CDRL_A003.pdf

PDF 669 KB Posted

Attached to
Digital Integration Laboratory (DIL)
Solicitation number
W900KK-19-R-0010
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) outlining reporting requirements for a contractor providing technical and management support services to the Digital Integration Lab (DIL). The contractor must submit monthly progress, status and management reports no later than 12 working days after the close of each monthly accounting period. The reports should be provided via the WAWF system and email in Microsoft Office format. They must include the contract and CDRL numbers and reporting period in the subject line and submission text. The government will have 10 days to review each report and provide comments, to which the contractor has 5 days to respond. Distribution of the reports is limited to U.S government agencies only. The DIL provides integration support and risk reduction for PEO STRI programs through centralized facilities at Fort Hood, Texas managed by the Central Technical Support Facility.

CDRL A003

View the file

Other files

File Type Posted
Attachment_7_DIL_Price_Elements_Table.xlsx XLSX spreadsheet
DIL_Final_RFP_Consolidated_Industry_Questions_and_Government_Responses_8OCT19.xlsx XLSX spreadsheet
Attachment_11_DIL_Proposal_Receipt_Form.doc DOC document
W900KK-19-R-0010_Amendment_0001.pdf PDF
W900KK-19-R-0010_Amendment_0001.rtf RTF text file
Attachment_9_DIL_Past_Performance_Questionnaire.docx DOCX document
Attachment_6_DIL_RFP_PWS_Reference.xlsx XLSX spreadsheet
CDRL_A004.pdf PDF
CDRL_A004.pdf PDF
Attachment_1_DIL_PWS_12SEP2019.pdf PDF
Attachment_3_DIL_GFP_Module20181107.xlsx XLSX spreadsheet
Attachment_4_DIL_QASP.PDF PDF
Attachment_2_DIL_DD254_Signed.pdf PDF
Attachment_7_DIL_Price_Elements_Table.xlsx XLSX spreadsheet
Attachment_9_DIL_Past_Performance_Questionnaire.docx DOCX document
Attachment_10_DIL_Preaward_Survey_of_Prospective_Contractor_Accounting_S....doc DOC document
Attachment_11_DIL_Proposal_Receipt_Form.doc DOC document
W900KK-19-R-0010.pdf PDF
DIL_DRFP_Consolidated_QA_FINAL_12_SEP_2019.XLSX XLSX spreadsheet
Attachment_8_DCAA_Pre-Award_Survey_of_Prospective_Contractor_Accounting_....pdf PDF
Attachment_6_DIL_RFP_PWS_Reference.xlsx XLSX spreadsheet
Attachment_5_DIL_RFP_Question_Comment_Form.xlsx XLSX spreadsheet
CDRL_A002.pdf PDF
CDRL_A001.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP ____ TM _______ OTHER_MGMT__

D. SYSTEM/ITEM F. CONTRACTOR

Digital Integration Laboratory (DIL)

E. CONTRACT/PR NO.

1. DATA ITEM NO. 17. PRICE G

2. TITLE OF DATA ITEM

Contractors Progress, Status and Management Report (CPSMR)

N/A A003

3. SUBTITLE

6. REQUIRING OFFICE 18. ESTIMA4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80227

5. CONTRACT REFERENCE

PWS PARA 4.2.4 SFAE-STRI-PM ITE TOTAL

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION N/A LT REQUIRED MNTHLY SEE BLK 16 b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE final SEE BLK 16 draft reg repr

16. REMARKS PEO STRI PD 1

1. BLOCK 9: Distribution authorized to U.S. Government agencies only; proprietary information, effective 01 JAN 10. Other requests for this document shall be referred to us army PEO STRI, SFAE-

STRI-PMITE-WTI.

2. BLOCK 12: Shall be due 30 days after contract award.

3. BLOCK 13: Shall be submitted no later than 12 working days following the contractor's monthly accounting period cutoff date.

4. BLOCK 14: The contractor shall submit the data, in the form of attachments, via WAWF and email to the addressee. The subject line shall include the contract number, CDRL data item number, and reporting period (E.G. W900KK-18-D-0020, CLIN 0002, CDRL A001, 1 May 2018). Submissions shall be in Contractor format in a professional manner using MS Office 2013 or other format approved by the government. For data submission with an electronic file size greater than 10 MB or if the combined size of the attachments is greater than 10 MB, contact the COR for submission instructions.

Compressed or zip files and executable files are not accepted by the PEO STRI firewall. For submission of these file types, contact the COR for submission instructions.

5. The government will have 10 days for review and acceptance or rejection of each submission.

6. The contractor shall have 5 days to incorporate government comments.

7. Contractor format is acceptable.

PEO STRI Cont Admin 1

15. TOTAL - - - - - - - - -> 0 3

G. PREPARED BY: Jose Orozco/ PEOSTRI/PM ITE H. DATE 11/1/18 I. APPROVED BY: J. DATE DD Form 1423-1, JUN 90 Previous editions are obsolete

TBD Enc-4 CDRL javascript:void(0)

File details come from the government source that posted it. Updated .