L-7_Task_Order_Proposal_Schedule.docx

DOCX document 19 KB Posted

Attached to
Environmental Remediation Services MATOC Federal contract opportunity
Solicitation number
W911KB-13-R-0014
Issued by
Department of the Army Corps of Engineers Engineering District Alaska

About this file

Attachment L-7 Initial Task Order Proposal Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Environmental Remediation Services MATOC, newest first.
File Type Posted
L-4_Key_Personnel_Resume_AM_3.docx DOCX document
L-8_Schedule_B_worksheet_AM_3.xls XLS spreadsheet
W911KB-13-R-0014_AM_3.pdf PDF
VH-H_2_photos.pdf PDF
A.9_Pre-proposal_Conference_Notes_and_Attendees.pdf PDF
W911KB-13-R-0014_AM_2.pdf PDF
Manual_for_Electronic_Deliverables_2011_Final.pdf PDF
W911KB-13-R-0014_AM_1.pdf PDF
L-8_Schedule_B_worksheet.xls XLS spreadsheet
L-9_Pre-Award_Survey.doc DOC document
L-5_PPQ.docx DOCX document
L-1_Resume_of_Offeror's_Environmental_Experience.doc DOC document
L-4_Key_Personnel_Resume.docx DOCX document
W911KB-13-R-0014_Environmental_Remediation_Services.pdf PDF
L-10_Accounting_System_Survey.doc DOC document
L-3_Letter_of_Commitment.docx DOCX document
L-2_Project_Experience_Form.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment L-7

W911KB-13-R-0014

Initial Task Order Proposal Schedule (Submit for Volume 3, Section 1, Tab 1-3)

Provide pricing for each task listed below along with detailed breakout of all labor, material, subcontracts, travel, ODC’s etc to support the proposed pricing.

Item Number
Base Item
Description
Quantity
Unit
Unit Price
Total Price
1
Project Management
Provide Project Management
1
LS
2
Work Plans
Provide Draft & Final Planning Documents
1
LS
3
Site Visit
Preliminary Site Visit
1
LS
4
MOB/DEMOB
MOB & DEMOB All Equipment, Materials and Supplies to/from Site
1
LS
5
Field Work
Implement All Field Work Specified in Accepted Planning Docs. (Except MOB/DEMOB)
1
LS
6
Chemical Data Review & Analytical
Provide Chemical Data Quality Review & Laboratory Analysis
1
LS
7
Waste Transport and Disposal
Transport and Dispose of All Waste
1
LS
8
Removal Action Report
Provide Draft and Final Removal Action Report
1
LS

Subtotal of Base Items

Subtotal Base

Option Items

A
Additional Pipeline Removal
Remove, Dispose of 500 ft Pipeline 12-16". Analytical sampling along pipe. Backfill Hole. (up to 2000ft total)
4
Each
B
Additional POL Product Removal/Disposal
Remove & Dispose 200 Gal Off-Spec Fuel (up to 6000 gallons total)
30
Each
C
Additional Vault Removal/Disposal
Remove & Dispose of One Vault, Water & All Contents Except Transformers. Backfill.
5
Each
D
Additional, Non-TSCA Transformer Removal/Disposal
Removal & Dispose of one Transformer with fluid below 50 mg/L PCBs up 10 Transformers
10
Each
E
TSCA Transformer Removal/Disposal
Removal & Dispose of one Transformer with fluid at or above 50 mg/L PCBs up to 6 Transformers
6
Each
F
1.5 Ton POL-Contaminated Soil Removal /Disposal
Remove, Dispose of 1.5 Tons POL Contaminated Soil. Confirmation soil sampling. Backfill Hole (up to 30 tons)
20
Each

Subtotal of Options

Subtotal Options

Grand Total

Grand Total

File details come from the government source that posted it. Updated .