SWHARC15R0005-A001.pdf

PDF 257 KB Posted

Attached to
Professional, Administrative, and Facilities Support Services
Solicitation number
SWHARC15R0005
Issued by

About this file

SWHARC15R0005-A001

View the file

Other files

File Type Posted
SWHARC15R0005-A002.pdf PDF
Attachment_1_Rev_01_-_Labor_Category_Descriptions.pdf PDF
Attachment_10_Rev_01_-_Pricing_Tables.xlsx XLSX spreadsheet
SWHARC15R0005_-_Summary_of_Changes_A001_-_12_Jan_2016.pdf PDF
Attachment_8_Rev_01_-_Labor_Categories_FSN_Equivalents.pdf PDF
SWHARC15R0005_-_Q As_-_12_Jan_2016.pdf PDF
SWHARC15R0005_-_Questions_Template.docx DOCX document
SWHARC15R0005.pdf PDF
Attachment_1_-_Labor_Category_Descriptions.pdf PDF
Attachment_8_-_Labor_Categories_FSN_Equivalents.pdf PDF
Attachment_9_-_Embassy_Bogota_FSN_Pay_Scales.pdf PDF
Attachment_6_-_Sample_Subcontracting_Report.pdf PDF
Attachment_3A_-_Program_Manager_Required_Qualifications.pdf PDF
Attachment_5B_-_Sample_Client_Authorization_Letter.docx DOCX document
Attachment_3_-_Program_Management_Office_Requirements.pdf PDF
Attachment_10_-_Pricing_Tables.xlsx XLSX spreadsheet
Attachment_5A_-_Sample_Subcontractor_Consent_Letter.docx DOCX document
Attachment_7_-_Key_Personnel_Resume_Format.pdf PDF
Attachment_5_-_Past_Performance_Questionnaire.docx DOCX document
Draft_SWHARC15R0005_-_Q As_-_27_Nov_2015.pdf PDF
Draft_Attachment_4A_-_Sample_Subcontractor_Consent_Letter.pdf PDF
Draft_Attachment_4B_-_Sample_Client_Authorization_Letter.pdf PDF
Draft_Attachment_4_-_Past_Performance_Questionnaire.pdf PDF
Draft_Attachment_5_-_Sample_Subcontracting_Report.xlsx XLSX spreadsheet
Draft_SWHARC15R0005_-_Questions_ _Recommendations_Template.docx DOCX document
Draft_Attachment_1_-_Labor_Category_Descriptions.pdf PDF
Draft_SWHARC15R0005.pdf PDF
Draft_Attachment_6_-_Key_Personnel_Resume_Format.pdf PDF
Draft_Attachment_2_-_Pricing_Table.xlsx XLSX spreadsheet
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE RATING

2. AMENDMENT/MODIFICATION NO.

A001

3. EFFECTIVE DATE

01/12/2016

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

RPSOMCODE

REGIONAL PROCUREMENT SUPPORT

4000 NORTH ANDREWS AVE

ATTN: FLORIDA REGIONAL CENTER

FORT LAUDERDALE, FL 33309

Juan M. Fernandez

NAME

305-718-4291

TEL.

fernandezjm@state.gov

EMAIL

6. ISSUED BY RPSOMCODE

REGIONAL PROCUREMENT SUPPORT

4000 NORTH ANDREWS AVE

ATTN: FLORIDA REGIONAL CENTER

FORT LAUDERDALE, FL 33309

7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NO.

SWHARC15R0005

CONTACT DUNS

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

12/10/2015

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning __1__copies of the amendment;(b)By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.__1__X

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Refer to attached summary of changes.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Benita D. Williams

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

01/12/2016

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SWHARC15R0005

Table of Contents

Section Description Page Number

B Supplies or Services and Prices/Costs

B.1. GENERAL

B.2. TYPE OF CONTRACT

B.3. MINIMUM AND MAXIMUM CONTRACT AMOUNTS

B.4. FIXED FULLY-LOADED HOURLY LABOR RATES

B.5. FIRM-FIXED-PRICE PER MONTH FOR PROGRAM MANAGEMENT OFFICE (PMO)

B.6. RESERVED

B.7. RESERVED

B.8. TRAVEL COSTS

B.9. POST HARDSHIP DIFFERENTIAL PAY AND DANGER PAY

B.10. DEFENSE BASE ACT (DBA) INSURANCE

B.11. OVERTIME

B.12. RESERVED

B.13. ADVANCE UNDERSTANDING

B.14. ADJUSTMENT OF NEGOTIATED FIXED FULLY-LOADED HOURLY RATES FOR

LOCAL NATIONALS (EXCHANGE RATE FLUCTUATIONS)

C Descriptions/Specifications/Statement of Work

C.1. SCOPE OF SERVICES

C.2. GENERAL PERFORMANCE AREAS

C.3. QUALIFICATIONS OF CONTRACTOR PERSONNEL

C.4. OTHER PERSONNEL REQUIREMENTS

C.5. NOTICE TO GOVERNMENT OF LABOR DISPUTES

C.6. INCORPORATION OF CONTRACTOR'S TECHNICAL PROPOSAL

C.7. SYSTEMS OF RECORDS ON INDIVIDUALS

D Packaging and Marking

D.1. PRESERVATION, PACKAGING, PACKING, AND MARKING

D.2. DATA MARKING

D.3. SOFTWARE AND MAGNETIC MEDIA MARKING

D.4. MARKING OF REPORTS

D.5. PACKING LIST(S)

D.6. WARRANTY NOTIFICATION

E Inspection and Acceptance 52.246-4 Inspection of Services - Fixed-Price (Aug 1996) 52.246-5 Inspection of Services Cost-Reimbursement (Apr 1984) 52.246-6 Inspection - Time-and-Material and Labor-Hour (May 2001)

E.1 - E.2 RESERVED

E.3. INSPECTION AND ACCEPTANCE

E.4. GOVERNMENT INSPECTION AND EVALUATION

E.5. CONTRACTOR QUALITY CONTROL

E.6. GOVERNMENT QUALITY ASSURANCE

F Deliveries or Performance 52.242-15 Stop-Work Order (Aug 1989) 52.242-17 Government Delay of Work (Apr 1984)

F.1 - F.2 RESERVED

F.3. IDIQ CONTRACT ORDERING PERIOD

F.4. TASK ORDER PERIOD OF PERFORMANCE

F.5. PLACE OF PERFORMANCE

F.6. TIME OF PERFORMANCE

F.7. DELIVERABLES

G Contract Administration Data

G.1. GENERAL

G.2. DESIGNATION OF ADMINISTRATIVE CONTRACTING OFFICE

G.3. ROLES AND RESPONSIBILITIES

G.4. ADVERTISING AND MARKETING

G.5. RESERVED

G.6. ORDERING PROCEDURES

G.7. TASK ORDER PROPOSAL REQUEST

G.8. SUBCONTRACTORS

G.9. PAYMENT

G.10. RPSO FLORIDA INVOICE INSTRUCTIONS

G.11. EXPANDED INVOICE INSTRUCTIONS

G.12. EVALUATION OF INVOICES AND PAYMENT

G.13. CURRENCY OF PAYMENTS

G.14. FINAL INVOICE

G.15. NONDISPLACEMENT OF QUALIFIED WORKERS

G.16. QUICK-CLOSEOUT PROCEDURES

652.242-70 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (AUG 1999)

H Special Contract Requirements

H.1. GOVERNING LAW

H.2. LAWS AND REGULATIONS

H.3. ENVIRONMENTAL WASTE REPORT

H.4. LICENSES, BONDS AND PERMITS

H.5. LANGUAGE PROFICIENCY

H.6. INSURANCE

H.7. PERSONNEL

H.8. CONTRACTOR TRAINING

H.9. GOVERNMENT-FURNISHED EQUIPMENT AND SPACE (ON-SITE)

H.10. GOVERNMENT-FURNISHED PROPERTY (GFP)

H.11. GOVERNMENT-FURNISHED DATA

H.12. SECURITY REQUIREMENTS

H.13. DEPARTMENT ACCESS FOR NON-U.S. CITIZENS

H.14. LOCAL HOST COUNTRY SUBCONTRACTOR(S) AND PERSONNEL

H.15. POTENTIAL FOREIGN SUBCONTRACTORS

H.16. CONTRACTOR BADGES AND KEY CONTROL

H.17. CONTRACTOR IDENTIFICATION

H.18. STANDARDS OF CONDUCT

H.19. REMOVAL FROM DUTY

H.20. ORGANIZATIONAL CONFLICT OF INTEREST (GENERAL)

H.21. ORGANIZATIONAL CONFLICT OF INTEREST SPECIAL CLAUSE

H.22. SAFEGUARDING INFORMATION

H.23. DOCUMENT CONTROL

H.24. OPERATION OF GOVERNMENT VEHICLES

H.25. INSURANCE FOR OVERSEAS TRAVEL

H.26. RECRUITMENT OF THIRD COUNTRY NATIONALS (TCNS) FOR PERFORMANCE ON

DEPARTMENT OF STATE CONTRACTS (DECEMBER 4, 2014)

H.27. TECHNICAL DIRECTION

H.28. CONTRACTOR COMMITMENTS, WARRANTIES, AND REPRESENTATIONS

H.29. FOREIGN INCOME TAXES

H.30. UTILIZATION OF GOVERNMENT SOURCES OF SUPPLY

H.31. EXPORT RESTRICTIONS

H.32. INL SOURCE-NATIONALITY RESTRICTIONS

H.33. INCORPORATION OF ADDITIONAL CLAUSES AT THE TASK ORDER LEVEL

H.34. NOTICES

I Contract Clauses 52.202-1 Definitions (Nov 2013) 52.203-3 Gratuities (Apr 1984) 52.203-5 Covenant Against Contingent Fees (May 2014) 52.203-6 Restrictions On Subcontractor Sales To The Government (Sept 2006) 52.203-7 Anti-Kickback Procedures (May 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014) 52.203-12 Limitation On Payments To Influence Certain Federal Transactions (Oct 2010) 52.203-13 Contractor Code of Business Ethics and Conduct (Oct 2015) 52.203-14 Display of Hotline Poster(s) (Oct 2015) 52.203-16 Preventing Personal Conflicts of Interest (Dec 2011) 52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights (Apr 2014) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011) 52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011)

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2015) 52.204-13 System for Award Management Maintenance (JUL 2013) 52.204-15 Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Jan 2014) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Oct 2015) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) 52.210-1 Market Research (Apr 2011) 52.215-2 Audit and Records - Negotiation (Oct 2010) 52.215-8 Order of Precedence - Uniform Contract Format (Oct 1997) 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data - Modifications (Aug 2011) .67 52.215-13 Subcontractor Certified Cost or Pricing Data - Modifications (Oct 2010) 52.215-15 Pension Adjustments and Asset Reversions (Oct 2010) 52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits (PRB) Other than Pensions (July 2005) 52.215-19 Notification of Ownership Changes (Oct 1997) 52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data - Modifications (Oct 2010) 52.216-7 Allowable Cost and Payment (Jun 2013) 52.219-8 Utilization of Small Business Concerns (Oct 2014) 52.219-14 Limitations on Subcontracting (Nov 2011) 52.219-28 Post-Award Small Business Program Rerepresentation (Jul 2013) 52.222-1 Notice to the Government of Labor Disputes (Feb 1997) 52.222-2 Payment for Overtime Premiums (July 1990) 52.222-17 Nondisplacement of Qualified Workers (May 2014) 52.222-19 Child Labor - Cooperation with Authorities and Remedies (Jan 2014) 52.222-21 Prohibition of Segregated Facilities (Apr 2015) 52.222-26 Equal Opportunity (Apr 2015) 52.222-29 Notification of Visa Denial (Apr 2015) 52.222-37 Employment Reports on Veterans (Oct 2015) 52.222-50 Combating Trafficking in Persons (Mar 2015) 52.222-54 Employment Eligibility Verification (Oct 2015) 52.223-3 Hazardous Material Identification and Material Safety Data (Jan 1997) 52.223-5 Pollution Prevention and Right-to-Know Information (May 2011) 52.223-6 Drug Free Workplace (May 2001) 52.223-10 Waste Reduction Program (June 2011) 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (May 2008) 52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving (Aug 2011) 52.224-1 Privacy Act Notification (Apr 1984) 52.224-2 Privacy Act (Apr 1984) 52.225-13 Restrictions on Certain Foreign Purchases (June 2008) 52.225-19 Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular Mission Outside the United States (Mar 2008) 52.227-3 Patent Indemnity (Apr 1984) 52.227-14 Rights in Data - General (May 2014) 52.227-19 Commercial Computer Software License (Dec 2007) 52.228-3 Workers' Compensation Insurance (Defense Base Act) (July 2014) 52.228-4 Workers' Compensation and War-Hazard Insurance Overseas (Apr 1984) 52.228-5 Insurance - Work on a Government Installation (Jan 1997) 52.229-3 Federal, State and Local Taxes (Feb 2013) 52.229-6 Taxes - Foreign Fixed-Price Contracts (Feb 2013) 52.229-8 Taxes - Foreign Cost-Reimbursement Contracts (Mar 1990) 52.232-1 Payments (Apr 1984) 52.232-7 Payments under Time-and-Materials and Labor Hour Contracts (Aug 2012) 52.232-8 Discounts For Prompt Payment (Feb 2002) 52.232-9 Limitation on Withholding of Payments (Apr 1984) 52.232-11 Extras (Apr 1984) 52.232-17 Interest (May 2014) 52.232-18 Availability Of Funds (Apr 1984) 52.232-24 Prohibition of Assignment of Claims (May 2014) 52.232-25 Prompt Payment (Jul 2013)

52.232-25 Alt I Prompt Payment (Jul 2013) - Alternate I (Feb 2002) 52.232-33 Payment by Electronic Funds Transfer - System for Award Management (Jul 2013) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013) 52.233-1 Disputes (May 2014) 52.233-1 Alt I Disputes (May 2014) - Alternate I (Dec 1991) 52.233-3 Protest after Award (Aug 1996) 52.233-3 Alt I Protest after Award (Aug 1996) - Alternate I (Jun 1985) 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) 52.237-2 Protection Of Government Buildings, Equipment, And Vegetation (Apr 1984) 52.237-3 Continuity Of Services (Jan 1991) 52.239-1 Privacy or Security Safeguards (Aug 1996) 52.242-1 Notice of Intent to Disallow Costs (Apr 1984) 52.242-3 Penalties for Unallowable Costs (May 2014) 52.242-4 Certification of Final Indirect Costs (Jan 1997) 52.242-13 Bankruptcy (July 1995) 52.243-1 Changes - Fixed-Price (Aug 1987) 52.243-1 Alt II Changes - Fixed-Price (Aug 1987) - Alternate II (Apr 1984) 52.243-1 Alt III Changes - Fixed-Price (Aug 1987) - Alternate III (Apr 1984) 52.243-1 Alt IV Changes - Fixed-Price (Aug 1987) - Alternate IV (Apr 1984) 52.243-2 Changes - Cost-Reimbursement (Aug 1987) 52.243-2 Alt II Changes - Cost-Reimbursement (Aug 1987) - Alternate II (Apr 1984) 52.243-2 Alt III Changes - Cost-Reimbursement (Aug 1987) - Alternate III (Apr 1984) 52.243-2 Alt IV Changes--Cost-Reimbursement - Alternate IV 52.243-3 Changes - Time-and-Material or Labor-Hours (Sept 2000) 52.244-2 Subcontracts (Oct 2010) 52.244-2 Alt I Subcontracts (Oct 2010) - Alternate I (June 2007) 52.244-5 Competition In Subcontracting (Dec 1996) 52.244-6 Subcontracts for Commercial Items (Oct 2015) 52.245-1 Government Property (Apr 2012) 52.245-9 Use and Charges (Apr 2012) 52.246-23 Limitation of Liability (Feb 1997) 52.246-25 Limitation of Liability - Services (Feb 1997) 52.247-63 Preference for U.S.-Flag Air Carriers (June 2003) 52.247-64 Preference for Privately Owned U.S. - Flag Commercial Vessels 52.248-1 Value Engineering (Oct 2010) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (Apr 2012) 52.249-6 Termination (Cost Reimbursement) (May 2004) 52.249-6 Alt IV Termination (Cost-Reimbursement) (May 2004) - Alternate IV (Sept 1996) 52.249-8 Default (Fixed-Price Supply and Service) (Apr 1984) 52.249-14 Excusable Delays (Apr 1984) 52.251-1 Government Supply Sources (Apr 2012) 52.253-1 Computer Generated Forms (Jan 1991)

652.216-70 ORDERING INDEFINITE-DELIVERY CONTRACTS (APR 2004)

652.225-71 SECTION 8(a) OF THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED

(AUG 1999)

652.228-71 WORKER'S COMPENSATION INSURANCE (DEFENSE BASE ACT) - SERVICES

(FEB 2015)

652.229-71 PERSONAL PROPERTY DISPOSITION AT POSTS ABROAD (AUG 1999)

652.242-73 AUTHORIZATION AND PERFORMANCE (AUG 1999)

52.252-2 Clauses Incorporated by Reference (Feb 1998) 52.216-18 Ordering (Oct 1995) 52.216-19 Order Limitations (Oct 1995) 52.216-22 Indefinite Quantity (Oct 1995) 52.217-8 Option to Extend Services (Nov 1999) 52.217-9 Option to Extend the Term of the Contract (Mar 2000) 52.219-18 Notification of Competition Limited to Eligible 8 (A) Concerns (June 2003) 52.223-7 Notice of Radioactive Materials (Jan 1997) 52.222-35 Equal Opportunity for Veterans (Oct 2015) 52.222-36 Equal Opportunity for Workers with Disabilities (Jul 2014) 52.243-7 Notification of Changes (Apr 1984) 52.246-20 Warranty of Services (May 2001)

52.252-6 Authorized Deviations in Clauses (Apr 1984)

652.204-70 DEPARTMENT OF STATE PERSONAL IDENTIFICATION CARD POLICY AND

PROCEDURES (FEB 2015)

652.216-71 PRICE ADJUSTMENT (AUG 1999)

652.219-71 SECTION8(a) DIRECT AWARDS (AUG 1999)

652.237-72 OBSERVANCE OF LEGAL HOLIDAYS AND ADMINISTRATIVE LEAVE (FEB

2015)

652.245-71 SPECIAL REPORTS OF GOVERNMENT PROPERTY (FEB 2015)

I.1 DEFINITIONS - EMBASSY, DEPARTMENT, GOVERNMENT

J List of Attachments

J.1 LIST OF ATTACHMENTS

K Representations, Certifications, and Other Statements of Offerors or Respondents 52.222-56 Certification Regarding Trafficking in Persons Compliance Plan (Mar 2015) 52.204-8 Annual Representations and Certifications (Dec 2014) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.209-7 Information Regarding Responsibility Matters (Jul 2013) 52.237-8 Restriction on Severance Payments to Foreign Nationals (Aug 2003) 652.209-79 Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony Criminal Conviction under any Federal Law. (DEVIATION)(Sept 2014)

652.225-70 ARAB LEAGUE BOYCOTT OF ISRAEL (AUG 1999)

652.228-70 DEFENSE BASE ACT - COVERED CONTRACTOR EMPLOYEES (FEB 2015)

K.1 - K.6 RESERVED

K.7. ORGANIZATIONAL CONFLICT OF INTEREST CERTIFICATION AND DISCLOSURE

K.8. AUTHORIZED NEGOTIATORS

K.9. CERTIFICATION

L Instructions, Conditions, and Notices to Offerors and Respondents 52.204-7 System for Award Management (Jul 2013) 52.204-16 Commercial and Government Entity Code Maintenance (Jul 2015) 52.204-18 Commercial and Government Entity Code Maintenance (Jul 2015) 52.215-1 Instructions to Offerors - Competitive Acquisition (Jan 2004) 52.215-16 Facilities Capital Cost of Money (June 2003) 52.222-24 Preaward On-Site Equal Opportunity Compliance Evaluation (Feb 1999) 52.222-46 Evaluation of Compensation for Professional Employees (Feb 1993) 52.232-13 Notice Of Progress Payments (Apr 1984) 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) 52.216-1 Type of Contract (Apr 1984) 52.215-20 Alt IV Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data (Oct 2010) - Alternate IV (Oct 2010) 52.233-2 Service of Protest (Sept 2006) 52.252-5 Authorized Deviations in Provisions (Apr 1984)

652.206-70 ADVOCATE FOR COMPETITION/OMBUDSMAN (FEB 2015)

652.245-70 Status of Property Management System

L.1. GENERAL

L.2 - L.9 RESERVED

L.10. MULTIPLE PROPOSALS/ALTERNATIVE SOLUTIONS

L.11. OFFERS IN U.S. CURRENCY AND ENGLISH LANGUAGE

L.12. COMMUNICATION CONCERNING SOLICITATION

L.13. QUESTIONS REGARDING SOLICITATION

L.14. PROPOSAL SUBMITTAL

L.15. ELECTRONIC REFERENCE DOCUMENTS

L.16. DISCREPANCIES

L.17. PROPOSAL PREPARATION INSTRUCTIONS

L.17.1. GENERAL INSTRUCTIONS

L.17.2. SPECIFIC INSTRUCTIONS

L.17.2.1. VOLUME I - CONTRACT DOCUMENTATION

L.17.2.2. VOLUME II - BUSINESS

L.17.2.3. VOLUME III - PRICE

L.17.2.4. VOLUME IV - PAST PERFORMANCE

L.17.2.5. VOLUME V - TECHNICAL

L.18. NOTICE OF CHANGES

M Evaluation Factors for Award

M.1 - M.2 RESERVED

M.3. BASIS FOR CONTRACT AWARD

M.4. NUMBER OF CONTRACTS TO BE AWARDED

M.5. COMPLIANCE WITH SOLICITATION REQUIREMENTS, TERMS AND CONDITIONS..110

M.6. USE OF SUPPORTING INFORMATION

M.7. PRE-AWARD SURVEY

M.8. SOLICITATION AMENDMENTS

M.9. RESERVED

M.10. DISCUSSIONS

M.11. DEBRIEFINGS

M.12. DETERMINATION OF RESPONSIBILITY

M.13. EVALUATION FACTORS AND SUBFACTORS

M.14. FACTOR 1: TECHNICAL

M.15. FACTOR 2: PAST PERFORMANCE

M.16. FACTOR 3: PRICE

001 1.00 0.00

1.00 LT

INL Bogota Professional, Administrative, and Support Services IDIQ Contract

Refer to attached Sections B through J for a list of pricing, ordering period, and all other applicable terms and conditions.

IDIQ Minimum: $100,000.00 IDIQ Maximum: $80,000,000.00

Base Ordering Period: TBD Option Year 1: TBD Option Year 2: TBD Option Year 3: TBD Option Year 4: TBD

Doc Ref No:

Delivery

Date

FOB:

B.1. GENERAL

The mission of the United States Department of State’s Bureau for International Narcotics and Law Enforcement Affairs (INL) is to minimize the impact of international crime and illegal drugs on the United States, its citizens, and partner nations by providing effect-ive foreign assistance and fostering global cooperation. The U.S. Embassy INL Section Bogota (in Colombia) is responsible for the administration of projects and funds provided by INL.

The Contractor shall provide professional, administrative, and support services to meet the performance objectives and business re-quirements of the U.S. Embassy INL Section Bogota.

This is a non-personal services contract, as defined by Federal Acquisition Regulation (FAR) 37.101. Inherently Governmental Ser-vices, as identified in FAR 7.503 or by the ordering agency, are prohibited under this contract. The Government will neither supervise contractor employees nor control the method by which the contractor performs the required tasks. The contractor shall manage its em-ployees and guard against any actions that are of the nature of personal services or give the perception of personal services. The con-tractor shall notify the Contracting Officer (CO) immediately if they perceive any actions constitute personal services. This contract shall not be used to perform any Inherently Governmental Functions (IGF).

B.2. TYPE OF CONTRACT

(a) This is a single-award indefinite-delivery, indefinite-quantity (IDIQ) contract, as defined in Federal Acquisition Regulation (FAR) 16.504 (Indefinite-Quantity Contracts).

(b) This contract is for non-commercial items.

(c) The Government anticipates to award labor-hour, time-and-materials, and firm-fixed-price task orders. However, the Govern-ment reserves the right to award task orders utilizing any of the contract types, or a combination thereof, identified in FAR Part 16 (Types of Contracts).

(d) If a task order will be performance-based, as described in FAR subpart 37.6 (Performance-based Acquisition), its requirements will be conveyed and administered at the task order level.

B.3. MINIMUM AND MAXIMUM CONTRACT AMOUNTS

SWHARC15R0005

Line Item Summary

Solicitation Number:

SWHARC15R0005

Contract Number: Title: INL Bogota Professional, Administrative & Support

Date of Solicitation:

01/12/2016

Line Item No. Description Quantity Unit Unit Price Total Cost

(a) Per FAR 52.216-22 "INDEFINITE QUANTITY," the minimum for this indefinite quantity contract shall be any quantity or combination of supplies and services equal to $100,000. This guaranteed minimum covers the base year and all option years of the contract.

(b) The maximum for this indefinite quantity contract (including options) shall be any quantity or combination of supplies and ser-vices equal to $80,000,000.

B.4. FIXED FULLY-LOADED HOURLY LABOR RATES

(a) This section applies to labor-hour arrangements (i.e., task orders or line items in a task order), the time portion of time-and-materials arrangements, and the fixed price under fixed-price arrangements.

(b) Attachment 2 under Section J contains the negotiated fixed fully-loaded hourly labor rates.

(c) The labor category description for each labor category identified in Attachment 2 in Section J is located in Attachment 1 in Sec-tion J.

(d) The negotiated fixed fully-loaded hourly labor rates are in United States currency.

(e) The negotiated fixed fully-loaded hourly labor rates are based on performance by Local National employees only.

(f) Each negotiated fixed fully-loaded hourly labor rate consists of an unloaded hourly labor rate, any labor-related direct costs (e.g., any direct fringe benefits, any direct bonuses), applicable indirect costs, and profit amount. It also consists of at least the minimum labor rate and minimum costs required by applicable labor laws. It does not consist of any other costs, including DBA Insurance.

Any other costs that are part of the Contractor’s established compensation plan and consistent with FAR subpart 31.2 shall be alloc-ated separately as an ODC (other direct cost) (under fixed-price and cost-reimbursement arrangements) or as a Material (under time-and-materials arrangements) at the task order level. Examples of such costs, if applicable, that shall be allocated separately as an ODC or Material, are post hardship differential pay and danger pay.

(g) Any costs included in the negotiated fixed fully-loaded hourly labor rates shall not be charged elsewhere under this contract.

(h) At the task order level, the Government will specify the CLINs for task order performance. The Contractor shall comply unless it has requested and received from the Contracting Officer in advance of task order performance written approval of an alternative (e.g., use of a third-country national).

(i) The following describes the normal workweek for the Contractor and subcontractor employees:

1. A normal workweek falls within a consecutive seven-day period.

2. The negotiated fixed fully-loaded hourly labor rates apply to a normal workweek of 40 or 48 hours, respectively.

3. A normal workweek of 40 hours is based on routine performance of eight hours per day multiplied by five days per week.

4. A normal workweek of 48 hours is based on routine performance of eight hours per day multiplied by six days per week.

5. A normal workweek of 40 hours applies to performance in the continental United States (CONUS) or in Bogota, Colombia. “CONUS” means the 48 contiguous states, Alaska, Hawaii, and the District of Columbia.

6. A normal workweek of 48 hours generally applies to performance in Colombia, excluding Bogota.

7. If the normal workweek for an individual task order differs from a 40-hour or 48-hour normal workweek, the Govern-ment will solicit and negotiate labor rates based on the normal workweek for the individual task order. Such negoti-ated rates will apply only to that task order, unless additionally negotiated into the contract.

(j) Each negotiated fixed fully-loaded hourly labor rate applies to all categories of employees, including permanent, temporary, full-time, and part-time.

(k) Any required additional labor categories (i.e. those not identified in attachment 2) will be specified and their associated labor rates will be proposed and negotiated at the task order level. Additional labor categories and associated labor rates proposed and negotiated for an individual task order will apply only to that task order, unless additionally negotiated into the contract.

(l) For labor-hour arrangements and the time portion of time-and-materials arrangements, the Government will pay, for each labor category, the negotiated fixed fully-loaded hourly labor rate for only performed labor that meets the labor qualifications specified in the contract and individual task order.

(m)For labor-hour arrangements and the time portion of time-and-materials arrangements, labor hours for each labor category will be paid at the same negotiated fixed fully-loaded hourly labor rate regardless of whether the individual performing the labor works (either as an employee or consultant) for the prime contractor or a subcontractor.

(n) For labor-hour arrangements and the time portion of time-and-materials arrangements, the Government will pay the negotiated fixed fully-loaded hourly labor rates multiplied by the respective actual incurred hours that the Contracting Officer determines allow-able, pursuant to FAR 52.232-7 (Payments under Time-and-Materials and Labor-Hour Contracts).

(o) For labor-hour arrangements and the time portion of time-and-materials arrangements, the Government will pay the negotiated fixed fully-loaded hourly labor rate minus ___% (to be inserted at award) attributable to profit for those hours the Contractor incurs when replacing or correcting services or materials [reference FAR 52.246-6 (Inspection – Time-and-Material and Labor-Hour)].

(p) Reserved.

(q) For direct labor costs under arrangements when payment is made based on actual costs incurred (e.g., cost-reimbursement ar-rangements, materials portion of time-and-materials arrangements, and progress payments based on costs under fixed-price arrange-ments), the Government will pay the actual incurred unloaded hourly labor rates multiplied by the respective actual incurred hours, subject to the Contracting Officer’s allowability determination, pursuant to FAR 31.201-2 (Determining Allowability).

B.5. FIRM-FIXED-PRICE PER MONTH FOR PROGRAM MANAGEMENT OFFICE (PMO)

a) The following table displays the negotiated firm-fixed-price (FFP) per month for Program Management Office:

Table B.5 – Negotiated FFP

CLIN Description Price per Month Months Total 0001 Program Management

Office – Base Year To be inserted at con-tract award

12 To be inserted at con-tract award

1001 Program Management Office – Option Year 1

To be inserted at con-tract award

12 To be inserted at con-tract award

2001 Program Management Office – Option Year 2

To be inserted at con-tract award

12 To be inserted at con-tract award

3001 Program Management Office – Option Year 3

To be inserted at con-tract award

12 To be inserted at con-tract award

4001 Program Management Office – Option Year 4

To be inserted at con-tract award

12 To be inserted at con-tract award

5001 Program Management Office – 6 Month Exten-sion in accordance with

FAR 52.217-8

To be inserted at con-tract award

6 To be inserted at con-tract award

b) Each negotiated FFP is in United States currency. The negotiated FFP will not be subject to adjustment after award.

c) Each negotiated FFP consists of all costs (direct, indirect, labor, non-labor, minimum costs required by local laws) and profit.

Performance shall be in accordance with Attachment 3 under Section J.

d) Any costs included in the negotiated FFP shall not be charged elsewhere under this contract.

e) At the task order level, the Contractor shall propose and be paid only the FFP identified in Table B.5.

B.6. RESERVED

B.7. RESERVED

B.8. TRAVEL COSTS

(a) Travel under this contract is defined as Contractor air and ground transportation, lodging, meals and incid-ental expenses, and passport/visa costs.

(b) Except as otherwise provided herein, the Contractor shall be paid its allowable travel costs in accordance with FAR 31.205-46 (Travel Costs).

(c) Travel costs are authorized for travel beyond a 50-miles’ radius of the Contractor employee’s local place of performance (official duty station) whenever work is required to be accomplished at a remote work site.

(d) Local travel shall be processed as follows:

1. If the Government requires a Contractor employee to work an entire normal work day at a site other than the employee’s local place of performance (official duty sta-tion) and the radius between the two locations is within 50 miles, travel costs are gen-erally allowable, but only for any difference in costs between the employee’s normal daily commuting expense and commuting expense resulting from the most economical means of transportation available to the employee, after considering: any physical or medical needs of the employee; and mission requirements. An example is an employ-ee having to attend an all-day local conference.

Payment for time associated with such travel is unallowable.

2. If the Government requires a Contractor employee to work part of a normal work day at a site other than the Contractor employee’s local place of performance (official duty station) and the radius between the two locations is within 50 miles, all travel costs are generally allowable, but only for those costs resulting from the most econom-ical means of transportation available to the employee, after considering: any physical or medical needs of the employee; and mission requirements.

For this section, “part of a normal work day” is one in which the employee arrives at the start of his normal work day to his local place of performance (official duty station) and departs at the end of his normal work day from his local place of performance (official duty station). An example is an employee having to attend a meeting at a De-partment of State site in the middle of the work day.

Payment for time associated with such travel is generally allowable as long as such time is counted as part of the employee’s normal work day.

3. If the Government requires a Contractor employee to work part of a normal work day at a site other than the employee’s local place of performance (official duty sta-tion) and the radius between the two locations is within 50 miles, travel costs are gen-erally allowable, but only for any difference in costs between the employee’s normal daily commuting expense and commuting expense resulting from the most economical means of transportation available to the employee, after considering: any physical or medical needs of the employee; and mission requirements.

For this section, “part of a normal work day” is only one of the following:

a. one in which the employee arrives at the start of his normal work day to his local place of performance (official duty station); or

b. one in which the employee departs at the end of his normal work day from his local place of performance (official duty station).

An example is an employee having to attend an all-morning local meeting and return-ing afterwards to his local place of performance (official duty station).

Payment for time associated with going from the employee’s local place of perform-ance (official duty station) to a site other than the employee’s local place of perform-ance (official duty station) is generally allowable as long as such time is counted as part of the employee’s normal work day.

Similarly, payment for time associated with returning from a site other than the em-ployee’s local place of performance (official duty station) to the employee’s local place of performance (official duty station) is generally allowable as long as such time is counted as part of the employee’s normal work day.

(e) No travel costs (or associated labor time during travel) shall be allowable for regular commuting or telecom-muting beyond (or within) a 50-miles’ radius of the Contractor’s local place of performance (official duty sta-tion).

(f) Costs when using a privately owned vehicle (POV) for official travel are allowable provided that such costs do not exceed costs that would have resulted from use of other reasonable transportation methods (e.g., taxi, air-plane, train). Reasonable associated costs, such as tolls and parking fees, are also generally allowable.

(g) When traveling in a POV for official travel, the Contractor shall be paid mileage costs at a rate that does not exceed the POV mileage rate established by the Internal Revenue Service.

(h) Costs for car rentals for official travel are allowable pursuant to the following:

1. such rentals are consistent with good business practice;

2. such costs do not exceed costs that would have resulted from use of other reasonable transportation methods (e.g., taxi, airplane, train); and

3. such costs do not exceed the actual cost of renting a compact automobile (maximum of one automobile for four Contractor personnel), unless extenuating circumstances (e.g., excess baggage) require other arrangements and Contracting Officer approval is obtained.

Reasonable associated costs, such as tolls and parking fees, are also generally allowable.

(i) The Government will pay the Contractor, under the applicable labor category CLIN(s), for each Contractor employee’s travel time to or from authorized work locations as long as the following are met:

1. Payment of travel time described herein is in accordance with the Contractor’s es-tablished travel policy.

2. Travel time begins no earlier than two (2) hours prior to the scheduled departure time and concludes upon arrival to the initial destination point (e.g., airport) at the place of performance.

3, The Government will not pay for a Contractor employee’s time spent in layovers that are for the convenience of the Contractor employee or Contractor.

4. The Government will not pay more than eight (8) hours per day per Contractor em-ployee for travel time.

5.The Government will not pay for a Contractor employee’s travel time that is outside the employee’s regular working hours.

6. The Government will not pay for a Contractor employee more than the number of hours in the employee’s normal workweek. “Number of hours” includes productive time hours, travel time hours, and paid time off hours (e.g., sick, vacation, holiday).

7. “Productive time hours” consist of hours that, other than travel time hours, directly benefit the contract.

8. Exceptions must be authorized in advance and in writing by the Contracting Officer.

(j) The following items concern passports and visas:

1. The Contractor shall be responsible for ensuring that all personnel who will be re-quired to travel outside the United States have a current and valid U.S. passport.

2. The Contractor shall be responsible for obtaining any visas required for travel to for-eign countries under this contract.

3. The Contractor’s costs for obtaining and maintaining passports and/or visas will be generally allowable, but the Contractor shall pro-rate equitably such costs if they will benefit cost objectives (e.g., contracts) other than this cost objective.

4. The Government will not reimburse the Contractor for travel expenses when travel is cancelled or modified as a result of the Contractor’s failure to obtain a visa, and where the Government has determined that such failure is due to the action or inaction of the Contractor.

5. The Government will not reimburse the Contractor for the use of private visa pro-curement services provided by a third party.

(k) Costs for travel that has been modified or cancelled are not allowable unless such modification or cancella-tion was caused by the Government or otherwise exceeded the control of the Contractor.

(l) Pursuant to FAR 47.402, 47.403, and the Fly America Act, the Contractor shall use a U.S.-flag air carrier service unless specific conditions exist. If such conditions exist under a fixed-price arrangement (i.e., task order or line item in a task order), the Contractor shall submit with its task order proposal a memorandum explaining why it does not intend to use a U.S.-flag air carrier service. Inclusion of such costs in the awarded fixed-price is contingent upon Government acceptance of such explanation.

If such conditions exist under arrangements when payment is made based on actual costs incurred (e.g., cost-reimbursement arrangements, materials portion of time-and-materials arrangements, and progress payments based on costs under fixed-price arrangements), the Contractor shall submit with its voucher a memorandum ex-plaining why it did not use a U.S.-flag air carrier service. Reimbursement is contingent upon Government ac-ceptance of such explanation.

(m) All travel must be authorized in writing and in advance by the Contracting Officer's Representative or Gov-ernment Technical Monitor. Travel costs will not be reimbursed for any travel for which advance written ap-proval has not been obtained.

B.9. POST HARDSHIP DIFFERENTIAL PAY AND DANGER PAY

Post Hardship Differential Pay and Danger Pay, which are forms of incentive compensation, will be generally allowable. Each shall be allocated separately as an ODC (other direct cost) (under fixed-price and cost-reimbursement arrangements) or as a Material (under time-and-materials arrangements) at the task order level.

However, Government payment of such costs is contingent on the Contractor meeting all of the following re-quirements:

(a) Paying Post Hardship Differential Pay and Danger Pay is part of the Contractor’s established incentive compensation plan or policy, or employer/employee agreement entered into in good faith before the services are rendered, pursuant to FAR 31.205-6(f)(1)(i) (Bonuses and Incentive Compensation).

(b) When paying Post Hardship Differential Pay and Danger Pay is part of the Contractor’s established in-centive compensation plan or policy, such plan or policy is followed consistently as to imply, in effect, an agreement to make such payment, pursuant to FAR 31.205-6(f)(1)(i) (Bonuses and Incentive Compensation).

(c) The Contractor's basis for paying Post Hardship Differential Pay and Danger Pay is supported, pursu-ant to FAR 31.205-6(f)(1)(ii) (Bonuses and Incentive Compensation).

(d) Payment of such costs is otherwise consistent with FAR subpart 31.2.

(e) Payment will be made only for areas identified as Post Hardship Differential Pay areas and/or Danger Pay areas in Section 920 of the Department of State Standardized Regulations (DSSR).

(f) Payment will be made only for eligible employees. Eligible employees are employees:

i. whose country of citizenship is not in the task order place of performance; and

ii. whose primary residence is in an area not identified in Section 920 of the DSSR, or an area identified in Section 920 of the DSSR with an applicable DSSR percentage that is less than the respective ap-plicable DSSR percentage for the task order place of performance.

(g) Payment for a given workweek for an eligible employee will not exceed the dollar amount resulting from multiplying the applicable DSSR percentage by the employee’s basic compensation for the given work-week.

(h) The applicable DSSR percentage will be the DSSR percentage effective at the time of task order pro-posal(s) (or later time until task order award, if feasible) when the Contractor proposes and the Government awards the fixed-price under fixed-price arrangements (i.e., task orders or line items in a task order).

(i) The applicable DSSR percentage will be the DSSR percentage effective at the time of task order per-formance for arrangements when payment is made based on actual costs incurred (e.g., cost-reimbursement ar-rangements, materials portion of time-and-materials arrangements, and progress payments based on costs under fixed-price arrangements).

(j) An eligible employee’s basic compensation for a given workweek is the dollar amount attributable to the employee as a result of the employee’s productive hours and paid time off (e.g., sick, vacation, holiday) hours for the given workweek. It is the employee’s base salary/unloaded compensation for the given work-week. However, such compensation must:

i. benefit the task order; and/or

ii. be an equitable amount that is necessary to the overall operation of the business, although a direct relationship to any particular cost objective (e.g., task order) cannot be shown.

(k) The number of hours included in an eligible employee’s basic compensation for a given workweek can-not exceed the number of hours for the task order’s normal workweek. A normal workweek is defined in Sec-tion B.4.

(l) Basic compensation included in the negotiated fixed-price under fixed-price arrangements will consist of each eligible employee’s negotiated base salary/unloaded compensation for the task order period of perform-ance.

(m) Basic compensation will consist of actual incurred base salary/unloaded compensation for arrangements when payment is made based on actual costs incurred (e.g., cost-reimbursement arrangements, materials portion of time-and-materials arrangements, and progress payments based on costs under fixed-price arrangements).

(n) An eligible employee may receive Post Hardship Differential Pay and Danger Pay during paid time off only when the employee takes paid time off in the task order place of performance or in another Post Hardship Differential Pay and Danger Pay area, respectively.

(o) When an eligible employee takes paid time off in another Post Hardship Differential Pay and/or Danger Pay area, payment will be based on the applicable DSSR percentage(s) for the task order place of performance.

(p) Payment of Post Hardship Differential Pay for an eligible employee will not commence until the eli-gible employee has served 42 calendar days in the task order place of performance. Payment will commence on the first productive or non-productive day after day 42, and will not be retroactive to days previously served un-less paragraph “q” immediately below applies. The 42 calendar days are not required to be consecutive, and “served” consists of productive time, paid time off, and time otherwise spent in the task order place of perform-ance.

(q) Once an eligible employee has served 42 calendar days in the task order place of performance, payment of Post Hardship Differential Pay will be retroactive to day 1 served in the task order place of performance if the task order place of performance is in an area identified in Footnote N in the Post Classification and Payment Tables in Section 920 of the DSSR. Currently, Afghanistan and Iraq are the only such areas.

(r) Payment of Post Hardship Differential Pay for an eligible employee will conclude when the eligible employee departs the task order place of performance, unless such departure is to another Post Hardship Differ-ential Pay area during paid time off.

(s) For Post Hardship Differential Pay, when an eligible employee has not yet served 42 calendar days and returns to the task order place of performance after an absence from the task order place of performance, the number of days served resumes on the day of return. For example, if an eligible employee served 30 calendar days in the task order place of performance and departed the task order place of performance for 14 days, the day of return (day 44) will be considered day 31 of days served.

(t) Payment of Danger Pay for an eligible employee will commence on the day of arrival in the task order place of performance and conclude on the day of departure from the task order place of performance, unless such departure is to another Danger Pay area during paid time off.

B.10. DEFENSE BASE ACT (DBA) INSURANCE

(a) DBA Insurance costs are generally allowable for performance outside the United States, but only for covered Contractor and subcontractor employees pursuant to DOSAR 652.228-71 [Worker’s Compensation In-surance (Defense Base Act) – Services].

(b) In addition, DBA Insurance costs are generally allowable for performance outside the United States, but only when such costs accord with the terms of the Contractor’s DBA Insurance policy, law, and regulation.

(c) DBA Insurance costs shall be allocated separately as an ODC (other direct cost) (under fixed-price and cost-reimbursement arrangements) or as a Material (under time-and-materials arrangements) at the task order level.

B.11. OVERTIME

(a) The Contractor agrees to perform this contract, so far as practicable, without using overtime, particularly as a regular employment practice, except when lower overall costs to the Government will result or when it is necessary to meet urgent program needs [reference FAR 22.103-2 (Overtime – Policy)].

(b) Overtime is defined as time worked in excess of the number of hours in a normal workweek.

(c) “Number of hours” includes productive time hours, travel time hours, and paid time off hours (e.g., sick, vacation, holiday).

(d) “Productive time hours” consist of hours that, other than travel time hours, directly benefit the contract.

(e) “Travel time hours” consist of hours spent by the employee traveling to or from authorized work loca-tions. See Section B.8(i) for further information.

(f) A normal workweek is defined in Section B.4(i).

(g) For fixed-price arrangements (i.e., task orders or line items in a task order), the Government will not pay for overtime.

(h) The following applies to cost-reimbursement arrangements and the materials portion of time-and-materials arrangements (task orders or line items in a task order):

1. Government payment for overtime must be authorized in advance of any Contractor employee’s performance of overtime and in writing by the Contracting Officer when the Contractor requests an overtime premium cost that exceeds $0.00. Such request shall be submitted in writing to the Contracting Officer and shall address each item un-der FAR 52.222-2(b) (Payment for Overtime Premiums).

2. Evidence showing the Contracting Officer’s approval shall be sent with each invoice on which overtime containing a premium cost that exceeds $0.00 is being billed.

3. Advance Government authorization for any Contractor employee’s performance of overtime is not required when the overtime premium cost does not exceed $0.00.

4. Unless advance authorization has been granted pursuant to Section B.11(h)(1), any Government payment for Contractor employee overtime will be made at the actual in-curred straight-time hourly labor rate that the Contractor pays the Contractor employee and determined allowable by the Contracting Officer, pursuant to FAR 31.201-2

(Determining Allowability).

5. Government payment for overtime must not conflict with any Contractor uncom-pensated overtime policy or practice. If the Contractor has such a policy or practice, the Government will not compensate the Contractor for overtime costs in accordance with such policy or practice.

(i) The following applies to labor-hour arrangements and the time portion of time-and-materials arrangements (task orders or line items in a task order):

1. Government payment for overtime will be made at the fixed fully-loaded hourly labor rates negotiated in Section B.4(b) unless a different rate is approved in writing by the Contracting Officer at the task order level.

2. Advance written COR authorization for any Contractor employee’s performance of overtime is required.

3. Government payment of overtime will be made only if the Contractor compensates the Contractor employee for the employee’s overtime performance. Contractor pay-ment for each overtime hour shall be, at a minimum, at the regular hourly labor rate that the employee actually receives for normal workweek performance, and, if applic-able, at the overtime premium that the employee actually receives for overtime per-formance.

B.12. RESERVED

B.13. ADVANCE UNDERSTANDING

(a) At the task order level, when payment is made based on actual hours or costs incurred (e.g., cost-reimbursement arrangements, time-and-materials arrangements, and progress payments based on costs under fixed-price arrangements), the Government will not reimburse costs for cost elements for which there were no estimated costs. Any exceptions must be approved in writing by the Contracting Officer.

(b) While compensation costs and compensation-related taxes that are a liability of the Contractor are gen-erally allowable, income taxes on compensation costs are unallowable when such taxes are a liability of the em-ployee and not the Contractor.

(c) The Contractor’s costs to remove and replace Contractor personnel from the task order performance location, as a result of such personnel doing the following, are unallowable: jeopardizing or interfering with mission accomplishment; disrupting good order and discipline; violating applicable laws, regulations, orders, instructions, policies, or directives; and/or failing to comply with or violating applicable requirements of this contract and the awarded task order.

(d) Where indirect cost rates are negotiated in the contract, such information will be used in each resulting task order, as specified in the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .