Pre-Bid RFI Intel Vault 11May22.pdf

PDF 80 KB Posted

Attached to
138 FW Intel Vault Upgrade Federal contract opportunity
Solicitation number
W50S8U-22-B-0002
Issued by
Department of the Army National Guard

About this file

This solicitation package outlines requirements for an intelligence vault upgrade project. The Tulsa Air National Guard, Oklahoma is seeking bids to perform drywall, electrical, HVAC, and security upgrades at the vault, including installation of Corning Edge Housing and Splice Cassette, Kaba Mas X-10 High Security Lock, Indalla card readers and Cisco networking equipment. The project is set aside exclusively for small businesses with a NAICS code of 236220 and size standard of $39.5 million. Bids are due no later than 1300 hours on May 18th, 2022. Funds are anticipated but not presently available, with an expected award date of September 30th, 2022 contingent on funding and bids within an awardable range.

View the file

Other files for this federal contract opportunity

Other files attached to 138 FW Intel Vault Upgrade, newest first.
File Type Posted
Abstract of Offers Intel Vault.pdf PDF
Attendance Sheet Bid opening Intel Vault_Redacted.pdf PDF
W50S8U-22-B-0002-0003.pdf PDF
SOW - Intel Vault Conversion v1.9.pdf PDF
22B00020002.pdf PDF
W50S8U-22-B-0002-0001.pdf PDF
WALL SECTION.pdf PDF
RFI_5_MiniSplitPhotos.pdf PDF
E-101 revised.pdf PDF
Site Visit Minutes - Intel Vault_signed.pdf PDF
Site Visit Sign In - Intel Vault_3May22_Redacted.pdf PDF
Site Visit Slides Intel vault.ppt PPT presentation
W50S8U-22-B-0002.pdf PDF
JA APC Smart-UPS.pdf PDF
RFI Template Intel Vault Repairs.docx DOCX document
JA Cooper V-line Cabinet.pdf PDF
SOW - Intel Vault Conversion v1.8.pdf PDF
Brand_Name_Justification X-10 1.2.pdf PDF
Brand_Name_Justification (Corning_FODP) 1.0.pdf PDF
Brand_Name_Justification Indalla 1.4.pdf PDF
A101 Final - Drawing.pdf PDF
Upgrade Intel Vault Specs.pdf PDF
Brand_Name_Justification (Cisco_infrastructure) 1.0.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: RFI No.

IFB Reference (Sect/Para/Page) RFI QUESTION GOVERNMENT RESPONSE

5/3/2022 1 Drwg A101 Construction note 4 references detail 1 on sht. A-501 for new 3’0” 7’0” Door and Jamb. I do not find a sheet A-501 in the solicitation. Please advise

Please see the attached drawing 501-A for details.

5/3/2022 2 DDEDIT

Construction note 6 references specification for door, frame, and hardware. The specification refers to the plan for door schedule. Where is the schedule listing for this door? The hollow metal spec appears to be performance type spec without model listing. Please advise.

The basis of design for the specified STC rated door and jamb is Overly but other manufactures could meet the specification.

5/3/2022 3 Drwg A101 Construction note 8 calls for matching corrugated metal over any unused penetrations. How is this metal to be fastened?

Tap con style anchor or welding

5/3/2022 4 SOW

What happens with the ceiling? The demolition notes say to take existing grid ceiling down. The construction notes do not reference what happens at the ceiling.

Please advise.

Paint ceiling black with dry fall or dtm paint

5/4/2022 5 SOW

Item #23 “Take down and remount existing split system in room 151” - can a photo of this unit be provided?

yes, please see provided photos.

5/4/2022 6 Sow Will the furniture still be in room 151 at the time of construction.

No, the base will remove all furniture from room 151 prior to work starting. Furniture in other rooms will remain and need to be protected.

Pre-Bid RFI Log for Intel Vault