Attachment 1 - SOW B239 dated 9 June 2020.pdf

PDF 14 KB Posted

Attached to
349 AMW Facility Project B239 Renovation Federal contract opportunity
Solicitation number
FA442720R0044
Issued by
Department of the Air Force Air Mobility Command

About this file

This scope of work document outlines the requirements for a renovation project at building B239 of an Air Force base. The contractor will be responsible for renovating bay G of building B239, including new construction work associated with a reconfigured layout, such as new stud walls, flooring, ceilings and doors. The contractor will also renovate the existing mechanical, electrical and communication systems in the project area, including all equipment, ductwork, diffusers, piping and controls. The exterior mechanical enclosure will be demolished and replaced to accommodate new equipment. The contractor must test for lead paint and asbestos, follow the Air Force interior design policy manual for materials selection, and adhere to the general requirements and mitigation measures specified in the attachments. References and attachments include design drawings, basis of design documents, structural designs, policy manuals and specification sections.

View the file

Other files for this federal contract opportunity

Other files attached to 349 AMW Facility Project B239 Renovation, newest first.
File Type Posted
Bldg 239 Bay G RFIs 8-31-2020.pdf PDF
239 BayDPanel.pdf PDF
239 As-builts Combined Files.pdf PDF
Solicitation Amendment FA442720R00440004 SF 30.pdf PDF
Solicitation Amendment FA442720R00440003 SF 30.pdf PDF
Solicitation Amendment FA442720R00440002 SF 30.pdf PDF
Solicitation Amendment FA442720R00440001 SF 30 (1).pdf PDF
Attachment 5 - UFGS 01 14 00 WORK RESTRICTIONS.pdf PDF
Travis AFB_B239_Final Specifications.pdf PDF
Attachment 8 - UFGS 01 45 00.00 40-QUALITY CONTROL.pdf PDF
Attachment 3 - WD CA20190007 dated 08 May 2020.pdf PDF
SECTION 01 56 00_Environmental Specifications April 2019.pdf PDF
Attachment 10 - UFGS 01 78 00 Closeout Submittals.pdf PDF
Attachment 4 - Travis Design Guide FEG.PDF PDF
Travis AFB_B239_Final Drawings.pdf PDF
Solicitation - FA442720R0044.pdf PDF
Attachment 11 - Past Performance Questionnaire.pdf PDF
AFRC Interior Design Policy Manual.pdf PDF
Attachment 2 - TAFB Security Clause dated 05 Mar 19.pdf PDF
Attachment 7 - UFGS 01 35 26-GOVERNMENTAL SAFETY REQUIREMENTS.pdf PDF
Attachment 9 - UFGS 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS.pdf PDF
SECTION 01000 Updated 07 Jun 19.pdf PDF
Attachment 6 - UFGS 01 33 00- SUBMITTAL PROCEDURES.pdf PDF
23 09 00 Johnson Controls Spec.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

Project Name: Interior Renovation Bay G B239

XDAT # 17-1064

09 June 2020

1. SCOPE

1.2 Renovate B239 Bay G.

1.3 Work to include:

i. New construction associated with reconfigured building layout, as noted including, but not limited to, new stud walls, floor and wall finishes, ceilings, and doors.

ii. Renovation of the existing mechanical, electrical, and communication systems in the project area including all equipment, ductwork, diffusers, piping, and controls as noted.

iii. Demolition of the existing exterior mechanical enclosure and construction of new exterior mechanical enclosure to accommodate new equipment.

2. REQUIREMENTS

2.1 General Requirements

2.1.1 Contractor to test for lead paint & asbestos.

2.1.2 Contractor to follow AFRC Interior Design Policy Manual for materials

2.1.3 Contractor to follow Division 01 General Requirements Section 01000.

2.2 Special Requirements

2.2.1 See Design Drawings (Attachment 1), Basis of Design (Attachment 2) and Structural

Design (Attachment 3).

2.2.2 Contractor shall follow mitigation measures/requirements as required in Section 01 56 00, Environmental General Requirements

2.2.3 Contractor shall subcontract any work on Johnson EMS controllers to Johnson Controls.

3. REFERENCES

3.1.1 See A-E Design Drawings (Attachment 1), Basis of Designs (Attachment 2) and Structural

Design (attachment 3).

4. ATTACHMENTS

Attachment 1: 100% B239 Design Drawings Attachment 2: 100% B239 Basis of Design Attachment 3: 100% B239 Structural Design Attachment 4: AFRC Interior Design Policy Manual Attachment 5: Division 01 General Requirements 01000 (03/22/2019) Attachment 6: Section 01 56 00 Environmental General Requirements (04/05/2019) Attachment 7: 23 90 00 Johnson Controls Specification

//End of S.O.W. //

SCOPE OF WORK
Project Name: Interior Renovation Bay G B239
XDAT # 17-1064

1.2 Renovate B239 Bay G.

File details come from the government source that posted it. Updated .