T2946 Assignment Change Order 6~7.docx

DOCX document 73 KB Posted

Attached to
Contract RFP/NJCOOP/SC-SBE NJ|26-GNSV1-134353
Contract number
26-GNSV1-134353
Issued by
New Jersey

About this file

This is a Contract Assignment Change Order issued by the State of New Jersey Department of the Treasury, Division of Purchase and Property, dated June 9, 2026. The document notifies all using agencies of a contract assignment under Solicitation #19DPP00440 for T2946 - Elevator Maintenance, Repair, Testing, and Inspection Services. The original contract (Contract #23-GNSV2-49037) was awarded to 3Phase Excel Elevator LLC dba TEC, located at 510 S. Shore Rd, Suite C, Marmora, NJ 08223, and has been reassigned to Specialized Elevator Corp, located at 60 Shawmut Rd, Suite 1, Canton, MA 08021. The new contract number is 26-GNSV1-134353.

The contract period commenced on March 1, 2020, and extends through February 28, 2027, encompassing the original term through four renewal extensions. All contract pricing, terms, and conditions remain unchanged under the assignment. The reassignment does not alter the scope, cost, or operational requirements of the elevator maintenance, repair, testing, and inspection services. All references to the previous contract number have been updated to reflect the new contract designation.

View the file

Other files

File Type Posted
T2946 Bid Amendment 1.docx DOCX document
Revised Method of Operations 6.9.26~3.docx DOCX document
TEC Price Sheet~1.xlsx XLSX spreadsheet
23-GNSV2-49037 3Phase Excel Elevator LLC_New Amend.pdf PDF
T2946 Bid Amendment 2~2.docx DOCX document
T2946 Specialized OA Page Dated.pdf PDF
T2946 Change Order Updated~5.docx DOCX document
T2946 RFP 10419~1.docx DOCX document
T2946 Change Order 2~3.docx DOCX document
Signed Tec OA_Redacted.pdf PDF
T2946 Change Order 4~9.docx DOCX document
T2946 Change Order~1.docx DOCX document
T2946 Transition Amendment - TEC Countersigned.pdf PDF
T2946 Attachment 2 Procedure for Background Checks.pdf PDF
State Location List - 10 04 19.xlsx XLSX spreadsheet
Updated MOO 6.21.23.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MIKIE SHERRILL

Governor State of New Jersey

DEPARTMENT OF THE TREASURY

DIVISION OF PURCHASE AND PROPERTY

PROCUREMENT BUREAU

33 WEST STATE STREET

P. O. BOX 230

TRENTON, NEW JERSEY 08625-0230

AARON BINDER

State Treasurer

DR. DALE G. CALDWELL

Lt. Governor

AMY F. DAVIS, ESQ.

Acting Director https://www.njstart.gov

Change Order # 6 T2946 – Elevator Maintenance, Repair, Testing, and Inspection Services

SOLICITATION #19DPP00440

Contract #: 23-GNSV2-49037

To: All Using Agencies

DATE: June 9, 2026

FROM: Tanner Gaccione State Procurement Specialist 1, Procurement Bureau

SUBJECT: Contract Assignment from 3Phase Excel Elevator LLC dba TEC, Assignor to Specialized Elevator Corp, Assignee

CONTRACT PERIOD:Original Term: March 1, 2020 to February 28, 2023
1st Extension: March 1, 2023 to February 29, 2024
2nd Extension: March 1, 2024 to February 28, 2025
3rd Extension: March 1, 2025 to February 28, 2026
4th Extension: March 1, 2026 to February 28, 2027

Please be advised that the Contract #23-GNSV2-49037 under T2946 – Elevator Maintenance, Repair, Testing, and Inspection Services, previously awarded to:

3Phase Excel Elevator LLC dba TEC, Assignor 510 S. Shore Rd, Suite C Marmora NJ 08223 has been assigned to:

Specialized Elevator Corp, Assignee 60 Shawmut Rd. Suite 1 Canton MA 08021

The new Contract # is: 26-GNSV1-134353

As such, all references to Contract #: 23-GNSV2-49037 have been changed to reflect the new Contract

All Contract pricing, terms and conditions remain the same.

Please retain a copy of this Change Order with the Notice of Award.

image1.png

File details come from the government source that posted it. Updated .