Attachment 12-Historical IJOs.pdf
PDF 799 KB Posted
- Attached to
- Base Operation Support Services for Dugway Proving Grounds, UT Federal contract opportunity
- Solicitation number
- W911S6-16-R-0002
About this file
Attachment 12-Historical IJOs
View the file
Other files for this federal contract opportunity
Show all 50
Base Operation Support Services for Dugway Proving Grounds, UT has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IJO Serial Number FY IJO Type Building Short Description Preliminary Estimate Detailed Estimate Final Cost IJO Received Date
974N 9 J
VALDEZ CIRCLE ROAD
REPLACEMENT $ 297,300.00 $ - $ - 08-Oct-09
983N 9 J 195A COM UNIT $ - $ - 15-Oct-09 001D 9 J 5220 COM ON ROOM 214A/B $ - $ - 21-Oct-09 994N 9 J 5701 R.V. LOT FENCE $ 11,183.14 $ 8,875.24 $ - 21-Oct-09 007D 9 J 5330 REPLACE PARKING LOT $ 279,200.00 $ - $ - 21-Oct-09 009D 9 J 8027 REPLACE AIR HANDLER #5 $ - $ - 27-Oct-09
034D 9 J 5100
INSTALL REQUIRED RANGE
TOP $ 5,100.00 $ - $ - 18-Nov-09
035D 9 J UPGRADE CIRCUIT BREAKER $ - $ - 18-Nov-09
037D 9 J 4165 MODIFICATION OF ROOM 103 $ - $ - 18-Nov-09
038D 9 J 8241
PURCHASE & INSTALL
COMMAND POST $ - $ - 18-Nov-09
041D 9 J CARR CARR MIXING FACILITY $ 1,150,000.00 $ - 18-Nov-09 036D 9 J 2029 LIGHT POLE $ 5,200.00 $ - $ - 18-Nov-09 042D 9 J 4046 TEMPORARY ROOF REPAIR $ - $ - 18-Nov-09 043D 9 J 7146 LOUVERS TO GENERATOR $ - $ - 19-Nov-09 044D 9 J 167 INSPECT FURNACES $ - $ - 19-Nov-09 045D 9 J 5441 SHUT OFF WATER TO BLDG. $ - $ - 23-Nov-09
047D 9 J 8142
CHECK AND REPAIR ROOF
LEAKS $ - $ - 23-Nov-09
049D 9 J 3145 MODIFY VENTING SYSTEM $ - $ - 24-Nov-09
052D 9 J 2029 INSTALL TWO LP GAS TANKS $ 142,200.00 $ - $ - 01-Dec-09 057D 9 J 5111 DECORATE TREE $ - $ - 03-Dec-09 063D 9 J 4156 RE-ROUTE PROPANE LINE $ - $ - 09-Dec-09 065D 9 J 5230 PAINT ROOM $ - $ - 09-Dec-09 4531 9 J 4531 REPAIR X07 LOCK $ - $ - 10-Dec-09
079D 9 J 4156
REPLACE/REPAIR SUPPLY
FAN $ - $ - 14-Dec-09
078D 9 J PMUAS
INSTALL GOV'T MODULAR
OFFICE $ - $ - 14-Dec-09
075D 9 J 623B COM UNIT $ - $ - 14-Dec-09
083D 9 J 5212 REPAIR/REPLACE DOORBELL $ - $ - 21-Dec-09 084D 9 J 2050 REPLACE ALTITUDE VALVE $ - $ - 29-Dec-09 086D 9 J DITTO POLE TESTING $ - $ - 29-Dec-09
048D 9 J 4106 MODIFY VENTING SYSTEM $ - $ 76.00 24-Nov-09 055D 9 J 5474 REPLACE PIPING $ - $ 80.50 02-Dec-09 068D 9 J 5132 COM ROOM 105A/B $ - $ 131.14 14-Dec-09 069D 9 J 5220 COM ROOM 102A/B $ - $ 262.28 14-Dec-09 962N 9 J 5236 INSTALL EXHAUST FAN $ - $ 468.01 25-Jul-13 033D 9 J 5140 COM ROOM 111A/B $ - $ 524.56 10-Nov-09 005D 9 J 628B COM UNIT $ - $ 786.84 21-Oct-09 020D 9 J 5140 COM ROOM 100 $ - $ 885.20 28-Oct-09 029D 9 J 313B COM UNIT $ - $ 885.20 10-Nov-09 076D 9 J 325A COM UNIIT $ - $ 917.98 14-Dec-09 985N 9 J 185 COM UNIT $ - $ 948.99 15-Oct-09 988N 9 J 179 COM UNIT $ - $ 1,057.10 15-Oct-09
971N 9 J 4561
RE-BUILD ROOF MOUNTED
COOLING SYSTEM $ - $ 1,550.00 05-Oct-09
085D 9 J 4313 INSTALL LOUVERS $ - $ 1,558.00 29-Dec-09 072D 9 J 615B COM UNIT $ - $ 1,770.39 14-Dec-09 025D 9 J 635B COM UNIT $ - $ 1,901.53 10-Nov-09 987N 9 J 183A COM UNIT $ - $ 1,946.03 15-Oct-09 995N 9 J 5140 REPAIR WEST SIDE DOOR $ - $ 1,954.94 21-Oct-09 991N 9 J 186 COM UNIT $ - $ 2,054.14 20-Oct-09 004D 9 J 602A COM UNIT $ - $ 2,360.52 21-Oct-09 996N 9 J 4156 WELD OR PEEN HINGE PINS $ - $ 2,615.30 21-Oct-09 982N 9 J 195B COM UNIT $ - $ 2,622.80 15-Oct-09 061D 9 J 4122 REPAIR/REPLACE DOORS $ - $ 2,664.73 08-Dec-09 062D 9 J 4542 FAB SIGNS $ - $ 2,678.62 08-Dec-09 986N 9 J 183B COM UNIT $ - $ 2,690.80 15-Oct-09 030D 9 J 633A COM UNIT $ - $ 2,753.94 10-Nov-09 071D 9 J 631A COM UNIT $ - $ 2,753.94 14-Dec-09
088D 9 J 4515 UNPLUG SINK BREAKROOM $ - $ 2,813.89 15-Dec-09
024D 9 J 2029
REPLACE STEAM
REGULATOR $ - $ 2,837.35 10-Nov-09
027D 9 J 83A COM UNIT $ - $ 2,950.65 10-Nov-09 058D 9 J 4146 REMOVE BOOK SHELVES $ - $ 2,960.58 07-Dec-09
012D 9 J 9423
CHECK HIGH VOLTAGE
CABINET $ - $ 3,240.92 27-Oct-09
031D 9 J 2090 REMOVE TAMARACK $ - $ 3,242.54 10-Nov-09 984N 9 J 168 COM UNIT $ - $ 3,409.64 15-Oct-09
050D 9 J 5450
REPLACE BURNED OUT
LIGHTS $ - $ 3,424.31 30-Nov-09
064D 9 J 4165 REPAIR EXHAUST FAN # 1-B $ - $ 3,523.93 09-Dec-09
056D 9 J 5124 INSTALL PANIC HARDWARE $ - $ 3,680.23 02-Dec-09 981N 9 J 198 COM UNIT $ - $ 3,770.28 15-Oct-09 040D 9 J 4156 REPLACE CIRC. PUMP #2 $ - $ 3,904.04 18-Nov-09
066D 9 J 4156
REPLACE AURORA HEAT
RECOVERY PUMP #16 $ - $ 3,926.52 09-Dec-09
074D 9 J 317A/B COM UNIT $ - $ 4,065.34 14-Dec-09
059D 9 J 4156
REPLACE HEAT
RECOVERING PUMP $ - $ 4,188.94 07-Dec-09
992N 9 J 5220
REPLACE OUTSIDE DOUBLE
DOORS $ - $ 4,195.04 20-Oct-09
011D 9 J 8027
REPLACE BUILDING
CONTROL $ - $ 4,250.00 27-Oct-09
989N 9 J 167 COM UNIT $ - $ 4,327.62 15-Oct-09 053D 9 J 5126 REPLACE DOORS $ - $ 4,490.46 01-Dec-09
975N 9 J 2029
REPLACE BUILDING
CONTROLS $ - $ 4,496.74 13-Oct-09
015D 9 J 04352
XERISCAPE FRONT OF
BUILDING $ - $ 4,498.69 27-Oct-09
990N 9 J 205 COM UNIT $ - $ 4,786.61 15-Oct-09 054D 9 J 4046 INSTALL CRASH BARS $ - $ 5,256.15 01-Dec-09 039D 9 J 4156 REPLACE CIRC. PUMP #1 $ - $ 5,566.60 18-Nov-09 022D 9 J 600 BLOW OUT PROPANE LINES $ 5,603.96 03-Nov-09
970N 9 J 5212
CLEAN WEEDS & PUT DOWN
XERISCAPE $ - $ 5,850.67 01-Oct-09
013D 9 J 4258
XERISCAPE FRONT OF
BUILDING $ - $ 5,886.86 27-Oct-09
976N 9 J 5124 CHECK WALL WITH LEVEL $ - $ 6,029.96 13-Oct-09 019D 9 J 291A COM UNIT $ - $ 6,098.01 28-Oct-09
977N 9 J 3445
REPAIR/REPLACE
BREATHABLE AIR
COMPRESSOR $ 6,297.82 13-Oct-09
997N 9 J 624A COM UNIT $ - $ 6,396.66 21-Oct-09 999N 9 J 611B COM UNIT $ - $ 6,414.68 21-Oct-09 051D 9 J 4156 REPLACE VFD'S $ - $ 6,586.17 30-Nov-09
079D 9 J 4156
REPLACE/REPAIR SUPPLY
FAN #4 $ - $ 6,805.01 14-Dec-09
010D 9 J 4156
REPLACE VFD'S ON
EXHAUST FANS $ - $ 7,000.71 27-Oct-09
021D 9 J 310 COM UNIT $ - $ 7,507.77 28-Oct-09 046D 9 J 4323 SERVICE LOCKS ON DOORS $ - $ 7,564.60 23-Nov-09 006D 9 J 5382 COM UNIT $ - $ 8,065.60 26-Oct-09 017D 9 J 3034 REPLACE CARPET $ - $ 8,987.21 27-Oct-09 077D 9 J 4046 BOILER DOWN $ - $ 9,439.20 14-Dec-09 073D 9 J 31B COM UNIT $ - $ 9,802.72 14-Dec-09 998N 9 J 534B COM UNIT $ - $ 9,933.86 21-Oct-09 060D 9 J 214A COM UNIT $ - $ 10,325.59 07-Dec-09 026D 9 J 5375 COM UNIT $ - $ 11,473.55 10-Nov-09 993N 9 J 5370 COM UNIT $ - $ 11,834.19 20-Oct-09 028D 9 J 278 COM UNIT $ - $ 11,916.40 10-Nov-09 973N 9 J 5460 REPLACE (4) EXIT DOORS $ - $ 12,360.49 07-Oct-09
018D 9 J 3043
PAINT & REPLACE FLOOR
TILE $ - $ 12,803.62 27-Oct-09
002D 9 J 269A COM UNIT $ - $ 12,805.33 21-Oct-09
014D 9 J 4038
XERISCAPE FRONT OF
BUILDING $ - $ 12,826.47 27-Oct-09
003D 9 J 252C/D COM UNIT $ - $ 13,526.08 21-Oct-09 016D 9 J 3034 REPLACE ROOF $ - $ 15,995.00 27-Oct-09 070D 9 J 25 COM UNIT $ - $ 18,947.28 14-Dec-09
080D 9 J 9322
REPLACE PAD MOUNT
TRANSFORMER $ - $ 19,901.07 17-Dec-09
032D 9 J 5460 PATCH & REPAIR CEILING $ - $ 21,900.33 10-Nov-09
008D 9 J 8027
REPLACE BATTERIES ON UPS
SYSTEM $ - $ 23,444.80 27-Oct-09
972N 9 J 5474 INSTALL ENG. & QA OFFICES $ - $ 35,326.63 06-Oct-09
023D 9 J WIG
THREAT CONTROL
BUILDING $ - $ 93,469.00 04-Nov-09
980N 9 J 5233
INSTALL FIRE DEPT.
CONNECTION $ 20,760.00 15-Oct-09
978N 0 J 4026
INSTALL COMMERCIAL
GRADE STOVE $ 7,900.00 $ - $ - 14-Oct-09
979N 0 J 5212
INSTALL COMMERICAL
GRADE STOVE $ 8,600.00 $ - $ - 14-Oct-09
087D 0 J 5228 PAINT INTERIOR WALLS $ - $ - 05-Jan-10 089D 0 J DPG READ DPG METERS $ - $ - 07-Jan-10
091D 0 J 5230
INCREASE EXHAUST FAN
DRAW $ 7,200.00 $ - $ - 12-Jan-10
093D 0 J 4038
REMOVE AND RE-BUILD
WALL $ 9,970.00 $ - $ - 14-Jan-10
092D 0 J 5240 2" COPPER PIPING $ - $ - 14-Jan-10 096D 0 J 5391 COM UNIT $ - $ - 19-Jan-10
104D 0 J 4165
RELOCATION OF CCTF
FENCE $ - $ - 21-Jan-10
105D 0 J 8225
DETAILED COST ESTIMATE
TO FINISH INTERIOR OF
AEROSOL TEST FACILITY $ 185,200.00 $ - $ - 21-Jan-10
106D 0 J 4046 PROVIDE COST ESTIMATE $ 246,700.00 $ - $ - 21-Jan-10 108D 0 J 242 COM UNIT $ - $ - 26-Jan-10 109D 0 J 8027 UPGRADE AIR HANDLER #5 $ - $ - 26-Jan-10
110D 0 J
PERIMETER
FENCE
INSTALL FENCE AROUND
PERIMETER $ 3,073,849.72 $ 6,846,736.72 $ - 27-Jan-10
125D 0 J 5384 LEVEL DRIVEWAY $ - $ - 02-Feb-10 120D 0 J 4038 ELECTRICAL RECEPTACLE $ - $ - 02-Feb-10 129D 0 J 5460 REPLACE LIGHT $ - $ - 11-Feb-10
131D 0 J 5240
RENOVATE DETENTION
CELLS $ 142,601.00 $ - $ - 11-Feb-10
130D 0 J 5950 REMODEL BUILDING 5950 $ 115,068.00 $ 251,773.94 $ - 11-Feb-10
135D 0 J 3034
INSTALL EMERGENCY
LIGHTS $ 6,500.00 $ - $ - 17-Feb-10
137D 0 J 2028 CONSTRUCT SIDEWALK $ 4,900.00 $ - $ - 17-Feb-10 149D 0 J 187B COM UNIT $ - $ - 23-Feb-10 150D 0 J 169A COM UNIT $ - $ - 23-Feb-10 157D 0 J 197 COM UNIT $ - $ - 23-Feb-10 148D 0 J 187A COM UNIT $ - $ - 23-Feb-10 147D 0 J 209B COM UNIT $ - $ - 23-Feb-10 161D 0 J 4015 SHOWER DRAIN $ 3,500.00 $ - $ - 24-Feb-10 166D 0 J 4531 CHANGE CIRCUIT BREAKER $ - $ - 03-Mar-10 168D 0 J 4038 SUPPORT BW LINE $ - $ - 08-Mar-10 169D 0 J 4156 CLEAN DUCTWORK $ - $ - 08-Mar-10
001P 0 M PM
PM/M&R WATER SIDTR
SYSTEMS. $ - $ - 10-Mar-10
172D 0 J 2029
MODIFICATIONS TO
AUTOCLAVES $ - $ - 10-Mar-10
173D 0 J 4231 WIND TUNNEL $ - $ - 10-Mar-10 175 0 J 4313 SUPPORT POWER OUTAGE $ - $ - 15-Mar-10 176D 0 J 5900 REPLACE ROOF $ 20,500.00 $ - $ - 15-Mar-10 180D 0 J 635A COM UNIT $ - $ - 17-Mar-10
183D 0 J 651A COM UNIT $ - $ - 17-Mar-10 179D 0 J 13 COM UNIT $ - $ - 17-Mar-10 181D 0 J 382 COM UNIT $ - $ - 17-Mar-10 178D 0 J 343A/B COM UNIT $ - $ - 17-Mar-10 177D 0 J 5910 Upgrade interior of VCC $ 7,600.00 $ 12,538.54 $ - 17-Mar-10 187D 0 J 3131 REPLACE WATER HEATER $ - $ - 23-Mar-10 192D 0 J 4215 RENOVATION FOR ACBIRC $ - $ - 25-Mar-10
197D 0 J 7355
REPAIR/REPLACE
OBSTRUCTION LIGHT $ - $ - 06-Apr-10
200D 0 J 3043
REMOVE CARPET &
ASBESTOS TILE $ - $ - 07-Apr-10
201D 0 J FRIES PARK REMOVE TREES $ - $ - 07-Apr-10 207D 0 J 300B COM UNIT $ - $ - 13-Apr-10 205D 0 J 357C/D COM UNIT $ - $ - 13-Apr-10
214D 0 J 8046
TEMP. SHORE POWER DIS.
SYSTEM $ - $ - 14-Apr-10
215D 0 J 5030 PROVIDE KEY INVENTORY $ - $ - 19-Apr-10
217D 0 J MM6
INSTALL COMMUNICATION
TOWER $ - $ - 20-Apr-10
219D 0 J 2029
ADDITIONAL POWER
CIRCUITS $ - $ - 20-Apr-10
219D 0 J 2029
ADDITIONAL POWER
CIRCUITS $ - $ - 21-Apr-10
221D 0 J 2048 INSTALL A/C SYSTEM $ - $ - 21-Apr-10 224D 0 J GATES UPGRADE RANGE GATES $ - $ - 21-Apr-10 222D 0 J 4038 MOVE 7 X 7 FOOT WALL $ - $ - 22-Apr-10
225D 0 J 4335
RE-WIRE ELECTRICAL
PANEL $ - $ - 27-Apr-10
259D 0 J 343C/D COM UNIT $ - $ - 04-May-10 233D 0 J 85110 READ DPG METERS $ - $ - 04-May-10 234D 0 J 5230 REPLACE CEILING TILES $ - $ - 04-May-10 235D 0 J 2090 REPLACE RIP RAP $ - $ - 04-May-10 236D 0 J 8027 REMOVE RAZOR WIRE $ - $ - 04-May-10 272D 0 J 5460 INSTALL NEW LIGHTS $ 18,800.00 $ - $ - 04-May-10 254D 0 J 5220 COM ROOM 101 $ - $ - 04-May-10
261D 0 J 6048
REPAIR & SLURRY SEAL
CHERAIT $ 208,500.00 $ - $ - 04-May-10
262D 0 J 6048 MOTOR POOL ACCESS RD $ 32,900.00 $ - $ - 04-May-10
263D 0 J 85110
DRIVEWAY ONTO 5TH,
NORTHEAST OF CRAFT SHOP $ 27,200.00 $ - $ - 04-May-10
264D 0 J 5450
COMMAND CENTER SIDE
PARKING LOT $ 23,480.00 $ - $ - 04-May-10
266D 0 J 5230 CLUB U DRIVE $ 21,580.00 $ - $ - 04-May-10 244D 0 J 142 COM UNIT $ - $ - 04-May-10 239D 0 J 118 COM UNIT $ - $ - 04-May-10 257D 0 J 11 COM UNIT $ - $ - 04-May-10 248D 0 J 60C COM UNIT $ - $ - 04-May-10 247D 0 J 5220 COM ROOM 211 $ - $ - 04-May-10 249D 0 J 313C COM UNIT $ - $ - 04-May-10 255D 0 J 600B COM UNIT $ - $ - 04-May-10 258D 0 J 313D COM UNIT $ - $ - 04-May-10 250D 0 J 610B COM UNIT $ - $ - 04-May-10 260D 0 J 5374 COM UNIT $ - $ - 04-May-10 252D 0 J 383 COM UNIT $ - $ - 04-May-10 256D 0 J 5140 COM ROOM 112A/B $ - $ - 04-May-10 251D 0 J 303B COM UNIT $ - $ - 04-May-10 253D 0 J 6 COM UNIT $ - $ - 04-May-10
267D 0 J 4258
REPLACE & UPGRADE A/C
SYSTEM $ - $ - 04-May-10
269D 0 J 4165
FABRICATE STAIRS FOR
ACCESS $ - $ - 04-May-10
233D 0 J 5474 READ DPG METERS $ - $ - 04-May-10
273D 0 J 5468
MOTOTR POOL PARKING
LOT $ - $ - 05-May-10
288D 0 J 5460 TURN OFF AHU'S $ - $ - 10-May-10 279D 0 J 5330 INSTALL CATWALK $ - $ - 11-May-10 277D 0 J 3133 HYDRANT C-8 $ - $ - 11-May-10 283D 0 J 7948 CONCRETE PAD $ - $ - 18-May-10
284D 0 J 4258
REMOVE ASBESTOS FLOOR
TILE $ - $ - 18-May-10
285D 0 J 2029
REPLACE PRESSURE RELIEF
VAVLE $ - $ - 19-May-10
289D 0 J 4146
REPAIR ELECTRICAL
METERS $ - $ - 19-May-10
290D 0 J 5330 ADDING A DOOR $ - $ - 25-May-10 294D 0 J 81241 SUPPORT POWER OUTAGE $ - $ - 02-Jun-10 295D 0 J 85110 WIDEN ROAD $ - $ - 02-Jun-10
300D 0 J 3043
INSTALL TWO (2) WINDOW
A/C $ - $ - 08-Jun-10
304D 0 J 3043
INSTALL TWO (2) WINDOW
AIR CONDITIONERS $ - $ - 08-Jun-10
303D 0 J 4352
ERECT NEW WALLS WITH
MINIMAL ELECTRICAL $ - $ - 08-Jun-10
297D 0 J 5230 REPLACE 3 SWAMP COOLERS $ - $ - 08-Jun-10
307D 0 J 5330
REPAIR/REPLACE FIRE
ALARM SYSTEM $ - $ - 14-Jun-10
308D 0 J 4255
DEMO ELEVATED WATER
TOWER $ 114,900.00 $ - $ - 15-Jun-10
320D 0 J 4223
ADD/ALTER HVAC & FIRE
SUPPRESSION SYSTEM $ - $ - 15-Jun-10
311D 0 J 5132 COM ROOM 211A/B $ - $ - 15-Jun-10 312D 0 J 5220 COM ROOM 203A/B $ - $ - 15-Jun-10 313D 0 J 52A COM UNIT 52A $ - $ - 15-Jun-10 314D 0 J 83C COM UNIT $ - $ - 15-Jun-10 315D 0 J 5220 COM ROOM 103A/B $ - $ - 15-Jun-10 316D 0 J 351C COM UNIT $ - $ - 15-Jun-10 317D 0 J 325C COM UNIT $ - $ - 15-Jun-10 319D 0 J 623A COM UNIT $ - $ - 15-Jun-10 318D 0 J 608 COM UNIT $ - $ - 15-Jun-10
324D 0 J 4531
TEST AND BALANCE HVAC
SYSTEM $ - $ - 16-Jun-10
323D 0 J 5460 REDUCE HEAT GAIN $ 80,700.00 $ - $ - 16-Jun-10
330D 0 J NEW
CONSTRUCT
ADMINISTRATIVE FACILITY
FOR WDTC $ - $ - 29-Jun-10
331D 0 J NEW
CONSTRUCT
ADMINISTRATIVE FACILITY
FOR CHEM TEST DIVISION. $ - $ - 29-Jun-10
333D 0 J 5666 TANK FARM ROAD $ - $ - 01-Jul-10 334D 0 j 5124 REPAIR/REPLACE FENCE $ - $ - 06-Jul-10 335D 0 J 3359 RUN 3 PHASE, 480V POWER $ - $ - 06-Jul-10
336D 0 J 5230
CHECK AND REPAIR COOLER
(BEER) $ - $ - 07-Jul-10
338D 0 J 5-PLEX
INSTALL NEW ROOFING
SYSTEM $ 29,300.00 $ - $ - 08-Jul-10
340D 0 J 5460
REPLACE WAREHOUSE
DOORS $ 117,400.00 $ - $ - 12-Jul-10
343D 0 J 83E COM UNIT $ - $ - 12-Jul-10 345D 0 J 650A COM UNIT $ - $ - 12-Jul-10 342D 0 J 648B COM UNIT $ - $ - 12-Jul-10 349D 0 J 393 COM UNIT $ - $ - 12-Jul-10 354D 0 J 5140 COM ROOM 205A/B $ - $ - 14-Jul-10 357D 0 J 258 COM UNIT $ - $ - 14-Jul-10 355D 0 J 60D COM UNIT $ - $ - 14-Jul-10 356D 0 J 41C COM UNIT $ - $ - 14-Jul-10 353D 0 J 638A COM UNIT $ - $ - 14-Jul-10
359D 0 J 393
REPLACE BURNED OUT
STREET LIGHT $ - $ - 19-Jul-10
362D 0 J 3242
PROVIDE COOLING FOR
HALF OF BUILDING $ 12,800.00 $ - $ - 26-Jul-10
364D 0 J 5240 INSULATE ATTIC $ - $ - 02-Aug-10 367D 0 J 5474 READ DPG METERS $ - $ - 03-Aug-10 371D 0 J 28 REPLACE DAMAGED MAST $ - $ - 11-Aug-10
372D 0 J 8027
CHANNEL MTF EFFLUENT TO
CARR SEWAGE LAGOON. $ 35,000.00 $ - $ - 11-Aug-10
376D 0 J 1012
INSTALL A/C UNIT IN SIC
ROOM $ - $ - 16-Aug-10
411D 0 J 85110
GRANITE ROAD WASHED
OUT $ - $ - 16-Aug-10
380D 0 J 5326
PROVIDE TEMP. CEILING
SUPPORTS $ - $ - 18-Aug-10
383D 0 J 2032 PROVIDE BACK UP POWER $ - $ - 19-Aug-10 384D 0 J 2038 PROVIDE BACK UP POWER $ - $ - 19-Aug-10 391D 0 J 5132 COM ROOM 105 $ - $ - 19-Aug-10 389D 0 J 5383 COM UNIT $ - $ - 19-Aug-10 394D 0 J 19 COM UNIT $ - $ - 24-Aug-10 393D 0 J 5140 COM ROOM 212 A/B $ - $ - 24-Aug-10 392D 0 J 5140 COM ROOM 208 A/B $ - $ - 24-Aug-10
402D 0 J 2028
PROVIDE ELECTRICAL
CONNECTIONS FOR
MODULAR FUNITURE
SYSTEMS. $ - $ - 31-Aug-10
406D 0 J 5460 DOOR INSTALLATION $ - $ - 07-Sep-10
407D 0 J 7451
PLACE PRECAST CONCRETE
BUNKER $ - $ - 07-Sep-10
410D 0 J 1010 REPAIR ROOF LEAK $ - $ - 14-Sep-10 412D 0 J 19 REMOVE DEAD TREE $ - $ - 16-Sep-10
415D 0 J 3131
NOT ENOUGH WATER FLOW
TO RO SYSTEM. $ - $ - 20-Sep-10
417D 0 J 5910 LANDSCAPE VCC $ 44,000.00 $ - $ - 22-Sep-10
418D 0 J 4564
CORRECT FIRE
DEFICIENCIES $ - $ - 23-Sep-10
416D 0 J 8027
REFRIGERATE AGENT
VAULT $ 43,600.00 $ - $ - 23-Sep-10
419D 0 J 8027
EMERGENCY BOILER SHUT
DOWN SWITCHES $ - $ - 23-Sep-10
430D 0 J 4229 STEAM LEAK $ - $ - 27-Sep-10 436D 0 J 4146 MODIFY OFFICES $ - $ - 30-Sep-10 437D 0 J 1002 4 FT OF STANDING WATER $ - $ - 04-Oct-10
438D 0 J 4156
REMOVE/REPLACE HALON
SYSTEMS $ - $ - 05-Oct-10
439D 0 J 4153
REMOVE/REPLACE HALON
SYSTEMS $ - $ - 06-Oct-10
455D 0 J 3159
PROVIDE WATER SUPPLY
FOR EXISTING FIRE
SPRINKLER SYSTEM AND
PROVIDE ALARM
MODIFICATION. $ - $ - 13-Oct-10
442D 0 J PAPA GRADE ROADS $ - $ - 14-Oct-10
454D 0 J 3242
PROVIDE WATER SUPPLY,
FIRE SUPPRESSION SYSTEM
AND ALARM MODIFICATION. $ - $ - 14-Oct-10
453D 0 J 4165
CHEMICAL AGENT SIGN
HOLDERS $ - $ - 18-Oct-10
457D 0 J 4038
SPREAD GRAVEL ALONG
BACK ROAD TO "A SITE" $ - $ - 25-Oct-10
456D 0 J 4367
INSTALLL STORAGE
MEZZANINES $ - $ - 25-Oct-10
466D 0 J NEW
CONSTRUCT NEW RANGE
CONTROL FACILITY $ - $ - 26-Oct-10
465D 0 J 4168 MOVE JERSEY BARRIERS $ - $ - 27-Oct-10 458D 0 J 5474 READ DPG METERS $ - $ - 28-Oct-10
468D 0 J GRANITE
EXTENSION OF WEST
GRANITE ROAD $ - $ - 01-Nov-10
470D 0 J 8223
CHECK OPERATIONS OF
UTILITIES $ - $ - 04-Nov-10
471D 0 J 5330
INSTALL TEST LIGHTING
CONTROLS $ - $ - 04-Nov-10
475D 0 J 5380 COM UNIT 5380 $ - $ - 09-Nov-10 477D 0 J 26 COM UNIT 26 $ - $ - 09-Nov-10 478D 0 J 646A COM UNIT 646A $ - $ - 09-Nov-10
482D 0 J 5470
CONSTRUCT TEMP. WALL 7
X 16 $ - $ - 22-Nov-10
490D 0 J 4126 INSTALL AUTOCLAVE $ - $ - 01-Dec-10
486D 0 J 5109
REPLACE ALL EXISTING
HVAC CONTROLS $ - $ - 06-Apr-11
401D 0 J 5300 PAINT INTERIOR $ - $ - 17-May-11 299D 0 J 46A COM UNIT $ - $ - 10-Jun-11
488D 0 J 4325
INSTALL AWNING OVER
DOOR $ 4,200.00 $ - $ - 25-Aug-11
489D 0 J 4323
INSTALL AWNING OVER
DOOR $ 5,200.00 $ - $ - 25-Aug-11
484D 0 J 4258
REPLACE EXISTING A/C IN
COMPUTER ROOM $ 31,479.08 $ - $ - 27-Sep-11
382D 0 J 0202C
PROVIDE BACK UP POWER
FOR CRP $ 62,500.00 $ - $ - 04-Oct-11
363D 0 J 5438 PAINT EXTERIOR $ - $ - 18-Nov-11 341D 0 J 81241 BROKEN ELECTRICAL POLE $ - $ - 30-Nov-11
293D 0 J 9323
ENGINEER & IMPLEMENT
DRAINAGE PLAN $ - $ - 26-Jan-12
480D 0 J 1010 MODERIZE SECOND FLOOR $ - $ - 26-Jan-12
296D 0 J MAAF
MOW WEEDS AROUND
AIRFIELD $ - $ - 22-Feb-12
429D 0 J 4165 INCREASE SIZE OF DOOR #1 $ - $ - 18-Apr-12
483D 0 J 5226
REPLACE BOILER NUMBER
ONE $ - $ - 23-May-12
375D 0 J 4531
PROVIDE FIRE SUPPRESSION
IN ROOM 122 $ - $ - 31-May-12
487D 0 J HSG RE-INSULATE PEX LINES $ - $ - 28-Jun-12
461D 0 J 4367
INSTALL STORAGE
SHELTERS $ - $ - 08-Aug-12
378D 0 J 9425 INSTALL A/C/HEATER UNIT $ - $ - 07-Oct-12 310D 0 J 4235 ROOF LEAK $ - $ - 25-Jul-13
358D 0 J CEDAR GRADE & ADD ROAD BASE $ - $ - 25-Jul-13 366D 0 J 5399 BUILD VALVE VAULT $ - $ - 25-Jul-13 381D 0 J 5716 RESTORE FIRE HYDRANTS $ - $ - 25-Jul-13
485D 0 J 5230
REPLACE INDIRECT SWAMP
COOLERS $ - $ - 25-Jul-13
464D 0 J 3038
REPLACE DOUBLE SWING
GATE $ - $ 2.00 25-Oct-10
424D 0 J 5140 COM ROOM 115 $ - $ 34.13 27-Sep-10 123D 0 J 5300 ELECTRICAL BOXES $ - $ 90.58 02-Feb-10 211D 0 J 5220 COM ROOM 106 $ - $ 96.10 13-Apr-10 117D 0 J 5220 COM ROOM 110 $ - $ 131.04 01-Feb-10 204D 0 J 5132 COM ROOM 213A/B $ - $ 144.15 13-Apr-10 228D 0 J 5450 AIR HANDLER $ - $ 157.99 28-Apr-10 275D 0 J 5230 REPLACE DOOR $ - $ 166.28 06-May-10 445D 0 J 5220 COM ROOM 102 $ - $ 225.32 18-Oct-10 115D 0 J 5132 COM ROOM 103A/B $ - $ 262.28 01-Feb-10 302D 0 J AFH REPLACE GFI BREAKERS $ - $ 297.50 17-Sep-12 422D 0 J 5220 COM ROOM 208 $ - $ 327.78 23-Sep-10
265D 0 J 41
IRRIGATION REPAIRS - UPH
HSG $ - $ 330.96 04-May-10
440D 0 J 5438 PAINT INTERIOR $ - $ 340.08 07-Oct-10
227D 0 J 3359
SLIDING DOOR WILL NOT
CLOSE $ - $ 343.28 28-Apr-10
208D 0 J 313A COM UNIT $ - $ 384.40 13-Apr-10 216D 0 J 5300 MARQUEE SIGN REMOVAL $ - $ 401.54 19-Apr-10 203D 0 J 5132 COM ROOM 106 $ - $ 432.45 13-Apr-10 100D 0 J 5220 COM ROOM 105 $ - $ 458.99 19-Jan-10 124D 0 J 5230 ELECTRICAL OUTLET $ - $ 461.31 02-Feb-10 434D 0 J 5220 COM ROOM 213A/B $ - $ 475.48 28-Sep-10 213D 0 J 5220 COM ROOM 210 $ - $ 480.50 13-Apr-10 210D 0 J 263A COM UNIT $ - $ 528.55 13-Apr-10 428D 0 J 5220 COM ROOM 105 $ - $ 616.20 28-Sep-10 116D 0 J 5132 COM ROOM 100 $ - $ 688.49 01-Feb-10 245D 0 J 111 COM UNIT $ - $ 696.79 04-May-10
469D 0 J HSG
REPAIRS REQUIRED IN
PHASE I AND II HOUSES $ - $ 726.26 12-Sep-12
268D 0 J 4156
MODIFY EXISTING EXHAUST
DUCT $ - $ 762.00 04-May-10
206D 0 J 333A COM UNIT $ - $ 816.85 13-Apr-10 202D 0 J 5140 COM ROOM 104 $ - $ 948.99 13-Apr-10
405D 0 J 1002
MOISTURE LEAKING
THROUGH WALLS $ - $ 981.96 25-Jul-13
271D 0 J 2029 NEED EXHAUST DUCT WORK $ - $ 1,008.00 04-May-10 153D 0 J 173A COM UNIT $ - $ 1,105.15 23-Feb-10 276D 0 J 5474 WIRE SANDBLASTER $ - $ 1,117.14 06-May-10
400D 0 J 5240
DEMOLISH OLD PASS ID
CONSOLE $ - $ 1,142.62 31-Aug-10
346D 0 J 647B COM UNIT $ - $ 1,149.35 12-Jul-10
119D 0 J 5474
REMOVE CONSTENTINE
WIRE $ - $ 1,280.54 02-Feb-10
155D 0 J 230A COM UNIT $ - $ 1,297.35 23-Feb-10 190D 0 J 604B REPLACE PATIO $ - $ 1,304.07 24-Mar-10 156D 0 J 230B COM UNIT $ - $ 1,393.45 23-Feb-10
198D 0 J 4367
REPAIR/REPLACE ROLL UP
DOOR $ - $ 1,397.56 06-Apr-10
159D 0 J 4335 REPLACE LIGHT FIXTURES $ - $ 1,403.80 23-Feb-10 102D 0 J 5220 COM ROOM 205 $ - $ 1,442.54 19-Jan-10 142D 0 J 8 COM UNIT $ - $ 1,465.53 23-Feb-10
414D 0 J 4541 REPLACE TWO CORD REELS $ - $ 1,486.42 21-Sep-10
399D 0 J MAAF
NW DECON PAD TAXIWAY
CRACK SEAL $ - $ 1,488.10 22-Feb-12
144D 0 J 192 COM UNIT $ - $ 1,489.55 23-Feb-10 325D 0 J 5230 TRIM TREES $ - $ 1,499.21 17-Jun-10 432D 0 J 5132 COM ROOM 115 $ - $ 1,532.26 27-Feb-12 326D 0 J 5226 SHOWER PIPE RUSTED $ - $ 1,640.80 22-Jun-10 095D 0 J 5330 INSTALL DOOR $ - $ 1,721.69 19-Jan-10
107D 0 J 1036
GREENLEAF COMBINATION
LOCK $ - $ 1,727.66 26-Jan-10
101D 0 J 56C COM UNIT $ - $ 1,737.61 19-Jan-10
285D 0 J 2029
REPLACE PRESSURE RELIEF
VALVE $ - $ 1,760.00 19-May-10
370D 0 J 4515 WATER MAIN BREAK $ - $ 1,788.27 10-Aug-10 154D 0 J 175B COM UNIT $ - $ 1,801.88 23-Feb-10 328D 0 J 6676 ASPHALT IS BROKEN UP $ - $ 1,839.48 30-Jun-10 186D 0 J 2028 REMOVE OLD FENCE $ - $ 1,839.82 22-Mar-10 452D 0 J 5140 COM ROOM 211 $ - $ 1,844.98 18-Oct-10
292D 0 J 4038
REPAIR BROKEN WATER
LINE $ - $ 1,865.34 02-Jun-10
286D 0 J 8046 GRADE AND GRAVEL $ - $ 1,879.64 20-May-10
136D 0 J 4153
CONSTRUCT SIDEWALK TO
GATE $ - $ 1,956.49 17-Feb-10
365D 0 J 5390 PROVIDE ACCESS POINTS $ - $ 2,015.71 03-Aug-10 212D 0 J 64A COM UNIT $ - $ 2,018.10 13-Apr-10 098D 0 J 629A COM UNIT $ - $ 2,032.67 19-Jan-10 390D 0 J 321C COM UNIT $ - $ 2,098.89 19-Aug-10 121D 0 J 4531 REPAIR A/C $ - $ 2,134.69 02-Feb-10 209D 0 J 275 COM UNIT $ - $ 2,138.23 13-Apr-10 140D 0 J 637B COM UNIT $ - $ 2,150.24 23-Feb-10 274D 0 J 3034 PATCH CRACKS $ - $ 2,159.42 06-May-10 114D 0 J 263B COM UNIT $ - $ 2,196.60 01-Feb-10 151D 0 J 169B COM UNIT $ - $ 2,210.30 23-Feb-10 226D 0 J 5 SEWER BACKED UP $ - $ 2,218.53 28-Apr-10 278D 0 J 4445 HYDRANT D-12 $ - $ 2,239.41 11-May-10 459D 0 J 4165 REPAIR BOILER $ - $ 2,245.00 25-Jul-13 230D 0 J 5900 RE-ESTABLISH POWER $ - $ 2,274.71 28-Apr-10 129D 0 J 5460 REPLACE LIGHT $ - $ 2,275.63 11-Feb-10 427D 0 J 248B COM UNIT 248B $ - $ 2,290.99 28-Sep-10 321D 0 J 5-PLEX UPGRADE 5-PLEX TRAILER $ - $ 2,319.44 13-Jun-13
270D 0 J 2029
FABRICATE STAIRS FOR
ACCESS $ - $ 2,335.00 04-May-10
413D 0 J 5900
REMOVE THE COUNTER
PARTITION IN BUILDING $ - $ 2,338.41 16-Sep-10
195D 0 J 5220
REPAIR/REPLACE METAL
DOORS $ - $ 2,360.34 31-Mar-10
404D 0 J 5330
A/C UNIT BLOWING OUT
WARM AIR $ - $ 2,401.73 21-Nov-11
167D 0 J 4531
REPAIR BROKEN WATER
LINE $ - $ 2,446.77 08-Mar-10
395D 0 J 213 COM UNIT $ - $ 2,447.88 24-Aug-10 113D 0 J 603B COM UNIT $ - $ 2,458.88 01-Feb-10
373D 0 J 5450
REPLACE CARPET AND
PAINT ROOMS $ - $ 2,471.30 12-Aug-10
327D 0 J 4135
CUT/MOW GRASS AND
WEEDS $ - $ 2,477.83 29-Jun-10
193D 0 J DTRA
CORE CHANGE & PROVIDE
KEYS $ - $ 2,487.71 30-Mar-10
398D 0 J 263C COM UNIT $ - $ 2,590.23 24-Aug-10 097D 0 J 83D COM UNIT $ - $ 2,622.80 19-Jan-10
287D 0 J 8027 REPLACE HEAT EXCHANGER $ - $ 2,651.25 24-May-10
379D 0 J MAAF
REPLACE FOUR TAXIWAY
FIXTURES $ - $ 2,689.80 13-Mar-13
231D 0 J 8363 FLOOD DAMAGE $ - $ 2,749.11 29-Apr-10 128D 0 J 5360 FAB 55 KEYS $ - $ 2,897.42 08-Feb-10 133D 0 J 8027 REPLACE EXHAUST FAN #7 $ - $ 2,904.85 16-Feb-10 433D 0 J 5140 COM ROOM 210A/B $ - $ 2,936.24 28-Sep-10 126D 0 J 4352 DESSICANT AIR DRYER $ - $ 2,944.87 04-Feb-10 134D 0 J 83B PAINT INTERIOR $ - $ 3,016.22 17-Feb-10
368D 0 J HSG
REPAIR WATERWAY ON
WEST SCHOOL $ - $ 3,029.12 10-Aug-10
145D 0 J 207 COM UNIT $ - $ 3,075.20 23-Feb-10 174D 0 J 3445 REPAIR/REPLACE VFD $ - $ 3,085.84 11-Mar-10 240D 0 J 97 COM UNIT $ - $ 3,112.42 04-May-10 185D 0 J 4026 SEWER BACKING UP $ - $ 3,214.28 18-Mar-10 170D 0 J 5124 RE-LAY CARPET $ - $ 3,240.40 10-Mar-10
463D 0 J 4515
REPLACE EXISTING
BOLLARDS $ - $ 3,295.66 21-May-12
409D 0 J 5474 CHANGE DOOR SWING $ - $ 3,387.36 17-Jun-11 189D 0 J 4229 COMPRESSOR DOWN $ - $ 3,391.14 23-Mar-10 426D 0 J 625B COM UNIT 625B $ - $ 3,433.67 14-Mar-11 243D 0 J 100B COM UNIT $ - $ 3,448.97 04-May-10 220D 0 J 5392 PAINT FENCE $ - $ 3,455.11 21-Apr-10 450D 0 J 5132 COM ROOM 206 $ - $ 3,524.13 22-Mar-12 152D 0 J 171A COM UNIT $ - $ 3,531.68 23-Feb-10 112D 0 J 5132 REPAIR/REPLACE DOOR $ - $ 3,532.09 28-Jan-10 377D 0 J WIG RECOVERY STAGING AREA $ - $ 3,533.00 05-Aug-11
472D 0 J 24
REPAIR FIRE DAMAGES IN
KITCHEN $ - $ 3,596.04 08-Nov-10
339D 0 J 5126
DOOR WILL NOT CLOSE
PROPERLY $ - $ 3,606.53 12-Jul-10
090D 0 J 4258 PULL UP CARPET $ - $ 3,669.58 11-Jan-10 184D 0 J 609A COM UNIT $ - $ 3,690.88 18-Mar-10 448D 0 J 60B COM UNIT 60B $ - $ 3,762.89 18-Oct-10
191D 0 J 5124
REPLACE GARBAGE
DISPOSAL $ - $ 3,784.41 24-Mar-10
425D 0 J 303A COM UNIT 303A $ - $ 3,832.31 14-Mar-11
444D 0 J 4165
FABRICATE 58 SIGNS
(SURETY REQUIRED) $ - $ 3,846.56 01-Oct-10
441D 0 J 4165
REPLACE EXHAUST FAN
MOTOR #1 $ - $ 3,910.43 13-Oct-10
127D 0 J 3445 DELMONIC SYSTEM $ - $ 3,928.05 08-Feb-10 385D 0 J 5388 LIGHTS DIMMING $ - $ 4,081.29 21-Feb-12 431D 0 J 5132 COM ROOM 214A/B $ - $ 4,126.05 15-Sep-11 301D 0 J 103A COM UNIT $ - $ 4,163.77 12-Sep-11 374D 0 J 5468 RAISE SPILL BUCKETS $ - $ 4,165.20 12-Aug-10
443D 0 J AFH
WINTERIZE VACANT AFH
HOUSING $ - $ 4,166.20 31-Mar-11
158D 0 J 8033 RE-CAULK DECON PAD $ - $ 4,207.04 23-Feb-10
280D 0 J 2029
REPLACE BEARING AND
SHAFT $ - $ 4,330.72 11-May-10
241D 0 J 90 COM UNIT $ - $ 4,550.39 04-May-10 447D 0 J 83B COM UNIT 83B $ - $ 4,723.94 18-Oct-10 164D 0 J 5450 FAB SIGNS $ - $ 4,758.08 24-Feb-10
138D 0 J 4156
MAKE REPAIRS TO COOLING
TOWER $ - $ 4,837.84 18-Feb-10
175D 0 J 4313 SUPPORT POWER OUTAGE $ - $ 4,849.47 15-Mar-10 143D 0 J 190 COM UNIT $ - $ 4,877.08 23-Feb-10
361D 0 J 4156
REPLACE LEAKING CIRC.
PUMP $ - $ 5,178.00 25-Jul-13
298D 0 J 158A COM UNIT $ - $ 5,186.93 13-Sep-11 194D 0 J 8027 REPLACE EXIT LIGHTS $ - $ 5,235.61 29-Mar-10 423D 0 J 284 COM UNIT 284 $ - $ 5,273.40 23-Sep-10
165D 0 J 9420
REMOVE & REPAIR WELL
PUMP $ - $ 5,308.90 25-Feb-10
300D 0 J 98A COM UNIT $ - $ 5,468.17 05-Oct-11 103D 0 J 5140 COM ROOM 204A/B $ - $ 5,597.83 19-Jan-10 337D 0 J 1010 REMOVE WEEDS $ - $ 5,738.05 08-Jul-10 421D 0 J 400 COM UNIT 400 $ - $ 5,820.59 23-Sep-10 199D 0 J 5330 REPAIR DAMAGE TO ROOM $ - $ 5,873.72 06-Apr-10 420D 0 J 609B COM UNIT 609B $ - $ 6,090.85 23-Sep-10 282D 0 J 4229 FUEL LEAK $ - $ 6,156.07 17-May-10
460D 0 J 2029
REPLACE CONDENSATING
TANK $ - $ 6,211.70 28-Oct-10
182D 0 J 644B COM UNIT $ - $ 6,217.23 17-Mar-10 306D 0 J 1010 BUILD SAFETY CAGES $ - $ 6,235.00 25-Jul-13 347D 0 J 56D COM UNIT $ - $ 6,294.24 10-Jul-10 474D 0 J 374B COM UNIT 374B $ - $ 6,339.71 16-Mar-11
291D 0 J 169A
REPAIR BROKEN WATER
LINES $ - $ 6,751.03 26-May-10
462D 0 J 167
REPAIR/REPLACE DOOR
LOCKS $ - $ 6,902.00 01-May-12
348D 0 J 339A COM UNIT $ - $ 7,077.07 04-Aug-11 481D 0 J READ DPG METERS $ - $ 7,209.55 17-Nov-10 476D 0 J 634B COM UNIT 634B $ - $ 7,426.92 09-Nov-10 246D 0 J 140B COM UNIT $ - $ 7,448.30 04-May-10 232D 0 J 5124 INSTALL CATWALK $ - $ 7,469.18 04-May-10 332D 0 J 5297 RE-ROUTE SEWER LINE $ - $ 7,509.74 05-Oct-11 196D 0 J 201 COM UNIT $ - $ 7,577.69 05-Apr-10 162D 0 J 5440 REPAIR/REPLACE DOOR $ - $ 7,737.82 24-Feb-10 369D 0 J 8116 REPLACE THE EXIT DOORS $ - $ 7,769.85 10-Sep-12 396D 0 J 259A COM UNIT $ - $ 7,885.48 15-Mar-11 449D 0 J 390 COM UNIT 390 $ - $ 7,920.98 05-May-11 446D 0 J 4 COM UNIT 4 $ - $ 8,008.31 18-Jul-12
491D 0 J 5330
REPLACE CONTROLLER FOR
TRACER SYSTEM $ - $ 8,059.00 01-Dec-10
141D 0 J 602B COM UNIT $ - $ 8,242.58 23-Feb-10 397D 0 J 269B COM UNIT $ - $ 8,243.70 21-Apr-11 099D 0 J 279 COM UNIT $ - $ 8,721.08 19-Jan-10 408D 0 J 600A COM UNIT $ - $ 9,210.82 07-Sep-10 146D 0 J 208 COM UNIT $ - $ 9,420.73 23-Feb-10 122D 0 J 5474 REMOVE WALL $ - $ 10,076.55 02-Feb-10 329D 0 J 4531 A/C INOP. $ - $ 10,213.17 17-Jun-13 094D 0 J 8027 REPLACE AIR DRYER $ - $ 10,240.87 14-Jan-10 388D 0 J 374A COM UNIT $ - $ 10,272.64 19-Aug-10 242D 0 J 117 COM UNIT $ - $ 10,722.14 04-May-10 118D 0 J 5363 COM UNIT $ - $ 10,890.58 01-Feb-10 386D 0 J 378 COM UNIT $ - $ 11,481.96 03-May-11 350D 0 J 37A/B COM UNIT $ - $ 11,770.82 05-Aug-11 387D 0 J 5386 COM UNIT $ - $ 11,896.35 20-Aug-12 229D 0 J 5460 RE-WIRE BREAKROOM $ - $ 12,750.00 04-May-10 351D 0 J 37C/D COM UNIT $ - $ 14,341.73 12-Jul-10 435D 0 J 617A COM UNIT 617A $ - $ 15,304.40 11-Apr-12 344D 0 J 5379 COM UNIT $ - $ 15,560.49 11-Oct-11
238D 0 J 5297
IRRIGATION REPAIRS - AFH
HOUSING $ - $ 15,788.41 04-May-10
451D 0 J 355B COM UNIT 355B $ - $ 16,551.24 05-Aug-11
473D 0 J 5450
PAINT AND REPLACE
CARPET $ - $ 16,881.11 30-Mar-11
360D 0 J 5126
PAINT EXTERIOR AND
INTERIOR $ - $ 18,450.27 25-Jul-13
281D 0 J 5803 REPAIR OF EQUIPMENT $ - $ 18,806.28 12-May-10
352D 0 J
PERIMETER SIGNAGE FOR
JLENS $ - $ 18,939.47 14-Jul-10
403D 0 J 4146
PROVIDE SOUNDPROOFING
FOR DPG CO AND WDTC
DIRECTORS OFFICE. $ 28,100.00 $ - $ 20,000.00 19-Apr-12
309D 0 J 4543
MODIFY BLDG 4543 FOR
CBDP $ - $ 23,151.00 06-Mar-12
160D 0 J 2029
REPLACE RUPTURED BOILER
TUBES $ - $ 24,169.60 23-Feb-10
188D 0 J 5300
REPLACE HEATING & A/C
SYSTEM $ - $ 26,760.89 23-Mar-10
237D 0 J
IRRIGATION REPAIRS -
COMMON AREAS $ - $ 27,322.19 04-May-10
479D 0 J 5360 COM UNIT 5360 $ - $ 27,996.08 02-May-14
139D 0 J 8027
REPAIR/REPLACE VAPOR
SYSTEM $ - $ 34,052.14 18-Feb-10
322D 0 J 5450
INSULATE ATTIC
HEADQUARTERS BUILDING
5450 $ - $ 53,625.28 04-Apr-13
171D 0 J 5330
REMOVE AND REPLACE
CARPE T $ - $ 68,627.91 10-Mar-10
132D 0 J 2032
MODIFICATION FOR
INSTALLATION OF GAMMA
CELL IRRADIATOR $ - $ 108,153.08 16-Feb-10
218D 0 J CEDAR
INSTALL FLIGHT
TERMINATION SYSTEM. $ - $ 158,475.00 20-Apr-10
305D 0 J 9322
UPGRADE OF THE TPQ 39
RADAR $ - $ 5,000,000.00 26-Jan-12
467D 1 J
SHORE POWER
DISTRIBUTION $ - $ - 28-Oct-10
470D 1 J 1010 REPLACE FALSE FLOOR $ - $ - 04-Nov-10 497D 1 J 175A COM UNIT 175 A $ - $ - 07-Dec-10 510D 1 J 5212 REMODEL OR EXTEND BAY $ - $ - 13-Dec-10 515D 1 J 5222 INSTALL POWER METERS $ 3,800.00 $ - $ - 16-Dec-10 516D 1 J 5226 INSTALL POWER METERS $ 3,800.00 $ - $ - 16-Dec-10 514D 1 J 23 COM UNIT $ - $ - 20-Dec-10
55D 1 J 5132
COM ROOM 111-A&B, BLDG
5132 $ - $ - 20-Dec-10
524D 1 J 4132
INSTALL REQUIRED FIRE
SUPPRESSION AND SMOKE
DETECTION $ - $ - 29-Dec-10
534D 1 J 8223
BLDG 8223 COMPLEX,
PROVIDE FIRE PROTECTION
WATER LOOP WITH 4
HYDRANTS $ - $ - 29-Dec-10
533D 1 J 5330
INSTALL LIGHTING
CONTROLS $ - $ - 05-Jan-11
531D 1 J MAG
FIBER FROM GRANITE TO TS-
3 $ - $ - 06-Jan-11
535D 1 J 8223
BLDG 8223 COMPLEX,
PROVIDE 360 DEGREE FIRE
TRUCK ACCESS ROAD
AROUND THE ENTIRE
COMPLEX $ 38,800.00 $ - $ - 10-Jan-11
544D 1 J CONSTRUCT DOG PARK $ - $ - 12-Jan-11 552D 1 J 75A COM UNIT 75-A $ - $ - 24-Jan-11 564D 1 J 107A COM UNIT 107-A $ - $ - 26-Jan-11 574D 1 J 181 COM UNIT 181 $ - $ - 26-Jan-11
575D 1 J 2029 BOILER SHUT DOWN SWITCH $ - $ - 31-Jan-11 578D 1 0 5330 SOLAR WALL STUDY $ - $ - 02-Feb-11 581D 1 J 5230 REMODEL BUILDING 5230 $ - $ - 02-Feb-11 565D 1 J 107B COM UNIT 107-B $ - $ - 03-Feb-11 583D 1 J 125A COM UNIT 125-A $ - $ - 07-Feb-11 614D 1 J 5440 SHOPPETTE UPGRADE $ - $ - 08-Feb-11
616D 1 J INSTALL EYEWASH STATION $ - $ - 08-Feb-11
617D 1 J 2028
REPLACE CIPHER LOCKS,
LSD $ - $ - 08-Feb-11
619D 1 J MGRNT
PLACE TRAINING CONEXES
ON SAPPHIRE MT $ - $ - 09-Feb-11
620D 1 J MGRNT
IMPROVE ROAD FOR
CONVOY LIVE FIRE RANGE,
SAPPHIRE MT. $ - $ - 09-Feb-11
621D 1 J ATWIG
CONSTRUCT GRENADE PITS
AT OP1, WIG MTN. $ - $ - 09-Feb-11
623D 1 J MGRNT
GRANITE MT. LIVE FIRE
RANGE $ - $ - 09-Feb-11
624D 1 J ICAUS
EXTEND ROADS FROM
OP2/OP3 INTO WEST
GRANITE CAUSEWAY
IMPACT AREA. $ - $ - 09-Feb-11
612D 1 J 165A COM UNIT 165-A $ - $ - 09-Feb-11 600D 1 J 135B COM UNIT 135-B $ - $ - 09-Feb-11 604D 1 J 152A COM UNIT 152-A $ - $ - 09-Feb-11 613D 1 J 5304 UPGRADE SUBWAY $ - $ - 10-Feb-11
629D 1 J
CONSTRUCT SEMI-
IMPROVED ROADS $ - $ - 14-Feb-11
628D 1 J 2028
CONTROL SYSTEM
MODIFICATION AND
SUPPORT $ - $ - 15-Feb-11
631D 1 J 8027 BOILER SHUT DOWN SWITCH $ - $ - 16-Feb-11 645D 1 J 203A COM UNIT 203-A $ - $ - 17-Feb-11 646D 1 J 209A COM UNIT 209-A $ - $ - 17-Feb-11 647D 1 J 64A COM UNIT 64-A $ - $ - 17-Feb-11 651D 1 J 165B COM UNIT 165-B $ - $ - 17-Feb-11 658D 1 J 131A COM UNIT 131-A $ - $ - 17-Feb-11
633D 1 J 4223
PROVIDE OPERATOR
SUPPORT $ - $ - 18-Feb-11
637D 1 J 1020 FIRE SUPPRESSION SYSTEM $ - $ - 23-Feb-11
717D 1 J 1080 TIE INTO EXISTING CONDUIT $ - $ - 08-Mar-11 678D 1 J 626A COM UNIT 626-A $ - $ - 09-Mar-11 677D 1 J 5140 COM ROOM 209 A&B $ - $ - 09-Mar-11
721D 1 J 3445
HARD WIRE ADDITIONAL
DURESS SWITCH $ - $ - 14-Mar-11
723D 1 J 5326 PAINT ROOM 103 $ - $ - 16-Mar-11
638D 1 J 2028
CONSTRUCT JBSDS BSL-3
CHAMBER $ - $ - 23-Mar-11
640D 1 J 3359
PROVIDE POWER TO BLDG
3359 $ 8,600.00 $ - $ - 23-Mar-11
642D 1 J 1080
ELECTRICAL UPGRADE,
MAIN BREAKER WATTAGE
REPLACEMENT $ - $ - 23-Mar-11
668D 1 J 183A COM UNIT $ - $ - 23-Mar-11
709D 1 J 1016 FIX EXTERIOR CONCRETE $ - $ - 23-Mar-11 710D 1 J 1010 REPLACE FALSE FLOORS $ - $ - 23-Mar-11
711D 1 J 1010
REPLACE RECEIVING BAY
DOOR $ - $ - 23-Mar-11
712D 1 J 1010
SLURRY COAT AVERY
COMPLEX $ - $ - 23-Mar-11
713D 1 J 1010
ASPHALT IN AVERY
COMPLEX $ - $ - 23-Mar-11
714D 1 J 1028 DEMO BLDG 1028 $ - $ - 23-Mar-11
715D 1 J 4156
OPTIMIZE CHEM LAB
VENTILATION $ - $ - 23-Mar-11
722D 1 J 1012
ERGRESS DOOR IN
MAINTENANCE ROOM $ - $ - 23-Mar-11
726D 1 J 5470
WALL CONSTRUCTION AND
DOOR $ - $ - 23-Mar-11
727D 1 J 3043
INSTALL EMERGENCY
EYEWASH STATIONS $ - $ - 23-Mar-11
728D 1 J 8150
GERMAN VILLAGE
ELETRICAL UPGRADE $ - $ - 23-Mar-11
737D 1 J 3445 HOOK UP PUMP $ - $ - 28-Mar-11 738D 1 J 4218 REPLACE LIGHTING $ - $ - 30-Mar-11
734D 1 J 4146
FURNITURE POWER
CONNECTION $ - $ - 06-Apr-11
739D 1 J MATOC
MATOC YARD
IMPROVEMENTS $ - $ - 06-Apr-11
740D 1 J 4122
INSTALL EXTERIOR TEST
SUPPORT POWER
RECEPTACLES $ - $ - 06-Apr-11
594D 1 J 113A COM UNIT 113-A $ - $ - 06-Apr-11 595D 1 J 113B COM UNIT 113-B $ - $ - 06-Apr-11
632D 1 J 2029
ELECTRICAL SERVICE
UPGRADE $ - $ - 07-Apr-11
748D 1 J 3036 POST INDICATOR VALVE $ - $ - 11-Apr-11 696D 1 J 8 COM UNIT 8 $ - $ - 04-May-11 697D 1 J 11 COM UNIT 11 $ - $ - 04-May-11 698D 1 J 5377 COM UNIT 5377 $ - $ - 04-May-11 699D 1 J 628A COM UNIT 628-A $ - $ - 04-May-11
741D 1 J 5910
ADD ADDITIONAL
BATHROOM $ - $ - 04-May-11
749D 1 J 5255
REPAIR/REPLACE
PLAYGROUND EQUIPMENT $ - $ - 04-May-11
757D 1 J 3445
PROVIDE REFRIGERATED
COOLING FOR WEST
CHAMBER, BLDG 3445 $ - $ - 04-May-11
766D 1 J 8336
TROUBLESHOOT
TRANSFORMER $ - $ - 04-May-11
768D 1 J 4258
CHECK AIR FLOW TO
BUILDING $ 1,978.00 $ - $ - 04-May-11
700D 1 J 5220 COM ROOM 204 $ - $ - 05-May-11
745D 1 J 2029
INSTALL BOLLARDS FOR
CRASH CABLES ON LSTF
PERIMETER FENCE (SURETY
WORK REQUEST) $ 10,635.00 $ - $ - 05-May-11
770D 1 J 4258
PROVIDE AND INSTALL
SECURTIY CIPHER LOCKS ON
OPTICS BRANCH MIPS
TRAILER $ 3,862.00 $ - $ - 05-May-11
781D 1 J 5300 PAINTING OF BALL ROOM $ - $ - 07-May-11
778D 1 J 4165
CONSTRUCT ADDITIONAL
TOILET IN MENS RESTROOM $ - $ - 09-May-11
701D 1 J 28 COM UNIT 28 $ - $ - 11-May-11 702D 1 J 623A COM UNIT 623-A $ - $ - 11-May-11
779D 1 J 4357
FENCE IN BUILDING 4357
AND BUILD A COVER TO
PROTECT POL PRODUCT
FROM THE WEATHER $ - $ - 11-May-11
699D 1 J 628A COM UNIT 628-A $ - $ - 18-May-11 701D 1 J 28 COM UNIT 28 $ - $ - 18-May-11
771D 1 J 4545
DOOR INSTALLATION AND
LOCKS $ 7,757.00 $ - $ - 18-May-11
779D 1 J 4357
FENCE IN BUILDING 4357
AND BUILD A COVER TO
PROTECT POL PRODUCT
FROM THE WEATHER
CONDITIONS $ - $ - 18-May-11
770D 1 J 4258
PROVIDE AND INSTALL
SECURITY CIPHER LOCKS. $ - $ - 24-May-11
788D 1 J 2048
UPGRADE TEST TRAILER
POWER PEDESTALS $ - $ - 01-Jun-11
782D 1 J 5100
FABRICATE AND HANG
CUTAIN $ - $ - 07-Jun-11
573D 1 J 216 COM UNIT 216 $ - $ - 10-Jun-11 588D 1 J 46B COM UNIT 46-B $ - $ - 10-Jun-11 662D 1 J 216B COM UNIT 216-B $ - $ - 10-Jun-11 663D 1 J 221A COM UNIT 221-A $ - $ - 10-Jun-11 664D 1 J 225A COM UNIT 225-A $ - $ - 10-Jun-11 806D 1 J 171B COM UNIT 171-B $ - $ - 15-Jun-11 808D 1 J 5220 COM ROOM 206, BLDG 5220 $ - $ - 15-Jun-11 811D 1 J 21 COM UNIT 21 $ - $ - 15-Jun-11
841D 1 J 4531 HOOK-UP NEW ACTUATORS $ - $ - 27-Jun-11
796D 1 J CDM
INSTALL MODULAR
CONSTRUCTION OFFICE
TRAILER FOR WATER
SYSTEM UPGRADE PROJECT. $ - $ - 29-Jun-11
840D 1 J 4038
PAVE AIRFIELD ACCESS
ROAD (BACK ROAD) $ - $ - 29-Jun-11
797D 1 J 5900 ROAD IMPROVEMENTS $ - $ - 30-Jun-11 842D 1 J 5468 CULVERT IN DITCH $ - $ - 30-Jun-11 843D 1 J 5314 REPLACE GATE VALVE $ - $ - 06-Jul-11
853D 1 J 5330
MANHOLE POURING OUT
WATER $ - $ - 07-Jul-11
857D 1 J 2026 CHECK POWER TO BUILDING $ - $ - 12-Jul-11
803D 1 J 4564
INSTALL WINDOWS AND
SOLAR TUBE SKYLIGHTS $ - $ - 13-Jul-11
839D 1 J 8231
CONSTRUCT TRAINING
CLASSROOM, SUPPRESSIVE
SHIELD $ - $ - 13-Jul-11
844D 1 J 4015
COMPLETE FIRE
SUPPRESSION SYSTEM IN
BLDG $ - $ - 13-Jul-11
848D 1 J 4564
INSTALL DAYLIGHTING
SYSTEM $ - $ - 13-Jul-11
858D 1 J 5383 CHECK POWER TO UNIT $ - $ - 14-Jul-11 851D 1 J 4146 MODIFY GIS OFFICE $ - $ - 27-Jul-11
854D 1 J 2030
INSTALL DAYLIGHTING
SYSTEM $ - $ - 27-Jul-11
859D 1 J 7353 WIG EXTERIOR REPAIR $ - $ - 27-Jul-11
860D 1 J ERMP
ERMP MODULAR OFFICE
TRAILER $ - $ - 27-Jul-11
862D 1 J 2029 VFD REPLACEMENT $ - $ - 27-Jul-11
622D 1 J 1002
UPGRADE AVERY TUNNEL
COMPLEX $ - $ - 03-Aug-11
874D 1 J 205 COM UNIT 205 $ - $ - 10-Aug-11
933D 1 J 5330
REQUEST FULL SET OF
DRAWINGS $ - $ - 15-Aug-11
918D 1 J 4038 INSTALL THREE BALLARDS $ - $ - 18-Aug-11
758D 1 J 4325
INSTALL AWNING ABOVE
DOORS $ - $ - 25-Aug-11
907D 1 J EV REPAIR OH POWER LINES $ - $ - 25-Aug-11 908D 1 J 5460 REPLACE WINDOWS $ - $ - 25-Aug-11
915D 1 J 5114
HVAC RECOMMISSIONING
AND DDC $ - $ - 25-Aug-11
916D 1 J 5304
HVAC RECOMMISSIONING
AND DDC $ - $ - 25-Aug-11
917D 1 J 5450
HVAC RECOMMISSIONING
AND DDC $ - $ - 25-Aug-11
918D 1 J 5124
HVAC RECOMMISSIONING
AND DDC $ - $ - 25-Aug-11
919D 1 J 5330
HVAC RECOMMISSIONING
AND DDC $ - $ - 25-Aug-11
920D 1 J 4531
HVAC RECOMMISSIONING
AND DDC $ - $ - 25-Aug-11
921D 1 J 5109
HVAC RECOMMISSIONING
AND DDC $ - $ - 25-Aug-11
922D 1 J 5111
HVAC RECOMMISSIONING
AND DDC $ - $ - 25-Aug-11
924D 1 J 5230 REPLACE WINDOWS $ - $ - 25-Aug-11
927D 1 J ATGNT
GRANITE MT MANUEVER
AREA VEHICLE RECOVERY
LANE. $ - $ - 25-Aug-11
929D 1 J 257B TOILET BACKING UP $ - $ - 25-Aug-11
904D 1 J 4072
REMOVE ELECTRICAL
SERVICE $ - $ - 30-Aug-11
800D 1 J 5220 PAINT BUILDING EXTERIOR $ - $ - 13-Sep-11 838D 1 J 2029 RENOVATE ROOM 507 $ - $ - 21-Sep-11
932D 1 J 4046
COMPLETE OVERHAUL OF
ELECTRICAL SYSTEM. $ - $ - 21-Sep-11
998D 1 J 5330
WALL REMOVAL, BLDG 5330,
ROOM 2701 $ - $ - 29-Sep-11
899D 1 J 31B COM UNIT 31-B $ - $ - 05-Oct-11 952D 1 J 5132 COM ROOM 208 A/B $ - $ - 05-Oct-11 954D 1 J 173A COM UNIT 173-A $ - $ - 05-Oct-11
961D 1 J PAD 11
INSTALL CALIBRATION
TOWER $ - $ - 05-Oct-11
032G 1 J
CONSTRUCT NEW DISPATCH
AND DETENTION FACILITY. $ - $ - 02-Nov-11
935D 1 J 3034 INSTALL RO WATER SYSTEM $ - $ - 02-Nov-11 761D 1 J UPH IRRIGATION REPAIRS $ - $ - 03-Nov-11 025G 1 J 5910 NEW PARKING AREA $ 20,500.00 $ - $ - 18-Nov-11 026G 1 J 4165 INSTALL CABLE BARRIERS $ - $ - 12-Dec-11
069G 1 J 4046 Install static discharge reels in BLDG 4046 $ 16,800.00 $ - $ - 11-Jan-12
729D 1 J 5460
RENOVATE ELECTRICAL
SYSTEM $ - $ - 19-Jan-12
784D 1 J 5304
INSTALL RAINGUTTERS ON
OUTSIDE FREEZER $ - $ - 13-Feb-12
504D 1 J 6654
REPLACE CHLORINE SENSOR
AND ALARM $ - $ - 27-Feb-12
869D 1 J 232A COM UNIT 232-A $ - $ - 19-Mar-12 881D 1 J 376 COM UNIT 376 $ - $ - 19-Mar-12 795D 1 J 4165 PROVIDE EXHAUST STACKS $ - $ - 27-Mar-12
902D 1 J 4515
UPGRADE SECURITY
CONTROL CENTER $ - $ - 28-Mar-12
946D 1 J 5900
CREATE AN OUTBOUND
VISITOR TURN-OUT AT THE
MAIN GATE $ 6,500.00 $ - $ - 28-Mar-12
772D 1 J 5112
PROCURE/INSTALL
HANDICAP POOL ACCESS
LIFT $ 7,525.00 $ - $ - 02-May-12
665D 1 J 5140 COM ROOM 109 $ - $ - 29-May-12
523D 1 J 4352
INSTALL REQUIRED FIRE
ALARM SYSTEM. $ - $ - 31-May-12
716D 1 J MAAF INSTALL ELECTRONIC GATE $ 9,700.00 $ - $ - 06-Jun-12
847D 1 J 5444
INSTALL STANDING SEAM
METAL ROOF $ - $ - 06-Jun-12
755D 1 J 4156 Ventilation Fans Rooms 77 and 78 $ 4,506.00 $ - $ - 25-Jun-12 925D 1 J 4223 REPAIR DRY PIPE SYSTEM $ - $ - 25-Aug-12 928D 1 J 4531 INSTALL DIMMER $ - $ - 25-Aug-12 519D 1 J 252C/D COM UNIT 252 C/D $ - $ - 29-Aug-12 683D 1 J 244 COM UNIT 244 C&D $ - $ - 29-Aug-12 693D 1 J 372A/B COM UNIT 372-A/B $ - $ - 29-Aug-12 824D 1 J 252A/B COM UNIT 252 A/B $ - $ - 29-Aug-12 834D 1 J 357C/D COM UNIT 357-C/D $ - $ - 29-Aug-12 836D 1 J 383 COM UNIT 383 $ - $ - 29-Aug-12 872D 1 J 317A/B COM UNIT 317-A/B $ - $ - 29-Aug-12 873D 1 J 398 COM UNIT 398 $ - $ - 29-Aug-12 808D 1 J 5111 REPLACE BACKFLOW $ - $ - 11-Sep-12 861D 1 J 5124 NEW BLDG ID SIGN $ - $ - 17-Sep-12
024G 1 J 2030
CORRECT STORM DRAINAGE
PROBLEMS $ - $ - 03-Oct-12
850D 1 J 4235
RENOVATE ROOF AND
EXTERIOR $ - $ - 03-Oct-12
756D 1 J 4165
CORRECT HIGH HEAT
CONDITION IN BLDG 4165
MECHANICAL ROOM, DOOR
#9 $ - $ - 10-Oct-12
030G 1 J Installation of Gate $ - $ - 05-Dec-12
543D 1 J 8223
RESTORE FIRE ALARM
NOTIFICATION
COMMUNICATION LINE $ 5,262.00 $ - $ - 21-Feb-13
625D 1 J 4215
CHECK TWO ROLL UP
DOORS $ - $ - 13-Mar-13
778D 1 J 4165
CONSTRUCT ADDITIONAL
TOILET $ - $ - 08-Apr-13
004G 1 J 5441
REPAIR EXISTING FIRE
SUPPRESSION SYSTEM $ - $ - 25-Jul-13
499D 1 J 3012
INSTALL WATER LINE AND
FREEZE LESS WATER
HYDRAN. $ - $ - 25-Jul-13
500D 1 J 3010
REPLACE 2 BALL VALVES
AND 3 SHUT OFF VALVES $ - $ - 25-Jul-13
501D 1 J 4596
REPLACE GUIDE SYSTEM
AND BASE ELBOW $ - $ - 25-Jul-13
502D 1 J 4597 DREDGE PRIMARY CELL $ - $ - 25-Jul-13
508D 1 J 4357 REPAIR EXISTING BOILER $ - $ - 25-Jul-13
513D 1 J 4323 REPLACE OVERHEAD DOOR $ - $ - 25-Jul-13
525D 1 J 5360
REPAIR/REPLACE STREET
LIGHTS IN ST. JOHNS
HOUSING AREA $ - $ - 25-Jul-13
539D 1 J 4105 REPLACE FLOW METER $ - $ - 25-Jul-13
731D 1 J 6676
RE-SURFACE OF FLOOR IN
OPEN AIR ,90-DAY
HAZARDOUS WASTE
STORAGE BUILDING 6676 $ - $ - 25-Jul-13
746D 1 J 5230 REPAIR SIDEWALK $ - $ - 25-Jul-13
763D 1 J 4313
M&R ON ELECTRICAL
SYSTEMS $ - $ - 25-Jul-13
794D 1 J 5212 REPLACE CARPET $ - $ - 25-Jul-13 903D 1 J 5464 REPLACE CARPET $ - $ - 25-Jul-13
962D 1 J 2029
INSULATION AROUND
STEAM PIPE $ - $ - 25-Jul-13
964D 1 J 5236
REMOVE AND REPLACE
OVERHANGS $ - $ - 25-Jul-13
926D 1 J 5330 REPLACE ROOF $ - $ - 29-Jul-13 724D 1 J 4034 REPLACE ROOF $ - $ - 07-Aug-13
010G 1 J
OVERHEAD DISTRIBUTION
REPAIRS $ - $ - 07-Oct-13
013G 1 J TOWER
OVERHEAD DISTRIBUTION
REPAIRS $ - $ - 07-Oct-13
659D 1 J 131B COM UNIT 131-B $ - $ - 17-Feb-14
511D 1 J 5212 BUILD PARKING STRUCTURE $ - $ - 08-Apr-14 831D 1 J 5220 COM ROOM 213-A/B $ - $ 53.83 26-Jul-11 700D 1 J 5220 COM ROOM 204, BLDG 5220 $ - $ 68.26 18-May-11 895D 1 J 5140 COM ROOM 204 A/B $ - $ 68.38 26-Sep-11 876D 1 J 5220 COM ROOM 105 $ - $ 77.29 01-Nov-11 880D 1 J 5140 COM ROOM 207A/B $ - $ 98.73 07-Sep-11 900D 1 J 5220 COM ROOM 204 $ - $ 98.84 01-Nov-11 805D 1 J 5220 COM ROOM 201, BLDG 5220 $ - $ 102.40 06-Jun-11 822D 1 J 5220 COM ROOM 110 $ - $ 106.86 05-Aug-11 704D 1 J 5220 COM ROOM 104 A/B $ - $ 115.91 20-Jun-11 005G 1 J 5330 UPGRADE ELEVATOR $ - $ 120.75 11-Sep-12 955D 1 J 5220 COM ROOM 205 $ - $ 137.36 01-Nov-11
656D 1 J 5220 COM UNIT 212 $ - $ 146.38 25-Jul-11 492D 1 J 5220 COM ROOM 204 $ - $ 156.22 07-Dec-10 690D 1 J 284 COM UNIT 284 $ - $ 174.93 18-Apr-11 635D 1 J 5100 REPLACE GLASS GLOBES $ - $ 175.48 21-Nov-11 871D 1 J 5140 COM ROOM 212-A/B $ - $ 227.76 15-Aug-11 706D 1 J 263C COM UNIT 263-C $ - $ 420.43 05-Aug-11
627D 1 J 5126
REPAIR/REPLACE
OVERHANG $ - $ 434.75 04-Oct-11
818D 1 J 5364 COM UNIT 5364 $ - $ 455.15 20-Jul-11 648D 1 J 5365 COM UNIT 5365 $ - $ 469.88 21-Mar-11 707D 1 J 609B COM UNIT 609-B $ - $ 480.39 30-Jun-11 913D 1 J 5124 REPLACE WALLPAPER $ - $ 505.92 12-Sep-12 018G 1 J 5450 REPLACE GLASS IN DOOR $ - $ 516.04 11-Sep-12 888D 1 J 111 COM UNIT 111 $ - $ 525.49 17-Oct-11 649D 1 J 5369 COM UNIT 5369 $ - $ 572.82 21-Mar-11
014G 1 J BAKER
OVERHEAD DISTRIBUTION
REPAIRS $ - $ 625.63 29-Oct-13
650D 1 J 5371 COM UNIT 5371 $ - $ 642.77 17-Mar-11 823D 1 J 5220 COM ROOM 206 $ - $ 739.85 07-Jul-11 584D 1 J 125B COM UNIT 125-B $ - $ 743.62 09-Feb-11 816D 1 J 321C COM UNIT 321-C $ - $ 744.53 23-Aug-11 702D 1 J 623A COM UNIT 623-A $ - $ 749.79 26-Jul-11
783D 1 J 4357
PROVOIDE GRAVEL AND
LEVEL $ - $ 766.65 25-May-11
652D 1 J 5140 COM ROOM 101 A/B $ - $ 838.74 05-Aug-11
009G 1 J EV
OVERHEAD DISTRIBUTION
SYSTEM $ - $ 866.25 07-Oct-13
678D 1 J 626A COM UNIT 626A $ - $ 925.75 20-Apr-11 541D 1 J 278 COM UNIT 278 $ - $ 942.21 16-Dec-10 826D 1 J 313D COM UNIT 313-D $ - $ 967.60 24-Aug-11
753D 1 J 5124 REPLACE DECAYING BRICKS $ - $ 1,039.60 17-Aug-11 885D 1 J 259A COM UNIT 259-A $ - $ 1,042.54 06-Sep-11 894D 1 J 90 COM UNIT 90 $ - $ 1,081.74 03-Oct-11 545D 1 J 5132 COM ROOM 105 $ - $ 1,100.54 21-Feb-12 819D 1 J 56C COM UNIT 56-C $ - $ 1,113.75 09-Nov-11
015G 1 J CEDAR
OVERHEAD DISTRIBUTION
REPAIRS $ - $ 1,113.87 07-Oct-13
875D 1 J 5392 COM UNIT 5392 $ - $ 1,139.19 28-Sep-11 686D 1 J 5140 COM ROOM 108 A&B $ - $ 1,239.47 06-Jun-11
691D 1 J 5220 COM ROOM 202 $ - $ 1,243.02 12-May-11 653D 1 J 5140 COM ROOM 103 A/B $ - $ 1,252.56 05-Aug-11 828D 1 J 647A COM UNIT 647-A $ - $ 1,282.23 05-Jun-12
930D 1 J 5140
REPLACE DIVERTERS IN RMS
102 A/B AND 214 A/B $ - $ 1,362.88 12-Sep-11
694D 1 J 5220 COM ROOM 107 $ - $ 1,385.19 16-Jun-11 567D 1 J 119A COM UNIT 119-A $ - $ 1,386.87 04-Apr-13 521D 1 J 258 COM UNIT $ - $ 1,402.52 21-Dec-10 672D 1 J 5140 COM ROOM 214 A&B $ - $ 1,418.80 07-Apr-11 815D 1 J 637A COM UNIT 637-A $ - $ 1,419.63 14-Jun-12 754D 1 J 5950 DIG UP WATER VALVE $ - $ 1,468.17 06-Jul-11 522D 1 J 631A COM UNIT $ - $ 1,488.99 31-Mar-11 671D 1 J 5140 COM ROOM 110 A&B $ - $ 1,538.04 04-Apr-11
001G 1 J 4541
REPAIR EXISTING FIRE
SUPPRESSION SYSTEM $ - $ 1,579.00 25-Jul-13
912D 1 J 6048 FAB STORAGE BOXES $ - $ 1,647.75 29-Aug-11 685D 1 J 5375 COM UNIT 5375 $ - $ 1,675.98 05-Jan-12 951D 1 J 5220 COM ROOM 103 A/B $ - $ 1,681.91 19-Dec-11 528D 1 J 198 COM UNIT 198 $ - $ 1,714.24 05-Jan-11 527D 1 J 5220 COM ROOM 108 $ - $ 1,760.15 16-Jun-11 602D 1 J 147B COM UNIT 147-B $ - $ 1,797.48 09-Jun-11
498D 1 0 5314
REMOVAL OF WASTE
WATER $ - $ 1,800.00 09-Dec-10
618D 1 J 4038 INSTALL THREE BALLARDS $ - $ 1,802.97 09-May-12 896D 1 J 248B COM UNIT 248-B $ - $ 1,826.60 20-Dec-11
019G 1 J 4597
REPAIR UNDERGROUND
ELECTRIC LINE $ - $ 1,870.00 18-Oct-11
003G 1 J 4132
REPAIR EXISTING FIRE
SUPPRESSION SYSTEM $ - $ 1,927.00 25-Jul-13
017G 1 J 1002
REPAIR CONCRETE
ENTRANCE WAYS. $ - $ 1,952.29 18-Oct-11
817D 1 J 382 COM UNIT 382 $ - $ 1,953.47 27-Jun-11 890D 1 J 5132 COM ROOM 108 A/B $ - $ 1,954.70 20-Dec-11 666D 1 J 5140 COM ROOM 204 A&B $ - $ 2,035.37 05-Aug-11 576D 1 J 2029 INOPERABLE VALVE $ - $ 2,080.00 25-Jul-13
774D 1 J
RE-GRADE ROUGH HALL
ROAD $ - $ 2,114.70 06-Sep-11
787D 1 J 6672 REPAIR/REPLACE DOORS $ - $ 2,131.35 07-May-13 023G 1 J 608 MOLD REMEDIATION $ - $ 2,225.91 24-Nov-11
868D 1 J 5910
REPLACE/UPGRADE A/C
UNIT $ - $ 2,232.73 29-Dec-11
911D 1 J MAAF
PLACEW JERESY BARRIERS
ADJACENT RIAC OFFICE
COMPLEX $ - $ 2,240.06 15-Sep-11
006G 1 J 5468
WATER ON BATHROOM
FLOORS. $ - $ 2,252.74 06-Oct-11
943D 1 J HSG
REPAIR VENT STACKS AND
CAPS $ - $ 2,255.03 11-Sep-12
661D 1 J 187B COM UNIT 187-B $ - $ 2,264.57 19-Jun-12 027G 1 J 5460 PLUGGED FLOOR DRAIN $ - $ 2,280.11 21-Nov-11 696D 1 J 8 COM UNIT 8 $ - $ 2,301.82 26-Apr-12 798D 1 J 5440 REPLACE DRAINAGE BOX $ - $ 2,337.85 15-Sep-11 887D 1 J 325A COM UNIT 325-A $ - $ 2,361.19 19-Jun-12 953D 1 J 83C COM UNIT 83-C $ - $ 2,441.46 24-Jan-12 655D 1 J 5140 COM ROOM 215 $ - $ 2,448.08 29-Feb-12 870D 1 J 5132 COM ROOM 110-A/B $ - $ 2,481.39 22-Nov-11
765D 1 J 600
REPAIR ROOF - AFH 600
UNITS $ - $ 2,520.76 21-Nov-11
725D 1 J 3445
REPLACE MODULATING
MOTOR $ - $ 2,534.18 03-May-11
747D 1 J 9425 REPAIR/REPLACE URINALS $ - $ 2,547.55 06-Apr-11 689D 1 J 271D COM UNIT 271-D $ - $ 2,693.20 09-May-11
767D 1 J 4156
TOUCH-UP PAINT IN
HALLWAYS $ - $ 2,767.80 02-Apr-12
062G 1 J 5112
INSTALL CHRISTMAS
LIGHTS $ - $ 2,787.37 10-Jan-12
852D 1 J 5230 REPAIR OVERHANG $ - $ 2,788.50 14-Oct-11 708D 1 J 230B COM UNIT 230-B $ - $ 2,816.07 03-Aug-11 677D 1 J 5140 COM ROOM 209 A&B $ - $ 2,851.29 05-Aug-11 705D 1 J 259C COM UNIT 259-C $ - $ 2,852.35 16-Aug-11 050G 1 J 8027 replace heat exchanger# 3 $ - $ 2,946.82 27-Dec-11 905D 1 J 8027 REPLACE COMPRESSOR $ - $ 2,968.30 16-Nov-11
020G 1 j 2029
REPLACE FILTERS ON AIR
HANDLILNG UNIT $ - $ 2,976.53 16-Nov-11
744D 1 J 5330
REPLACE DOOR TO BOILER
ROOM, BLDG 5330 $ - $ 2,982.80 12-Sep-12
936D 1 J HSG INSTALL CULVERT PIPE $ - $ 2,987.72 13-Dec-12 692D 1 J 5132 COM ROOM 103 A/B $ - $ 3,076.45 14-Nov-11
733D 1 J 5230
REPLACE WATER BOOSTER
PUMP $ - $ 3,087.10 21-Nov-11
585D 1 J 127A COM UNIT 127-A $ - $ 3,131.20 05-Aug-11 676D 1 J 5140 COM ROOM 203 A& B $ - $ 3,156.28 05-Aug-11 909D 1 J 4595 REPAIR EYEWASH $ - $ 3,156.85 03-Nov-11
016G 1 J 4531
REPAIR COMPRESSOR TO AC
UNIT $ - $ 3,275.22 20-Oct-11
780D 1 J 4531 REPAIR WATER LINE $ - $ 3,329.34 03-Nov-11
886D 1 J 5132
COM ROOM 102 A/B, BLDG
5132 $ - $ 3,340.88 23-Nov-11
654D 1 J 5140 COM ROOM 213 A/B $ - $ 3,360.58 05-Aug-11
942D 1 J HSG
REPAIR VENT STACKS AND
CAPS $ - $ 3,367.09 11-Sep-12
939D 1 J 5230 PAINT EXTERIOR $ - $ 3,372.68 04-Oct-11 496D 1 J 263B COM UNIT 263B $ - $ 3,427.93 07-Dec-10 031G 1 J 4055 THREE POLE LIGHTS INOP $ - $ 3,439.53 17-Apr-12
012G 1 J DITTO
OVERHEAD DISTRIBUTION
REPAIRS $ - $ 3,510.36 07-Oct-13
963D 1 J
SUPPORT SCH. POWER
OUTAGE $ - $ 3,546.81 02-Oct-11
827D 1 J 396 COM UNIT 396 $ - $ 3,566.55 08-Aug-11 785D 1 J INF GRADE INF ROAD $ - $ 3,574.10 28-Jul-11 752D 1 J 4046 HEATER LEAKING $ - $ 3,608.55 18-Apr-11
743D 1 J 5019
REPLACE ALL STATION
WIRES $ - $ 3,616.35 24-Aug-11
893D 1 J 636A COM UNIT 636-A $ - $ 3,635.56 29-Sep-11 007G 1 J 5236 REPAIR HEAT EXCHANGER $ - $ 3,645.82 25-Jul-13 647D 1 J 64A COM UNIT 64-A $ - $ 3,653.32 17-Nov-11 529D 1 J 641B COM UNIT 641B $ - $ 3,685.27 29-Jun-11 064G 1 J 2050 REPAIR DRAIN LINE $ - $ 3,707.53 04-Apr-13 561D 1 J 98B COM UNIT 98-B $ - $ 3,742.56 22-Sep-11 680D 1 J 5140 COM ROOM 102 A&B $ - $ 3,757.29 07-Apr-11 799D 1 J 4016 PAINT BLDG EXTERIOR $ - $ 3,774.17 01-Sep-11 674D 1 J 5140 COM ROOM 201 $ - $ 3,887.03 27-Feb-12 550D 1 J 88 COM UNIT 88 $ - $ 3,910.11 07-Feb-12
509D 1 J 4595
REPLACE CHLORINE SENSOR
AND ALARM $ - $ 3,926.22 27-Feb-12
720D 1 J 5330 NO POWER IN ROOM 1508 $ - $ 3,965.07 21-Nov-11 597D 1 J 123A COM UNIT 123-A $ - $ 4,008.05 23-Oct-12 586D 1 J 127B COM UNIT 127-B $ - $ 4,019.72 07-Feb-11
667D 1 J 171A COM UNIT $ - $ 4,134.29 02-Jun-11 703D 1 J 642A COM UNIT 642-A $ - $ 4,180.74 12-Jun-12
793D 1 J 13
REMOVAL OF ITEMS FROM
UNITS $ - $ 4,260.91 12-Sep-12
555D 1 J 5132
COM ROOM 111-A&B, BLDG
5132 $ - $ 4,285.36 29-Dec-11
670D 1 J 5140 COM ROOM 105 $ - $ 4,309.11 13-Mar-12 821D 1 J 5140 COM ROOM 106 A/B $ - $ 4,325.85 06-Jan-12 675D 1 J 30B COM UNIT 30 B $ - $ 4,400.81 20-Dec-11 937D 1 J 5240 PAINT EXTERIOR $ - $ 4,435.95 29-May-12 592D 1 J 105 COM UNIT 105 $ - $ 4,453.19 03-Nov-11 736D 1 J 1002 REPAIR BREAKER BOX $ - $ 4,480.21 17-Jun-11 941D 1 J 1010 PAINT EXTERIOR $ - $ 4,489.71 11-Sep-12 751D 1 J 4165 CHECK AND REPAIR ROOF $ - $ 4,489.80 02-Apr-12 944D 1 J 2029 REPAIR BOILER #2 $ - $ 4,493.69 03-Nov-11 548D 1 J 147A COM UNIT 147-A $ - $ 4,510.14 18-Jan-11 611D 1 J 163 COM UNIT 163 $ - $ 4,510.45 23-May-11 776D 1 J 621A REPAIR WATER LEAK $ - $ 4,515.08 21-Nov-11
792D 1 J 4223
LEAK IN FIRE SUPPRESSION
SYSTEM $ - $ 4,532.00 01-Sep-11
596D 1 J 121A COM UNIT 121-A $ - $ 4,539.47 04-Dec-12 679D 1 J 5132 COM ROOM 203 A&B $ - $ 4,566.56 16-Nov-11 684D 1 J 263A COM UNIT 263-A $ - $ 4,569.66 10-May-11 547D 1 J 91B COM UNIT 91-B $…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .