered after the closeout inspection and before the expiration date of the contract.
5.15 SPECIAL EVENTS: The contractor will be required to provide a service tech for stand by duties at special events (examples, graduation, and football games) for emergency repairs if necessary. The COR will notify the contractor, in writing, no less than a week in advance of the date and times for the special event. Historically there have been approximately eight (8) special events annually.
6 APPLICABLE DOCUMENTS: Documents applicable to this contract are listed below. The Contractor shall follow and adhere to these documents and shall use them for guidance and information. Published later editions with supplements shall be used as documents applicable to this contract.
a. National Safety Code for Elevators and Escalators, ASME A17.1-2000
b. National Standard Practice for Inspection of Elevators, Escalators and Moving Walks.
c. National Safety Code for Existing Elevators and Escalators, ASME A17.3
d. Guide for Emergency Evacuation of Passengers from Elevators, ASME A17.4
e. National Electrical Code, (NEC) 2005 / NFPA-70
f. Corps of Engineers Health and Safety Manual EM 385-1-1.
g. AWS Section 5 D I.I
h. AMSE A17.1, Section #8.8, Title Welding, Rule 8.8.1, 8.8.2, and 8.8.
SITE VISIT INSTRUCTIONS
SITE VISIT INSTRUCTIONS
All interested offerors in the Solicitation W911SD-22-R-0064, for the Elevator Maintenance & Repair Service, must attend a mandatory site visit to observe the different elevators, dumb waiters, chair lifts, sidewalk lift and stage lift at the United States Military Academy, at West Point, N.Y., in order to be considered for award.
***The changes to the Site Visit are listed in red.
Due to the weather conditions, the Site Visit will take place on Thursday, March 16, at 10:00 am Eastern Time, at Building 681 Hardee Place, West Point, N.Y.
(Garrison Headquarters). We will meet in the parking lot of Building 681. We will inspect the elevator at Building 681 and walk a short distance to Building 667, then we will walk to the buildings listed below for the rest of the site visit.
Directions for entering West Point:
All visitors must go to the Visitor Center, in Highland Falls, NY prior to entering West Point for a Visitor Pass. Any person with a criminal record, will not be allowed to enter the gate. After receiving the Visitor Pass, you can enter West Point, at the Thayer Gate Entrance, near the Visitor Center. Please drive to the parking lot of Bldg. 681 Hardee Place, West Point, NY, where we will meet.
The Visitor Center make take awhile to get a pass. Please allow an hour before the meeting to go the Visitor Center to ensure you will have a Visitor Pass. Please be on time for the meeting.
Please contact Ms. Tara D’Amico, at Tara.M.Damico.civ@army.mil to confirm you will be attending the site visit. Please confirm your attendance no later than Tuesday, March 14, 2023 by 12 pm. Eastern Time. Please send your name, cell phone #, name of company and how many will be attending the site visit in an e-mail to Ms. Tara D’Amico by the date and time listed above.
Any questions after the Site Visit are due no later than Wednesday, March 22, by 12 pm. Eastern Time.
The following dates and times for the Site Visit:
1. Site Visit – Bldg. 681 Hardee Place, West Point, N.Y. (Parking lot) on Thursday, March 16, 2023 at 10:00 am. Eastern Time.
2. Confirm attendance with your name, cell phone #, name of company, and how many attendees will be in attendance by Tuesday, March 14, 2023 no later than 12 pm. Eastern Time.
3. After the Site Visit, requests for Information (RFI’s) no later than Wednesday, March 22, 2023 by 12 pm. Eastern Time.
mailto:Tara.M.Damico.civ@army.mil
The buildings listed below are for the Site Visit for the Elevator Maintenance & Repair Service.
USMA West Point Elevator ITM Site visit
1. Building 681 Car 1
2. Building 667 Car Passenger 2
3. Building 667 Dumbwaiter Car 6
4. Building 667 Freight Car 1
5. Building 639 Passenger Car 1
6. Building 727 Freight Car 1a
7. Building 727 Passenger Car 1
8. Building 727 Chairlift 4
9. Building 735 Passenger Car 1
10. Building 745 Freight Car 4b
11. Building 745 Freight Car 5b
12. Building 601 Sidewalk lift Car 1
SECTION SF 1449 - CONTINUATION SHEET
The following have been added by reference:
52.216-4 Economic Price Adjustment-Labor and Material JAN 2017 52.237-1 Site Visit APR 1984
(End of Summary of Changes)
File details come from the government source that posted it. Updated .