Attachment 11 - Past Performance Questionnaire.pdf

PDF 269 KB Posted

Attached to
349 AMW Facility Project B239 Renovation Federal contract opportunity
Solicitation number
FA442720R0044
Issued by
Department of the Air Force Air Mobility Command

About this file

This past performance questionnaire requests feedback on a contractor's prior work renovating building 239 at Travis Air Force Base, including HVAC upgrades and relocation work, interior room repurposing, new stud walls and floor/wall finishes, ceilings, doors, electrical and communication systems, and construction of an outside mechanical HVAC enclosure. Respondents are asked to evaluate the contractor's performance on a scale of 1 to 5 in areas such as project management, quality control, scheduling, and cooperation on a previous contract to renovate mechanical, electrical and plumbing systems and modify fire alarm and sprinkler systems. Feedback is requested on issues like timely resolution of warranty defects and payment of subcontractors.

View the file

Other files for this federal contract opportunity

Other files attached to 349 AMW Facility Project B239 Renovation, newest first.
File Type Posted
Bldg 239 Bay G RFIs 8-31-2020.pdf PDF
239 BayDPanel.pdf PDF
239 As-builts Combined Files.pdf PDF
Solicitation Amendment FA442720R00440004 SF 30.pdf PDF
Solicitation Amendment FA442720R00440003 SF 30.pdf PDF
Solicitation Amendment FA442720R00440002 SF 30.pdf PDF
Solicitation Amendment FA442720R00440001 SF 30 (1).pdf PDF
Attachment 5 - UFGS 01 14 00 WORK RESTRICTIONS.pdf PDF
Travis AFB_B239_Final Specifications.pdf PDF
Attachment 8 - UFGS 01 45 00.00 40-QUALITY CONTROL.pdf PDF
Attachment 3 - WD CA20190007 dated 08 May 2020.pdf PDF
SECTION 01 56 00_Environmental Specifications April 2019.pdf PDF
AFRC Interior Design Policy Manual.pdf PDF
Attachment 2 - TAFB Security Clause dated 05 Mar 19.pdf PDF
Attachment 7 - UFGS 01 35 26-GOVERNMENTAL SAFETY REQUIREMENTS.pdf PDF
Attachment 9 - UFGS 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS.pdf PDF
SECTION 01000 Updated 07 Jun 19.pdf PDF
Attachment 1 - SOW B239 dated 9 June 2020.pdf PDF
Attachment 6 - UFGS 01 33 00- SUBMITTAL PROCEDURES.pdf PDF
23 09 00 Johnson Controls Spec.pdf PDF
Attachment 10 - UFGS 01 78 00 Closeout Submittals.pdf PDF
Attachment 4 - Travis Design Guide FEG.PDF PDF
Travis AFB_B239_Final Drawings.pdf PDF
Solicitation - FA442720R0044.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST AND PRESENT PERFORMANCE QUESTIONNAIRE

When Filled In This Document Is Source Selection Sensitive IAW FAR 2.101 and FAR 3.104

SUBJECT: Request for Past Performance Evaluation

You have been identified as a point of contact for a past and/or present performance evaluation of the firm listed on the attached questionnaire. This firm is currently being considered for a construction contract at Travis AFB, CA.

Your prompt attention to this questionnaire will be greatly appreciated. If you have any questions concerning this request, please contact Jonny Ochoa at (707) 424-7736 or jonny.ochoa@us.af.mil

Rory Gardner Contracting Officer

1 Atch Past and Present Performance Questionnaire mailto:jonny.ochoa@us.af.mil

PAST AND PRESENT PERFORMANCE QUESTIONNAIRE

A. GENERAL INFORMATION: Please correct any information below known to be inaccurate:

Contractor’s Name:

Address:

Phone Number:

Project Title and Brief Description of Work:

Contract Number Provided by Offeror:

Dollar Amount:

Contract Period or Dates of Performance Provided by Offeror:

Contractor performed as the Prime Contractor Sub-Contractor Key Personnel.

B. RESPONDENT INFORMATION:

Name of Respondent: Title:

Address: Telephone Number:

Fax Number:

Email Address:

Respondent wet or digital signature: _________________________

C. EMAIL COMPLETED SURVEY FORM TO:

60th Contracting Squadron Attn: Jonny Ochoa jonny.ochoa@us.af.mil mailto:jonny.ochoa@us.af.mil

D. PERFORMANCE INFORMATION: Choose the appropriate number on the scale (1, 2, 3, 4, and 5) that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF 4 or 5.

1 2 3 4 5

Substantial Confidence

Satisfactory Confidence

Limited Confidence

No Confidence Unknown Confidence

Based on the offeror’s performance record, the government has a high expectation that the offeror will successfully perform the required effort.

Based on the offeror’s performance record, the government has an expectation that the offeror will successfully perform the required effort.

Based on the offeror’s performance record, the government has a low expectation that the offeror will successfully perform the required effort

Based on the offeror’s performance record, the government has no expectation that the offeror will successfully perform the required effort

No performance record is identifiable or the offeror’s performance record is so sparse that no confidence assessment rating can be reasonably assigned.

Place an “X” in the appropriate column using the definitions matrix above.

The contractor: 1 2 3 4 5

1. Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.

2. Demonstrated the ability to hire, maintain, and replace, if necessary, qualified personnel during the contract period.

3. Delegated authority to project managers and supervisors commensurate with contract requirements.

4. Provided effective quality control and/or inspection procedures to meet contract requirements.

5. Identified problems as they occurred.

6. Suggested alternative approaches to problems.

7. How would you rate the contractor's overall performance?

8. Developed realistic progress schedules.

9. Met established project schedules.

10. Provided timely resolution of warranty defects.

11. Provided adequate project supervision.

12. Paid subcontractors/suppliers in a timely manner.

13. Provided accurate and complete line item cost proposals including all aspects of work required for each task.

14. Cooperated with Government personnel after award.

15. Completed projects involving mechanical, electrical and plumbing renovations.

16. Is familiar with Unified Facilities Criteria’s (UFCs) for HVAC, Plumbing and Interior Electrical Systems.

17. Modified fire alarm systems and wet pipe fire sprinkler systems.

The contractor: 1 2 3 4 5

18. Was the contractor ever issued a cure or show cause notice under the referenced contract?

If yes, explain.

EXPLANATION:

□ Yes

□ No

19. Would you award another contract to this contractor? If not, explain.

EXPLANATION:

□ Yes

□ No

B. RESPONDENT INFORMATION:
Place an “X” in the appropriate column using the definitions matrix above.
2020-07-21T09:10:50-0700
GARDNER.RORY.D.1167676517

File details come from the government source that posted it. Updated .