Pre-Bid RFI Intel Vault 11May22.pdf
PDF 80 KB Posted
- Attached to
- 138 FW Intel Vault Upgrade Federal contract opportunity
- Solicitation number
- W50S8U-22-B-0002
- Issued by
- Department of the Army National Guard
About this file
This solicitation package outlines requirements for an intelligence vault upgrade project. The Tulsa Air National Guard, Oklahoma is seeking bids to perform drywall, electrical, HVAC, and security upgrades at the vault, including installation of Corning Edge Housing and Splice Cassette, Kaba Mas X-10 High Security Lock, Indalla card readers and Cisco networking equipment. The project is set aside exclusively for small businesses with a NAICS code of 236220 and size standard of $39.5 million. Bids are due no later than 1300 hours on May 18th, 2022. Funds are anticipated but not presently available, with an expected award date of September 30th, 2022 contingent on funding and bids within an awardable range.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract of Offers Intel Vault.pdf | ||
| Attendance Sheet Bid opening Intel Vault_Redacted.pdf | ||
| W50S8U-22-B-0002-0003.pdf | ||
| SOW - Intel Vault Conversion v1.9.pdf | ||
| 22B00020002.pdf | ||
| W50S8U-22-B-0002-0001.pdf | ||
| WALL SECTION.pdf | ||
| RFI_5_MiniSplitPhotos.pdf | ||
| E-101 revised.pdf | ||
| Site Visit Minutes - Intel Vault_signed.pdf | ||
| Site Visit Sign In - Intel Vault_3May22_Redacted.pdf | ||
| Site Visit Slides Intel vault.ppt | PPT presentation | |
| RFI Template Intel Vault Repairs.docx | DOCX document | |
| JA Cooper V-line Cabinet.pdf | ||
| SOW - Intel Vault Conversion v1.8.pdf | ||
| Brand_Name_Justification X-10 1.2.pdf | ||
| Brand_Name_Justification (Corning_FODP) 1.0.pdf | ||
| Brand_Name_Justification Indalla 1.4.pdf | ||
| A101 Final - Drawing.pdf | ||
| Upgrade Intel Vault Specs.pdf | ||
| Brand_Name_Justification (Cisco_infrastructure) 1.0.pdf | ||
| W50S8U-22-B-0002.pdf | ||
| JA APC Smart-UPS.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: RFI No.
IFB Reference (Sect/Para/Page) RFI QUESTION GOVERNMENT RESPONSE
5/3/2022 1 Drwg A101 Construction note 4 references detail 1 on sht. A-501 for new 3’0” 7’0” Door and Jamb. I do not find a sheet A-501 in the solicitation. Please advise
Please see the attached drawing 501-A for details.
5/3/2022 2 DDEDIT
Construction note 6 references specification for door, frame, and hardware. The specification refers to the plan for door schedule. Where is the schedule listing for this door? The hollow metal spec appears to be performance type spec without model listing. Please advise.
The basis of design for the specified STC rated door and jamb is Overly but other manufactures could meet the specification.
5/3/2022 3 Drwg A101 Construction note 8 calls for matching corrugated metal over any unused penetrations. How is this metal to be fastened?
Tap con style anchor or welding
5/3/2022 4 SOW
What happens with the ceiling? The demolition notes say to take existing grid ceiling down. The construction notes do not reference what happens at the ceiling.
Please advise.
Paint ceiling black with dry fall or dtm paint
5/4/2022 5 SOW
Item #23 “Take down and remount existing split system in room 151” - can a photo of this unit be provided?
yes, please see provided photos.
5/4/2022 6 Sow Will the furniture still be in room 151 at the time of construction.
No, the base will remove all furniture from room 151 prior to work starting. Furniture in other rooms will remain and need to be protected.
Pre-Bid RFI Log for Intel Vault
Sheet1
File details come from the government source that posted it. Updated .