Site Visit Minutes - Intel Vault_signed.pdf

PDF 234 KB Posted

Attached to
138 FW Intel Vault Upgrade Federal contract opportunity
Solicitation number
W50S8U-22-B-0002
Issued by
Department of the Army National Guard

About this file

This document outlines a solicitation for an Intel Vault Upgrade project. The Tulsa Air National Guard in Oklahoma is seeking bids to upgrade the intelligence vault, including drywall systems, electrical, combinations, minor HVAC work and meeting STC sound requirements for new wall and door systems. Sole source items specified include Corning Edge Housing and Splice Cassette, Kaba Mas X-10 High Security Lock, Indalla card readers and Cisco switches. This opportunity is set aside 100% for small businesses under NAICS code 236220 with a size standard of $39.5 million. The estimated value is between $100,000 and $250,000. A pre-bid conference was held on May 3rd and questions are due by May 18th. Award will be made to the responsible bidder offering the most advantageous price. Funds are anticipated to become available by September 30, 2022. Sealed bids must be submitted in-person rather than electronically.

View the file

Other files for this federal contract opportunity

Other files attached to 138 FW Intel Vault Upgrade, newest first.
File Type Posted
Abstract of Offers Intel Vault.pdf PDF
Attendance Sheet Bid opening Intel Vault_Redacted.pdf PDF
W50S8U-22-B-0002-0003.pdf PDF
SOW - Intel Vault Conversion v1.9.pdf PDF
22B00020002.pdf PDF
W50S8U-22-B-0002-0001.pdf PDF
WALL SECTION.pdf PDF
RFI_5_MiniSplitPhotos.pdf PDF
E-101 revised.pdf PDF
Pre-Bid RFI Intel Vault 11May22.pdf PDF
Site Visit Sign In - Intel Vault_3May22_Redacted.pdf PDF
Site Visit Slides Intel vault.ppt PPT presentation
Brand_Name_Justification Indalla 1.4.pdf PDF
RFI Template Intel Vault Repairs.docx DOCX document
JA Cooper V-line Cabinet.pdf PDF
SOW - Intel Vault Conversion v1.8.pdf PDF
Brand_Name_Justification X-10 1.2.pdf PDF
Brand_Name_Justification (Corning_FODP) 1.0.pdf PDF
A101 Final - Drawing.pdf PDF
Upgrade Intel Vault Specs.pdf PDF
Brand_Name_Justification (Cisco_infrastructure) 1.0.pdf PDF
W50S8U-22-B-0002.pdf PDF
JA APC Smart-UPS.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 138TH FIGHTER WING

9100 EAST 46TH STREET NORTH

TULSA OKLAHOMA 74115-1000

10 May 2022

MEMORANDUM FOR RECORD

SUBJECT: MINUTES OF PRE-BID CONFERENCE AND SITE VISIT, SOLICITATION W50S8U-22-B-

0002, Intel Vault Upgrade

03 May 2022/0900/45 Minutes

1. The list of contractors attending the meeting is shown on the attached sign-in sheet. The following Government representatives attended the subject meeting:

Name Position SMSgt Amanda Lonsdale Base Contracting Officer Mr. Scott Agee Technical Advisor TSgt Joshua Kingori Contract Specialist Capt Dillon Vaughan Chief of Intel/ Customer

2. The following items were discussed during the Pre-bid Conference:

a. The Contract period is 240 days. This includes all work to include cleanup and punch list.

We anticipate award of the contract in mid-April. Following receipt and approval of bonds we will hold a pre-construction conference and issue two NTPS. One for materials and submissions and another after materials and submittals.

b. Interested bidders must be registered in SAM.

3. A power point slide presentation on the project specifics and the selection process was provided to all attendees. (Attached)

4. After meeting in the CE Classroom at Building 222 the attendees walked to, Building 320 and toured the rooms impacted by the project.

5. Questions: RFI process was explained. This process includes an e-mail to the contracting office at 138.FW.MSC@us.af.mil

a. RFIs on the following will be provided: Door at Room 149, new hardware for Room 149, furniture removal from room, drawings and electric plans, HVAC entries, Strike plate and card readers.

6. Any correspondence, questions and answers, amendments etc. that are issued will be posted to contracting opportunities at sam.gov. Contractors were advised to check the website frequently. DO NOT CONTACT the Design Engineers or the Government Engineers. All questions must be routed through the Contracting Office

7. The pre-proposal conference and site visit concluded at 0945 hours.

AMANDA J. LONSDALE, SMSgt, ANG Base Contracting Officer