BEM_Overview_-_WWEC_WP.pptx.pdf
PDF 2 MB Posted
- Attached to
- BULK PETROLEUM WESTERN PACIFIC AND MIDDLE EAST
- Solicitation number
- SPE602-19-R-0707
- Issued by
-
Defense Logistics Agency Energy
About this file
This document provides an overview of the Bulk Bid Evaluation Model (BEM) used by the Defense Logistics Agency to evaluate fuel supply offers for large bulk contracts. The BEM utilizes mixed-integer linear programming to determine the lowest total laid down cost solution that meets fuel requirements for bases based on the unique transportation costs and conditions presented in each offer. Offer conditions such as tiered pricing, minimum/maximum volumes restrictions, transportation modes, additive injection capabilities, and conditional statements are evaluated. The BEM conducts multiple runs to initially evaluate pricing, incorporate interim offers, and finally determine the lowest cost distribution plan while considering small business set-asides and other socioeconomic programs. Additional details provided in the Laid Down Cost Report and award information published on FBO. Questions regarding offer specifics should be directed to the contracting officer.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEFENSE LOGISTICS AGENCY
AMERICA S COMBAT LOGISTICS SUPPORT AGENCY
WARFIGHTER FIRST
Bulk Bid Evaluation Model
(BEM)
Matthew Shuster May 2019
WARFIGHTER FIRST
Bulk Fuels Business Model
Manage petroleum products in very large volumes
Fewer contracts with large dollar values
Estimated quantity with high minimum lift guarantee (75%)
Awards on FOB Origin and FOB Destination Basis
Extensive use of commercial distribution systems Distribution may be direct to demand point or through intermediate
Defense Fuel Supply Points (DFSPs) Socio-Economic considerations
Small Business Set-asides (Price Matching)
Hubzone Premium Program
8(a) reservations
Bid Evaluation Model (BEM)
Mixed-integer linear optimization program used to find the minimum laid down cost for the entire procurement.
Laid Down Price includes:
Offered product price
All transportation costs
All additive costs
All intermediate DFSP distribution costs (fixed and variable costs)
– Excess throughput charges
Offer specific evaluation factors –Base Reference Price evaluation factors
Offer Conditions
Offer Conditions
Offer Conditions
Optional
BEM evaluates complex offers
– Tiered pricing
– Block pricing
– Volume restrictions (Minimums and Maximums)
– Multiple load capabilities (modes of transportation)
– Additive injection capabilities
– Offer conditions such as “Either/Or” and “One before Two”
Conflicting Conditions
– Conditional statements must not conflict with each other (i.e.: Minimum award by Tanker is 5 million and overall maximum award is 3 million)
Evaluation Example
Offers A: 6,000,000 USG by TT @ $2.95/gallon B: 6,000,000 USG by PL @ $3.00/gallon C: 1,000,000 USG by PL @ $2.98gallon
Requirements Base 1: 3,000,000 gallons received by TT Base 2: 3,000,000 gallons received by TT Base 3: 1,000,000 gallons received by TT
Intermediate Depot Support Available Into X by PL, out by TT to all Requirements Into Y by PL, out by TT to all Requirements
Transportation Rates A to 1 (TT): .28/gallon A to 2 (TT): .20/gallon A to 3 (TT): .23/gallon B to X (PL): .02/gallon B to Y (PL): .02/gallon C to X (PL): .01/gallon C to Y (PL): .04/gallon X to 1 (TT): .05/gallon X to 2 (TT): .02/gallon X to 3 (TT): .05/gallon Y to 1 (TT): .04/gallon Y to 2 (TT): .06/gallon Y to 3 (TT): .02/gallon
PL = Pipeline; TT = Tank Truck
Offer A
6,000,000 USG
@$2.95
Offer C
1,000,000 USG
@$2.98
Offer B
6,000,000 USG
@$3.00
DFSP X
DFSP Y
Base 3
1,000,000 USG
Base 2
3,000,000 USG
Base 1
3,000,000 USG
.28
.02
.05
.01
.02 .05.02
.04
.02
.04
.20
.23
.06
Req 1 – Offer A (total cost $3.23/gal) Req 2 – Offer A (total cost $3.15/gal) Req 3 – Offer C (total cost $3.04/gal) Total cost: $22,180,000
Req 1 – Offer B (total cost $3.06/gal) Req 2 – Offer C (total cost $3.01/gal) Req 2 – Offer B (total cost $3.04/gal) Req 3 – Offer B(total cost $3.04/gal) Total cost: $21,310,000 $870K Savings Distribution Plan Generated
Evaluated on Offered Price Only: Evaluated on Laid-Down Cost:
BEM Rounds
INITIAL OFFERS /
OET ROUND 1
INTERIM OFFERS /
OET ROUND 2
IPR BEM RUN - MCBEW
FINAL OFFERS /
OET ROUND 3 FPR BEM RUN – MCBEW & LCRPRICE REDUCTION ROUND
BEM MCBEW
Laid Down Cost Report (LCR)
SEQUENCE OF BEM RUNS
Final Forced Run
Small Business Set-Aside Run
HUBZone Run
8(A) Run
Base Run
Post Award
Once the solicitation is awarded, award data will be published on Federal Business Opportunities website at https://www.fbo.gov/
For questions specific to an offer, please contact the Contracting Officer listed on the solicitation.
Contact Information
For questions concerning the functionality of BEM/OET, please contact:
Matthew Shuster Matthew.Shuster@dla.mil Work: (571) 767-9250
WARFIGHTER FIRST 12
QUESTIONS?
File details come from the government source that posted it. Updated .