W50S8A-21-B-5200 _RFI Tracker 20210201.pdf

PDF 112 KB Posted

Attached to
Building 149 & 256 Roof Replacement Federal contract opportunity
Solicitation number
W50S8A
Issued by
Department of the Army New Hampshire Army National Guard

About this file

This document contains details regarding a federal solicitation for roof replacement services at two buildings located at Pease Air National Guard Base in New Hampshire. The US Army Contracting Command is seeking a contractor to remove and replace the built-up asphalt roof systems on Buildings 149 and 256 with new roof systems using either EPDM or PVC membrane. The work includes installation of a new 20-year roof, removal and replacement of exterior insulation and fascia, all flashings and penetrations, replacement of failed wood decking, asbestos abatement, and optional replacement of ceiling tiles. A pre-bid conference is scheduled for January 20th followed by a site visit, with all questions due by January 18th. Sealed bids are due by February 10th. The selected contractor must be registered in the System for Award Management. Additional project details are provided in the attached solicitation, specifications and plans.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Number RFI Text KO/KS Response Text Sketch Posted (Title or N/A)

Beta.SAM Date of Change

1 Is there a copy of the HAZMAT report available for review, if so would you please forward?

See HAZMAT Report Report Posted Update 01‐ 01/11/2021

2 Will there be a site visit for this project Yes, Jan 20th. See Solicitation 1/11/2021 3 RCP Drawings were not provided for this project please clarify Post the 2 drawings 2 drawings posted Amendment 02‐

01/15/2021

4 Are we replacing tile and grid for the RCP or are we doing tile only

Post the 2 drawings 2 drawings posted Amendment 02‐ 01/15/2021

5 Detail shows Metal fascia with drip edge and Continuous cleat.

The clarification requested is unclear. The drawings show design intent and final installation sequence is up to the contractor. The intent of detail 8/AE502 is to match existing fascia configuration.

Update 02‐1/15/2021

6 Curb Flashing detail. Installing roof membrane up and over curb edge is acceptable;

however, per ANGETL 15‐01‐06 section 4.4.6, permanently installed flashing with detachable counterflashing is required at equipment curbs.

Update 02‐1/15/2021

7 Are the structures already built with a pitched roof towards the drains or is it just a built up tapered insulation roof?

Buildings 149 and 256 both have existing roof structures that are sloped. Please refer to drawings AD501 and AD502.

Detail 1/AD501 calls out “Exist sloped wood roof structure” and detail 1/AD502 calls out “Exist sloped steel roof structure.”

Additional slope at the roof overhangs on building 256 is shown on sheet AD502.

In addition, the arrow symbols on the various roof plans differentiate “roof deck slope” from “tapered insulation slope” as defined on sheet G‐002.

Update 03‐01/25/2021

SZCQ192256 & SZCQ152149 Replace BLDG 149 and 256 Roofs

8 Detail 8 on AE501 says to “reinstall existing mechanical equipment and frame”.

1. What is the existing Mechanical equipment to be salvaged and reinstalled other than the Solar Tube Collector which is clearly identified.

2. Who will be responsible for shutting it down?

3. Who will be responsible for startup once reinstalled?

4. Will the existing mechanical equipment be inspected/serviced prior to being removed (assuming being removed by selected bidder)?

1. See plans, bidder is to verify equipment on roof during the site visit.

2. Prime Contractor

3. Prime Contractor

4. Contractor and Gov will complete a functionality check before removing the system and then when it is reinstalled.

Update 03‐01/25/2021

9 Do you have any information on that RTU on top of B149 by any chance?

Trane Roof Top Unit – Downflow – YC/TC/WC R22 148L x 71W x60H

Update 03‐01/25/2021

10 Do you have a count for damaged ceiling tiles that need replacement? Are we required to provide additional attic stock?

Please refer to sheets AE101 and AE102 for ceiling tile quantities.

Additional attic stock is not required.

Update 04‐ 02/01/2021

11 Do you have a laydown plans for the bldgs? Locations for materials, dumpsters, lifts, staging, porta‐potty and ladder locations? Are there areas of the bldg that is not accessible?

Locations of laydown areas and building access to be coordinated with the Contracting Officer.

Update 04‐ 02/01/2021

12 Is the use of a boom crane allowed? is there a max. height for the stick? requirements for hoisting? any markers or flags needed due to proximate of the airport?

Yes, Contractor can use a boom crane but is responsible to submit the required paper work to the FAA for approval.

Update 04‐ 02/01/2021

13 Can you confirm if the existing roof deck is flat and not sloped? Is existing insulation flat and not tapered?

Please refer to RFI #7 response. Existing insulation is assumed to be flat.

Update 04‐ 02/01/2021

14 Can you confirm if .080 mil thick PVC would be an acceptable substitution to the specified .072 mil PVC?

Yes, .080 mil thick PVC would be an acceptable substitution. Update 04‐ 02/01/2021

15 Can you confirm that the scheduled site visit was mandatory? Per specifications document 002213‐ Page 1, Part 1, 1.1 Tour of Jobsite states that " all offerors are required to visit the site during the scheduled walk‐thru."

Please confirm.

Site visits are not required for the bidding process. However, site visits are required during the construction process.

Update 04‐ 02/01/2021

16 What is the legal name that the Bid Bond Form SF‐24 should be made payable to and address?

On the bid bond form, the principle contractor needs to sign and then the surety needs to also sign it additionally.

Update 04‐ 02/01/2021

17 Is the EPDM to be black or white? Normally I would assume standard black but we just did a 90 mil white EPDM job on an adjacent building out there? The specs call for a Class A roof which will require gypsum over the deck first which the specs doesn’t spell out and the drawings don’t show.

PVC or EPDM membrane color will be White. Refer to manufacturer's recommendations for achieving class A roof system.

For example, a class A roof system can be achieved by providing 1/2" DensDeck Prime coverboard.

Update 04‐ 02/01/2021

18 Is there a Table 2, confirmed ACM quantities for Bldg 149?

Page 31 shows the Table 2 for Bldg. 256 and lists quantities, cannot locate for bldg. 149. Does that mean that Bldg. 149 does not have ACM to be removed?

Refer to summary on page 1 ‐ the material tested at Building 149 was not classified as ACM in accordance with NH regulations.

Update 04‐ 02/01/2021

19 Solar collector and wanted to ask the question. It says to provide temporary support during construction. This tells me that it needs to stay up on the roof. I am concerned that it will be broken or blown off by high winds if it’s left up on the roof and not bolted down to anything. Would it be ok to take down off the roof and support on the ground somewhere during construction? Im not quite sure if this thing is supposed to remain operational during construction or not, it says to remove the pipe penetrations, but not the pipes.

The Contractor can remove the solar hot water system after the function check and place it on the ground during the construction project and reinstall it when the roof has been installed and inspected by the contracting officer.

Update 04‐ 02/01/2021

20 1. Will you accept bids that are mailed (FedEx, UPS, or USPS) if by the deadline?

2. If so, can you please tell me the mailing address where the bid can be mailed?

Yes, we will accept mailed bids to the address which is located in block 7 on the solicitation. However, please be aware that bids must be received by the time and date specified in block 13 of the solicitation; late bids will not be considered IAW FAR 14.304.

Update 04‐ 02/01/2021