PHILIP D. MURPHY
Governor State of New Jersey
DEPARTMENT OF THE TREASURY
DIVISION OF PURCHASE AND PROPERTY
PROCUREMENT BUREAU
33 WEST STATE STREET
P. O. BOX 230
TRENTON, NEW JERSEY 08625-0230
ELIZABETH MAHER MUOIO
State Treasurer
SHEILA Y. OLIVER
Lt. Governor
AMY F. DAVIS, ESQ.
Acting Director https://www.njstart.gov
CHANGE ORDER # 4
T2946
SOLICITATION # 19DPP00440
BLANKET P.O. #Multiple
To: Department of Treasury
DATE: February 24, 2023
FROM: Karissa Aponte, Analyst Trainee Procurement Bureau
SUBJECT: Blanket P.O. Extension – Elevator Maintenance, Repair, Testing, and Inspection Services
| BLANKET P.O. PERIOD: | Original Term: February 26, 2020 to February 28, 2023 | |
| | 1st Extension: March 1, 2023 to February 29, 2024 |
Please be advised that the State term Blanket P.O. 2946 for Elevator Maintenance, Repair, Testing, and Inspection Services has been extended for a period of one (1) year commencing on March 1, 2023 and expiring on February 29, 2024.
| Blanket P.O. # |
| Vendor {Contractor} |
| Blanket P.O. # |
| Vendor {Contractor} |
| 22-GNSV2-01885 |
| Champion Elevator Inc. |
| 20-GNSV2-01120 |
| TEC Elevator Inc. |
| 20-GNSV2-01119 |
| Slade Industries Inc. |
| 20-GNSV2-01121 |
| Schindler Elevator Corporation |
The following price increase was approved for Champion Elevation and will be effective immediately:
| Price Line |
| Description |
| Current Price |
| New Price |
| 1 |
| Mechanic - Regular |
| $ 250.37 |
| $ 262.89 |
| 2 |
| Helper - Regular |
| $ 187.78 |
| $ 197.17 |
| 3 |
| Adjuster - Regular |
| $ 265.23 |
| $ 278.49 |
| 4 |
| Team - Regular |
| $ 438.15 |
| $ 460.06 |
| 5 |
| 31 Petticoat Lane Annandale - Unit 1 Hydro |
| $ 237.50 |
| $ 249.38 |
| 6 |
| 31 Petticoat Lane Annandale - Unit 2 Hydro |
| $ 237.50 |
| $ 249.38 |
| 7 |
| 40 Polhemus Lane Bridgewater - Hydro |
| $ 225.00 |
| $ 236.25 |
| 8 |
| 500 North Bridge Street Bridgewater - Unit 1 Hydro |
| $ 225.00 |
| $ 236.25 |
| 9 |
| 500 North Bridge Street Bridgewater - Unit 2 Hydro |
| $ 225.00 |
| $ 236.25 |
| 10 |
| 40 Pittstown Road Clinton - Unit 1 Hydro |
| $ 200.00 |
| $ 210.00 |
| 11 |
| 40 Pittstown Road Clinton - Unit 2 Hydro |
| $ 200.00 |
| $ 210.00 |
| 12 |
| 132 Evergreen Road Edison - Unit 1 Hydro |
| $ 225.00 |
| $ 236.25 |
| 13 |
| 132 Evergreen Road Edison - Unit 2 Hydro |
| $ 225.00 |
| $ 236.25 |
| 14 |
| 132 Evergreen Road Edison - Unit 3 Hydro |
| $ 225.00 |
| $ 236.25 |
| 15 |
| 132 Evergreen Road Edison - Unit 4 Hydro |
| $ 225.00 |
| $ 236.25 |
| 16 |
| 314 Route 12 Flemington - Building 1 Unit Hydro |
| $ 225.00 |
| $ 236.25 |
| 17 |
| 314 Route 12 Flemington - Building 3 Unit Hydro |
| $ 225.00 |
| $ 236.25 |
| 18 |
| 314 Route 12 Flemington - Building 3 Dumbwaiter |
| $ 150.00 |
| $ 157.50 |
| 19 |
| 314 Route 12 Flemington - Building 5 Lift |
| $ 163.00 |
| $ 171.15 |
| 20 |
| 4 Gauntt Place Flemington - Hydro |
| $ 225.00 |
| $ 236.25 |
| 21 |
| 71 Main Street Flemington - Hydro |
| $ 225.00 |
| $ 236.25 |
| 22 |
| 75 Main Street Flemington - Hydro |
| $ 225.00 |
| $ 236.25 |
| 23 |
| 1 East Main Street Freehold - Unit 1 Hydro |
| $ 150.00 |
| $ 157.50 |
| 24 |
| 1 East Main Street Freehold - Unit 2 Traction |
| $ 250.00 |
| $ 262.50 |
| 25 |
| 1 East Main Street Freegold - Annex Building Hydro |
| $ 200.00 |
| $ 210.00 |
| 26 |
| 1 Waterworks Road Freehold - Unit 1 Hydro |
| $ 200.00 |
| $ 210.00 |
| 27 |
| 1 Waterworks Road Freehold - Unit 2 Hydro |
| $ 200.00 |
| $ 210.00 |
| 28 |
| 132 Jerseyville Avenue Freehold - Unit 1 Hydro |
| $ 200.00 |
| $ 210.00 |
| 29 |
| 132 Jerseyville Avenue Freehold - Unit 2 Hydro |
| $ 200.00 |
| $ 210.00 |
| 30 |
| 300 Halls Mill Road Freehold - Wheelchair Lift |
| $ 160.00 |
| $ 168.00 |
| 31 |
| 3000 Kozloski Road Freehold - Unit 1 Hydro |
| $ 200.00 |
| $ 210.00 |
| 32 |
| 3000 Kozloski Road Freehold - Unit 2 Hydro |
| $ 200.00 |
| $ 210.00 |
| 33 |
| 33 Mechanic Street Freehold - Hydro |
| $ 200.00 |
| $ 210.00 |
| 34 |
| 71 Monument Street Freehold - Unit 1 Traction |
| $ 500.00 |
| $ 525.00 |
| 35 |
| 71 Monument Street Freehold - Unit 2 Traction |
| $ 500.00 |
| $ 525.00 |
| 36 |
| 71 Monument Street Freehold - Unit 3 Traction |
| $ 500.00 |
| $ 525.00 |
| 37 |
| 71 Monument Street Freehold - Unit 4 Traction |
| $ 385.00 |
| $ 404.25 |
| 38 |
| 71 Monument Street Freehold - Unit 5 Traction |
| $ 385.00 |
| $ 404.25 |
| 39 |
| 71 Monument Street Freehold - Unit 6 Hydro |
| $ 200.00 |
| $ 210.00 |
| 40 |
| 71 Monument Street Freehold - Unit 7 Hydro |
| $ 200.00 |
| $ 210.00 |
| 41 |
| 71 Monument Street Freehold - Unit 8 Traction |
| $ 385.00 |
| $ 404.25 |
| 42 |
| 71 Monument Street Freehold - Unit 9 Traction |
| $ 385.00 |
| $ 404.25 |
| 43 |
| 71 Monument Street Freehold - Unit 10 Hydro |
| $ 200.00 |
| $ 210.00 |
| 44 |
| 71 Monument Street Freehold - Unit 11 Hydro |
| $ 200.00 |
| $ 210.00 |
| 45 |
| 35 Cambridge Road Kendall Park - Wheelchair Lift |
| $ 150.00 |
| $ 157.50 |
| 46 |
| 41 Kory Drive Kendall Park - Wheelchair Lift |
| $ 150.00 |
| $ 157.50 |
| 47 |
| 125 Symmes Road Manalapan - Unit 1 |
| $ 200.00 |
| $ 210.00 |
| 48 |
| 125 Symmes Road Manalapan - Unit 2 |
| $ 200.00 |
| $ 210.00 |
| 49 |
| 195 Major Road Monmouth Junction - Unit 1 Hydro |
| $ 225.00 |
| $ 236.25 |
| 50 |
| 195 Major Road Monmouth Junction - Unit 2 Wheelchair Lift |
| $ 150.00 |
| $ 157.50 |
| 51 |
| 231 Black Horse Lane Monmouth Junction - Hydro |
| $ 225.00 |
| $ 236.25 |
| 52 |
| 635 Georges Road Monmouth Junction - Wheelchair Lift |
| $ 150.00 |
| $ 157.50 |
| 53 |
| 750 Ridge Road Monmouth Junction - Unit 1 Hydro |
| $ 250.00 |
| $ 262.50 |
| 54 |
| 750 Ridge Road Monmouth Junction - Unit 2 Wheelchair Lift |
| $ 150.00 |
| $ 157.50 |
| 55 |
| 750 Ridge Road Monmouth Junction - Unit 3 Hydro |
| $ 250.00 |
| $ 262.50 |
| 56 |
| 125 Speedwell Avenue Morris Plains - Hydro |
| $ 115.00 |
| $ 120.75 |
| 57 |
| 161 East Hanover Avenue Morris Township - LULA Hydro |
| $ 150.00 |
| $ 157.50 |
| 58 |
| 353 East Hanover Avenues Morris Township - Unit 1 Traction |
| $ 300.00 |
| $ 315.00 |
| 59 |
| 353 East Hanover Avenues Morris Township - Unit 2 Traction |
| $ 300.00 |
| $ 315.00 |
| 60 |
| 10 Jane Way Morristown - Hydro |
| $ 115.00 |
| $ 120.75 |
| 61 |
| 19-A Normandy Parkway Morristown - Wheelchair Lift |
| $ 75.00 |
| $ 78.75 |
| 62 |
| 24 Mills Street Morristown - Unit 1 Traction |
| $ 115.00 |
| $ 120.75 |
| 63 |
| 24 Mills Street Morristown - Unit 2 Wheelchair Lift |
| $ 75.00 |
| $ 78.75 |
| 64 |
| 300 Mendham Road Morristown - Hydro |
| $ 200.00 |
| $ 210.00 |
| 65 |
| 31 Hazel Street Morristown - Hydro |
| $ 115.00 |
| $ 120.75 |
| 66 |
| 50 Early Street Morristown - Unit 1 Hydro |
| $ 230.00 |
| $ 241.50 |
| 67 |
| 50 Early Street Morristown - Unit 2 Hydro |
| $ 230.00 |
| $ 241.50 |
| 68 |
| 303 University Avenue Newark - Unit 1 Hydro |
| $ 250.00 |
| $ 262.50 |
| 69 |
| 303 University Avenue Newark - Unit 2 Hydro |
| $ 250.00 |
| $ 262.50 |
| 70 |
| 303 University Avenue Newark - Unit 3 Traction |
| $ 310.00 |
| $ 325.50 |
| 71 |
| 303 University Avenue Newark - Unit 4 Traction |
| $ 310.00 |
| $ 325.50 |
| 72 |
| 303 University Avenue Newark - Unit 5 Hydro |
| $ 250.00 |
| $ 262.50 |
| 73 |
| 303 University Avenue Newark - Unit 6 Hydro |
| $ 250.00 |
| $ 262.50 |
| 74 |
| 303 University Avenue Newark - Unit 7 Hydro |
| $ 250.00 |
| $ 262.50 |
| 75 |
| 303 University Avenue Newark - Unit 8 Hydro |
| $ 250.00 |
| $ 262.50 |
| 76 |
| 303 University Avenue Newark - Unit 9 Hydro |
| $ 250.00 |
| $ 262.50 |
| 77 |
| 303 University Avenue Newark - Unit 10 Hydro |
| $ 250.00 |
| $ 262.50 |
| 78 |
| 303 University Avenue Newark - Unit 11 Hydro |
| $ 250.00 |
| $ 262.50 |
| 79 |
| 1 Veterans Drive Paramus - Unit 1 Hydro |
| $ 196.00 |
| $ 205.80 |
| 80 |
| 1 Veterans Drive Paramus - Unit 2 Hydro |
| $ 196.00 |
| $ 205.80 |
| 81 |
| 1 Veterans Drive Paramus - Unit 3 Hydro |
| $ 196.00 |
| $ 205.80 |
| 82 |
| 1 Veterans Drive Paramus - Unit 4 Hydro |
| $ 196.00 |
| $ 205.80 |
| 83 |
| 1 Veterans Drive Paramus - Unit 5 Hydro |
| $ 196.00 |
| $ 205.80 |
| 84 |
| 111 Broadway Paterson - Unit 3 - Hydro |
| $ 250.00 |
| $ 262.50 |
| 85 |
| 111 Broadway Paterson - Unit 4 - Hydro |
| $ 250.00 |
| $ 262.50 |
| 86 |
| 111 Broadway Paterson - Unit 5 - Hydro |
| $ 200.00 |
| $ 210.00 |
| 87 |
| 111 Broadway Paterson - Unit 6 - Hydro |
| $ 200.00 |
| $ 210.00 |
| 88 |
| 115 Ellison Street Paterson - Traction |
| $ 475.00 |
| $ 498.75 |
| 89 |
| 155 Market Street - Unit 1 Traction |
| $ 475.00 |
| $ 498.75 |
| 90 |
| 155 Market Street - Unit 2 Traction |
| $ 475.00 |
| $ 498.75 |
| 91 |
| 155 Market Street - Wheelchair Lift |
| $ 150.00 |
| $ 157.50 |
| 92 |
| 176 Broadway Paterson - Hydro |
| $ 200.00 |
| $ 210.00 |
| 93 |
| 48 Temple Street Paterson - Hydro |
| $ 150.00 |
| $ 157.50 |
| 94 |
| 1001 Route 35 Shrewsbury - Hydro |
| $ 250.00 |
| $ 262.50 |
| 95 |
| 1 East Main Street Somerville - Hydro |
| $ 200.00 |
| $ 210.00 |
| 96 |
| 15 Mechanics Street Somerville - Unit 1 Hydro |
| $ 225.00 |
| $ 236.25 |
| 97 |
| 15 Mechanics Street Somerville - Unit 2 Hydro |
| $ 225.00 |
| $ 236.25 |
| 98 |
| 20 Grove Street Somerville - Unit 1 Hydro |
| $ 225.00 |
| $ 236.25 |
| 99 |
| 20 Grove Street Somerville - Unit 2 Hydro |
| $ 225.00 |
| $ 236.25 |
| 100 |
| 20 Grove Street Somerville - Unit 3 Hydro |
| $ 225.00 |
| $ 236.25 |
| 101 |
| 20 Grove Street Somerville - Unit 4 Wheelchair Lift |
| $ 150.00 |
| $ 157.50 |
| 102 |
| 20 North Bridge Street Somerville - Unit 1 Traction |
| $ 500.00 |
| $ 525.00 |
| 103 |
| 20 North Bridge Street Somerville - Unit 2 Traction |
| $ 500.00 |
| $ 525.00 |
| 104 |
| 20 North Bridge Street Somerville - Unit 3 Traction |
| $ 500.00 |
| $ 525.00 |
| 105 |
| 20 North Bridge Street Somerville - Unit 4 Traction |
| $ 500.00 |
| $ 525.00 |
| 106 |
| 20 North Bridge Street Somerville - Unit 5 Traction |
| $ 500.00 |
| $ 525.00 |
| 107 |
| 20 North Bridge Street Somerville - Unit 6 Traction |
| $ 500.00 |
| $ 525.00 |
| 108 |
| 20 North Bridge Street Somerville - Unit 7 Material Lift |
| $ 150.00 |
| $ 157.50 |
| 109 |
| 20 North Bridge Street Somerville - Unit 8 Material Lift |
| $ 150.00 |
| $ 157.50 |
| 110 |
| 35 East Main Street Somerville - Unit 1 Hydro |
| $ 225.00 |
| $ 236.25 |
| 111 |
| 35 East Main Street Somerville - Unit 2 Wheelchair Lift |
| $ 150.00 |
| $ 157.50 |
| 112 |
| 40 Grove Street Somerville - Unit 1 Traction |
| $ 500.00 |
| $ 525.00 |
| 113 |
| 40 Grove Street Somerville - Unit 2 Traction |
| $ 500.00 |
| $ 525.00 |
| 114 |
| 40 North Bridge Street Somerville - Unit 1 Traction |
| $ 500.00 |
| $ 525.00 |
| 115 |
| 40 North Bridge Street Somerville - Unit 2 Traction |
| $ 500.00 |
| $ 525.00 |
| 116 |
| 73 East High Street Somerville - Unit 1 Hydro |
| $ 500.00 |
| $ 525.00 |
| 117 |
| 73 East High Street Somerville - Unit 2 Hydro |
| $ 500.00 |
| $ 525.00 |
| 118 |
| 80 East High Street Somerville - Hydro |
| $ 225.00 |
| $ 236.25 |
| 119 |
| 556 Tinton Avenue Tinton Falls - Unit 1 Hydro |
| $ 225.00 |
| $ 236.25 |
| 120 |
| 556 Tinton Avenue Tinton Falls - Unit 2 Hydro |
| $ 225.00 |
| $ 236.25 |
| 121 |
| 250 Minnisink Road Totowa - Hydro |
| $ 225.00 |
| $ 236.25 |
| 122 |
| 1 Memorial Drive Trenton - Unit 1 Hydro |
| $ 250.00 |
| $ 262.50 |
| 123 |
| 1 Memorial Drive Trenton - Unit 2 Hydro |
| $ 250.00 |
| $ 262.50 |
| 124 |
| 1 Memorial Drive Trenton - Unit 3 Hydro |
| $ 250.00 |
| $ 262.50 |
| 125 |
| 1 Memorial Drive Trenton - Unit 4 Wheelchair Lift |
| $ 212.50 |
| $ 223.13 |
| 126 |
| 1 Memorial Drive Trenton - Unit 5 Wheelchair Lift |
| $ 212.50 |
| $ 223.13 |
| 127 |
| 1 Memorial Drive Trenton - Unit 6 Wheelchair Lift |
| $ 212.50 |
| $ 223.13 |
| 128 |
| 1 Memorial Drive Trenton - Unit 7 Wheelchair Lift |
| $ 212.50 |
| $ 223.13 |
| 129 |
| 111 West State Street Trenton - Unit 1 Hydro |
| $ 400.00 |
| $ 420.00 |
| 130 |
| 111 West State Street Trenton - Unit 2 Hydro |
| $ 400.00 |
| $ 420.00 |
| 131 |
| 111 West State Street Trenton - Unit 3 Traction |
| $ 475.00 |
| $ 498.75 |
| 132 |
| 135 West Hanover Trenton - Unit 1 Traction |
| $ 475.00 |
| $ 498.75 |
| 133 |
| 135 West Hanover Trenton - Unit 2 Traction |
| $ 475.00 |
| $ 498.75 |
| 134 |
| 135 West State Street Trenton - Unit 1 Traction |
| $ 475.00 |
| $ 498.75 |
| 135 |
| 135 West State Street Trenton - Unit 2 Traction |
| $ 475.00 |
| $ 498.75 |
| 136 |
| 135 West State Street Trenton - Unit 3 Wheelchair Lift |
| $ 350.00 |
| $ 367.50 |
| 137 |
| 135 West State Street Trenton - Unit 4 Wheelchair Lift |
| $ 350.00 |
| $ 367.50 |
| 138 |
| 145 West State Street Trenton - Unit 1 Hydro |
| $ 212.50 |
| $ 223.13 |
| 139 |
| 145 West State Street Trenton - Unit 2 Hydro |
| $ 212.50 |
| $ 223.13 |
| 140 |
| 145 West State Street Trenton - Unit 3 Traction |
| $ 225.00 |
| $ 236.25 |
| 141 |
| 145 West State Street Trenton - Unit 4 Traction |
| $ 225.00 |
| $ 236.25 |
| 142 |
| 145 West State Street Trenton - Unit 5 Traction |
| $ 225.00 |
| $ 236.25 |
| 143 |
| 20 West State Street Trenton - Unit 1 Traction |
| $ 475.00 |
| $ 498.75 |
| 144 |
| 20 West State Street Trenton - Unit 2 Traction |
| $ 475.00 |
| $ 498.75 |
| 145 |
| 20 West State Street Trenton - Unit 3 Traction |
| $ 475.00 |
| $ 498.75 |
| 146 |
| 20 West State Street Trenton - Unit 4 Traction |
| $ 475.00 |
| $ 498.75 |
| 147 |
| 20 West State Street Trenton - Unit 5 Traction |
| $ 475.00 |
| $ 498.75 |
| 148 |
| 20 West State Street Trenton - Unit 6 Traction |
| $ 475.00 |
| $ 498.75 |
| 149 |
| 222 South Warren Street Trenton - Unit 1 Traction |
| $ 475.00 |
| $ 498.75 |
| 150 |
| 222 South Warren Street Trenton - Unit 2 Traction |
| $ 475.00 |
| $ 498.75 |
| 151 |
| 222 South Warren Street Trenton - Unit 3 Traction |
| $ 475.00 |
| $ 498.75 |
| 152 |
| 222 South Warren Street Trenton - Unit 4 Traction |
| $ 475.00 |
| $ 498.75 |
| 153 |
| 2300 Stuyvesant Avenue Trenton - Unit 1 Hydro |
| $ 225.00 |
| $ 236.25 |
| 154 |
| 2300 Stuyvesant Avenue Trenton - Unit 2 Material Lift |
| $ 150.00 |
| $ 157.50 |
| 155 |
| 2300 Stuyvesant Avenue Trenton - Unit 3 Material Lift |
| $ 150.00 |
| $ 157.50 |
| 156 |
| 2300 Stuyvesant Avenue Trenton - Unit 4 Material Lift |
| $ 150.00 |
| $ 157.50 |
| 157 |
| 401 East State Street Trenton - Unit 1 Traction |
| $ 475.00 |
| $ 498.75 |
| 158 |
| 401 East State Street Trenton - Unit 2 Traction |
| $ 475.00 |
| $ 498.75 |
| 159 |
| 401 East State Street Trenton - Unit 3 Traction |
| $ 475.00 |
| $ 498.75 |
| 160 |
| 401 East State Street Trenton - Unit 4 Traction |
| $ 475.00 |
| $ 498.75 |
| 161 |
| 401 East State Street Trenton - Unit 5 Traction |
| $ 475.00 |
| $ 498.75 |
| 162 |
| 401 East State Street Trenton - Unit 6 Traction |
| $ 475.00 |
| $ 498.75 |
| 163 |
| 401 East State Street Trenton - Unit 7 Traction |
| $ 475.00 |
| $ 498.75 |
| 164 |
| 452 Ward Avenue Trenton |
| $ 330.00 |
| $ 346.50 |
| 165 |
| 50 Barrack Street Trenton - Unit 1 Traction |
| $ 500.00 |
| $ 525.00 |
| 166 |
| 50 Barrack Street Trenton - Unit 2 Traction |
| $ 500.00 |
| $ 525.00 |
| 167 |
| 50 Barrack Street Trenton - Unit 3 Traction |
| $ 500.00 |
| $ 525.00 |
| 168 |
| 50 Barrack Street Trenton - Unit 4 Traction |
| $ 500.00 |
| $ 525.00 |
| 169 |
| 50 Barrack Street Trenton - Unit 5 Traction |
| $ 500.00 |
| $ 525.00 |
| 170 |
| 77 Carroll Street Trenton - Wheelchair Lift 1 |
| $ 100.00 |
| $ 105.00 |
| 171 |
| 77 Carroll Street Trenton - Wheelchair Lift 2 |
| $ 100.00 |
| $ 105.00 |
| 172 |
| 55 North Willow Street Trenton - Unit 1 Traction MRL |
| $ 475.00 |
| $ 498.75 |
| 173 |
| 55 North Willow Street Trenton - Unit 2 Traction MRL |
| $ 475.00 |
| $ 498.75 |
| 174 |
| 55 North Willow Street Trenton - Unit 3 Traction MRL |
| $ 475.00 |
| $ 498.75 |
| 175 |
| 55 North Willow Street Trenton - Unit 4 |
| $ 475.00 |
| $ 498.75 |
| 176 |
| 500 Warrenville Road Warren - Hydro |
| $ 200.00 |
| $ 210.00 |
| 177 |
| 1034 River Road West Trenton - Building 18 Hydro |
| $ 225.00 |
| $ 236.25 |
| 178 |
| 1034 River Road West Trenton - Builing 15 Unit 1 Hydro |
| $ 185.00 |
| $ 194.25 |
| 179 |
| 1034 River Road West Trenton - Builing 15 Unit 2 Hydro |
| $ 185.00 |
| $ 194.25 |
| 180 |
| 1034 River Road West Trenton - Builing 15 Unit 3 Hydro |
| $ 185.00 |
| $ 194.25 |
| 181 |
| 98 Highbridge Road Yardville |
| $ 330.00 |
| $ 346.50 |
| 182 |
| 65 Halstead Street Clinton - Hydro |
| $ 225.00 |
| $ 236.25 |
| 183 |
| 1225 NJ-31 Lebanon - Hydro |
| $ 150.00 |
| $ 157.50 |
| 184 |
| 1370 Route 31 Lebanon - Hydro |
| $ 250.00 |
| $ 262.50 |
| 185 |
| 118 Lamington Road North Branch - Bateman Center Hydro |
| $ 200.00 |
| $ 210.00 |
| 186 |
| 118 Lamington Road North Branch - College Center Material Lift |
| $ 80.00 |
| $ 84.00 |
| 187 |
| 118 Lamington Road North Branch - College Center Wheelchair |
| $ 60.00 |
| $ 63.00 |
| 188 |
| 118 Lamington Road North Branch - College Center Hydro |
| $ 200.00 |
| $ 210.00 |
| 189 |
| 118 Lamington Road North Branch - Hunterdon Hall Hydro |
| $ 200.00 |
| $ 210.00 |
| 190 |
| 118 Lamington Road North Branch - Library Hydro |
| $ 200.00 |
| $ 210.00 |
| 191 |
| 118 Lamington Road North Branch - New Science Building Roped Hydro |
| $ 225.00 |
| $ 236.25 |
| 192 |
| 118 Lamington Road North Branch - Old Science Building Hydro |
| $ 200.00 |
| $ 210.00 |
| 193 |
| 118 Lamington Road North Branch - Somerset Hall Hydro |
| $ 200.00 |
| $ 210.00 |
| 194 |
| 118 Lamington Road North Branch - West Building Hydro |
| $ 200.00 |
| $ 210.00 |
| 195 |
| 118 Lamington Road North Branch - Work Force Hydro |
| $ 200.00 |
| $ 210.00 |
All other terms and conditions remain the same.
Please file a copy of this Amendment with your Notice of Award for future reference.
image1.png