W911SD-23-R-0064 - Elevator Maintenance and Repair Service.pdf

PDF 1 MB Posted

Attached to
Special Notice - Unrestricted Solicitation-Elevator Maintenance & Repair Service
Solicitation number
W911SD-23-R-0064
Issued by

About this file

This is a solicitation for elevator maintenance and repair services at West Point, New York. The requirement is unrestricted under NAICS code 811310 with a size standard of $11 million. The base period of performance is from April 13, 2023 to April 12, 2024 with four one-year option periods to extend through April 12, 2028. Quotes are due by April 5, 2023 and must be submitted electronically. Interested firms must attend a mandatory site visit on March 15, 2023 and confirm attendance by March 14. The solicitation will be available on SAM.gov and questions are due by March 21. Services include preventative maintenance, inspections, testing, repairs and technical support for approximately 77 elevators, 9 chairlifts, 2 dumbwaiters, and 1 sidewalk and 1 stage lift across various buildings at West Point.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W911SD23R0064 07-Mar-2023

b. TELEPHONE NUMBER

845-938-5102

8. OFFER DUE DATE/LOCAL TIME

12:00 PM 05 Apr 2023

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W911SD9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

TARA M. D'AMICO

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

0011908124

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

MICC - WEST POINT

681 HARDEE PLACE

WEST POINT NY 10996-1514

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W16BCU 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

W6BM USAG WEST POINT

W6BM USAG WEST POINT

DPW FUEL AND PROPANE CONTRACT

BLDG 667B RUGER RD

WEST POINT NY 10996-1592

TEL: 845-938-4222 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$11,000,000

NAICS:

811310

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 30 - BLOCK 14 CONTINUATION PAGE

SITE VISIT INSTRUCTIONS

SITE VISIT INSTRUCTIONS

All interested offerors in the Solicitation W911SD-22-R-0064, for the Elevator Maintenance & Repair Service, must attend a mandatory site visit to observe the different elevators, dumb waiters, chair lifts, sidewalk lift and stage lift at the United States Military Academy, at West Point, N.Y., in order to be considered for award.

The Site Visit will take place on Wednesday, March 15, 2023 at 10:00 am Eastern Time, at Building 681 Hardee Place, West Point, N.Y. (Garrison Headquarters). We will meet in the parking lot of Building 681. We will inspect the elevator at Building 681 and walk a short distance to Building 667.

Directions for entering West Point:

All visitors must go to the Visitor Center, in Highland Falls, NY prior to entering West Point for a Visitor Pass. Any person with a criminal record, will not be allowed to enter the gate. After receiving the Visitor Pass, you can enter West Point, at the Thayer Gate Entrance, near the Visitor Center. Please drive to the parking lot of Bldg. 681 Hardee Place, West Point, NY, where we will meet.

The Visitor Center make take awhile to get a pass. Please allow an hour before the meeting to go the Visitor Center to ensure you will have a Visitor Pass. Please be on time for the meeting.

Please contact Ms. Tara D’Amico, at Tara.M.Damico.civ@army.mil to confirm you will be attending the site visit. Please confirm your attendance no later than Tuesday, March 14, 2023 by 12 pm. Eastern Time. Please send your name, cell phone #, name of company and how many will be attending the site visit in an e-mail to Ms. Tara D’Amico by the date and time listed above.

Any questions after the Site Visit are due no later than Tuesday, March 21, 2023 by 12 pm. Eastern Time.

The following dates and times for the Site Visit:

1. Site Visit – Bldg. 681 Hardee Place, West Point, N.Y. (Parking lot) on Wednesday, March 15, 2023 at 10:00 am. Eastern Time.

2. Confirm attendance with your name, cell phone #, name of company, and how many attendees will be in attendance by Tuesday, March 14, 2023 no later than 12 pm. Eastern Time.

3. After the Site Visit, requests for Information (RFI’s) no later than Tuesday, March 21, 2023 by 12 pm. Eastern Time.

PERFORMANCE WORK STATEMENT

ELEVATOR

MAINTENANCE

POST WIDE

05-Nov-2022 mailto:Tara.M.Damico.civ@army.mil

Table of Contents

- Scope of Work: The Contractor shall provide the necessary management, supervision, administration, personnel, transportation, supplies, material, repair parts, tools and test equipment necessary to perform complete preventive maintenance service (PM), 3yr and 5yrs full load safety testing and inspection, emergency call-back service, daily service calls and all other repairs (example, lighting) to approximately( 77) elevators, (9) chair lifts, (2) dumbwaiters, (1) sidewalk lift (1) Stage lift and related equipment as per ANSI/ ASME A17.1-2019 Safety Code for Elevators and Escalators. Elevator list (see appendix 1 group A thru D).Services shall also be performed at the U.S. Military Academy (USMA), USMAPS, Motor Pool Bldg 1940 at West Point New York 10996. Contract will be one (1) 12-month base period and four (4) 12-month option periods with a clause for a 6 month extension (if needed). Services shall be performed at the U.S. Military Academy (USMA), USMAPS, Motor Pool Bldg 1940, West Point New York 10996.

• NORMAL DUTY HOURS / WORK DAYS: All work, with the exception of emergency call-back service as indicated on Appendix 1, Groups A thru D shall be performed during normal duty hours from 8:00am through 4:30pm hours Monday through Friday (excluding federal holidays). A service tech is required to be on site daily (excluding federal holidays) by 8:00am.

1.1.2 Acceptance of Existing Equipment: In accordance with this contract the contractor shall accept all elevators, chairlifts and dumbwaiters “as is”.

(1) CONTRACTOR’S PERSONNEL: The Contractor shall provide sufficient personnel possessing the skills, knowledge and training to satisfactorily perform the services required by this contract. Personnel performing under this contract shall remain employees of the Contractor and shall not be considered employees of the Government.

• Deficiencies in performance will be reported to the Contractor, including employee misconduct, and left to the Contractor for resolution. If not resolved satisfactorily, the Government may take action to terminate and/or reflect on the Contractor’s Performance Record.

• The Contractor’s personnel shall comply with Clause 52.204-0911 MEVA Personnel Access Control be required to conspicuously display on their person, a photo identification badge containing company and employee name and shall be furnished by the Contractor in such a manner as to be plainly visible at all times while the workmen are on the job site. The Contractor shall collect identification badges from employees due to a change in personnel prior to release and notify the Contracting Officer within 24 hours.

l.3 VEHICLE IDENTIFICATION: The Contractor shall have painted or magnetic type signs with a minimum of 18” high by 24” wide with 2” lettering the company name on the vehicle(s) used under this contract.

• The Contractor shall have the appropriate USMA parking passes displayed on windshields of the vehicles. All Contractors’ personnel shall observe all applicable rules pertaining to parking, vehicle speeds, and designated parking areas for service vehicles.

Parking on sidewalks anywhere on West Point is prohibited.

• PARKING FACILITIES: There is limited parking available for the Contractor’s privately owned vehicles in and around work sites. Parking is available on a “first come first served” basis at public parking areas. All vehicles can be parked in the following areas:

Buffalo Solider H-lot Clinton Field

1.4 QUALITY CONTROL: The objective of this contract is to insure that quality equal to or exceeding industrial standards and workmanship is provided to maintain safe and efficient elevator operation. Quality control is a function within the Contractor’s scope of responsibility. The Contractor shall establish a Quality Control Program to ensure the requirements of the contract are provided as specified. The Contractor’s Quality Control Program Plan shall be provided to the Contracting Officer for review and approval within seven (7) calendar days from date of award. The Contractor will be notified of acceptance or rejection within five (5) calendar days from receipt in the Contracting Office. The program shall include, but not be limited to, the following:

1) An inspection system covering all the services to be performed under the contract.

2) A method for identifying deficiencies in the quality of services performed to prevent the level of performance from becoming unacceptable.

3) A method of documenting and enforcing quality control standards including in process inspection and testing.

4) A complete permanent file record of inspections, safety tests, maintenance, and all emergency call back and service calls shall be maintained. The documentation of all records shall be available at all times to the Contracting Officer and Contracting Officer Representative. (COR)

1.4.1 The Contractor shall notify the Contracting Officer in writing of any proposed change to the Contractor’s quality control system.

1.4.2 The contractors QC Rep shall meet with the COR once a month to review maintenance records, service call reports and do a joint inspection / QC check on at least two elevators and four service calls .

1.5 Key Control- See 2.27 Below

1.6 DOCUMENTS: The Contractor shall maintain drawings, maintenance manuals and specifications within each building in machine rooms.

1.6.1 The Contractor shall maintain a computer generated spread sheet file in tabular form compatible with Microsoft Excel software of all tests, maintenance and repairs done under this contract and provide a monthly updated computer CD to the COR.

l .7 SAFETY: The Contractor shall be responsible for instructing his employees in safety measures considered appropriate by him.

The Contractor shall provide and maintain barriers and warning devices designed for the intended use. Contractor shall conduct his operations in strict conformance with the safety requirements of the Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1and insure compliance with requirements as out lined in Occupational Safety and Health Act (OSHA).

1.7.1 FIRE REGULATIONS: The Contractor shall comply with all USMA Fire Regulations.

2. DEFINITIONS: As used throughout this specification; the following terms shall have the meaning set forth below.

2.1 PREVENTIVE MAINTENANCE: Preventive Maintenance (PM) includes a systematic examination to determine the serviceability of elevators, dumbwaiters and chairlifts, all components and related items

2.2 PREVENTIVE MAINTENANCE SCHEDULE: Frequency (i.e. quarterly, semiannual, annual) that PM is performed.

2.3 SERVICE CALLS: A “Service Call” is a report of an elevator malfunction made by Government representative to the Contractor and the Contractor’s subsequent response to, and correction of, the problem.

2.5.1 APPENDIX GROUP A –Elevators in Buildings group A require emergency repair service after normal duty hours and weekends and holidays because they are in use 24 hours a day 7 days per week (example, mess hall, single officer quarters). Response shall be in accordance with 5.8.1.

2.5.2 APPENDIX GROUP B –Elevators in Buildings group B require emergency repair service after normal duty hours and weekends and holidays because they are in use 16 hours a day 7 days per week (Example, academic buildings, administration buildings, sports complex, theater, library). Response shall be in accordance with 5.8.1.

2.5.3 APPENDIX GROUP C –Elevators in Building group C require emergency repair service after normal duty hours and weekends and holidays because they are in use 10 hours a day 7 days a week. Response shall be in accordance with 5.8.1.

2.5.4 APPENDIX GROUP D- Elevators in Building group D do not have emergency repair service after normal working hours.

Response shall be in accordance with 5.8.1.

2.6 CONTRACTING OFFICER REPRESENTATIVE (COR): That Government person responsible for monitoring and accepting Contractor performance.

2.7 ELEVATOR INSPECTOR: ASME A17 QEI-1 Standard for the Qualification of Elevator Inspectors Certified.

2.8 QUALITY CONTROL: Those actions taken by a Contractor to control services so they meet the requirements of this contract.

2.9 VANDALISM: The malicious destruction of Government owned property.

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES:

3.1 The Government reserves the right to add and remove elevators, chair lifts and dumbwaiters from this contract at any time.

The Government will inform the Contractor as far in advance as possible of any changes. Any changes in the terms and conditions of this contract may be made only by written agreement of the parties. If such change causes an increase or decrease in the cost or time required for performance, the Contracting Officer will make an equitable adjustment in the contract price.

3.2 OWNERSHIP OF BLUEPRINTS AND KEYS: All blue prints, specifications, memoranda, access keys to mechanical and elevator motor rooms relating to work being performed are the property of the Government. The items are to be carefully used and returned to the Contracting Officer Representative at completion of contract, or permanent termination of work for any cause. Items mentioned above shall be signed for on a Government Issued form.

3.3 The Government will provide parking passes to the Contractor. The Contractor shall display these passes on the windshields of the vehicles while performing under this contract. All Contractors’ personnel shall observe all applicable Army rules and regulations given by the USMA, pertaining to parking, vehicle speeds, and vehicle inspections and designated parking areas for service vehicles.

3.4 Government will provide all parts in the existing inventory of spare parts in “as is” condition. No inventory of these parts exists.

No inventory will be prepared or maintained. These parts are considered incidental and shall be used for the sole purpose of performing this contract.

3.5 HOT WORK PERMITS. The Contractor shall obtain a hot work permits from the West Point Fire Department, by calling 845-938-7848/ 2043. Hot work permits shall be posted at the work site.

3.6 Contractor may store limited parts in selected building machine rooms as designated by the COR. The Government is not liable for loss, damage, or destruction of any contractor owned property stored in Government buildings.

4. CONTRACTOR FURNISHED ITEMS:

4.1 The Contractor shall provide fire code approved and labeled steel containers suitable for the storage of oily rags and a 5 lb ABC Fire Extinguisher dry chemical. The Contractor shall provide the steel containers and fire extinguishers in every elevator machine room.

4.2 The Contractor shall provide Safety Data Sheets (SDS) to the Contracting Officer Representative for all materials it uses under this contract. The Contractor shall submit the SDS copies within seven (7) calendar days from notice of award.

4.3 All parts and components used shall be from the original manufacturer or original manufacturer specifications or equivalent.

4.4 The Contractor shall furnish and replace elevator fire recall and equipment keys and keys that operate all elevator cab control panels, Peelle door locks, hallway panels, dumbwaiters, chairlifts and any other elevator devices as needed.

4.5 The Contractor shall provide a cellular telephone to the Contractor’s personnel so that the Government may contact the mechanics by telephone on an immediate basis.

5. SPECIFIC TASKS:

5.1 PREVENTIVE MAINTENANCE SCHEDULE: The Contractor shall prepare schedules of Quarterly, Semi-Annual, and Annual Preventive Maintenance services which lists by building, elevator, dumbwaiter and chairlift number and type, to include the date on which the Contractor plans to perform preventive maintenance. Three (3) copies of each schedule shall be submitted to the Contracting Officer for review and approval fifteen

(15) days prior to preventative maintenance being performed. The Government will approve / disapprove within ten (10) days.

5.2 PREVENTIVE MAINTENANCE SERVICES: Based upon the approved schedule, the Contractor shall perform preventive maintenance in accordance with manufacturer’s specifications, safety factors and applicable safety codes for elevators, dumbwaiters and chairlifts, and all related equipment of the entire system. The Contractor shall maintain the entire system at the contract specified speed, under all conditions of loading; and shall adjust and maintain car leveling to within 1/16 of an inch level, at all floors, under all conditions of loading. Subject to the capability of the equipment, the Contractor shall ensure that the original operating criteria is maintained at all times for each elevator:

(a) Maximum capacity in pounds.

(b) Rated speed in feet per minute.

(c) Performance time measured brake to brake.

(d) Door operation.

(e) Traffic handling capabilities.

(f) Response times.

(g) Ride quality.

5.2.1 The Contractor shall prepare and submit PM records to the Contracting Officer Representative within ten

(10) days after award, as a minimum, those items included on the sample sheets (appendix 2) to serve as a record of work performed. The Contractor’s completed PM records shall be furnished to the Contracting Officer’s Representative within five (5) workdays after PM is completed.

5.2.2 The Contractor shall be responsible to take necessary action to correct any defects of operation noted during the PM service performed at no additional cost. It includes replacing parts that are defective or show excess signs of wear, cleaning door tracks, securing handrails, replacing floor tiles, etc. Repairs shall be made within 5 working days of noted defects.

5.2.3 The following items are specifically excluded from the preventive maintenance portion of this contract. If it is deemed necessary by the Contracting Officer to perform these items of work, a cost proposal will be requested from the Contractor.

1. The replacement of the elevator cab.

2. Alignment of guide rails.

3. Furnishing replacement of elevator system line disconnect switches and line side power feeders to the line disconnect switches.

4. Buried piping.

5. Hoist way enclosures.

5.3 The Contractor shall be responsible for all repairs to elevators, dumbwaiters and chair lift systems at no additional cost to the Government unless qualified under Sections 5.2.3 or 5.3.1.

5.3.1 If vandalism is suspected to be the cause for the breakdown, immediately notify the COR. An equitable adjustment for parts will be reached and assessed based on the determination of vandalism. The Vandalism CLIN is estimated at a not to exceed $10,000.00 amount for bid purposes only. No historical data exists.

5.4 The Contractor shall keep the exterior of the machinery and other parts of the equipment subject to rust properly painted and presentable at all times, and shall keep machine rooms clean and floors painted.

5.5 Before any welding is undertaken, the Contractor shall submit to the Contracting Officer, three (3) copies of the name(s) of the welder(s), welding operator(s), and tacker(s), with their up to date certification, the code and procedure under which the individual(s) are qualified, the date qualified, the name of the firm, and person certifying the qualification tests. The Contractor shall maintain and furnish up to date certifications and it shall be kept current for the duration of the contract.

5.6 SAFETY TESTS: The Contractor shall perform periodic Full Load Safety Tests of elevators and chairlifts in accordance with ASME A17.1. The full load safety testing includes all hydraulic elevators that will be tested at full load. The Contractor shall submit a schedule, and safety test report within thirty days in advance of cars to be safety tested. This schedule shall be approved / disapproved by the Contracting Officer’s Representative. This schedule shall list the dates on which such periodic tests will be performed. This shall be based on elevators and chairlifts that have reached the expiration year of its last performed full load safety test. The duration of these tests is to be made every five- (5) years for electric elevators and chairlifts and every three- (3) years for hydraulic elevators or shorter intervals if periodic inspection indicates this to be necessary.

5.6.1 The Contractor’s personnel who are not responsible for preventative maintenance shall perform the safety tests.

5.6.2The Contractor shall notify the Contracting Officers Representative verbally upon identifying any defects or safety test failures that may occur or occurred during the testing and in writing within 5 days. This notification shall include corrective action to be taken and annotated on safety test report.

5.6.3. The Contractor’s safety test report forms shall contain as a minimum; those item included on the sample form (appendix 3).

5.6.4 The Contractor shall utilize an independent Q.E.I. certified inspector to validate all elevators and chairlifts for full load safety tests and verify, in writing, that the tests were performed and passed as per code. Prior to performing safety tests, the Contractor shall submit to the Contracting Officer Representative, in writing a copy, showing up to date certification and licenses of the inspector.

5.6.5 Upon completion of each safety test, the Contractor shall obtain the signature of the QEI inspector on the approved safety test form showing that the tests was performed as specified including the date and provide to the COR.

5.6.6 The Contractor shall post a signed and dated safety test inspection certificates in all elevator machine rooms in a standard frame.

5.6.7 The Contracting Officers Representative has the option to witness all safety tests.

5.7 INSPECTIONS OF ELEVATORS: The Contractor shall perform annually inspections of elevators, chair lifts, dumbwaiters and related equipment. The Contractor’s personnel performing the inspections of elevators shall be personnel not assigned to duty as a mechanic on the USMA premises. The Contractor shall prepare inspection form sheets, based upon the Government’s approval, to serve as a record of inspections performed. These inspection form sheets submitted by the Contractor shall be furnished to the Contracting Officer’s Representative within five (5) workdays. The Contractor shall be responsible to take necessary action to correct any defects noted during the inspections performed and restore the elevator to a satisfactory safe operation.

5.8. SERVICE CALLS: Service calls shall be limited to restore an elevator to a safe and reliable service. The Contractor shall affix an “Out Of Order” sign near the elevator doors on all floors if service can’t be restored within sixty (60) minutes of response. All service calls have a 30 minute telephonic response to the service call and an on- site response time of 2 hours from initial notification based on the times stated for service hours in paragraph 5.8.1. For service calls received after the service call hours, the contractor shall have their mechanic report at 8:00 am on the next service time/day.

5.8.1 SERVICE CALL HOURS: shall be available as indicated by the Appendix 1group schedule, listed below: GROUP A - 24 hours per day; 7 days per week GROUP B – 8:00 a.m. to 12:00 midnight; 7 days per week GROUP C

– 8:00 am to 6:00 pm; 7days per week GROUP D – No service after normal working hours; Monday – Friday, 8:00 am – 4:30 pm.

5.8.2 After normal USMA working hours (after 4:30 P.M.), weekends and holidays, the Contractor, upon receiving a call from the Power Plant that an elevator is out of order, shall have his standby emergency elevator mechanic report within two (2) hours from the time of receipt of request for service. After each service call is completed, the elevator mechanic shall call the Power Plant and give status of the elevator. The Contractor shall obtain keys from the West Point Fire Department for those areas where building access is required and services shall be provided during non-duty hours (1630-0800) and weekends. If the Contractor fails to arrive within two (2) hours thereof; $150.00 shall be deducted from the Contractor’s monthly payment for each hour increment beyond said two hours.

5.9 SERVICE CALL MONITORING BY CONTRACTOR: The Contractor shall call the service desk (938-2316) promptly each morning at 08:00 AM to receive any service calls. Near the end of each normal duty work day, at (16:15) hours, (4:15 PM), Contractor shall report back to the service desk, giving information on status of elevators and notification of any overnight shut downs or priority elevators in need of service repairs after normal duty hours.

5.9.1 For each service call, the Contractor shall provide to the Contracting Officers Representative, documentation that contains the following minimum information.

(1) A description of the problem.

(2) The location of the problem, building# & elevator #

(3) A description of the action taken to resolve the problem.

(4) The time and date corrective action was completed.

(5) The name of the person who corrected the problem.

(6) Customers Name & Phone #

5.9.2The Contractor shall respond on site to each service call within two (2) hours and complete all repairs within 24 hours after discovering the problem or of receiving notification that corrective action is required. If the Contractor cannot complete the repairs within 24 hours, they shall submit in detail, a plan for completing the work to the Contracting Officer or Contracting Officers representative. Prior to removing an elevator from service, the Contractor shall coordinate and notify the Service Desk Dispatcher, and the Contracting Officers Representative. If the service call is received outside of the Appendix 1, required service response times for that Group, the Contractor shall respond on site at 8:00 am on the next service time/day.

5.9.3In the case where longer lead time for manufacturing of a major repair item is necessary. The Contractor shall notify the Contracting Officer Representative in writing within twenty four (24) hours giving the reason for extended time and exact time frame the item will be shipped to West Point.

5.9 ACCEPTABLE PERFORMANCE. The Contractor’s performance shall be based on performance of all items delineated in 5.

SPECIFIC TASKS. The down time for each elevator shall not exceed two (2) percent per year for repairs (based on 365 days/24hrs/day) for group A thru D.

5.10 COMMUNICATION DEVICES: The Contractor shall be responsible for maintaining the emergency telephone lines and emergency telephones. The boundaries are from elevator cab station control panel or cabinet to the junction box, located in the elevator machine room.

5.11 GENERAL AND EMERGENCY LIGHTING. The Contractor shall be responsible for lighting installed in the elevator, machine room, hoistway, pit, car top, car bottom and emergency lighting, including emergency light batteries. The Contractor shall repair, furnish and install all lighting fixtures and components, including ballasts, bulbs, lamps, and fluorescent tubes.

5.12 STANDARD OF SANITATION AND CLEANLINESS: The Contractor shall take into account the special public, military and academic nature of the United States Military Academy and its prominence as a tourist attraction. The Contractor shall, at all times furnish a sufficient force to carry out the housekeeping and cleanup requirements on both exterior and interior areas affected by his contract operations on a day to day basis throughout the life of the contract. The Contractor shall, at all times, leave the work site in a clean orderly condition, and shall dispose of unusable materials. At a minimum each work area shall be cleaned up at the end of each day and trash removed from the site.

5.13.1 The Contractor shall take all necessary precautions, to safeguard and protect all Government property with which the Contractor comes in contact while performing the contract work.

5.13.2 All used oily wiping cloths and flammable materials shall be removed from each elevator machine room, in fire code approved containers, labeled, properly disposed of, and removed from the West Point premises. This shall be done on a monthly basis.

5.14 CONTRACT CLOSEOUT INSPECTION. Prior to the expiration of the contract, the Contractor in coordination with the Contracting Officer or Contracting Officers Representative shall inspect all elevators. Based on the survey, a copy of the Existing Deficiency Report that lists the deficiencies found by the Contracting Officers Representative shall be given to the Contractor for corrective action. The Contractor shall correct all the listed deficiencies that fall within the scope of this contract. The Contractor is also responsible for deficiencies that are discovered after the closeout inspection and before the expiration date of the contract.

5.15 SPECIAL EVENTS: The contractor will be required to provide a service tech for stand by duties at special events (examples, graduation, and football games) for emergency repairs if necessary. The COR will notify the contractor, in writing, no less than a week in advance of the date and times for the special event. Historically there have been approximately eight (8) special events annually.

6 APPLICABLE DOCUMENTS: Documents applicable to this contract are listed below. The Contractor shall follow and adhere to these documents and shall use them for guidance and information. Published later editions with supplements shall be used as documents applicable to this contract.

a. National Safety Code for Elevators and Escalators, ASME A17.1-2000

b. National Standard Practice for Inspection of Elevators, Escalators and Moving Walks.

c. National Safety Code for Existing Elevators and Escalators, ASME A17.3

d. Guide for Emergency Evacuation of Passengers from Elevators, ASME A17.4

e. National Electrical Code, (NEC) 2005 / NFPA-70

f. Corps of Engineers Health and Safety Manual EM 385-1-1.

g. AWS Section 5 D I.I

h. AMSE A17.1, Section #8.8, Title Welding, Rule 8.8.1, 8.8.2, and 8.8.

PERFORMANCE REQ. SUMMARY

ANTITERRORISM AND OPSEC

Antiterrorism and Operations Security Requirements

Identification for Contractor Personnel The company will have a law enforcement background and NCIC check completed for all employees who will be entering Army-controlled installations or facilities (central area/Restricted area). Documentation of these checks will be made available to the COR upon request.

The company will provide to the COR, ten days in advance of the event, names and Social Security numbers of all employees who will be entering Army-controlled installations or facilities.

The company will ensure that its employees entering Army-controlled installations or facilities have obtained access badges and passes (if required) in accordance with facility regulations and that these badges and passes are obtained in advance so as not to delay the accomplishment of contracted services.

The company will return all issued U.S. Government Common Access Cards, installation badges, and/or access passes to the COR when the contract is completed or when a contractor employee no longer requires access to the installation or facility.

*** DOD Level I Antiterrorism (AT) Standards Clause (As of 1 July 14)

(a) Pursuant to Department of Defense Instruction Number 2000.16, “DoD Antiterrorism (AT) Standards,” dated October 2, 2006, each contractor employee requiring access to a Federally-controlled installation, facility and/or Federally-controlled information system(s) shall complete Level I AT Awareness Training on an annual basis and receive a certificate of completion. The training is accessible from any computer and is available at http://jko.jten.mil/ follow the below instructions:

1. Click – DOD CAC or No DOD CAC

2. Next click - I am a U.S. mil, government civil servant, or contract employee

3. Next click - I've been directed to take required training on JKO

4. Next click - Courses

5. I do not have a .MIL, .GOV, or .NDU.EDU address or I am a Multi-National

Student

6. Fill out the contact sheet and email to sponsor (COR)

7. Sponsor (COR) will email to the JKO help desk

The COR and contractor are responsible for ensuring that all applicable employees have completed antiterrorism awareness training and shall certify that their workforce has completed the training through the submission of completion certificate(s) to the Contracting Officer and the Contracting Officer’s Representative (if appointed) within five working days after contract award or prior to access to a Federally-controlled installation or information system.

(b) In the event that the automated system is not available (e.g., server problems), Level I AT Awareness Training can be provided by a qualified instructor. However, if the training is not completed online, the Level I AT Awareness Instructor qualification must be coordinated with the Installation Antiterrorism Officer (or Installation Security equivalent) and the resultant name(s) of approved instructors shall be provided the contracting officer or designee along with all associated cost or schedule impacts to the contract. (c) Antiterrorism performance (Level I AT Awareness Training attendance and compliance) may be documented as a performance metric under the resultant contract, and be part of past performance information in support of future source selections.

Contracting Official Representative (COR).

(1) Will ensure that all contractors/subcontractors are processed for a background check or National Agency Check with Inquiry (NACI) as needed. The background check is the minimal investigation to be adjudicated for a USMA Identification Card (yellow badge) versus the NACI, which requires fingerprinting and http://jko.jten.mil/ submission of EQIP. NACIs are required for contractors/subcontractors that require a CAC and/or government computer accounts.

(2) Will ensure that the USMA Form 13-16, Personnel Background Check, dated Apr 06, is correctly completed and signed by the COR who is a properly cleared Federal Employee.

(3) Will ensure that the USMA Form 13-16, Personnel Background Check, dated Apr 06, is submitted within 10 days prior to personnel starting projects on West Point, depending on when contract is awarded and work is scheduled to start.

Waivers are made for the 10 day suspense on a case by case basis, in emergency situations as needed only.

(4) Will ensure that all identified contractors requiring a CAC and/or government computer access, submit fingerprints and complete a NACI investigation submission via EQIP, prior to being issued a CAC and/or given access to the government computer network.

(5) Will ensure that all government issued identification and vehicle stickers are confiscated from contractors/subcontractors upon termination of employment or end of project. These items will be returned to MPD and DES.

(6) Will ensure that all contractors requiring access to the Installation have completed antiterrorism awareness training and shall certify that their workforce has completed the training through the submission of completion certificate(s) to the Contracting Officer.

(7) Will ensure that all contractors with security clearances, per AR 381-12, have completed annual Threat Awareness and Reporting Program (TARP) training by a CI agent or other trainer and shall certify that their workforce has completed the training through the submission of completion certificate(s) to the Contracting Officer.

Force Protection Conditions (FPCON’s) Clause

a. During higher Force Protection Conditions (FPCON’s) Contract personnel are required to comply with all Antiterrorism policies and procedures while on the installation. Contract personnel may be directed to enter the installation through certain access control points where they can best be identified and searched.

Contractor personnel may be prohibited from certain portions of the installation during exercises and actual emergencies.

b. Contractors will comply with parking restrictions and will not park in unauthorized parking areas or within 82 feet of an inhabited building when directed.

c. Access control roster (personnel and vehicles) must be provided. Names / vehicles verified by the company and received background screening.

Substitutes receive same vetting process prior to work.

d. All contractor personnel and vehicles are subject to search while on the installation

e. In the event of an identified restricted/exclusion area, the contractor personnel will not be authorized without specific permission or an escort.

f. Access may be denied during increased readiness or Force Protection Conditions (FPCON’s).

Alien Employment The contractor shall not employ any alien who does not have a valid US Immigration I- 551 or I-94. The contractor shall provide valid social security numbers and citizenship status of all employees to the Government, upon request.

E-Verify E-Verify is an Internet based system operated by the Department of Homeland Security (DHS) in partnership with the Social Security Administration (SSA) that allows participating employers to electronically verify the employment eligibility of their newly hired employees. E-Verify is currently free to employers and is available in all 50 states. E-Verify provides an automated link to federal databases to help employers determine employment eligibility of new hires and the validity of their Social Security numbers. E-Verify are the best means for determining employment eligibility of new hires and the validity of their Social Security numbers.

Contractors shall use E-Verify on all employees that will be working on this installation, under this contract. This shall be done prior to the employee starting work on the installation.

For E-Verify information: www.dhs.gov/E-Verify 1-888-464-4218 The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Additional information about trafficking in persons may be found at the website for the Department of State’s Office to Monitor and Combat Trafficking in Persons’ at http://www.state.gov/g/tip. Government contracts shall —

(a) Prohibit contractors, contractor employees, subcontractors, and subcontractor employees from —

(1) Engaging in severe forms of trafficking in persons during the period of performance of the contract;

(2) Procuring commercial sex acts during the period of performance of the contract; or

(3) Using forced labor in the performance of the contract;

(b) Require contractors and subcontractors to notify employees of the prohibited activities described in paragraph (a) of this section and the actions that may be taken against them for violations; and

(c) Impose suitable remedies, including termination, on contractors that fail to comply with the requirements of paragraphs (a) and (b) of this section.

http://www.dhs.gov/E-Verify%201-888-464-4218

Contractor Vehicles – ensure the contractor understands the parking policy dated 29 July 2013.

The local general, visitor, and government designated parking areas SHALL NOT be used by the contractor. No general contractor or subcontractor employee parking is available near the immediate site. The contractor will need to identify and locate parking facilities for general and subcontractors off of West Point and provide a means for shuttling workers to the site. West Point shuttle services will not be used for transporting workers to the site.

Contractors and construction vehicles can only park in pre approved designated staging areas or as identified in their contract. Central Area Parking is reserved for Staff and Faculty and requires a special pass. In accordance with AR 190-5, persons who operate a motor vehicle on West Point shall be deemed to have given consent for the removal and temporary impoundment of the privately owned vehicle (POV) and construction equipment when it is:

(1) Parked illegally

(2) Interfering with operations

(3) Creating a safety hazard

(4) Left unattended in a restricted or controlled area

(5) Parked in a Central Parking Area (CPA) lot without the proper CPA Pass

(6) Parked in a reserved space authorized by the Installation Commander

The COR overseeing the contract will review and coordinate all contractor pass requests.

52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL

(JAN 2011)

(a) The Contractor shall comply with agency personal identity verification procedures identified in the contract that implement Homeland Security Presidential Directive-12 (HSPD-12), Office of Management and Budget (OMB) guidance M-05-24, and Federal Information Processing Standards Publication (FIPS PUB) Number 201.

(b) The Contractor shall account for all forms of Government-provided identification issued to the Contractor employees in connection with performance under this contract.

The Contractor shall return such identification to the issuing agency at the earliest of any of the following, unless otherwise determined by the Government:

(1) When no longer needed for contract performance.

(2) Upon completion of the Contractor employee's employment.

(3) Upon contract completion or termination.

(c) The Contracting Officer may delay final payment under a contract if the Contractor fails to comply with these requirements.

(d) The Contractor shall insert the substance of this clause, including this paragraph (d), in all subcontracts when the subcontractor`s employees are required to have routine physical access to a Federally-controlled facility and/or routine access to a Federally-controlled information system. It shall be the responsibility of the prime Contractor to return such identification to the issuing agency in accordance with the terms set forth in paragraph (b) of this section, unless otherwise approved in writing by the Contracting Officer.

52.212-2 ADDENDUM

ADDENDUM TO FAR 52.212-2

52.212-2 Addendum EVALUATION--COMMERCIAL ITEMS (OCT 2014)

Evaluation Factors for Award

a. Basis for Contract Award. This is a Lowest Price Technically Acceptable source selection conducted in accordance with Federal Acquisition Regulation (FAR) 13, Simplified Acquisition Procedures, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Army Federal Acquisition Regulation Supplement (AFARS). The test program authorized under FAR Subpart 13.5 is applicable to this acquisition. Award will be made to a single offeror who is deemed responsible in accordance with the Federal Acquisition Regulation (FAR), whose quote is technically acceptable, conforms to the solicitation requirements, and whose quote, judged by an overall assessment of the evaluation criteria and other considerations specified in this solicitation, represents the lowest price.

b. Award for All of the Work. The Government intends to award one (1) contract as a result of this solicitation. Quotes received for less than the stated number of items listed in the Price Schedule will be considered ineligible for award. As set forth in FAR 52.212-1 (g), the Government intends to evaluate quotes and award a contract without discussions with quoters. Therefore, the quoter’s initial quote should contain the quoter’s best terms from a price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. The Government may reject any or all quotes if such action is in the public interest; accept other than the lowest quote and waive informalities and minor irregularities in quotes received.

c. Evaluation Criteria. Evaluation criteria consists of factors. The quotes will be evaluated under three (3) evaluation factors: Technical Capability, Past Performance and Price.

Factor 1 – Technical Factor. The Technical Factor will receive one of the ratings defined below.

Table 1. Technical Capability Acceptable/Unacceptable Ratings Rating Description Acceptable Quote clearly meets the minimum requirements of the solicitation.

Unacceptable Quote does not clearly meet the minimum requirements of the solicitation.

In order to receive an acceptable rating, the technical factor submissions must demonstrate technical capability in the same or similar magnitude and complexity outlined in the Performance Work Statement. As per the Performance Work Statement, in Section 2.7, Elevator Inspector, the Elevator Inspector must have the certification for the ASME A17 QEI-Q Standard for the Qualification of Elevator Inspectors Certified.

Every interested offeror must send a copy of their certification/licenses and experience of their past performance with Elevator Maintenance and Repair Service, in order to be considered for award.

Factor 2 – Past Performance. The Past Performance Factor will receive one of the ratings defined below.

Table 1. Past Performance Evaluation Ratings Rating Description Acceptable Based on the quoter’s performance record, the Government has a reasonable expectation that the quoter will successfully perform the required effort, or the quoter’s performance record is unknown.

Unacceptable Based on the quoter’s performance record, the Government has no reasonable expectation that the quoter will be able to successfully perform the required effort.

In order to receive an acceptable rating, the Past Performance submissions must show evidence of successfully performing work same or similar to the work outlined in the PWS or meet the criteria for “unknown” record of past performance. Quoters without a record of relevant past performance, the quoter may not be evaluated favorably or unfavorably on past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.” Past Performance must be both recent and relevant. To be recent, the effort must be ongoing or must have been performed during the past three (3) years from the date of issuance of this solicitation. To be relevant, the effort must be similar in nature of work, size, and complexity.

Quoters must submit their Experience and Past Performance on the attached Performance Assessment Questionnaires.

Factor 3 – Price. Price will not be scored or rated. Evaluation of price will be performed using one or more of the price analysis techniques in FAR 13.106-3(a).

Through these techniques the Government will determine whether prices are reasonable.

The Government will evaluate its Option to Extend Services (see FAR Clause 52.217-8) by adding six (6) months of the Quoter’s final option period price. Evaluation of 52.217-8 shall not obligate the Government to exercise the option(s) to extend the services, unless the Contracting Officer determines it to be necessary.

Quoters responding to this solicitation are advised that, prior to award, the Government may request Quoters to submit substantiating information/data to support price reasonableness if it is warranted.

Options. The Government will evaluate quotes for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that a quote is unacceptable if the option prices are significantly unbalanced.

Evaluation of options shall not obligate the Government to exercise the option(s).

Evaluation of Option to Extend Services under 52.217-8. For the purposes of the award of this Contract, the Government intends to evaluate the option to extend services, provided under FAR 52.217-8, as follows: by adding one-half of the Quoter’s final 12-month period prices to the total proposed price. Thus, the Quoter’s total price for the purpose of evaluation will include the 60-month term plus an additional six-month period. Quoters will not quote a price for this additional six-month period. The evaluation will consider the possibility that the option can be exercised at any time during any contract performance period and can be exercised in increments of one to six months, but for no more than a total of six months during the life of the contract.

d. A written notice of award or acceptance of a quote, mailed or otherwise furnished to the successful…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .