This is a Request for Proposal (RFP) No. BPM003500 issued by the Arizona Department of Environmental Quality, located in Phoenix, Arizona. The solicitation is for Water Quality Sampling and Monitoring services, with a detailed pricing sheet that outlines various sampling and data management categories.

The pricing document includes unit rates for different water quality sampling activities, such as Stream Chemistry, Lake Chemistry, Biological and Habitat, Streamflow Duration Assessment Method, Groundwater, Fish Tissue, and Miscellaneous ADEQ Pre-approved Additional Costs. Hourly rates range from $112 to $167 depending on the specific task, with each category broken down into mobilization/demobilization, sampling, data entry, and quality assurance/quality control components. Travel expenses are noted to be covered separately in Section 2-B of the pricing document. The offeror is required to complete and submit the pricing sheet with their proposal, and provide a brief explanation of how the proposed rates were derived.

View the file

Other files

File Type Posted
2023-10-01_Tetra_Tech_CTR056545_GAWP.pdf PDF
3.0-Responsibility Responsiveness and Susceptibility Form.pdf PDF
3.2-OIG Search Results_GLEC.pdf PDF
3.4-OIG Search Results_Tetra Tech.pdf PDF
4.2-GLEC_USVI BAWQMP 2021 1st Quarter Monitoring Data.pdf PDF
5.5-Tetra Tech Price Reduction Request BPM003500.pdf PDF
CTR056545_Tetra_Tech_Amendment_2_Extension_to_8.3.2024.pdf PDF
Tetra Tech BPM003500_Method_of_Approach_Attachment_3_A.pdf PDF
Tetra Tech BPM003500_Offer_and_Acceptance_signed.pdf PDF
Tetra Tech CTR056545_Revised_Offer_and_Acceptance - signed.pdf PDF
2-BPM003500 Consensus Evaluation Report - signed (1).pdf PDF
2024-10-01_Tetra_Tech_CTR056545_GAUWP.pdf PDF
3.1-OIG Search Results_Blaine.pdf PDF
4.3-Harris Clarification for BPM003500 Submittal Water Quality Sampling and Monitoring.pdf PDF
5.1-Harris Environmental Group Revised Pricing BPM003500.pdf PDF
5.6-Tetra Tech Revised Pricing BPM003500.pdf PDF
BPM003500_Solicitation Requirements.pdf PDF
CTR056545_Tetra_Tech_Amendment__3_Extension_to_8.3.2025.pdf PDF
Tetra Tech Pricing BPM003500.xlsx XLSX spreadsheet
2021-10-01_Tetra_Tech_CTR056545_GAUWP.pdf PDF
2022-10-01_Tetra_Tech_CTR056545_GAWP.pdf PDF
3.3-OIG Search Results_Harris.pdf PDF
4.1-GLEC_USVI BAWQMP 2021 1st Quarter Monitoring Data.pdf PDF
4.4-Tetra Tech Clarification Request - BPM003500_080221.pdf PDF
5.3-GLEC Pricing BPM003500_revised_8.02.21.pdf PDF
CTR056545_Pricing.xlsx XLSX spreadsheet
Tetra Tech BPM003500_Experience_and_Capacity_Questionnaire_2A_3B_3C.pdf PDF
Tetra Tech BPM003500_Required_Offer_Forms.pdf PDF
1-Executive Summary_Determination of Award RFP BPM003500 - signed.pdf PDF
5.2-Harris Environmental Price Reduction Request BPM003500.pdf PDF
5.4-GLEC Price Reduction Request BPM003500.pdf PDF
CTR056545_Amendment__4_Extension_to_8.3.2026.pdf PDF
CTR056545_Amendment___1_-_Personnel.pdf PDF
CTR056545_COI_GL_AL_WC_PEL.pdf PDF
Tetra Tech Price Reduction Request BPM003500.docx DOCX document
Tetra Tech Price Reduction Request BPM003500.pdf PDF
Tetra Tech Revised Pricing BPM003500.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposal Solicitation No. BPM003500

Description:

Water Quality Sampling and Monitoring

Arizona Department of Environmental Quality

1110 W. Washington Street Phoenix, AZ 85007

Attachment 1 Pricing Sheet

Offeror shall complete & submit this “Pricing Sheet” with offer:

Category

Unit Rate (hourly)

Stream Chemistry Pricing

Mobilization/demobilization. Includes time used for travel to and from site and any preparatory work such as gaining site access or equipment calibration. Travel expenses are covered in Section 2-B (Pricing Document) and should not be included in the hourly rate.

Sampling. One Completed & Submitted Water Quality Sample Event

Data Entry and Quality Assurance/Quality Control. Time to enter the field data, calculate streamflow, upload lab data, complete quality assurance review and approve the data in the database.

$ ___125.00____

$ ___125.00____

$ __112.00______

Lake Chemistry Pricing preparatory work such as gaining site access or equipment calibration. Travel expenses are covered in Section 2-B (Pricing Document) and should not be included in the hourly rate.

Sampling. One Completed & Submitted Water Quality Sample Event

Data Entry and Quality Assurance/Quality Control. Time to enter the field data, including lake profile data, upload lab data, and review and approve the data in the database.

$ ____140.00______

$ _____140.00_____

$ ____112.00_______

Description:

Water Quality Sampling and Monitoring

Arizona Department of Environmental Quality

Biological and Habitat Pricing preparatory work such as gaining site access or equipment calibration. Travel expenses

Data Entry. Time to calculate some metrics and enter habitat data (approx. 50 parameters) into the water quality database.

Quality Assurance/Quality Control. Time to review and approve the data in the

$ __140.00______

$ _140.00________

$ _125.00_______

$ __125.00_______

Streamflow Duration Assessment Method (Beta version) Pricing preparatory work such as gaining site access or equipment calibration. Travel expenses

Data Entry. Time to enter the survey data and photos into the SDAM Survey123 GIS database.

Quality Assurance/Quality Control. Time to review and approve the data in the

$ __140.00_____

$ ___140.00______

$ __112.00_______

$ __167.00______

Description:

Water Quality Sampling and Monitoring

Arizona Department of Environmental Quality

Groundwater Pricing preparatory work such as gaining site access or equipment calibration. Travel expenses

Data Entry and Quality Assurance/Quality Control. Time to enter the field data and review and approve the data in the database.

$ ___125.00_____

$ __125.00______

$ ___112.00______

Fish Tissue Pricing preparatory work such as gaining site access. Travel expenses are covered in Section 2-B (Pricing Document) and should not be included in the hourly rate.

$ __167.00_______

$ __167.00________

Miscellaneous ADEQ Pre-approved Additional Costs (by the hour)

(ie. Compliance sampling of a spill, National Aquatic Resource Survey sampling)

$ _125.00________

Description:

Water Quality Sampling and Monitoring

Arizona Department of Environmental Quality

On this page Offeror to include one (1) or two (2) paragraphs describing how Offeror derived the rates proposed in Attachment 1.

File details come from the government source that posted it. Updated .