About this file
This is a Request for Information (RFI) document providing specific manufacturer, model, and serial number details for backflow preventer devices scheduled for replacement under solicitation W50S7X-26-Q-0010. The RFI identifies five backflow prevention systems across multiple buildings at McConnell Air Force Base, Kansas: Building 33 (6" Maxim 200 DC, Serial JC-0416, fire suppression); Building 44 Room 118 (1" Watts 909 RPZ, Serial 548898, boiler makeup); Building 44 Room 122 (4" Colt 200 DC, Serial EC-0652, fire suppression); Building 48 (4" Colt 200 DC, Serial EL-0865, fire suppression); and Building 65 (2-1/2" Wilkins 350 DC, Serial J22384, domestic main). The information includes device locations, types (Double Check Valve and Reduced Pressure Zone assemblies), pipe sizes, manufacturers, model numbers, and serial numbers for each unit.
This RFI supports the Kansas Air National Guard's firm fixed-price solicitation for removal and replacement of these five backflow preventer systems within a 60-day period of performance. The project is set aside 100% for small business contractors, with an organized site visit scheduled for August 12, 2026, at 0900 CDT. Quotations should be submitted to 184WG.MSG.CONTRACTING@us.af.mil with questions directed to the same contact.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Question | Response | ||
| The scope identifies the following: | |||
| • | Buildings 33 and 44, Room 122: Double Check Valve (DCV) | ||
| • | Building 44, Room 118, boiler makeup: Presumed Reduced Pressure Zone (RP) assemblyPlease provide the manufacturer, model, and serial number for each device scheduled for replacement, including the devices located in Buildings 48 and 65. | BLDG 33 South Bay, Fire Suppression |
6” Maxim 200 DC JC-0416
BLDG 44 Room 118 (East Mech Room), Boiler Makeup 1” Watts 909 RPZ 548898
BLDG 44 Room 122 (South Mech Room), Fire Suppression 4” Colt 200 DC EC-0652
BLDG 48 Fire Riser Room, Fire Suppression 4” Colt 200 DC EL-0865
BLDG 65 South Mech Room, Domestic Main 2-1/2” Wilkins 350 DC J22384