SRPO Technology Roadmap June 2021.pdf

PDF 76 KB Posted

Attached to
NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal, eLibrary Federal contract opportunity
Solicitation number
80GSFC21R0037-eLibrary
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This document contains a technology roadmap for the NASA Sounding Rockets Program covering the years 2019 through 2025. The roadmap outlines key technology goals and milestones to increase payload and sub-payload capabilities, enable longer observation times through high altitude vehicles and reentry/recovery systems, improve telemetry and onboard data recording, and develop new mesospheric vehicles and payloads. Near term focus areas include increasing sub-payload deployment velocity, developing 3U CubeSat form factor deployers, and achieving 300-400 Mbps C-band and 1 Gbps onboard telemetry. Mid-term goals incorporate integrated power systems, GPS upgrades, and 40 km telemetry ranges. Later milestones consist of consolidated ordnance, high altitude vehicle recovery, and nested skin designs for reentry. The related federal contract opportunity is a final RFP for the NASA Sounding Rocket Operations Contract (NSROC) IV to be awarded by the National Aeronautics and Space Administration Goddard Space Center.

View the file

Other files for this federal contract opportunity

Other files attached to NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal, eLibrary, newest first.
File Type Posted
SRPO Cryogenic Safety Users Guide Revision A Final.pdf PDF
NSROC III NNG16WA70C Attachment M - Contract Historical Data 19-20.pdf PDF
NSROC III List of Ongoing Work - October 2021.pdf PDF
SRPO Annual Report 2016.pdf PDF
Rocket_Report_4th_quarter_2019.pdf PDF
SR User Handbook Final_July 2015.pdf PDF
SRPO Annual Report 2019.pdf PDF
Doing Business with Wallops.pdf PDF
Sounding Rockets_NASA_fact_sheet.pdf PDF
NASA-STD-8719.12A Safety Standard for Explosives, Propellants, and Pyrotechnics.pdf PDF
803-GS-ESP-ES-F10-01 F-10 Explosive Site Plan.pdf PDF
803-PG-8730 1 WFF Met and Cal Lab Quality Manual.pdf PDF
GPR 8710.2.pdf PDF
NPR 8715.3.pdf PDF
NPR 4200.2.pdf PDF
GPD 7150.0.pdf PDF
GPR 1840.1.pdf PDF
GPR 8715.8.pdf PDF
GPR 8715.1.pdf PDF
GPR 8710.7.pdf PDF
GPR 7120.11.pdf PDF
200-PG-8812.1.1 Wallops Facilities Review Committee.pdf PDF
800-PG-8715.5.1A Range Safety Process for Programs and Projects.pdf PDF
GPR 8500.1.pdf PDF
NPR 1040.1 Updated.pdf PDF
NPD 8730.5.pdf PDF
GPR 1820.2.pdf PDF
GPR 1840.2.pdf PDF
GPR 1600.2.pdf PDF
GPR 8800.1.pdf PDF
GPR 8715.12.pdf PDF
GPR 4100.2.pdf PDF
NPD 8700.1 Updated.pdf PDF
800-PG-8715.0.4C_Certification Procedures for OSS at WFF.pdf PDF
NPD 2800.1.pdf PDF
NPR 6000.1.pdf PDF
NPD 2025.1.pdf PDF
800-PG-8710.0.2D Operations in Cold Weather Environments.pdf PDF
GPD 1800.0.pdf PDF
800-PG-7120.4.1 Risk Mgmt.pdf PDF
NPR 5200.1.pdf PDF
Vehicle Launcher and Performance Info.pdf PDF
NSROC III SOW Rev 10 - April 2021.pdf PDF
Acronym List.pdf PDF
Rocket_Report_2nd_quarter_2019.pdf PDF
Sounding_Rocket_Brochure1.pdf PDF
SRWG Findings_June_2021.pdf PDF
SRWG_Findings_July_2019.pdf PDF
810-PG-5100.1.1F Management of the NASA Sounding Rockets Operations Contract (NSROC).pdf PDF
500-PG-4520.2.1 EEE CPAP.pdf PDF
Show all 50

NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal, eLibrary has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sounding Rockets Program Technology Roadmap G oa ls

M is si on

M ap pi ng C or e

T ec hn ol og ie s

2019 2020 2021 2022 2023 2024

SubTec- 9 SubTec- 10

Sub-payload development

• Turn deployable small payloads into science platforms

• Increase capability of sub-payload systems

Miniaturization and modernization of payload systems

• Minimize weight and volume of support systems

High data rate telemetry and onboard recording

• Increase amount of science data obtained on each flight

High altitude vehicle with reentry and recovery

• Allows longer science observation times while still allowing re-flight of science instruments and payload systems

• Dual main receiver

• GPS receiver

• Larger battery packs

• 40 Mbps C-band telemetry development

• Ethernet P/L bus communication development

• Swarm Communication

• High data rate encoder

• 40 Mbps S-band telemetry

• Ethernet via telemetry

(EVTM) development

SubTec- 8

Mesospheric vehicle and payload

• Leverage sub-payload systems to develop miniature yet capable payloads for mesospheric science

• Increase spring deployment velocity

• 3u CubeSat form factor and deployer

• Tern SPARCS development

• High energy density battery development

• Tern INS and GIPS

• Tern NIACS

• TM over IP data distribution

• Telemetry analysis suite (MUTAS)

• Deployable ground station

Sub-Payloads

Telemetry

Miniaturization and Modernization

New Capability

• 1 Mbps telemetry

• Single main receiver

• Sub-payload sensor suite

• Deploying and Retracting Tubular (DaRT) Boom

• 300-400 Mbps C-band telemetry development

• Mesospheric payload

• New ignition system

• New power system

• Payload lightweight concepts

• Large diameter payload (>32”)

• Mesospheric vehicle

• High altitude vehicle

• Integrated power system development

• Versatile Linear Shape Charge (FTS)

• GPS sub-payload antenna upgrade

• Increased RF range (~40

km) with lower-rate data

• Ground station upgrades for C-band telemetry

• High rate (1 Gbps) onboard data recorder development

• Low-cost flight computer

• Wallops Integrated Star Tracker

• Nested skin for high altitude reentry

• Consolidated ordnance system development

• High altitude vehicle recovery

Sounding Rockets Program Technology Roadmap

File details come from the government source that posted it. Updated .