REQUEST FOR INFORMATION (RFI)
VA250-17-R-0594
PROJECT NUMBER: 583-331
PROJECT TITLE: Specialty Care Clinic
PROJECT LOCATION:
Indianapolis, IN
Department of Veterans Affairs RLR VA Medical Center 1481 W. 10th Street Indianapolis, IN 46202
Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
TO:
Felecia Beamen, Contracting Officer Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100 Indianapolis, IN 46240 Felecia.Beamen@va.gov
RFI NO.: 1 DATE: 12/26/2017
SPEC/DWG. REFERENCE(s): Solicitation, General Notes Drawing Number 5-SS-002, Pile/Pile Cap Details/Schedules on Drawing Number 5-SS-310
REPLY NEEDED BY:
INFORMATION NEEDED:
1. Pile tip elevation on General Notes Drawing Number 5-SS-002 is 660.00’ and pile tip elevation on Pile/Pile Cap Details/Schedules on Drawing Number 5-SS-310 is 664.80’. Please clarify the correct pile tip elevation or a pile length. Pile Tip Elevation = 660.00
2. What will the working grade elevation be established for the auger cast pile contractors work, i.e. top of pile cap, bottom of pile cap, etc? Working grade elevation is determined by the general contractor.
3. Will EMR information or past performance information be required from subcontractors bidding to general contractors? Not required for general contractors subcontractors.
REPLY:
RFI’s will be answered by amendment(s) posted to fbo.gov.
See above answers in blue
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: Berkel & Company Contractors, Inc. CITY/STATE: La Grange, KY