This document provides an overview of the Bulk Bid Evaluation Model (BEM) used by the Defense Logistics Agency to evaluate fuel supply offers for large bulk contracts. The BEM utilizes mixed-integer linear programming to determine the lowest total laid down cost solution that meets fuel requirements for bases based on the unique transportation costs and conditions presented in each offer. Offer conditions such as tiered pricing, minimum/maximum volumes restrictions, transportation modes, additive injection capabilities, and conditional statements are evaluated. The BEM conducts multiple runs to initially evaluate pricing, incorporate interim offers, and finally determine the lowest cost distribution plan while considering small business set-asides and other socioeconomic programs. Additional details provided in the Laid Down Cost Report and award information published on FBO. Questions regarding offer specifics should be directed to the contracting officer.

View the file

Other files

Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEFENSE LOGISTICS AGENCY

AMERICA S COMBAT LOGISTICS SUPPORT AGENCY

WARFIGHTER FIRST

Bulk Bid Evaluation Model

(BEM)

Matthew Shuster May 2019

WARFIGHTER FIRST

Bulk Fuels Business Model

Manage petroleum products in very large volumes

Fewer contracts with large dollar values

Estimated quantity with high minimum lift guarantee (75%)

Awards on FOB Origin and FOB Destination Basis

Extensive use of commercial distribution systems Distribution may be direct to demand point or through intermediate

Defense Fuel Supply Points (DFSPs) Socio-Economic considerations

Small Business Set-asides (Price Matching)

Hubzone Premium Program

8(a) reservations

Bid Evaluation Model (BEM)

Mixed-integer linear optimization program used to find the minimum laid down cost for the entire procurement.

Laid Down Price includes:

Offered product price

All transportation costs

All additive costs

All intermediate DFSP distribution costs (fixed and variable costs)

– Excess throughput charges

Offer specific evaluation factors –Base Reference Price evaluation factors

Offer Conditions

Offer Conditions

Offer Conditions

Optional

BEM evaluates complex offers

– Tiered pricing

– Block pricing

– Volume restrictions (Minimums and Maximums)

– Multiple load capabilities (modes of transportation)

– Additive injection capabilities

– Offer conditions such as “Either/Or” and “One before Two”

Conflicting Conditions

– Conditional statements must not conflict with each other (i.e.: Minimum award by Tanker is 5 million and overall maximum award is 3 million)

Evaluation Example

Offers A: 6,000,000 USG by TT @ $2.95/gallon B: 6,000,000 USG by PL @ $3.00/gallon C: 1,000,000 USG by PL @ $2.98gallon

Requirements Base 1: 3,000,000 gallons received by TT Base 2: 3,000,000 gallons received by TT Base 3: 1,000,000 gallons received by TT

Intermediate Depot Support Available Into X by PL, out by TT to all Requirements Into Y by PL, out by TT to all Requirements

Transportation Rates A to 1 (TT): .28/gallon A to 2 (TT): .20/gallon A to 3 (TT): .23/gallon B to X (PL): .02/gallon B to Y (PL): .02/gallon C to X (PL): .01/gallon C to Y (PL): .04/gallon X to 1 (TT): .05/gallon X to 2 (TT): .02/gallon X to 3 (TT): .05/gallon Y to 1 (TT): .04/gallon Y to 2 (TT): .06/gallon Y to 3 (TT): .02/gallon

PL = Pipeline; TT = Tank Truck

Offer A

6,000,000 USG

@$2.95

Offer C

1,000,000 USG

@$2.98

Offer B

6,000,000 USG

@$3.00

DFSP X

DFSP Y

Base 3

1,000,000 USG

Base 2

3,000,000 USG

Base 1

3,000,000 USG

.28

.02

.05

.01

.02 .05.02

.04

.02

.04

.20

.23

.06

Req 1 – Offer A (total cost $3.23/gal) Req 2 – Offer A (total cost $3.15/gal) Req 3 – Offer C (total cost $3.04/gal) Total cost: $22,180,000

Req 1 – Offer B (total cost $3.06/gal) Req 2 – Offer C (total cost $3.01/gal) Req 2 – Offer B (total cost $3.04/gal) Req 3 – Offer B(total cost $3.04/gal) Total cost: $21,310,000 $870K Savings Distribution Plan Generated

Evaluated on Offered Price Only: Evaluated on Laid-Down Cost:

BEM Rounds

INITIAL OFFERS /

OET ROUND 1

INTERIM OFFERS /

OET ROUND 2

IPR BEM RUN - MCBEW

FINAL OFFERS /

OET ROUND 3 FPR BEM RUN – MCBEW & LCRPRICE REDUCTION ROUND

BEM MCBEW

Laid Down Cost Report (LCR)

SEQUENCE OF BEM RUNS

Final Forced Run

Small Business Set-Aside Run

HUBZone Run

8(A) Run

Base Run

Post Award

Once the solicitation is awarded, award data will be published on Federal Business Opportunities website at https://www.fbo.gov/

For questions specific to an offer, please contact the Contracting Officer listed on the solicitation.

Contact Information

For questions concerning the functionality of BEM/OET, please contact:

Matthew Shuster Matthew.Shuster@dla.mil Work: (571) 767-9250