About this file

This document contains a request for proposal for the Launch Operations Support Contract at Vandenberg Air Force Base in California. The solicitation seeks proposals to provide facilities support services with a North American Industry Classification System code of 561210 and a small business size standard of $41.5 million. Proposals are due by January 27, 2022. The performance work statement and appendices describe requirements for supporting launch operations, including maintenance of pressure vessels, facilities, equipment, and auxiliary systems. Offerors must also address organizational conflict of interest mitigation and subcontractor consent in their proposals. The incumbent contractor is Space X. The contract will be awarded by the 30th Space Wing and involve compliance with Department of Labor service contract act wage determinations.

View the file

Other files for this federal contract opportunity

Other files attached to Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL, newest first.
File Type Posted
L-4_Section L dtd 19Nov21_Revised_30Aug22.pdf PDF
L-5_Section M dtd 19Nov21_Revised_30Aug22.pdf PDF
L-4_Section L dtd 19Nov21_Revised_04Feb2022.pdf PDF
RFP Amendment 0004 Conf SF33 - FA461022R00010004.pdf PDF
RFP Amendment - FA461022R00010002 Conf SF33 20220118.pdf PDF
Atch 8 SCA WD 2015-5637_Rev 19_20211020_12Jan2022.pdf PDF
L-2_SubcontractTeamingPartnerConsent_Revised_11Jan2022.pdf PDF
Solicitation - FA461022R0001_20211209.pdf PDF
L-2_SubcontractTeamingPartnerConsent_Final_9Dec2021.pdf PDF
Atch 2_Appendix B_Antenna Tower Responibility List_Final_9Dec2021.pdf PDF
Atch 2_Appendix G_Environmental Requirements_Final_9Dec2021.pdf PDF
Atch 2_Appendix J_Contract Data Requiremetns List (CDRL) Deliverables_Final_9Dec2021.pdf PDF
Atch 3_LOSC_GFP Attachment_9Dec2021.pdf PDF
Atch 7 DB WD CA20210018_Mod 28_20211203.pdf PDF
Atch 11 2019-2024 CBA_Redacted_w_Appendix A.pdf PDF
Atch 11 CBA-2019-12949.pdf PDF
Atch 12 DB WD CA20210014_Mod 14_20211029.pdf PDF
Exhibit A_CDRL_A001_Corrosion Prevention and Control Plan_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A006_Technical Report Waster Water Discharge_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A009_Program Management Plan_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A015_Solid Waste Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A016_HMMP Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A019_Cost Peformance Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A021_JOCAS Reports_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A023_RCM Plan_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A024_Work Order Status Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A026_System Safety Program Plan_Final_9Dec2021.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1756-td002_-en-e.pdf PDF
TECH LIBRARY 1 Drawings - As Builts - ACGAL020E000000.pdf PDF
TECH LIBRARY 1 Func Desc Instrux - Control - ACGAL020S000002_B.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals EthosEnergy Speed Input Module II User Manual.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Rockwell 1756-OB32 Contact Output Module.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Axiomatic 0-200mA to 4-20mA Converter.pdf PDF
TECH LIBRARY 1 SVPP Supplier Manuals Phoenix Contact 3044102 (1).pdf PDF
TECH LIBRARY 2-8310-PV-181-VTE-20210225.pdf PDF
TECH LIBRARY 6-PTO-13968-R2-Final.pdf PDF
TECH LIBRARY 13-CDRL_A005_FUGITIVE REPORT_example.pdf PDF
TECH LIBRARY 13-CDRL_A025_Generator Testing and Maint Report_example.pdf PDF
Exhibit A_CDRL_A011_Quality Management Plan_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A012_Requisition Summary_Final_9Dec2021.pdf PDF
Atch 1_LOSC PWS_dtd 09Dec2021_Final.pdf PDF
Atch 2_Appendix A_Property and Equipment Responibility List_Final_9Dec2021.xlsx XLSX spreadsheet
Atch 2_Appendix K_Compliance documents_Final_9Dec2021.pdf PDF
Atch 9 SCA WD 2015-5647_Rev 13_20211020.pdf PDF
Atch 10 SCA WD 1986-0431 Rev 54_20210219.pdf PDF
Exhibit A_CDRL_A003_Test Inspection Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A007_P-E Certification Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A013_Backflow Prevention Systems Report_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A017_Lead-Based Abatement Plan_Final_9Dec2021.pdf PDF
Exhibit A_CDRL_A022_Accident Incident Report_Final_9Dec2021.pdf PDF
Show all 50

Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOSC ISI Program

CHI-PV-229-VTE-2021

Bld. Number

N/A

A/R/F/O

Acceptable

Acceptable

Acceptable

Acceptable

N/A

Acceptable

A/R/F/O

Acceptable

Acceptable

Acceptable

Acceptable

Acceptable

Acceptable

A/R/F/O

Other

Acceptable

N/A

N/A

Drain

Other No Comments

No Comments

Evidence of Leakage

Dents/Deformations

Insulation/CUI

Paint

Condition of Shell No Comments

Comments

No Comments

Welds

Head to Shell Welds

No Comments

Areas of minor corrosion\bio growth

No Comments

No Comments

No Comments

No Comments

No CommentsGrayloc Connection

Skirt/Band Welds

Additional Component Welds

Bolts/Flanges

No Comments

No Comments

Comments

Dissimilar metals

Attachments

Longitudinal Weld(s)

Nozzle Welds

Support/Saddle Welds

The vessel was located at the High Pressure Gas Storage Area (HPGSA) on SLC-4. Access must be set up in advance with the facility operator, Space X.

Previous Inspection Documentation

Manufacturer & Year Built

Taylor Forge

Inspector/Level

Brett Strickland / II

Client

Call Henry Inc.

National Board Number

N/A

MAWP Temp. Range

6,000 PSI

Vessel ID

Location/Area

SLC-4/HPGSA

Commodity

Gaseous Nitrogen

Required Equipment

Exterior Pressure Vessel Inspection Report Number: CHI-PV-229-VTE-2021

No Comments

No Comments

Date

1/21/2021

Serial Number

750400-1V7

PV-229

Vessel Type

Horizontal Pressure Vessel

Exam Type

External

Ladder, flashlight, mirror, bubble leak, picks, hammer, ruler, camera

Condition of Heads

Room Number

-25 to 140 °F

VTE: 2020

GP-R-142002 (2010)

Access Notes

Vessel Inspection

CommentsPrimary

N/A

A/R/F/O

Acceptable

Acceptable

Acceptable

Acceptable

N/A

Acceptable

Acceptable

N/A

N/A

N/A

N/A

A/R/F/O

Acceptable

N/A

N/A

Other

Acceptable

N/A

Inspection Findings/Code Violations

No Comments

No Comments

Additional Notes/Recommendations

Parties are exploring the option of constructing a new panel to eliminate the leaks, updates will be available upon request. The leak should be monitored for any increase in severity until corrective action is taken. Both relief valves are due for calibration and are to be replaced with calibrated relief valves as part of schedule work to the system. The vessel isolation valve has areas of moderate corrosion. This item should be addressed before the corrosion impacts the function of the valve.

Other

There was a slight offset in the foundation concrete (1.25"-1.5"). It is recommended that this continue to be monitored.

There was not notable change in the offset severity. The relief valves were missing system reference designators. This is a violation of AFSPCMAN 91-710 LOSC Tailored 11.2.1.7.6.7. The vessel had dissimilar metals on the flange head. It could not be determined if the dissimilar metals were properly isolated as they were painted over. It is recommended that this area continued to be monitored for signs of accelerated corrosion.

Comments

No Comments

No Comments

No Comments

Vessel Inspection Cont. Vessel SN: 750400-1V7

Releif valves planned to be changed out

Comments

No Comments

No Comments

No Comments

Gauges

Sensors/Transducer

Sight Glass/Liquid Level

Relief Valve

Grounding

Anchor Bolting

Saddle/Steel Support Structure

Supports

Platforms

Grating

Handrails/Kickplates

Auxiliary Equipment

Pedestal/Grouting

Concrete Pad

Foundation

Containment

Ladders/Stairs

No Comments

No Comments

1.5" offset in foundation

No Comments

No Comments

No Comments

No Comments

No Comments

Skirts/Bands

Area Overview Vessel Overview

Nameplate Pressure Gauges/Relief Valves

External Pressure Vessel Inspection

External Photographs Vessel SN: 750400-1V7

Minor Corrosion Leaking Connection

External Pressure Vessel Inspection

External Photographs Vessel SN: 750400-1V7

Offset Foundation Bio Growth