REQUEST FOR INFORMATION (RFI)
VA250-17-R-0594
PROJECT NUMBER: 583-331 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Specialty Care Clinic
PROJECT LOCATION:
Department of Veterans Affairs RLR VA Medical Center 1481 W. 10th Street Indianapolis, IN 46202
TO:
Felecia Beamen, Contracting Officer Department of Veterans Affairs Network 10 Contracting Office 8888 Keystone Crossing, Suite 1100 Indianapolis, IN 46240 Felecia.Beamen@va.gov
RFI NO.: DATE:
SPEC/DWG. REFERENCE(s):
REPLY NEEDED BY:
INFORMATION NEEDED:
REPLY:
1. No.
2. The prints DO note to remove all existing piping.
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: CITY/STATE:
PHONE:
Alex Kramer 12/21/2017 mailto:Felecia.Beamen@va.gov crolfes Typewritten Text Armcorp Construction, Inc. Celina, Ohio crolfes Typewritten Text 419-778-7024 crolfes Typewritten Text 12/21/17 crolfes Typewritten Text
1. Will existing sprinkler system stay in service during construction of new sprinkler system?
2. The prints note to remove all existing piping for existing sprinkler system. At the pre-bid it was mentioned to re-use the lines if possible based on conditions. Please confirm which direction this project will go.