TECH LIBRARY 13-CDRL_A004_Power_example.pdf

PDF 1 MB Posted

Attached to
Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL Federal contract opportunity
Solicitation number
FA4610-22-R-0001
Issued by
Department of the Air Force Space Command

About this file

This document is a request for proposal for a launch operations support contract released by the 30th Space Wing at Vandenberg Air Force Base, California. The solicitation seeks proposals to provide facilities support services with a North American Industry Classification System code of 561210 and a small business size standard of $41.5 million. Interested contractors should review the 15 attachments detailing requirements like the performance work statement and appendices, government furnished property, security specifications, and Department of Labor service contract act wage determinations. Final proposals are due no later than January 27, 2022. Questions regarding the RFP must be submitted by January 4, 2022.

View the file

Other files for this federal contract opportunity

Other files attached to Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL, newest first.
File Type Posted
L-5_Section M dtd 19Nov21_Revised_04Feb2022.pdf PDF
RFP Amendment 0004 FA461022R00010004 SF30 signed 20220204.pdf PDF
L-4_Section L dtd 19Nov21_Revised_02Feb2022.pdf PDF
Atch 2_Appendix J_Contract Data Requiremetns List (CDRL) Deliverables dtd 07Jan22_Final.pdf PDF
Atch 12 DB WD CA20210014_Mod 14_20211029_12Jan2022.pdf PDF
Atch 9 SCA WD 2015-5647_Rev 13_20211020_12Jan2022.pdf PDF
Atch 11 Appendix B - Wage Rate Tables (2019-2024)_Redacted_12Jan2022.pdf PDF
Atch 1_LOSC PWS_dtd 07Jan2022_Final_rev1.pdf PDF
TECH LIBRARY 14-CES operations support_Template.pdf PDF
L-5_Section M dtd 19Nov21_Final_9Dec2021.pdf PDF
Atch 6_LOSC_DD254_9Dec2021.pdf PDF
Atch 11 Appendix B - Wage Rate Tables (2019-2024)_Redacted.pdf PDF
Exhibit A_CDRL_A002_GFP Inventory Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A010_Daily Maintenance and Repair Schedule_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A014_Cathodic Protection Booklet_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A020_Contract Funds Status Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A027_Facility Assessment Report_Final_9Dec2021.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1444-um001_-en-p.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1407-CGCM-DLR.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1444-td001_-en-p.pdf PDF
TECH LIBRARY 1 Drawings - As Builts - ACGAL020S000002_E1.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Everight Alliance S1AmanualRev022610V13.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Phoenix Contact 2814100.pdf PDF
TECH LIBRARY 10-Fences_Gates_WLF.pdf PDF
TECH LIBRARY 13-CDRL_A006_Waste Water_example.pdf PDF
TECH LIBRARY 13-CDRL_A008_P-E Responsibility List_example.pdf PDF
TECH LIBRARY 13-CDRL_A013_Backflows_example.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Axiomatic corr datasheet current-converter IC DR 11.pdf PDF
TECH LIBRARY 4-HPGSA-PV-229-VTE-20210121.pdf PDF
Exhibit A_CDRL_A005_Fugitive Hydrocarbons Report_Final_9Dec2021.pdf PDF
TECH LIBRARY 7-PPAFS Business Plan.pdf PDF
Atch 2_Appendix I - Glossary_Final_9Dec2021.pdf PDF
Solicitation - FA461022R0001_20211209.pdf PDF
L-2_SubcontractTeamingPartnerConsent_Final_9Dec2021.pdf PDF
Atch 2_Appendix B_Antenna Tower Responibility List_Final_9Dec2021.pdf PDF
Atch 2_Appendix G_Environmental Requirements_Final_9Dec2021.pdf PDF
Atch 2_Appendix J_Contract Data Requiremetns List (CDRL) Deliverables_Final_9Dec2021.pdf PDF
Atch 3_LOSC_GFP Attachment_9Dec2021.pdf PDF
Atch 7 DB WD CA20210018_Mod 28_20211203.pdf PDF
Atch 11 2019-2024 CBA_Redacted_w_Appendix A.pdf PDF
Atch 11 CBA-2019-12949.pdf PDF
Atch 12 DB WD CA20210014_Mod 14_20211029.pdf PDF
Exhibit A_CDRL_A001_Corrosion Prevention and Control Plan_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A006_Technical Report Waster Water Discharge_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A009_Program Management Plan_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A015_Solid Waste Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A016_HMMP Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A019_Cost Peformance Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A021_JOCAS Reports_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A023_RCM Plan_Final_9Dec2021.pdf PDF
Show all 50

Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CDRL A004

South Vandenberg Power Plant and Generator Status Report

Month: Nov-20

UNIT A UNIT B UNIT C UNIT D UNIT E

3050 kW 3050 kW 3050 kW 3050 kW 3050 kW

Operational Operational Operational Deadlined Operational 4 of 5

18036.8 23217 7686.5 26819.6 27718.7 103478.6 1467 1697 1335 1429 1519 7447

12.8 2.7 12.2 0 2.5 30.2 0 0 0 0 0 0

12.8 2.7 12.2 0 2.5 30.2

2 2 2 0 1 7

6.4 1.3 6.1 0 2.5 4.3

101.8 120.5 79.9 87.4 138.3 527.9

18 0 12 0 6 36

1406.2 0 983.6 0 2400 1192.1

NATURAL GAS USED THIS MONTH 852,000 cu ft THERMS USED THIS MONTH 8792.64 therms

DIESEL FUEL USED THIS MONTH 0 gallons 1 gallons DIESEL FUEL RECEIVED THIS MONTH 0 gallons 0 gallons TOTAL DIESEL FUEL ON HAND 6578.1 gallons 100 gallons

MBTU'S USED THIS MONTH 881.8 MBTU

BTU'S PER KWH THIS MONTH 24495 BTU

MOSR HOURS THIS MONTH 0 Hrs MAINT & TRAINING HRS THIS MONTH 30.2 Hrs SOURCE TEST HRS THIS MONTH 0 Hrs

AVERAGE KW THIS MONTH

STATUS

TOTAL TURBINE HOURS

TOTAL TURBINE STARTS

TOTAL

GAS HRS THIS MONTH

DIESEL HRS THIS MONTH

TOTAL HRS THIS MONTH

STARTS THIS MONTH

HRS/START THIS MONTH

TOTAL PONY ENGINE HRS

MWH THIS MONTH

SAMPLE

Sheet1

File details come from the government source that posted it. Updated .