W50S8A-21-B-5200 _RFI Tracker 20210115.pdf

PDF 102 KB Posted

Attached to
Building 149 & 256 Roof Replacement Federal contract opportunity
Solicitation number
W50S8A
Issued by
Department of the Army New Hampshire Army National Guard

About this file

This document contains a federal solicitation and related questions and responses file regarding a roof replacement project at Pease Air National Guard Base in New Hampshire. The U.S. Property and Fiscal Office for New Hampshire is seeking a contractor to provide all labor, materials, equipment, and supervision necessary to remove and replace the built-up asphalt roof systems on Buildings 149 and 256 with new 20-year EPDM or PVC roof systems. The work includes installation of the new roof membrane, removal and replacement of exterior insulation and fascia, flashings and sealing of all penetrations and mechanical systems, replacement of failed wood decking, asbestos abatement, and an option to replace ceiling tiles. A pre-bid conference will be held on January 20th followed by a site visit, with all questions due by January 18th. Sealed bids are due on February 10th. Interested contractors must be registered in the System for Award Management. The solicitation, specifications and plans provide complete project details.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Number RFI Text Date Received from CTR KO/KS Response Text Sketch Posted (Title or

N/A) Beta.SAM Date of Change

Is there a copy of the HAZMAT report available for review, if so would you please forward? 11‐Jan‐21 See HAZMAT Report Report Posted Update 01‐ 01/11/2021

2 Will there be a site visit for this project 12‐Jan‐21 Yes, Jan 20th. See Solicitation 1/11/2021

RCP Drawings were not provided for this project please clarify 12‐Jan‐21 Post the 2 drawings 2 drawings posted

Amendment 02‐ 01/15/2021

Are we replacing tile and grid for the RCP or are we doing tile only 12‐Jan‐21 Post the 2 drawings 2 drawings posted

Amendment 02‐ 01/15/2021

Detail shows Metal fascia with drip edge and Continuous cleat. 14‐Jan‐21

The clarification requested is unclear. The drawings show design intent and final installation sequence is up to the contractor. The intent of detail 8/AE502 is to match existing fascia configuration. 1/15/2021

6 Curb Flashing detail. 14‐Jan‐21

Installing roof membrane up and over curb edge is acceptable;

however, per ANGETL 15‐01‐06 section 4.4.6, permanently installed flashing with detachable counterflashing is required at equipment curbs. 1/15/2021