Attachment 10 - UFGS 01 78 00 Closeout Submittals.pdf

PDF 93 KB Posted

Attached to
349 AMW Facility Project B239 Renovation Federal contract opportunity
Solicitation number
FA442720R0044
Issued by
Department of the Air Force Air Mobility Command

About this file

This solicitation requests proposals for facility renovation services at building B239 at the 349th Air Mobility Wing. The contractor will be responsible for all professional services, permits, equipment, labor, materials, and other ancillary items necessary to complete HVAC upgrades and relocation work, interior room repurposing, new stud walls, floor and wall finishes, ceilings, doors, electrical and communication systems, and construction of an outside mechanical HVAC enclosure. Architectural and engineering designs will be provided by the 60th Contracting Squadron. Proposals are due by the date specified in the solicitation issued by the Department of the Air Force Air Mobility Command.

View the file

Other files for this federal contract opportunity

Other files attached to 349 AMW Facility Project B239 Renovation, newest first.
File Type Posted
Bldg 239 Bay G RFIs 8-31-2020.pdf PDF
239 BayDPanel.pdf PDF
239 As-builts Combined Files.pdf PDF
Solicitation Amendment FA442720R00440004 SF 30.pdf PDF
Solicitation Amendment FA442720R00440003 SF 30.pdf PDF
Solicitation Amendment FA442720R00440002 SF 30.pdf PDF
Solicitation Amendment FA442720R00440001 SF 30 (1).pdf PDF
Attachment 5 - UFGS 01 14 00 WORK RESTRICTIONS.pdf PDF
Travis AFB_B239_Final Specifications.pdf PDF
Attachment 8 - UFGS 01 45 00.00 40-QUALITY CONTROL.pdf PDF
Attachment 3 - WD CA20190007 dated 08 May 2020.pdf PDF
SECTION 01 56 00_Environmental Specifications April 2019.pdf PDF
Attachment 4 - Travis Design Guide FEG.PDF PDF
Travis AFB_B239_Final Drawings.pdf PDF
Solicitation - FA442720R0044.pdf PDF
Attachment 11 - Past Performance Questionnaire.pdf PDF
AFRC Interior Design Policy Manual.pdf PDF
Attachment 2 - TAFB Security Clause dated 05 Mar 19.pdf PDF
Attachment 7 - UFGS 01 35 26-GOVERNMENTAL SAFETY REQUIREMENTS.pdf PDF
Attachment 9 - UFGS 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS.pdf PDF
SECTION 01000 Updated 07 Jun 19.pdf PDF
Attachment 1 - SOW B239 dated 9 June 2020.pdf PDF
Attachment 6 - UFGS 01 33 00- SUBMITTAL PROCEDURES.pdf PDF
23 09 00 Johnson Controls Spec.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USACE / NAVFAC / AFCEC / NASA UFGS- 01 78 00 ( May 2019) Pr epar i ng Act i v i t y: USACE Super sedi ng UFGS- 01 78 00 ( August 2011)

UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS

Ref er ences ar e i n agr eement wi t h UMRL dat ed Januar y 2020

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 78 00

CLOSEOUT SUBMITTALS

05/19

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.2.1 As-Built Drawings

1.2.2 Record Drawings

1.2.3 Record Model

1.2.4 Advanced Modeling

1.2.5 USACE CAD/BIM Technology Center

1.3 SOURCE DRAWING FILES

1.3.1 Terms and Conditions

1.4 RECORD DRAWINGS

1.4.1 Variation with Contract Drawings

1.4.2 Data Loss, Corruption, and Error

1.4.3 Modeling Completeness and Quality

1.5 SUBMITTALS

1.6 SPARE PARTS DATA

1.7 QUALITY CONTROL

1.8 WARRANTY MANAGEMENT

1.8.1 Warranty Management Plan

1.8.2 Performance Bond

1.8.3 Pre-Warranty Conference

1.8.4 Contractor's Response to Construction Warranty Service

Requirements

1.8.5 Warranty Tags

PART 2 PRODUCTS

2.1 RECORD DRAWINGS

2.1.1 Additional Drawings

2.1.1.1 Sheet Numbers and File Names

2.2 ADVANCED MODELING PACKAGE

2.3 CERTIFICATION OF EPA DESIGNATED ITEMS

2.4 CERTIFICATION OF USDA DESIGNATED ITEMS

2.5 PDF AS-BUILT FILES

2.6 REDLINES AND MARKUPS

SECTION 01 78 00 Page 1

2.7 GEO-DATA-BASE FILES

2.8 AS-BUILT OR ADVANCED MODELING RE-SUBMISSION REQUIREMENTS

PART 3 EXECUTION

3.1 AS-BUILT DRAWINGS

3.1.1 Markup Guidelines

3.1.2 As-Built Drawings Content

3.2 RECORD DRAWING FILES

3.2.1 Rename the CAD Drawing files

3.3 RECORD DRAWINGS

3.3.1 Final Record Drawing Package

3.4 FINAL APPROVED SHOP DRAWINGS

3.5 CONSTRUCTION CONTRACT SPECIFICATIONS

3.6 AS-BUILT RECORD OF EQUIPMENT AND MATERIALS

3.7 OPERATION AND MAINTENANCE MANUALS

3.8 CLEANUP

3.8.1 Extraordinary Cleanup Requirements

3.9 REAL PROPERTY RECORD

3.9.1 Interim DD FORM 1354

3.9.2 Completed DD FORM 1354

ATTACHMENTS:

draft DD FORM 1354

-- End of Section Table of Contents --

SECTION 01 78 00 Page 2

USACE / NAVFAC / AFCEC / NASA UFGS- 01 78 00 ( May 2019) Pr epar i ng Act i v i t y: USACE Super sedi ng UFGS- 01 78 00 ( August 2011)

UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS

Ref er ences ar e i n agr eement wi t h UMRL dat ed Januar y 2020

SECTION 01 78 00

CLOSEOUT SUBMITTALS

05/19

NOTE: Thi s gui de speci f i cat i on cover s t he r equi r ement s f or c l oseout submi t t al s i ncl udi ng:

r evi sed pr oj ect document s, war r ant y management , t est i ng, adj ust i ng and bal anci ng, O & M manual s, and cleanup.

Adher e t o UFC 1-300-02 Uni f i ed Faci l i t i es Gui de Speci f i cat i ons ( UFGS) For mat St andar d when edi t i ng t hi s gui de speci f i cat i on or pr epar i ng new pr oj ect speci f i cat i on sect i ons. Edi t t hi s gui de speci f i cat i on f or pr oj ect speci f i c r equi r ement s by addi ng, del et i ng, or r evi s i ng t ext . For br acket ed i t ems, choose appl i cabl e i t em( s) or i nser t appr opr i at e i nf or mat i on.

Thi s gui de speci f i cat i on i ncl udes t ai l or i ng opt i ons f or DESI GN- BI D- BUI LD ( DBB) , DESI GN- BUI LD ( DB) , ARMY, NAVY, AI R FORCE and NASA pr oj ect s. Sel ect i on or desel ect i on of a t ai l or i ng opt i on wi l l i ncl ude or excl ude t hat opt i on i n t he sect i on, but edi t i ng t he r esul t i ng sect i on t o f i t t he pr oj ect i s st i l l r equi r ed. Thi s gui de speci f i cat i on al so i ncl udes t ai l or i ng opt i ons f or BI M and Advanced BI M Model i ng and i s t ai l or ed f or ARMY and AI R FORCE.

Remove i nf or mat i on and r equi r ement s not r equi r ed i n r espect i ve pr oj ect , whet her or not br acket s ar e present.

Comment s and suggest i ons on t hi s gui de speci f i cat i on ar e wel come and shoul d be submi t t ed as a Criteria Change Request (CCR) .

PART 1 GENERAL

NOTE: Coor di nat e wi t h t he cust omer r egar di ng speci al war r ant y r equi r ement s and opt i ons.

SECTION 01 78 00 Page 3

1.1 REFERENCES

NOTE: Thi s par agr aph i s used t o l i s t t he publ i cat i ons c i t ed i n t he t ext of t he gui de speci f i cat i on. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by basi c desi gnat i on onl y and l i s t ed i n t hi s par agr aph by or gani zat i on, desi gnat i on, dat e, and t i t l e.

Use t he Ref er ence Wi zar d' s Check Ref er ence f eat ur e when you add a Ref er ence I dent i f i er ( RI D) out si de of t he Sect i on' s Ref er ence Ar t i c l e t o aut omat i cal l y pl ace t he r ef er ence i n t he Ref er ence Ar t i c l e. Al so use t he Ref er ence Wi zar d' s Check Ref er ence f eat ur e t o updat e t he i ssue dat es.

Ref er ences not used i n t he t ext wi l l aut omat i cal l y be del et ed f r om t hi s sect i on of t he pr oj ect speci f i cat i on when you choose t o r econci l e r ef er ences i n t he publ i sh pr i nt pr ocess.

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM E1971 (2005; R 2011) Standard Guide for Stewardship for the Cleaning of Commercial and Institutional Buildings

GREEN SEAL (GS)

GS-37 (2017) Cleaning Products for Industrial and Institutional Use

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 1110-1-2909 (2012) Geospatial Data and Systems

ERDC/ITL TR-12-1 (2015) A/E/C Graphics Standard, Release 2.0

ERDC/ITL TR-12-6 (2015) A/E/C CAD Standard - Release 6.0

U.S. DEPARTMENT OF DEFENSE (DOD)

FC 1-300-09N (2014; with Change 4, 2018) Navy and Marine Corps Design

UFC 1-300-08 (2009, with Change 2, 2011) Criteria for Transfer and Acceptance of DoD Real Property

SECTION 01 78 00 Page 4

1.2 DEFINITIONS

1.2.1 As-Built Drawings

NOTE: Al l Navy pr oj ect use f i r st set of br acket s.

The second set of br acket s ar e t ai l or ed opt i ons f or use on Ar my or NASA pr oj ect s onl y.

As-built drawings are the marked-up drawings, maintained by the Contractor on-site, that depict actual conditions and deviations from the Contract Documents. These deviations and additions may result from coordination required by, but not limited to: contract modifications; official responses to submitted Requests for Information (RFI's); direction from the Contracting Officer; design that is the responsibility of the Contractor, and differing site conditions. Maintain the as-builts throughout construction as[ red-lined hard copies on site] [ and][ or][ red-lined PDF files] . These files serve as the basis for the creation of the record drawings.

1.2.2 Record Drawings

NOTE: Use t hi s par agr aph f or Desi gn- Bui l d pr oj ect s. For Desi gn- Bi d- Bui l d pr oj ect s, onl y use t hi s par agr aph i f t he Cont r act or i s pr epar i ng t he Recor d Dr awi ngs.

Use t he second br acket ed par agr aph, t ai l or ed f or Ar my, i f t he r ecor d dr awi ngs ar e t o be pr oduced f r om t he Recor d Model .

The record drawings are the final compilation of actual conditions reflected in the as-built drawings.

NOTE: Use t he f ol l owi ng t ai l or ed par agr aphs f or Ar my pr oj ect s onl y. Sel ect t he pr ef er r ed met hod of pr oduci ng t he Recor d Dr awi ngs f or t he pr oj ect .

I nser t i nf or mat i on when BI M i s r equi r ed on a pr oj ect .

I f t he pr ef er r ed met hod i s t o pr oduce Recor d Dr awi ngs f r om t he Recor d Model , edi t and keep t he par agr aphs bel ow.

[Produce the record drawings from the Record Model(s) and do not include annotations indicating revisions.]

[ 1.2.3 Record Model

A model reflecting approved changes during construction including red-lines, requests for information (RFI's), and contract modifications.

Include updated construction phase facility/site data for components.

SECTION 01 78 00 Page 5

] [ 1.2.4 Advanced Modeling

A subset of geospatial technologies as defined in EM 1110-1-2909 to include Building Information Modeling (BIM), Civil Information Modeling (CIM), Geographic Information Systems (GIS), and Computer-Aided Design (CAD). Advanced modeling is comprised of models and drawings that form a digital representation of the project, or part thereof, that are comprised of model elements with facility data.

] [ 1.2.5 USACE CAD/BIM Technology Center

The USACE CAD/BIM Technology Center hosts all standard content for USACE.

This content can be accessed through the CAD/BIM Technology Center website, https://cadbimcenter.erdc.dren.mil/ .

] 1.3 SOURCE DRAWING FILES

NOTE: Use t hi s par agr aph i f Cont r act or i s pr ovi di ng t he Recor d Dr awi ngs.

Request the full set of electronic drawings, in the source format, for Record Drawing preparation, after award and at least 30 days prior to required use.

1.3.1 Terms and Conditions

NOTE: For Ar my, i ncl ude br acket ed i t ems f or Desi gn- Bui l d pr oj ect s. Thi s i t em i s t ai l or ed f or Ar my, Desi gn- Bui l d.

Data contained on these electronic files must not be used for any purpose other than as a convenience in the preparation of construction [drawings and ] data for the referenced project. Any other use or reuse shall be at the sole risk of the Contractor and without liability or legal exposure to the Government. The Contractor must make no claim and waives to the fullest extent permitted by law, any claim or cause of action of any nature against the Government, its agents or sub consultants that may arise out of or in connection with the use of these electronic files. The Contractor must, to the fullest extent permitted by law, indemnify and hold the Government harmless against all damages, liabilities or costs, including reasonable attorney's fees and defense costs, arising out of or resulting from the use of these electronic files.

These electronic CAD drawing files are not construction documents.

Differences may exist between the CAD files and the corresponding construction documents. The Government makes no representation regarding the accuracy or completeness of the electronic CAD files, nor does it make representation to the compatibility of these files with the Contractor hardware or software. In the event that a conflict arises between the signed and sealed construction documents prepared by the Government and the furnished Source drawing files, the signed and sealed construction documents govern. The Contractor is responsible for determining if any conflict exists. Use of these Source Drawing files does not relieve the Contractor of duty to fully comply with the contract documents, including and without limitation, the need to check, confirm and coordinate the work

SECTION 01 78 00 Page 6 of all contractors for the project. If the Contractor uses, duplicates or modifies these electronic source drawing files for use in producing construction [drawings and ] data related to this contract, remove all previous indicia of ownership (seals, logos, signatures, initials and dates).

1.4 RECORD DRAWINGS

NOTE: Use t hi s par agr aph f or ARMY and NASA onl y.

Do not use f or NAVY pr oj ect s. Thi s par agr aph i s t ai l or ed f or ARMY and NASA.

The Government will provide an optical disc (CD or DVD) at the preconstruction conference that contains one set of "as-designed" electronic CAD files in the specified software and format revised to reflect all amendments and the final contract PDF drawings. The CAD files are provided to enable preparation of as-built or as-constructed drawings. If discrepancies exist between the CAD files and the contract PDF drawings, correct the CAD files to show the contract PDF drawings.

1.4.1 Variation with Contract Drawings

The electronic files provided are not part of the contract documents. If there is any discrepancy between the electronic files and the contract drawings, the contract drawings govern. The Government has no responsibility to modify any GFM due to changes in the design that occur after award.

Evaluate the content and quality of the GFM upon receipt. If major discrepancies or omissions occur in the GFM, notify the Contracting Officer and indicate the nature of such variations.

1.4.2 Data Loss, Corruption, and Error

Transfer of GFM files may result in corrupted files resulting in data loss and errors. Use of GFM files at own risk. Verify data integrity upon receipt and request a replacement if necessary. Make any adjustment in file structure, format, or software version as needed to make GFM compatible with computer systems and/or software to meet the requirements of the contract.

NOTE: Edi t t he par agr aph bel ow i f pr oduct i on of a f i nal model i s a r equi r ement on t hi s pr oj ect .

Del et e t he par agr aph bel ow i f BI M i s not a r equi r ement on t he pr oj ect .

[ 1.4.3 Modeling Completeness and Quality

The Government makes no guarantee that the GFM provide the level of completeness or quality as required by the contract. Further, the Government makes no guarantee that identified variations will be corrected upon notification.

SECTION 01 78 00 Page 7

] 1.5 SUBMITTALS

NOTE: Revi ew submi t t al descr i pt i on ( SD) def i ni t i ons i n Sect i on 01 33 00 SUBMI TTAL PROCEDURES and edi t t he f ol l owi ng l i s t t o r ef l ect onl y t he submi t t al s r equi r ed f or t he pr oj ect .

The Gui de Speci f i cat i on t echni cal edi t or s have desi gnat ed t hose i t ems t hat r equi r e Gover nment appr oval , due t o t hei r compl exi t y or cr i t i cal i t y, wi t h a " G. " Gener al l y, ot her submi t t al i t ems can be r evi ewed by t he Cont r act or ' s Qual i t y Cont r ol Syst em. Onl y add a “ G” t o an i t em, i f t he submi t t al i s suf f i c i ent l y i mpor t ant or compl ex i n cont ext of t he pr oj ect .

For submi t t al s r equi r i ng Gover nment appr oval on Ar my pr oj ect s, a code of up t o t hr ee char act er s wi t hi n t he submi t t al t ags may be used f ol l owi ng t he " G" desi gnat i on t o i ndi cat e t he appr ovi ng aut hor i t y.

Codes f or Ar my pr oj ect s usi ng t he Resi dent Management Syst em ( RMS) ar e: " AE" f or Ar chi t ect - Engi neer ; " DO" f or Di st r i ct Of f i ce ( Engi neer i ng Di v i s i on or ot her or gani zat i on i n t he Di st r i ct Of f i ce) ; " AO" f or Ar ea Of f i ce; " RO" f or Resi dent Of f i ce; and " PO" f or Pr oj ect Of f i ce. Codes f ol l owi ng t he " G" t ypi cal l y ar e not used f or Navy, Ai r For ce, and NASA pr oj ect s.

The " S" f ol l owi ng a submi t t al i t em i ndi cat es t hat t he submi t t al i s r equi r ed f or t he Sust ai nabi l i t y eNot ebook t o f ul f i l l f eder al l y mandat ed sust ai nabl e r equi r ement s i n accor dance wi t h Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG. Locat e t he " S" submi t t al under t he SD number t hat best descr i bes t he submi t t al i t em.

Choose t he f i r st br acket ed i t em f or Navy, Ai r For ce and NASA pr oj ect s, or choose t he second br acket ed i t em f or Ar my pr oj ect s.

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for [Contractor Quality Control approval.][information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.] Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Warranty Management Plan

Warranty Tags

Final Cleaning

SECTION 01 78 00 Page 8

Spare Parts Data

SD-08 Manufacturer's Instructions

Posted Instructions

SD-10 Operation and Maintenance Data

Operation and Maintenance Manuals ; G[, [_____]]

SD-11 Closeout Submittals

As-Built Drawings ; G[, [_____]]

Record Drawings ; G[, [_____]]

Record Model ; G[, [_____]]

As-Built Record of Equipment and Materials

Final Approved Shop Drawings ; G[, [_____]]

Construction Contract Specifications ; G[, [_____]]

Certification of EPA Designated Items ; G[, [_____]]

Certification Of USDA Designated Items ; G[, [_____]]

Interim DD FORM 1354 ; G[, [_____]]

Checklist for DD FORM 1354 ; G[, [_____]]

High Performance and Sustainable Building (HPSB) Checklist ; G

1.6 SPARE PARTS DATA

NOTE: Fol l owi ng sent ence cont ai ns t ai l or i ng f or NAVFAC NW f or f our copi es.

Submit [two][_____] [four] copies of the Spare Parts Data list.

a. Indicate manufacturer's name, part number, and stock level required for test and balance, pre-commissioning, maintenance and repair activities. List those items that may be standard to the normal maintenance of the system.

NOTE: Use t hi s t ai l or ed par agr aph f or ARMY and NASA pr oj ect s onl y. Spar e par t s ar e not per mi t t ed t o be pr ovi ded f or Navy pr oj ect s.

b. At acceptance of commissioning, ensure the required stock level is supplied as indicated in subparagraph a for maintenance and repair activities through the facilities warranty period. Provision of spare parts does not relieve the Contractor of responsibilities listed

SECTION 01 78 00 Page 9 under the contract guarantee provisions.

1.7 QUALITY CONTROL

NOTE: Thi s subpar t i s t ai l or ed f or ARMY and NASA use onl y. Do not use t hi s par agr aph f or NAVY projects.

Additions and corrections to the contract drawings must be equal in quality and detail to that of the originals. Line colors, line weights, lettering, layering conventions, and symbols must [conform to ERDC/ITL TR-12-6 ][be the same as the original line colors, line weights, lettering, layering conventions, and symbols].

1.8 WARRANTY MANAGEMENT

NOTE: A war r ant y package based on a cost / benef i t det er mi nat i on wi l l be est abl i shed wi t h t he cust omer at t he begi nni ng of a pr oj ect . Coor di nat e wi t h t he cust omer r egar di ng speci al war r ant y r equi r ement s and options.

NOTE: Use f our set s f or NAVFAC NW.

1.8.1 Warranty Management Plan

Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction. At least 30 days before the planned pre-warranty conference, submit [one set] [[_____]][four sets] of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The plan narrative must contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesmen, or of engineering background, not necessarily familiar with this contract. The term "status" as indicated below must include due date and whether item has been submitted or was accomplished. Submit warranty information, made available during the construction phase, to the Contracting Officer for approval prior to each monthly pay estimate. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period must begin on the date of project acceptance and continue for the full product warranty period. Conduct a joint 4 month and 9 month warranty inspection, measured from time of acceptance; with the Contractor, Contracting Officer and the Customer Representative. The warranty management plan must include, but is not limited to, the following:

a. Roles and responsibilities of personnel associated with the warranty process, including points of contact and telephone numbers within the organizations of the Contractors, subcontractors, manufacturers or suppliers involved.

b. For each warranty, the name, address, telephone number, and e-mail of

SECTION 01 78 00 Page 10 each of the guarantor's representatives nearest to the project location.

c. A list and status of delivery of Certificates of Warranty for extended warranty items, including roofs, HVAC balancing, pumps, motors, transformers, and for commissioned systems, such as fire protection and alarm systems, sprinkler systems, and lightning protection systems.

d. As-Built Record of Equipment and Materials list for each warranted equipment, item, feature of construction or system indicating:

(1) Name of item.

(2) Model and serial numbers.

(3) Location where installed.

(4) Name and phone numbers of manufacturers or suppliers.

(5) Names, addresses and telephone numbers of sources of spare parts.

(6) Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have warranties longer than one year must be indicated with separate warranty expiration dates.

(7) Cross-reference to warranty certificates as applicable.

(8) Starting point and duration of warranty period.

(9) Summary of maintenance procedures required to continue the warranty in force.

(10) Cross-reference to specific pertinent Operation and Maintenance manuals.

(11) Organization, names and phone numbers of persons to call for warranty service.

(12) Typical response time and repair time expected for various warranted equipment.

e. The plans for attendance at the 4 and 9 month post-construction warranty inspections conducted by the Government.

f. Procedure and status of tagging of equipment covered by warranties longer than one year.

g. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty or safety reasons.

1.8.2 Performance Bond

The Performance Bond [must remain effective throughout the construction and warranty period] [_____].

NOTE: Use t he br acket ed i t em i f t he bond must ext end beyond t he const r uct i on per i od; coor di nat e r equi r ement wi t h t he Cont r act i ng Of f i cer .

a. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.

b. In the event sufficient funds are not available to cover the

SECTION 01 78 00 Page 11 construction warranty work performed by the Government at the Contractor's expense, the Contracting Officer will have the right to recoup expenses from the bonding company.

c. Following oral or written notification of required construction warranty repair work, respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the Contractor.

1.8.3 Pre-Warranty Conference

Prior to contract completion, and at a time designated by the Contracting Officer, meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section. At this meeting, establish and review communication procedures for Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for Contractor response, and other details deemed necessary by the Contracting Officer for the execution of the construction warranty In connection with these requirements and at the time of the Contractor's quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the Contractor. This point of contact must be located within the local service area of the warranted construction, be continuously available, and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the Contractor of any of its responsibilities in connection with other portions of this provision.

1.8.4 Contractor's Response to Construction Warranty Service Requirements

NOTE: Thi s subpar t i s t ai l or ed f or ARMY and NASA onl y. Del et e t hi s par agr aph f or NAVY pr oj ect s.

Following oral or written notification by the Contracting Officer, respond to construction warranty service requirements in accordance with the "Construction Warranty Service Priority List" and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period. Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the Contractor does not perform the construction warranty within the timeframe specified, the Government will perform the work and back charge the construction warranty payment item established.

a. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours and work continuously to completion or relief.

b. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours and work continuously to completion or relief.

c. Third Priority Code 3. All other work to be initiated within 3 work days and work continuously to completion or relief.

d. The "Construction Warranty Service Priority List" is as follows:

SECTION 01 78 00 Page 12

Code 1-Life Safety Systems

(1) Fire suppression systems.

(2) Fire alarm system(s) in place in the building.

Code 1-Air Conditioning Systems

(1) Recreational support.

(2) Air conditioning leak in part of building, if causing damage.

(3) Air conditioning system not cooling properly.

Code 1-Doors

(1) Overhead doors not operational, causing a security, fire, or safety problem.

(2) Interior, exterior personnel doors or hardware, not functioning properly, causing a security, fire, or safety problem.

Code 3-Doors

(1) Overhead doors not operational.

(2) Interior/exterior personnel doors or hardware not functioning properly.

Code 1-Electrical

(1) Power failure (entire area or any building operational after 1600 hours).

(2) Security lights

(3) Smoke detectors

Code 2-Electrical

(1) Power failure (no power to a room or part of building).

(2) Receptacle and lights (in a room or part of building).

Code 3-Electrical Street lights.

Code 1-Gas

(1) Leaks and breaks.

(2) No gas to family housing unit or cantonment area.

Code 1-Heat

(1) Area power failure affecting heat.

(2) Heater in unit not working.

Code 2-Kitchen Equipment

(1) Dishwasher not operating properly.

(2) All other equipment hampering preparation of a meal.

Code 1-Plumbing

(1) Hot water heater failure.

(2) Leaking water supply pipes.

Code 2-Plumbing

(1) Flush valves not operating properly.

(2) Fixture drain, supply line to commode, or any water pipe leaking.

(3) Commode leaking at base.

Code 3 -Plumbing Leaky faucets.

Code 3-Interior

(1) Floors damaged.

SECTION 01 78 00 Page 13

(2) Paint chipping or peeling.

(3) Casework.

Code 1-Roof Leaks Temporary repairs will be made where major damage to property is occurring.

Code 2-Roof Leaks Where major damage to property is not occurring, check for location of leak during rain and complete repairs on a Code 2 basis.

Code 2-Water (Exterior) No water to facility.

Code 2-Water (Hot) No hot water in portion of building listed.

Code 3-All other work not listed above.

1.8.5 Warranty Tags

NOTE: Par agr aph bel ow cont ai ns t ai l or i ng f or NAVFAC NW f or f our copi es.

At the time of installation, tag each warranted item with a durable, oil and water resistant tag approved by the Contracting Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating.

Also, submit [two][_____] [four] record copies of the warranty tags showing the layout and design. The date of acceptance and the QC signature must remain blank until the project is accepted for beneficial occupancy. Show the following information on the tag.

Type of product/material

Model number

Serial number

Contract number

Warranty period from/to

Inspector's signature

Construction Contractor

Address

Telephone number

SECTION 01 78 00 Page 14

Warranty contact

Address

Telephone number

Warranty response time priority code

WARNING - PROJECT PERSONNEL TO PERFORM ONLY OPERATIONAL MAINTENANCE DURING THE

WARRANTY PERIOD.

PART 2 PRODUCTS

2.1 RECORD DRAWINGS

NOTE: Thi s par agr aph i s t ai l or ed f or ARMY and NASA onl y. Do not use f or NAVY pr oj ect s.

NOTE: Use and edi t t hi s par agr aph t o speci f y CAD f i l es compat i bl e wi t h t he cust omer s CAD syst em.

Prepare the CAD drawing files in AutoCAD Release [2013][____] MicroStation [J][V8][_____] format compatible with a [Windows 7][_____] operating system.

2.1.1 Additional Drawings

If additional drawings are required, prepare them using the specified electronic file format applying [the same graphic standards specified for original drawings][ ERDC/ITL TR-12-6 and ERDC/ITL TR-12-1 ]. The title block and drawing border to be used for any new final record drawings must be identical to that used on the contract drawings.

2.1.1.1 Sheet Numbers and File Names

If a sheet needs to be added between two sequential sheets, append a Supplemental Drawing Designator in accordance with ERDC/ITL TR-12-6 Adding a drawing sheet, and ERDC/ITL TR-12-1 Adding or deleting drawing sheets and index sheet procedures.

[ 2.2 ADVANCED MODELING PACKAGE

NOTE: Thi s par agr aph i s t ai l or ed f or Ar my.

Del et e t hi s sect i on i f Advanced BI M Model i ng i s not r equi r ed on t he pr oj ect .

Del et e i t em ( f ) : I f expor t s f r om t he Model ar e not r equi r ed t o as a par t of t he cont r act r equi r ement s f or t he pr oj ect .

SECTION 01 78 00 Page 15

For each Advanced Modeling Package submittal for both the Interim Record Model Package and the Final Record Model Package, submit in accordance with ERDC/ITL TR-12-6 [and in accordance with Section 01 33 16.00 10 DESIGN DATA (DESIGN AFTER AWARD)] and also provide the following items:

a. Advanced Modeling PxP: Provide an electronic copy of the most current approved version of the project Advanced Modeling PxP.

b. Electronic Files: Provide an electronic list (.txt file or similar), of all submitted electronic files including a description, directory, and file name for each file submitted. Identify which files have been produced from the Model and Facility Data. For all sheet files, include a list of the sheet titles and sheet numbers.

c. Advanced Modeling Submittal Checklist: Complete the USACE BIM/CIM Advanced Modeling Submittal Checklist and include with each submittal. Download the Checklist from the USACE CAD/BIM Technology Center website.

d. Advanced Modeling Files: Provide all native Advanced Modeling files associated with the production of the contract drawings and associated as-modeled drawings. Update and maintain in compliance with the Advanced Modeling formatting, content requirement, and standards in [Section 01 33 16.00 10 DESIGN DATA (DESIGN AFTER AWARD)] [_____], in order to yield a complete and coordinated document package.

e. Quality Control (QC) Reports: Provide electronic PDFs of all QC reports and checklist utilized to ensure full compliance with the contract requirements and standards.

[ f. CAD Exports of BIM-Generated Sheets and Drawings: Provide supplemental 2D CAD exports from the project BIM model as needed to demonstrate compliance with contract requirements. Export all contract drawings sheets to the CAD format(s) defined in Section 01 33 16.00 10 DESIGN

DATA(DESIGN AFTER AWARD).]

] [ 2.3 CERTIFICATION OF EPA DESIGNATED ITEMS

NOTE: Thi s par agr aph addr esses r equi r ement s f or Cer t i f i cat i on of EPA Desi gnat ed I t ems.

By si gni ng t hi s cont r act t he Of f er or i s cer t i f y i ng t hat t he per cent age of r ecover ed/ r ecycl ed mat er i al s f or EPA Desi gnat ed i t ems del i ver ed or used i n t he per f or mance of t hi s cont r act wi l l meet t he mi ni mum amount r equi r ed i n accor dance wi t h t he FAR r ef er ences i n t he cont r act document s.

Submit the Certification of EPA Designated Items as required by FAR 52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items and FAR 52-223-17 Affirmative Procurement of EPA designated items in Service and Construction Contracts.. Include on the certification form the following information: project name, project number, Contractor name, license number, Contractor address, and certification. The certification will read as follows and be signed and

SECTION 01 78 00 Page 16 dated by the Contractor. ["I hereby certify the information provided herein is accurate and that the requisition/procurement of all materials listed on this form comply with current EPA standards for recycled/recovered materials content. The following exemptions may apply to the non-procurement of recycled/recovered content materials:

1) The product does not meet appropriate performance standards;

2) The product is not available within a reasonable time frame;

3) The product is not available competitively (from two or more sources);

4) The product is only available at an unreasonable price (compared with a comparable non-recycled content product)."][_____]

Record each product used in the project that has a requirement or option of containing recycled content in accordance with SECTION 01 33 29 SUSTAINABILITY REPORTING, noting total price, total value of post-industrial recycled content, total value of post-consumer recycled content, exemptions (1, 2, 3, or 4, as indicated), and comments. Recycled content values may be determined by weight or volume percent, but must be consistent throughout.

] 2.4 CERTIFICATION OF USDA DESIGNATED ITEMS

NOTE: Thi s par agr aph addr esses r equi r ement s f or Cer t i f i cat i on of USDA Desi gnat ed I t ems.

By si gni ng t hi s cont r act t he Of f er or i s cer t i f y i ng t hat t he per cent age of Bi obased mat er i al s f or USDA Desi gnat ed i t ems del i ver ed or used i n t he per f or mance of t hi s cont r act wi l l meet t he mi ni mum amount r equi r ed i n accor dance wi t h t he FAR r ef er ences i n t he cont r act document s.

Submit the Certification of USDA Designated Items as required by FAR 52-223-1 Bio-based Product Certifications and FAR 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts. Include on the certification form the following information:

project name, project number, Contractor name, license number, Contractor address, and certification. The certification will read as follows and be signed and dated by the Contractor. ["I hereby certify the information provided herein is accurate and that the requisition/procurement of all materials listed on this form comply with current USDA standards for biobased materials content. The following exemptions may apply to the non-procurement of biobased content materials:

1) The product does not meet appropriate performance standards;

2) The product is not available within a reasonable time frame;

3) The product is not available competitively (from two or more sources);

4) The product is only available at an unreasonable price (compared with a comparable bio-based content product)."][_____]

Record each product used in the project that has a requirement or option of containing biobased content in accordance with SECTION 01 33 29 SUSTAINABILITY REPORTING, noting total price, total value of post-industrial recycled content, total value of post-consumer recycled content,[ total value of biobased content,] exemptions (1, 2, 3, or 4, as indicated), and comments. Biobased content values may be determined by weight or volume percent, but must be consistent throughout.

SECTION 01 78 00 Page 17

2.5 PDF AS-BUILT FILES

NOTE: Thi s par agr aph i s t ai l or ed f or ARMY.

Provide electronic PDF "plots" of all contract drawings sheets associated with the as-built drawing submittal. Compile and organize the PDF set to match the contract drawings. Bookmark and label the pages of the PDF file in accordance with Section 01 33 16.00 10 DESIGN DATA (DESIGN AFTER AWARD).

2.6 REDLINES AND MARKUPS

NOTE: Thi s par agr aph i s t ai l or ed f or ARMY.

Provide PDFs of the current working redlines and/or markups complying with the as-builts drawing and markup requirements contained in this specification.

[ 2.7 GEO-DATA-BASE FILES

NOTE: Thi s par agr aph i s t ai l or ed f or ARMY.

Del et e t hi s r equi r ement i f Advanced Model i ng i s not a r equi r ement i n t hi s pr oj ect .

Provide a SDSFIE/FGDC GeoReferenced personal GeoDataBase. For all information outside of the building walls, provide a personal GeoDataBase in .mdb format using the latest version of Spatial Data Standard for Facilities, Infrastructure, and Environment (SDSFIE) as the database structure. Provide a shell database to define the projection and database structure.

For all drawings within and including the exterior walls, utilize the advanced modeling formats described and referenced herein. Provide a short GeoDataBase read-me file explaining the deliverable. The read-me file will include a description of the software used to create the data, projection, and include the attribute tables used.

] 2.8 AS-BUILT OR ADVANCED MODELING RE-SUBMISSION REQUIREMENTS

NOTE: Thi s par agr aph i s t ai l or ed f or ARMY.

If elements of an as-built submittal or advanced modeling package are rejected, provide the following for each re-submission, in addition to any information required in Section 01 33 00 SUBMITTAL PROCEDURES:

a. Re-submit all components required under paragraph As-Builts or Advanced Modeling Package, including a new Advanced Modeling Submittal Checklist and updated content in response to Government comments.

b. Provide a copy of all Government review comments.

SECTION 01 78 00 Page 18

c. Provide a disposition/response to each Government review comment for a back-check of the re-submission deliverable.

PART 3 EXECUTION

3.1 AS-BUILT DRAWINGS

NOTE: Par agr aph bel ow cont ai ns t ai l or i ng f or NAVY.

Provide and maintain two black line print copies of the PDF contract drawings for As-Built Drawings. Maintain the as-builts throughout construction as [red-lined hard copies on site][ and][ or][ red-lined PDF files]. Submit As-Built Drawings 30 days prior to Beneficial Occupancy Date (BOD).

3.1.1 Markup Guidelines

NOTE: The f ol l owi ng i nf or mat i on i s pr ovi ded t o i mpr ove t he qual i t y of t he mar kup pr i nt s and f aci l i t at e pr epar at i on of f i nal as- bui l t dr awi ngs.

The most i mpor t ant gui del i ne i s t hat t he mar kup changes on t he pr i nt s ar e compl et e and under st andabl e. Compl et e and under st andabl e mar kup pr i nt s wi l l mi ni mi ze ef f or t t o t r ansf er i nf or mat i on t o CAD f i l es.

Make comments and markup the drawings complete without reference to letters, memos, or materials that are not part of the As-Built drawing.

Show what was changed, how it was changed, where item(s) were relocated and change related details. These working as-built markup prints must be neat, legible and accurate as follows:

a. Use base colors of red, green, and blue. Color code for changes as follows:

(1) Special (Blue) - Items requiring special information, coordination, or special detailing or detailing notes.

NOTE: Del et e subpar agr aphs ( 2) and ( 3) f or NAVFAC SE pr oj ect s.

(2) Deletions (Red) - Over-strike deleted graphic items (lines), lettering in notes and leaders.

(3) Additions (Green) - Added items, lettering in notes and leaders.

] b. Provide a legend if colors other than the "base" colors of red, green, and blue are used.

c. Add and denote any additional equipment or material facilities, service lines, incorporated under As-Built Revisions if not already shown in legend.

SECTION 01 78 00 Page 19

d. Use frequent written explanations on markup drawings to describe changes. Do not totally rely on graphic means to convey the revision.

e. Use legible lettering and precise and clear digital values when marking prints. Clarify ambiguities concerning the nature and application of change involved.

f. Wherever a revision is made, also make changes to related section views, details, legend, profiles, plans and elevation views, schedules, notes and call out designations, and mark accordingly to avoid conflicting data on all other sheets.

g. For deletions, cross out all features, data and captions that relate to that revision.

h. For changes on small-scale drawings and in restricted areas, provide large-scale inserts, with leaders to the applicable location.

i. Indicate one of the following when attaching a print or sketch to a markup print:

1) Add an entire drawing to contract drawings

2) Change the contract drawing to show

3) Provided for reference only to further detail the initial design.

j. Incorporate all shop and fabrication drawings into the markup drawings.

3.1.2 As-Built Drawings Content

NOTE: The f ol l owi ng subpar t cont ai ns t ai l or i ng f or ARMY and NASA. For Navy, onl y use t he l ast sent ence i n par agr aph bel ow, and t he i t ems f ol l owi ng, whi ch ar e not t ai l or ed.

Revise [As-Built Drawings][ and][ or][ red-lined PDF files] in accordance with ERDC/ITL TR-12-1 [ and ][ ERDC/ITL TR-12-6 ]. Keep these working as-built markup drawings current on a weekly basis and at least one set available on the jobsite at all times. Changes from the contract drawings which are made during construction or additional information which might be uncovered in the course of construction must be accurately and neatly recorded as they occur by means of details and notes. Submit the working as-built markup drawings for approval prior to submission of each monthly pay estimate. For failure to maintain the working and final record drawings as specified herein, the Contracting Officer will withhold [10][_____] percent of the monthly progress payment until approval of updated drawings. Show on the as-built drawings, but not limited to, the following information:

a. The actual location, kinds and sizes of all sub-surface utility lines. In order that the location of these lines and appurtenances may be determined in the event the surface openings or indicators become covered over or obscured, show by offset dimensions to two permanently fixed surface features the end of each run including each change in direction on the record drawings. Locate valves, splice

SECTION 01 78 00 Page 20 boxes and similar appurtenances by dimensioning along the utility run from a reference point. Also record the average depth below the surface of each run.

b. The location and dimensions of any changes within the building structure.

c. Layout and schematic drawings of electrical circuits and piping.

d. Correct grade, elevations, cross section, or alignment of roads, earthwork, structures or utilities if any changes were made from contract plans.

e. Changes in details of design or additional information obtained from working drawings specified to be prepared or furnished by the Contractor; including but not limited to shop drawings, fabrication, erection, installation plans and placing details, pipe sizes, insulation material, dimensions of equipment, and foundations.

f. The topography, invert elevations and grades of drainage installed or affected as part of the project construction.

g. Changes or Revisions which result from the final inspection.

h. Where contract drawings or specifications present options, show only the option selected for construction on the working as-built markup drawings.

i. If borrow material for this project is from sources on Government property, or if Government property is used as a spoil area, furnish a contour map of the final borrow pit/spoil area elevations.

j. Systems designed or enhanced by the Contractor, such as HVAC controls, fire alarm, fire sprinkler, and irrigation systems.

k. Changes in location of equipment and architectural features.

l. Modifications and compliance with FC 1-300-09N procedures .

m. Actual location of anchors, construction and control joints, etc., in concrete.

n. Unusual or uncharted obstructions that are encountered in the contract work area during construction.

o. Location, extent, thickness, and size of stone protection particularly where it will be normally submerged by water.

3.2 RECORD DRAWING FILES

NOTE: Use t hi s par agr aph f or ARMY and NASA onl y.

Do not use f or NAVY pr oj ect s. Par agr aph i s t ai l or ed f or ARMY and NASA.

NOTE: Edi t t hi s par agr aph t o speci f y CAD dr awi ngs compat i bl e wi t h t he cust omer ' s CAD syst em, pr ovi di ng

SECTION 01 78 00 Page 21 t he ver si on wher e appl i cabl e.

If additional drawings are required, prepare them using the specified electronic file format applying [the same graphic standards specified for original drawings][ ERDC/ITL TR-12-6 and ERDC/ITL TR-12-1 ]. The title block and drawing border to be used for any new final record drawings must be identical to that used on the contract drawings. Accomplish additions and corrections to the contract drawings using CAD files. Provide all program files and hardware necessary to prepare final PDF record drawings. The Contracting Officer will review final PDF record drawings for accuracy and return them to the Contractor for required corrections, changes, additions, and deletions.

3.2.1 Rename the CAD Drawing files

Rename the CAD Drawing files using the contract number as the Project Code field,(e.g., W91238-15-C-10A-102. DWGDGN) as instructed in the Pre-Construction conference. Use only those renamed files for the Marked-up changes. Make all changes on the layer/level as the original item.

a. For AutoCAD files (DWG), enter all as-built delta changes and notations on the AS-BUILT layer. MicroStation files (DGN), enter all as-built delta changes and notations on:

- Level #63

- Level/Layer Name contains: ANNO-REVS

- Level/Layer Description: Revisions

c. When final revisions have been completed, show the wording "RECORD DRAWING AS-BUILTS" followed by the name of the Contractor in letters at least 5 mm 3/16 inch high on the cover sheet drawing. Date RECORD DRAWING AS-BUILTS" drawing revisions in the revision block.

d. Within [ 1020][_____] days after Government approval of all of the working record drawings for a phase of work, prepare the final CAD record drawings for that phase of work and submit PDF drawing files and two sets of prints for review and approval. The Government will promptly return one set of prints annotated with any necessary corrections. Within [ 710][_____] days revise the CAD files accordingly at no additional cost and submit one set of final prints for the completed phase of work to the Government. Within [ 1020 ][_____] days of substantial completion of all phases of work, submit the final record drawing package for the entire project. Submit one set of electronic CAD files, and one set of the approved working record PDF files on [an][three] optical disc[s] with two sets of prints. The CAD files must be complete in all details and identical in form and function to the CAD drawing files supplied by the Government. Prepare AutoCAD files for transmittal using e-Transmit.

Prepare MicroStation files for transmittal using the Packager (Archive). Make any transactions or adjustments necessary to accomplish this. The Government reserves the right to reject any drawing files it deems incompatible with the customer's CAD system.

Paper prints, drawing files and storage media submitted will become the property of the Government upon final approval. Failure to submit final record PDF drawing files, CAD files and marked prints as specified will be cause for withholding any payment due under this contract. Approval and acceptance of final record drawings must be

SECTION 01 78 00 Page 22 accomplished before final payment is made.

3.3 RECORD DRAWINGS

NOTE: Use t he f ol l owi ng par agr aph f or Navy Pr oj ect s onl y. Onl y use t hi s par agr aph i f Cont r act or i s pr ovi di ng t he Recor d Dr awi ngs. Par agr aph i s t ai l or ed f or NAVY.

Prepare and provide Record Drawings and Source Documents in accordance with FC 1-300-09N . Provide four copies of Record Drawings and Documents on separate CDs or DVDs [30][_____] days after BOD.

NOTE: Use t he f ol l owi ng par agr aphs f or ARMY and NASA pr oj ect s onl y. Do not use f or NAVY pr oj ect s.

Par agr aphs ar e t ai l or ed f or ARMY and NASA.

NOTE: The USACE pol i cy on Recor d ( As- Bui l t ) dr awi ngs i s as f ol l ows:

a. Met hod of Pr epar at i on f or DoD Pr oj ect s. The const r uct i on Cont r act or must pr epar e t he f i nal Recor d dr awi ngs i n PDF f r om t he CAD f i l es.

b. Met hod of Pr epar at i on f or Ci v i l Wor ks Pr oj ect s.

The pr ef er r ed met hod of pr epar i ng t he f i nal Recor d dr awi ngs i s by t he const r uct i on Cont r act or . The management pl an f or t he pr oj ect must j ust i f y t he pr epar at i on of t he f i nal Recor d dr awi ngs by any ot her met hod, such as by i n- house per sonnel . Two such except i ons ar e " emer gency const r uct i on" and oper at i ons wor k per f or med wi t h hi r ed l abor . Revi se t he f ol l owi ng speci f i cat i on par agr aphs i f as- bui l t s ar e not t o be done by t he Cont r act or .

c. Cust omer Coor di nat i on. Di scuss t he met hod of pr oduci ng t he r ecor d dr awi ngs and f or mat wi t h t he cust omer at t he begi nni ng of a pr oj ect , and r ecor d i t i n t he Memor andum of Under st andi ng wi t h t he cust omer ( i f appl i cabl e) and t he Pr oj ect Management Plan.

Prepare final record drawings after the completion of each definable [feature][phase] of work as listed in the Contractor Quality Control Plan (such as Foundations, Utilities, or Structural Steel as appropriate for the project). Transfer the changes from the approved working as-built markup drawings to the original electronic CAD drawing files. Modify the as-built CAD drawing files to correctly show the features of the project as-built by bringing the working CAD drawing set into agreement with approved working as-built markup drawings, and adding such additional drawings as may be necessary. Refer to ERDC/ITL TR-12-1 . Jointly review the working as-built markup drawings with printouts from working as-built

SECTION 01 78 00 Page 23

CAD drawing PDF files for accuracy and completeness. Monthly review of working as-built CAD drawing PDF file printouts must cover all sheets revised since the previous review. These PDF drawing files are part of the permanent records of this project. Any drawings damaged or lost must be satisfactorily replaced at no expense to the Government.

Drawing revisions (include within change order price the…