TECH LIBRARY 4-HPGSA-PV-229-VTE-20210121.pdf
PDF 538 KB Posted
- Attached to
- Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL Federal contract opportunity
- Solicitation number
- FA4610-22-R-0001
About this file
This document contains a request for proposal for the Launch Operations Support Contract at Vandenberg Air Force Base in California. The solicitation seeks proposals to provide facilities support services with a North American Industry Classification System code of 561210 and a small business size standard of $41.5 million. Proposals are due by January 27, 2022. The performance work statement and appendices describe requirements for supporting launch operations, including maintenance of pressure vessels, facilities, equipment, and auxiliary systems. Offerors must also address organizational conflict of interest mitigation and subcontractor consent in their proposals. The incumbent contractor is Space X. The contract will be awarded by the 30th Space Wing and involve compliance with Department of Labor service contract act wage determinations.
View the file
Other files for this federal contract opportunity
Show all 50
Launch Operations Support Contract (LOSC) Request for Proposal (RFP) – FINAL has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOSC ISI Program
CHI-PV-229-VTE-2021
Bld. Number
N/A
A/R/F/O
Acceptable
Acceptable
Acceptable
Acceptable
N/A
Acceptable
A/R/F/O
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
A/R/F/O
Other
Acceptable
N/A
N/A
Drain
Other No Comments
No Comments
Evidence of Leakage
Dents/Deformations
Insulation/CUI
Paint
Condition of Shell No Comments
Comments
No Comments
Welds
Head to Shell Welds
No Comments
Areas of minor corrosion\bio growth
No Comments
No Comments
No Comments
No Comments
No CommentsGrayloc Connection
Skirt/Band Welds
Additional Component Welds
Bolts/Flanges
No Comments
No Comments
Comments
Dissimilar metals
Attachments
Longitudinal Weld(s)
Nozzle Welds
Support/Saddle Welds
The vessel was located at the High Pressure Gas Storage Area (HPGSA) on SLC-4. Access must be set up in advance with the facility operator, Space X.
Previous Inspection Documentation
Manufacturer & Year Built
Taylor Forge
Inspector/Level
Brett Strickland / II
Client
Call Henry Inc.
National Board Number
N/A
MAWP Temp. Range
6,000 PSI
Vessel ID
Location/Area
SLC-4/HPGSA
Commodity
Gaseous Nitrogen
Required Equipment
Exterior Pressure Vessel Inspection Report Number: CHI-PV-229-VTE-2021
No Comments
No Comments
Date
1/21/2021
Serial Number
750400-1V7
PV-229
Vessel Type
Horizontal Pressure Vessel
Exam Type
External
Ladder, flashlight, mirror, bubble leak, picks, hammer, ruler, camera
Condition of Heads
Room Number
-25 to 140 °F
VTE: 2020
GP-R-142002 (2010)
Access Notes
Vessel Inspection
CommentsPrimary
N/A
A/R/F/O
Acceptable
Acceptable
Acceptable
Acceptable
N/A
Acceptable
Acceptable
N/A
N/A
N/A
N/A
A/R/F/O
Acceptable
N/A
N/A
Other
Acceptable
N/A
Inspection Findings/Code Violations
No Comments
No Comments
Additional Notes/Recommendations
Parties are exploring the option of constructing a new panel to eliminate the leaks, updates will be available upon request. The leak should be monitored for any increase in severity until corrective action is taken. Both relief valves are due for calibration and are to be replaced with calibrated relief valves as part of schedule work to the system. The vessel isolation valve has areas of moderate corrosion. This item should be addressed before the corrosion impacts the function of the valve.
Other
There was a slight offset in the foundation concrete (1.25"-1.5"). It is recommended that this continue to be monitored.
There was not notable change in the offset severity. The relief valves were missing system reference designators. This is a violation of AFSPCMAN 91-710 LOSC Tailored 11.2.1.7.6.7. The vessel had dissimilar metals on the flange head. It could not be determined if the dissimilar metals were properly isolated as they were painted over. It is recommended that this area continued to be monitored for signs of accelerated corrosion.
Comments
No Comments
No Comments
No Comments
Vessel Inspection Cont. Vessel SN: 750400-1V7
Releif valves planned to be changed out
Comments
No Comments
No Comments
No Comments
Gauges
Sensors/Transducer
Sight Glass/Liquid Level
Relief Valve
Grounding
Anchor Bolting
Saddle/Steel Support Structure
Supports
Platforms
Grating
Handrails/Kickplates
Auxiliary Equipment
Pedestal/Grouting
Concrete Pad
Foundation
Containment
Ladders/Stairs
No Comments
No Comments
1.5" offset in foundation
No Comments
No Comments
No Comments
No Comments
No Comments
Skirts/Bands
Area Overview Vessel Overview
Nameplate Pressure Gauges/Relief Valves
External Pressure Vessel Inspection
External Photographs Vessel SN: 750400-1V7
Minor Corrosion Leaking Connection
External Pressure Vessel Inspection
External Photographs Vessel SN: 750400-1V7
Offset Foundation Bio Growth
File details come from the government source that posted it. Updated .