This document provides specifications for renovating Building 239 at Travis Air Force Base. The contractor shall be responsible for professional services, permits, equipment, labor, tools, materials, and ancillary items necessary to complete HVAC upgrades and relocation work, repurposing interior rooms, and installing new stud walls, floor and wall finishes, ceilings, doors, electrical and communication systems. The contractor must also construct an outside mechanical HVAC enclosure to accommodate new equipment. Designs will be provided by the 60th Contracting Squadron. Renovation work includes demolishing existing construction; installing concrete, masonry, metals, thermal and moisture protection, openings, finishes, special construction, fire suppression, plumbing, HVAC, electrical, and electronic safety and security systems; and earthwork.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building 239 - AMW, BAY G & Computer Lab 1614899B239 Travis Air Force Base, Fairfield, California
PROJECT TABLE OF CONTENTS
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 01 00 REHABILITATION OF CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 40 00 COLD-FORMED METAL FRAMING
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 71 00 DOOR HARDWARE
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 22 36 LATH
09 24 23 CEMENT STUCCO
09 29 00 GYPSUM BOARD
09 51 00 ACOUSTICAL CEILINGS
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00 SEISMIC BRACING FOR MISCELLANEOUS EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 07 19.00 40 PLUMBING PIPING INSULATION
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 01 30.41 HVAC SYSTEM CLEANING
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
PROJECT TABLE OF CONTENTS Page 1
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 48.19 SEISMIC BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
23 11 25 FACILITY GAS PIPING
23 31 13.00 40 METAL DUCTS
23 36 00.00 40 AIR TERMINAL UNITS
23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS
23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 51 00 INTERIOR LIGHTING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 13.00 40 FIRE DETECTION AND ALARM CONTROL, GUI, AND LOGIC SYSTEMS
DIVISION 31 - EARTHWORK
31 23 00.00 20 EXCAVATION AND FILL
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SECTION 02 41 00
DEMOLITION
05/10
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)
AHRI Guideline K (2009) Guideline for Containers for Recovered Non-Flammable Fluorocarbon Refrigerants
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO M 145 (1991; R 2008) Standard Specification for Classification of Soils and Soil-Aggregate Mixtures for Highway Construction Purposes
AASHTO T 180 (2010) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE A10.6 (2006) Safety Requirements for Demolition Operations
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2008; Errata 1-2010; Changes 1-3 2010;
Changes 4-6 2011) Safety and Health Requirements Manual
U.S. DEFENSE LOGISTICS AGENCY (DLA)
DLA 4145.25 (June 2000) Storage and Handling of Liquefied and Gaseous Compressed Gases and Their Full and Empty Cylinders
U.S. DEPARTMENT OF DEFENSE (DOD)
DOD 4000.25-1-M (2006) MILSTRIP - Military Standard Requisitioning and Issue Procedures
MIL-STD-129 (2007; Rev P; Change 4 2007) Military Marking for Shipment and Storage
SECTION 02 41 00 Page 1
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 61 National Emission Standards for Hazardous Air Pollutants
40 CFR 82 Protection of Stratospheric Ozone
49 CFR 173.301 Shipment of Compressed Gases in Cylinders and Spherical Pressure Vessels
1.2 PROJECT DESCRIPTION
1.2.1 Demolition/Deconstruction Plan
Prepare a Demolition Plan and submit proposed salvage, demolition, and removal procedures for approval before work is started. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, a disconnection schedule of utility services, a detailed description of methods and equipment to be used for each operation and of the sequence of operations.
Identify components and materials to be salvaged for reuse or recycling with reference to paragraph Existing Facilities to be Removed. Append tracking forms for all removed materials indicating type, quantities, condition, destination, and end use. Coordinate with Waste Management Plan. Include statements affirming Contractor inspection of the existing roof deck and its suitability to perform as a safe working platform or if inspection reveals a safety hazard to workers, state provisions for securing the safety of the workers throughout the performance of the work.
Provide procedures for safe conduct of the work in accordance with EM 385-1-1. Plan shall be approved by Contracting Officer prior to work beginning.
1.2.2 General Requirements
Do not begin demolition or deconstruction until authorization is received from the Contracting Officer. The work of this section is to be performed in a manner that maximizes salvage and recycling of materials. Remove rubbish and debris from the station daily ; do not allow accumulations inside or outside the buildings or on airfield pavements. The work includes demolition, deconstruction, salvage of identified items and materials, and removal of resulting rubbish and debris. Remove rubbish and debris from Government property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Contracting Officer. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1, Section 23, Demolition, and other applicable Sections.
1.3 ITEMS TO REMAIN IN PLACE
Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as approved by the Contracting Officer.
Coordinate the work of this section with all other work indicated.
Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded. Increase structural supports or add new supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract. Do not overload structural elements or pavements to remain. Provide new supports and reinforcement for existing construction weakened by demolition, SECTION 02 41 00 Page 2 deconstruction, or removal work. Repairs, reinforcement, or structural replacement require approval by the Contracting Officer prior to performing such work.
1.3.1 Existing Construction Limits and Protection
Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of building components to prevent settlement or other movement. Provide protective measures to control accumulation and migration of dust and dirt in all work areas. Remove snow, dust, dirt, and debris from work areas daily.
1.3.2 Weather Protection
For portions of the building to remain, protect building interior and materials and equipment from the weather at all times. Where removal of existing roofing is necessary to accomplish work, have materials and workmen ready to provide adequate and temporary covering of exposed areas.
1.3.3 Trees
Protect trees within the project site which might be damaged during demolition or deconstruction, and which are indicated to be left in place, by a 6 foot high fence. Erect and secure fence a minimum of 5 feet from the trunk of individual trees or follow the outer perimeter of branches or clumps of trees. Replace any tree designated to remain that is damaged during the work under this contract with like-kind or as approved by the Contracting Officer.
1.3.4 Utility Service
Maintain existing utilities indicated to stay in service and protect against damage during demolition and deconstruction operations. Prior to start of work, utilities serving each area of alteration or removal will be shut off by the Government and disconnected and sealed by the Contractor .
1.3.5 Facilities
Protect electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. Floors, roofs, walls, columns, pilasters, and other structural components that are designed and constructed to stand without lateral support or shoring, and are determined to be in stable condition, must remain standing without additional bracing, shoring, or lateral support until demolished or deconstructed, unless directed otherwise by the Contracting Officer. Ensure that no elements determined to be unstable are left unsupported and place and secure bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract.
1.4 BURNING
The use of burning at the project site for the disposal of refuse and debris will not be permitted . Where burning is permitted, adhere to federal, state, and local regulations.
SECTION 02 41 00 Page 3
1.5 AVAILABILITY OF WORK AREAS
Areas in which the work is to be accomplished will be available in accordance with the following schedule:
Area Date
ALL AREAS OF WORK FOR THIS PROJECT AFTER NOTICE TO PROCEED
1.6 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Existing Conditions; G
SD-07 Certificates
Demolition Plan; G Notification; G
SD-11 Closeout Submittals
Receipts
1.7 QUALITY ASSURANCE
Submit timely notification of demolition and renovation projects to Federal, State, regional, and local authorities in accordance with 40 CFR 61, Subpart M. Notify the Regional Office of the United States Environmental Protection Agency (USEPA) State's environmental protection agency local air pollution control district/agency and the Contracting Officer in writing 10 working days prior to the commencement of work in accordance with 40 CFR 61, Subpart M. Comply with federal, state, and local hauling and disposal regulations. In addition to the requirements of the "Contract Clauses," conform to the safety requirements contained in ASSE/SAFE A10.6. Comply with the Environmental Protection Agency requirements specified. Use of explosives will not be permitted.
1.7.1 Dust and Debris Control
Prevent the spread of dust and debris to occupied portions of the building, on airfield pavements, and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution. Vacuum and dust the work area daily .
1.8 PROTECTION
1.8.1 Traffic Control Signs
a. Where pedestrian and driver safety is endangered in the area of removal work, use traffic barricades with flashing lights. Anchor barricades in a manner to prevent displacement by wind, jet or prop
SECTION 02 41 00 Page 4 blast. Notify the Contracting Officer prior to beginning such work.
1.8.2 Protection of Personnel
Before, during and after the demolition work continuously evaluate the condition of the structure being demolished and take immediate action to protect all personnel working in and around the project site. No area, section, or component of floors, roofs, walls, columns, pilasters, or other structural element will be allowed to be left standing without sufficient bracing, shoring, or lateral support to prevent collapse or failure while workmen remove debris or perform other work in the immediate area.
1.9 FOREIGN OBJECT DAMAGE (FOD)
Aircraft and aircraft engines are subject to FOD from debris and waste material lying on airfield pavements. Remove all such materials that may appear on operational aircraft pavements due to the Contractor's operations. If necessary, the Contracting Officer may require the Contractor to install a temporary barricade at the Contractor's expense to control the spread of FOD potential debris. The barricade shall include a fence covered with a fabric designed to stop the spread of debris. Anchor the fence and fabric to prevent displacement by winds or jet/prop blasts.
Remove barricade when no longer required.
1.10 RELOCATIONS
Perform the removal and reinstallation of relocated items as indicated with workmen skilled in the trades involved. Repair or replace items to be relocated which are damaged by the Contractor with new undamaged items as approved by the Contracting Officer.
1.11 EXISTING CONDITIONS
Before beginning any demolition or deconstruction work, survey the site and examine the drawings and specifications to determine the extent of the work. Record existing conditions in the presence of the Contracting Officer showing the condition of structures and other facilities adjacent to areas of alteration or removal. Photographs sized 4 inch will be acceptable as a record of existing conditions. Include in the record the elevation of the top of foundation walls, finish floor elevations, possible conflicting electrical conduits, plumbing lines, alarms systems, the location and extent of existing cracks and other damage and description of surface conditions that exist prior to before starting work. It is the Contractor's responsibility to verify and document all required outages which will be required during the course of work, and to note these outages on the record document. Submit survey results.
PART 2 PRODUCTS
2.1 FILL MATERIAL
a. Comply with excavating, backfilling, and compacting procedures for soils used as backfill material to fill basements, voids, depressions or excavations resulting from demolition or deconstruction of structures. Fill material shall be waste products from demolition or deconstruction until all waste appropriate for this purpose is consumed.
b. Fill material shall conform to the definition of satisfactory soil material as defined in AASHTO M 145, Soil Classification Groups A-1, SECTION 02 41 00 Page 5
A-2-4, A-2-5 and A-3. In addition, fill material shall be free from roots and other organic matter, trash, debris, frozen materials, and stones larger than 2 inches in any dimension.
c. Proposed fill material must be sampled and tested by an approved soil testing laboratory, as follows:
Soil classification AASHTO M 145
Moisture-density relations AASHTO T 180, Method B or D
PART 3 EXECUTION
3.1 EXISTING FACILITIES TO BE REMOVED
Inspect and evaluate existing structures onsite for reuse. Existing construction scheduled to be removed for reuse shall be disassembled.
Dismantled and removed materials are to be separated, set aside, and prepared as specified, and stored or delivered to a collection point for reuse, remanufacture, recycling, or other disposal, as specified.
Materials shall be designated for reuse onsite whenever possible.
3.1.1 Utilities and Related Equipment
3.1.1.1 General Requirements
Do not interrupt existing utilities serving occupied or used facilities, except when authorized in writing by the Contracting Officer. Do not interrupt existing utilities serving facilities occupied and used by the Government except when approved in writing and then only after temporary utility services have been approved and provided. Do not begin demolition or deconstruction work until all utility disconnections have been made.
Shut off and cap utilities for future use, as indicated.
3.1.2 Roofing
Remove existing roof system and associated components in their entirety down to existing roof deck. Sequence work to minimize building exposure between demolition or deconstruction and new roof materials installation.
3.1.2.1 Temporary Roofing
Install temporary roofing and flashing as necessary to maintain a watertight condition throughout the course of the work. Remove temporary work prior to installation of permanent roof system materials unless approved otherwise by the Contracting Officer. The existing deck and support structure is deteriorated where indicated, such that ability to support foot traffic and construction loads is unknown. Make provisions for worker safety during demolition, deconstruction, and installation of new materials as described in paragraphs entitled "Statements" and "Regulatory and Safety Requirements."
3.1.2.2 Reroofing
When removing the existing roofing system from the roof deck, remove only as much roofing as can be recovered by the end of the work day, unless approved otherwise by the Contracting Officer. Do not attempt to open the roof covering system in threatening weather. Reseal all openings prior to suspension of work the same day.
SECTION 02 41 00 Page 6
3.2 DISPOSITION OF MATERIAL
3.2.1 Title to Materials
Except for salvaged items specified in related Sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, shall become the property of the Contractor and shall be removed from Government property. Title to materials resulting from demolition and deconstruction, and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer of the Contractor's demolition, deconstruction, and removal procedures, and authorization by the Contracting Officer to begin demolition and deconstruction. The Government will not be responsible for the condition or loss of, or damage to, such property after contract award. Showing for sale or selling materials and equipment on site is prohibited.
3.2.2 Reuse of Materials and Equipment
Remove and store materials and equipment listed in the Demolition Plan to be reused or relocated to prevent damage, and reinstall as the work progresses.
3.2.3 Salvaged Materials and Equipment
Remove materials and equipment that are listed in the Demolition Plan to be removed by the Contractor and that are to remain the property of the Government, and deliver to a storage site .
a. Salvage items and material to the maximum extent possible.
b. Store all materials salvaged for the Contractor as approved by the Contracting Officer and remove from Government property before completion of the contract. On site sales of salvaged material is prohibited.
c. Remove salvaged items to remain the property of the Government in a manner to prevent damage, and packed or crated to protect the items from damage while in storage or during shipment. Items damaged during removal or storage must be repaired or replaced to match existing items. Properly identify the contents of containers. Deliver the following items reserved as property of the Government to the areas designated: None..
d. Remove the following items reserved as property of the using service prior to commencement of work under this contract: None..
e. Remove historical items in a manner to prevent damage. Deliver the following historical items to the Government for disposition: Corner stones, contents of corner stones, and document boxes wherever located on the site.
3.2.4 Disposal of Ozone Depleting Substance (ODS)
Class I and Class II ODS are defined in Section, 602(a) and (b), of The Clean Air Act. Prevent discharge of Class I and Class II ODS to the atmosphere. Place recovered ODS in cylinders meeting AHRI Guideline K suitable for the type ODS (filled to no more than 80 percent capacity) and provide appropriate labeling. Recovered ODS shall be removed from
SECTION 02 41 00 Page 7
Government property and disposed of in accordance with 40 CFR 82.
Products, equipment and appliances containing ODS in a sealed, self-contained system (e.g. residential refrigerators and window air conditioners) shall be disposed of in accordance with 40 CFR 82. Submit Receipts or bills of lading, as specified. Submit a shipping receipt or bill of lading for all containers of ozone depleting substance (ODS) shipped to the Defense Depot, Richmond, Virginia.
3.2.4.1 Special Instructions
No more than one type of ODS is permitted in each container. A warning/hazardous label shall be applied to the containers in accordance with Department of Transportation regulations. All cylinders including but not limited to fire extinguishers, spheres, or canisters containing an ODS shall have a tag with the following information:
a. Activity name and unit identification code
b. Activity point of contact and phone number
c. Type of ODS and pounds of ODS contained
d. Date of shipment
e. Naval stock number (for information, call (804) 279-4525).
3.2.4.2 Fire Suppression Containers
Deactivate fire suppression system cylinders and canisters with electrical charges or initiators prior to shipment. Also, safety caps must be used to cover exposed actuation mechanisms and discharge ports on these special cylinders.
3.2.5 Transportation Guidance
Ship all ODS containers in accordance with MIL-STD-129, DLA 4145.25 (also referenced one of the following: Army Regulation 700-68, Naval Supply Instruction 4440.128C, Marine Corps Order 10330.2C, and Air Force Regulation 67-12), 49 CFR 173.301, and DOD 4000.25-1-M.
3.2.6 Unsalvageable and Non-Recyclable Material
Dispose of unsalvageable and non-recyclable noncombustible material from the project area. Dispose of unsalvageable and non-recyclable combustible material off the site.
3.3 CLEANUP
Remove debris and rubbish from basement and similar excavations. Remove and transport the debris in a manner that prevents spillage on streets or adjacent areas. Apply local regulations regarding hauling and disposal.
3.4 DISPOSAL OF REMOVED MATERIALS
3.4.1 Regulation of Removed Materials
Dispose of debris, rubbish, scrap, and other nonsalvageable materials resulting from removal operations with all applicable federal, state and local regulations as contractually specified in the Waste Management Plan .
SECTION 02 41 00 Page 8
Storage of removed materials on the project site is prohibited.
3.4.2 Burning on Government Property
Burning of materials removed from demolished and deconstructed structures will not be permitted on Government property .
3.4.3 Removal to Spoil Areas on Government Property
Transport noncombustible materials removed from demolition and deconstruction structures to designated spoil areas on Government property.
3.4.4 Removal from Government Property
Transport waste materials removed from demolished and deconstructed structures, except waste soil, from Government property for legal disposal. Dispose of waste soil as directed.
3.5 REUSE OF SALVAGED ITEMS
Recondition salvaged materials and equipment designated for reuse before installation. Replace items damaged during removal and salvage operations or restore them as necessary to usable condition.
-- End of Section --
SECTION 02 41 00 Page 9
SECTION 03 01 00
REHABILITATION OF CONCRETE
02/18
PART 1 GENERAL
1.1 SCOPE
This specification governs the rehabilitation of structural concrete.
1.2 DEFINITIONS
1.2.1 Bracing
Temporary supplemental members used to avoid local or global instability during construction, evaluation, or repair that are intended to be removed after completion of construction.
1.2.2 Delamination
A planar separation in a material that is roughly parallel to the surface of the material.
1.2.3 Rehabilitation
Repairing or modifying an existing structure to a desired useful condition.
1.2.4 Repair
The reconstruction or renewal of concrete parts of an existing structure for its maintenance or to correct deterioration, damage, or faulty construction of members or systems of a structure.
1.2.5 Shoring
Props or posts of timber or other material in compression used for the temporary support of excavations, formwork, or unsafe structures; the process of erecting shores.
1.2.6 Termination Joint
The interface where a placement of repair material meets existing concrete, the edge of an expansion joint, or other existing surfaces.
1.2.7 Unsound Concrete
Concrete that is fractured, delaminated, spalled, deteriorated, defective, contaminated or otherwise damaged.
1.3 REFERENCES
AMERICAN CONCRETE INSTITUTE (ACI)
ACI 117 (2010; Errata 2011) Specifications for Tolerances for Concrete Construction and Materials and Commentary
SECTION 03 01 00 Page 1
ASTM INTERNATIONAL (ASTM)
ASTM C33/C33M (2018) Standard Specification for Concrete Aggregates
ASTM C1077 (2017) Standard Practice for Agencies Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Testing Agency Evaluation
ASTM C1602/C1602M (2018) Standard Specification for Mixing Water Used in Production of Hydraulic Cement Concrete
ASTM D4580/D4580M (2012) Standard Practice for Measuring Delaminations in Concrete Bridge Decks by Sounding
ASTM E329 (2018) Standard Specification for Agencies Engaged in Construction Inspection, Testing, or Special Inspection
INTERNATIONAL CONCRETE REPAIR INSTITUTE (ICRI)
ICRI 310.2R (2013) Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings, Polymer Overlays, and Concrete Repair
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Qualifications; G
Work Plan; G
Quality Control Plan; G
SD-03 Product Data
Miscellaneous Materials And Equipment
SD-04 Samples
Miscellaneous Materials And Equipment
SD-06 Test Reports
SECTION 03 01 00 Page 2
Mixture Proportioning
Quality Control
Miscellaneous Materials And Equipment
SD-07 Certificates
Qualifications
SD-08 Manufacturer's Instructions
Miscellaneous Materials And Equipment
1.5 QUALITY ASSURANCE
1.5.1 General Requirements
a. Follow the requirements of Section 03 30 53 MISCELANEOUS CAST-IN-PLACE CONCRETE for Work involving portland cement concrete.
b. To protect personnel from overexposure to toxic materials, conform to the applicable manufacturer's Safety data sheets or local regulations.
Submit manufacturer's Safety Data Sheets for all polymers as well as other potentially hazardous materials.
c. Submit the repair procedures for executing the work as well as the test data and documentation on materials used for repair. Submittal must include component materials, mixture proportions, and supplier's quality control program. REPAIR PROCEDURES MUST INCLUDE REVIEW LETTER
FROM MANUFACTURER'S TECHNICAL REPRESENTATIVE STATING THE PRODUCT CHOSEN
IS APPROTRATE FOR THE INTENDED USAGE.
d. Inspection and testing of surface preparation as well as placement of reinforcing steel must be in accordance with provisions included herein and the Contract Document.
e. Sampling and testing of materials, as well as inspection and testing of work, must be in accordance with established procedures, manufacturer's instructions, specific instructions from the Contracting Officer if given, or recommended practices as referenced herein and the Contract Documents.
f. Trial batches and testing requirements for various repair materials specified are the responsibility of the Contractor.
g. The testing agency must inspect, sample, and test repair materials and concrete production as required. When it appears that material furnished or work performed by Contractor fails to conform to Contract Documents the testing agency will immediately report such deficiency.
1.5.2 Quality Control Plan
Submit a quality control plan as specified in Sections 01 45 00.00 10
QUALITY CONTROL .
SECTION 03 01 00 Page 3
1.5.3 Qualifications
The submittals must where applicable, identify agencies and individuals who will be working on this contract and their relevant experience. Do not make changes in approved agencies or personnel without prior approval of the Contracting Officer.
1.5.3.1 Testing Agencies
In addition to the requirements of Section 01 45 00.00 10 QUALITY CONTROL, agencies that test concrete materials must meet the requirements of ASTM C1077. Testing agencies that test or inspect placement of reinforcing steel must meet the requirement of ASTM E329. Submit data on qualifications of Contractor's proposed testing agency for acceptance.
1.5.3.2 Quality Control Personnel
Field tests of repair materials required must be made by an ICRI Concrete Surface Repair Technician Tier 2. Submit resumes, pertinent information, past experience, training and education of all operators of specialized demolition equipment if needed for this and the three paragraphs above.
1.5.3.3 Contractor Qualifications
The contractor OR SUBCONTRACTOR performing the repair work must have been involved in a minimum of three concrete repair projects similar in size and scope to this project for at least five years. Submit information, including name, dollar value, date, and point-of-contact for similar projects which demonstrates the required experience and/or training.
1.5.3.4 Regulatory Requirements
Perform all work in accordance with applicable Federal, State, and local safety, health, and environmental requirements. The Contractor is responsible for obtaining all permits required by Federal, State, and local agencies for the performance of the work.
1.5.4 Pre-Construction Conference
Conduct a pre-construction conference to discuss repair materials performance requirements, control provisions, and roles and responsibilities for the Work to ensure that the Contractor's personnel understand all aspects of the repair material, its properties and application procedures. The conference must include the Contracting Officer or authorized representative, the Contractor's field superintendent and foreman, and a competent Technical Representative of the material manufacturer, and other involved trades or supplier representatives. The Technical Representative must be fully qualified to perform the work. IT IS
IMPARITIVE THAT THE MANUFACTURER'S TECHNICAL REPRESENTATIVEE BE INVOLVED
BEFORE THE START OF WORK.
1.5.5 Work Plan
Prepare a work plan describing the methods of concrete removal and repair, including methods, equipment and materials to be used for each feature.
Submit the work plan for approval at least 30 days prior to the start of the work. The plan must include, but not be limited to, repair materials to be used with specific information on products and/or constituents, and requirements for handling, storage, etc., equipment to be used, surface
SECTION 03 01 00 Page 4 preparation, and requirements for placement, finishing, curing and protection specific to the materials used. Include a description of field demonstrations in the work plan. Do not commence work until the work plan and field demonstration representative of the type of work are approved.
REPAIR PROCEDURES MUST INCLUDE REVIEW LETTER FROM MANUFACTURER'S TECHNICAL
REPRESENTATIVE STATING THE PRODUCT CHOSEN IS APPROTRATE FOR THE INTENDED
USAGE. MANUFACTURER'S TENCHICAL REPRESNETATIVE SHALL INCLUDE ANY REQUESTED
CHANGES TO THE PROPOSED CHANGES TO THE REPAIR PLAN.
1.6 ACCEPTANCE OF REHABILITATION WORK
1.6.1 General Requirements
a. Completed concrete rehabilitation work must conform to applicable requirements of Contract Document and this specification. The Contractor is responsible to bring Work into compliance with requirements of Contract Documents if the Concrete repair work fails to meet one or more requirements of Contract Documents.
b. Correct rejected repair work by removing and replacing or by strengthening with additional construction acceptable to the Contracting Officer. Use repair methods that meet applicable requirements for function, durability, dimensional tolerances, and appearance.
c. Submit proposed work plan, repair methods, materials, and modifications to the Work needed to correct rejected repair work to meet the requirements of Contract Documents.
1.6.2 Tolerances
a. Construction tolerances for repairs must conform to ACI 117. Where existing conditions do not allow tolerances to conform to ACI 117] notify the Contracting Officer before proceeding with the work at those locations.
b. Inaccurately formed concrete surfaces resulting in concrete members with dimensions that exceed ACI 117 tolerances are subject to rejection.
1.6.3 Appearance
Concrete surfaces not meeting the requirements of the Contract Documents must be brought into compliance.
1.7 PROTECTION OF COMPLETED REHABILITATION WORK
a. Do not allow construction loads to exceed the loads that a structural member or structure is safely capable of supporting without damage.
Provide supplemental support if construction loads are expected to exceed safe load capacity.
b. Protect repaired and adjacent areas from damage by construction traffic, equipment, and materials. During the curing period, protect repair materials from damage by mechanical disturbances, including load-induced stresses, shock, and vibration.
c. Protect repair materials from environmental damage by weather events during the length of the curing period.
SECTION 03 01 00 Page 5
PART 2 PRODUCTS
Products or materials used must conform to the requirements included herein as well as the Contract Documents. The usage of other products or materials not covered by this requirement or specified in the Contract Documents are permitted upon approval by the Contracting Officer. Additional information and submittals for products and materials not included in this document including product data, samples, design data, test reports, certificates, manufacturer's instructions, and field reports must be submitted as requested by the Contracting Officer.
2.1 MATERIALS FOR SHORING AND BRACING
2.1.1 Shoring and Bracing Systems
Use commercially manufactured and engineered shoring and bracing systems and components, except where custom built assemblies of lumber or other suitable materials are permitted by the Contracting Officer.
2.2 EQUIPMENT FOR CONCRETE PREPARATION
Means and methods used for concrete removal and surface preparation must be selected and used such as to minimize damage to the structure and to the concrete substrate that remains.
2.2.1 Equipment for Concrete Removal
Removal equipment and techniques must be suitable to produce concrete surface profiles and level of cleanliness in designated areas as required by this specification, THE MANUFACTURER'S TECHNICAL REPRESENTATIVE and the contract Documents.
2.2.1.1 Cutting Equipment
a. Cutting, lifting, and transporting equipment must be adequate to cut, support, and transport concrete sections without incurring any damage to the existing structure.
2.2.1.2 Concrete Breakers
a. Provide sharp tips on breaker equipment to minimize microcracking damage in partial depth removal.
2.2.2 Surface preparation and cleaning equipment
2.2.2.1 Abrasive Blasting
a. Use dry or wet oil-free abrasive blasting capable of removing loose micro-fractured (bruised) or otherwise damaged or pulverized concrete surfaces, and rust from exposed steel reinforcement, and providing a surface profile in compliance with the MANUFACTURER'S TECHNICAL REPRESENTATIVEContract Documents.
2.2.2.2 Low Pressure Water Cleaning
Use equipment capable of delivering 1000 psi to to 5000 psi at 2 gal/min to
SECTION 03 01 00 Page 6
10 gal/min for cleaning loose material from repair areas.
2.2.2.3 Other Cleaning Equipment
Use equipment that delivers oil free air capable of cleaning loose material and debris from repair areas. If necessary to dry the concrete surface, clean, dry, compressed air may be used. Also, use vacuums capable of removing loose material and debris.
2.3 MATERIALS FOR FORMWORK AND EMBEDDED ITEMS
a. Formwork and embedded items musBE AS REQUIRED. ].
b. Install and remove formwork without damaging or staining the existing structure or repair material.
c. Forms used for polymer concrete/mortars must be tight enough to hold the material that is used without leaking. All surfaces where bond is not desired, but which are exposed to the monomer or resin, must be treated with a form release agent.
2.4 REINFORCEMENT AND REINFORCEMENT SUPPORTS
2.4.1 Steel Bars, Wires, and Fiber-reinforced Concrete
a. Reinforcement and reinforcement support must meet the requirements specified in Section 03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE.
B. Submit mill certificates and shop drawings as requirement by Section
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE.
2.5 MISCELLANEOUS MATERIALS AND EQUIPMENT
2.5.1 Packaged and proprietary materials
The required properties for the materials listed in this paragraph must meet the properties specified in the Contract Documents. Submit Product data, samples, design data, test reports, certificates, manufacturer's instructions, and field reports as required by the Contracting Officer and the Contract Documents.
a. Packaged, concrete AND MASONRY STRUCUTRAL REPAIR repair materials /MORTAR must BE A ONE COMPONENT, SHINKAGE COMPENSATED, FIBER
REINFORCED PRODUCT THAT CONTAINS AN INTEGRAL CORROSION INHIBITOR.
(EMACO S88 CL / S488 CL OR APPROVED EQUAL). CONFIRM PRODUCT
APPLICATBILITY WITH MANUFACTURER'S TECHNICAL REPRESENTATIVE AND
CONTRACTOR'S MEANS AND METHODS OF CONSTRUCTION.
Water used with packaged and proprietary materials must meet ASTM C1602/C1602M requirements. Aggregates must meet the repair material manufacturer's requirements if available and ASTM C33/C33M if such requirements are not specified.
2.5.2 Miscellaneous Equipment
a. Equipment designed specifically for the application of repair materials must be used as required by the repair material manufacturer and the referenced specification.
SECTION 03 01 00 Page 7
b. Equipment not listed in this specification but referenced or used for repairs must be clean and in good operating condition.
c. All supplies and equipment must be available in sufficient quantities to allow continuity in the installation project and quality assurance.
2.6 MIXTURE PROPORTIONING
aoncrete REPAIR PRODUCTS proportioning, handling, and mixing procedures as well as equipment used for mixing these materials must conform to the requirements of the referenced material specifications and the repair material manufacturer's directions.
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.1.1 Examination
Locate area of unsound concrete or delamination using hammer sounding or chain drag sound methods in accordance to ASTM D4580/D4580M. Denote and mark perimeter boundaries and notify the Contracting Officer to approve the unsound concrete layout boundaries.
3.1.2 Protection
Protect pedestrians, motorized traffic, mechanical, electrical, and plumbing equipment, surrounding construction, project site, landscaping, and surrounding buildings from damage or injury resulting from concrete rehabilitation work.
a. Construct dust and debris barriers surrounding repair work perimeter to control dust and to protect and control construction traffic.
b. Dispose of runoff from wet demolition or surface preparation operations in accordance with all local ordinances. Disposal methods must avoid soil erosion, avoid undermining pavements and foundations, damage to landscaping and vegetation, and minimize water penetration through other parts of buildings.
c. Collect and neutralize alkaline wastes and acid wastes and dispose in accordance with local, state, and federal regulations.
d. Comply with local noise ordinances during demolition operations.
e. Perform demolition work and surface preparation work in a manner that minimizes disturbances of operations. Coordinate work with the Contracting Officer.
f. Submit a proposed protection plan for approval by owner representative and Licensed Design Professional.
3.1.3 Formwork and Shoring
Execution of formwork and shoring PROVIDED AS REQUIRED. .
SECTION 03 01 00 Page 8
3.1.4 Concrete preparation
a. Remove concrete as needed per the removal requirements of this section.
Limits on removal equipment are specified in the paragraph titled
EQUIPMENT FOR CONCRETE PREPARATION.
b. Remove foreign material, such as dirt, oil, grease, or other chemicals, from the cracks before injection using compressed air, low-pressure water, or vacuuming. Allow wet surfaces to dry at least 24 hours.
c. Immediately before placing the repair material or installing formwork, make the repair area available for inspection by the Contracting Officer. Obtain acceptance by the Contracting Officer of surface preparation before proceeding with Work. If the Work is rejected, perform additional operations to the satisfaction of Contracting Officer.
e. The prepared surface must have a concrete surface profile equivalent to AS RECEOMDNED BY MANUFACTURER'S TECHNICAL REPRESENTATIVE as defined by
ICRI 310.2R].
3.1.5 Quality Control
3.1.5.1 Quality control of surface preparation
Evaluation of prepared substrate must be continuously monitored to assure that the prepared substrate surface meets project requirements.
3.1.5.2 Quality control of repair overlays
All components of overlay PPCC materials must be certified by the material manufacturer or aggregate supplier to meet all project testing requirements. During the PPCC overlay, take mixed samples and check that the materials are mixed properly. Confirm that the right PC overlay thickness was applied by recording the volume of PC overlay materials and the substrate surface area covered by the overlay.
3.1.6 Curing
A. For FOR CONCRETE AND MASONRY REPAIR MORTAR'S follow manufacturer's requirements for curing
3.1.7 Clean up
a. Clean and remove all spills and leakS.
b. Dispose wastewater used for cutting and cleaning without staining or damaging the existing surfaces of the structure or the environment of the project area. The method of disposal must meet all the requirements of THE BASE.
3.1.8 Safety
a. Provide Material Safety Data Sheets (MSDS) for products on site reviewing them before work begins.
SECTION 03 01 00 Page 9
b. Provide safety guards, maintenance, and warnings for all machinery and equipment.
c. Have personal protection equipment practice in place - eye protection and face guards.
d. Have all workers in contact with wet cementitious material wear protective gloves and clothing.
e. Provide eyewash facilities on-site with location signage.
f. Provide dust masks for workers operating mixers.
g. Have confined space procedures in place including adequate ventilation in closed spaces before operating equipment or using products that emit potentially dangerous or toxic exhaust, fumes, or dust.
h. Provide secured storage available for all hazardous or flammable materials.
i. Conduct safety meetings prior to beginning repair operations.
3.2 CONCRETE STRENGTHENING
3.2.1 Preparation
a. Use equipment and methods specified in the paragraph titled EQUIPMENT FOR CONCRETE PREPARATION and the Contract Documents to produce a sound, rough, open-pore surface at locations where bonding between existing and new concrete is required. REMOVE CONCRETE AS REQUIRED BY
MANUFACTURER'S TECHNCIAL REPRESENTATIVE AND CONTRACT DRAWINGS.
c. Clean all surfaces from contaminant and remove unsound concrete using the prescribed cleaning equipment and methods in the paragraphs titled PRODUCTS. All laitance, dust, dirt, oil, curing compound, existing coatings, and any other matter that could interfere with bonding concrete to the repair material must be removed.
e. Insure that materials used for repairs are compatible with materials used for strengthening. Consult with the repair material manufacturers for information concerning material compatibility.
f. Surfaces not intended to be strengthened must be covered as needed to protect against contamination and spills.
g. Surfaces intended to be strengthened must be protected before application so that no materials that can interfere with bond are redeposited on the surface.
3.2.2 Application
3.2.2.1 Section enlargement
a. Install reinforcement as required by the Contract Documents. Follow the manufacturer's procedures for installing REPAIR MORTARS. .
SECTION 03 01 00 Page 10
b. Install formwork and shoring following the requirements of this section.
REQUIRED. A
c. Install reinforcement and reinforcement supports. Follow the requirements specified in Section 03 30 53 MISCELLANEOUS CAST-IN-PLACE
CONCRETE
3.2.3 Quality Control
MANUFACTURER'S TECHNICAL REPRESENTATIVE SHALL BE CONSULTED FOR THE WORK
PLAN AND PRODUCT SUBMITIALS. THE INTIAL CONCRETE REPAIR SHALL BE WITNESSED
BY THE MANUFACTURER'S TECHNICAL REPRESENTATIVE.
SECTION 03 01 00 Page 11
SECTION 03 30 53
MISCELLANEOUS CAST-IN-PLACE CONCRETE
05/14
PART 1 GENERAL
1.1 SUMMARY
Perform all work in accordance withACI 318.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)
ACI 117 (2010; Errata 2011) Specifications for Tolerances for Concrete Construction and Materials and Commentary
ACI 301 (2010; Errata 2011) Specifications for Structural Concrete
ACI 304R (2000; R 2009) Guide for Measuring, Mixing, Transporting, and Placing Concrete
ACI 305R (2010) Guide to Hot Weather Concreting
ACI 306R (2010) Guide to Cold Weather Concreting
ACI 318 (2011; Errata 1 2011; Errata 2 2012;
Errata 3-4 2013) Building Code Requirements for Structural Concrete and Commentary
ACI SP-66 (2004) ACI Detailing Manual
ASTM INTERNATIONAL (ASTM)
ASTM A1064/A1064M (2013) Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete
ASTM A615/A615M (2014) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement
ASTM C1064/C1064M (2011) Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
ASTM C1260 (2007) Standard Test Method for Potential Alkali Reactivity of Aggregates
SECTION 03 30 53 Page 1
(Mortar-Bar Method)
ASTM C143/C143M (2012) Standard Test Method for Slump of Hydraulic-Cement Concrete
ASTM C150/C150M (2012) Standard Specification for Portland Cement
ASTM C1567 (2013) Standard Test Method for Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)
ASTM C1602/C1602M (2012) Standard Specification for Mixing Water Used in Production of Hydraulic Cement Concrete
ASTM C172/C172M (2014) Standard Practice for Sampling Freshly Mixed Concrete
ASTM C173/C173M (2014) Standard Test Method for Air Content of Freshly Mixed Concrete by the Volumetric Method
ASTM C231/C231M (2014) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
ASTM C260/C260M (2010a) Standard Specification for Air-Entraining Admixtures for Concrete
ASTM C309 (2011) Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete
ASTM C31/C31M (2012) Standard Practice for Making and Curing Concrete Test Specimens in the Field
ASTM C33/C33M (2013) Standard Specification for Concrete Aggregates
ASTM C39/C39M (2014a) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
ASTM C494/C494M (2013) Standard Specification for Chemical Admixtures for Concrete
ASTM C618 (2012a) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete
ASTM C685/C685M (2011) Concrete Made by Volumetric Batching and Continuous Mixing
ASTM C94/C94M (2014a) Standard Specification for Ready-Mixed Concrete
ASTM D75/D75M (2014) Standard Practice for Sampling
SECTION 03 30 53 Page 2
Aggregates
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 247 Comprehensive Procurement Guideline for Products Containing Recovered Materials
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Installation Drawings
SD-03 Product Data
Air-Entraining Admixture Water-Reducing or Retarding Admixture
Mix Design Data Ready-Mix Concrete Curing Compound
SD-06 Test Reports
Aggregates Concrete Mixture Proportions Compressive Strength Testing Slump Air Content Water
SD-07 Certificates
Cementitious Materials Aggregates Delivery Tickets
SD-08 Manufacturer's Instructions
Curing Compound
1.4 QUALITY ASSURANCE
Indicate specific locations of Concrete Placement Forms Steel Reinforcement Accessories Expansion Joints Construction Joints Contraction Joints Control Joints on installation drawings and include, but not be limited to, square feet of concrete placements, thicknesses and widths, plan dimensions, and arrangement of cast-in-place concrete section.
SECTION 03 30 53 Page 3
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
The Government retains the option to sample and test joint sealer, joint filler material, waterstop, aggregates and concrete to determine compliance with the specifications. Provide facilities and labor as may be necessary to assist the Government in procurement of representative test samples.
Obtain samples of aggregates at the point of batching in accordance with ASTM D75/D75M. Sample concrete in accordance with ASTM C172/C172M.
Determine slump and air content in accordance with ASTM C143/C143M and ASTM C231/C231M, respectively, when cylinders are molded. Prepare, cure, and transport compression test specimens in accordance with ASTM C31/C31M.
Test compression test specimens in accordance with ASTM C39/C39M. Take samples for strength tests not less than once each shift in which concrete is produced from each strength of concrete required. Provide a minimum of five specimens from each sample; two to be tested at 28 days (90 days if pozzolan is used) for acceptance, two will be tested at 7 days for information and one held in reserve.
2.1.1 Strength
Acceptance test results are the average strengths of two specimens tested at 28 days (90 days if pozzolan is used). The strength of the concrete is considered satisfactory so long as the average of three consecutive acceptance test results equal or exceed the specified compressive strength, f'c, but not more than 20 percent, and no individual acceptance test result falls below f'c by more than 500 psi.
2.1.2…