SF30_SP452016R00010004.pdf
PDF 44 KB Posted
- Attached to
- European Scrap Processing and Disposal Federal contract opportunity
- Solicitation number
- SP4520-16-R-0001
About this file
Amendment 0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30_SP452016R00010006.pdf | ||
| Attachment_12_Price_schedule.xls | XLS spreadsheet | |
| SF30_SP452016R00010005.pdf | ||
| Attachment_12_Price_schedule.xls | XLS spreadsheet | |
| SF30_SP452016R00010003.pdf | ||
| SF30_SP452016R00010002.pdf | ||
| Attachment_12_Price_schedule.xls | XLS spreadsheet | |
| SF30_SP452016R00010001.pdf | ||
| Attachment_3b.doc | DOC document | |
| Attachment_8.pdf | ||
| Attachment_2.doc | DOC document | |
| Attachment_4b.pdf | ||
| Attachment_1_Redacted.pdf | ||
| Attachment_4a.pdf | ||
| Attachment_13_Past_Performance_Data_Sheet.pdf | ||
| Attachment_10a.docx | DOCX document | |
| Attachment_11_APL.pdf | ||
| Attachment_9.pdf | ||
| Attachment_3a.doc | DOC document | |
| Attachment_12_Price_schedule.xls | XLS spreadsheet | |
| Attachment_5_-Level_1_Historical_Information_-_Removals_FY_13_-_15.pdf | ||
| Attachment_6.pdf | ||
| Attachment_7.docx | DOCX document | |
| Attachment_10b.pdf | ||
| SF1449_SP452016R0001.pdf |
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SP4520 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SP452016R0001
X
2016 MAR 10
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX X is extended, is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA DISPOSITION SERVICES J-761
MANNHEIMERSTRASSE
KLEBER KASERNE BLDG 3227 67657
D- KAISERSLAUTERN
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
20 APR 2016
3. EFFECTIVE DATE
Opening/Closing Date Changed to:
2016 MAR 10 / 2016 APR 26
TIME 3:00 PM
See Attached Continuation Sheet(s).
(X)
CHECK ONE
PAGE OF PAGES
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CONTINUED ON NEXT PAGE
Amendment issued to correct an omission in the Price Schedule.
SubCLINs 0021SB, 1021SB, and 2021SB are added to the Price Schedule.
The corrected Price Schedule is attached.
Solicitation closing is extended to 1500 on 26 April 2016.
PAGE 2 OF 4 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SP452016R0001-0004
CONTINUED ON NEXT PAGE
Part 12 Clauses
ADDENDUM TO 52.212-04 CONTRACT TERMS AND CONDITIONS - COMMERCIAL ITEMS
FAR 52.212-4(c) - Changes, addendum : In accordance with FAR 52.212-4(c) (1) Changes in the terms and conditions of this basic contract may be made only by written agreement of the parties. Formal written agreement of parties relative to the following terms and conditions is hereby made through contract acceptance or bilateral contract modification, as applicable. This addendum serves as the formal written agreement of parties authorizing revisions to CLIN weights/quantities for task orders issued against the contract. The weight/quantities for CLINs issued on task orders are estimated therefore task order weights/quantities will frequently require adjustment upward or downward to reflect the actual weight/quantities being removed. Services which are not identified by weight may also require modification to ensure actuals are reflected. The revisions will be adjusted for instances where the Government has underestimated or overestimated the quantities/amount of weight that is required to be removed. In instances of decreasing weight/quantity, these decreases are not subject to FAR 52.212-4, termination for convenience coverage.
FAR 52.212-4(g) – Invoice, addendum: The contractor shall submit an invoice within 30 days of each task order completion date. In the possible event that the contractor must submit a check to the Government, the contractor shall still be required to submit an invoice in WAWF for 1 euro and deliver the invoice package with the check within 30 days of the task order completion date.
Attachments
List of Attachments
Description File Name ATTACH.A4 Price Schedule
Attachment 12 Price sc
List of Attachments
LIST OF ATTACHMENTS
ATTACHMENTS
No. Title Page(s)
1 DD Form 1155, Order for Supplies or Services Form 1
2 DRMS Form 1683E, Manifest Tracking Log (to be 2 used with Hazardous Waste disposal only)
3a 3b
Facility Profile Sheet Transporter Profile Sheet
4a 4b
DLA Disposition Services site Service Level DLA Disposition Services site Profiles and Site Information
5 Workload History FY 2013/2014/2015 14
6 Photographic Examples of CLINS and Standard Waste 15
Classification Codes (SCL)
7a Central Demilitarization Center Kaiserslautern Information and SOP 12
PAGE 3 OF 4 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
7b Demilitarization Surveillance Plans 15
8 DLA Form 1367, Shipment Receipt/Delivery Pass and Mutilation Certificate 2
9 Government Furnished Equipment/Dual Use Equipment 1
10a 10b
Level 3 Service Countries Level 3 Workload History Oct 12 – Sep 15
11 Acceptable Performance Levels (APL) 1
12 Price Schedule 1
13 Past Performance Data Sheet 4
PAGE 4 OF 4 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
| Part 12 Clauses |
| ADDENDUM TO 52.212-04 CONTRACT TERMS AND CONDITIONS - COMMERCIAL ITEMS |
| Attachments |
| List of Attachments |
| List of Attachments |
File details come from the government source that posted it. Updated .