Attachment_11_APL.pdf
PDF 233 KB Posted
- Attached to
- European Scrap Processing and Disposal Federal contract opportunity
- Solicitation number
- SP4520-16-R-0001
About this file
Attachment 11
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_12_Price_schedule.xls | XLS spreadsheet | |
| SF30_SP452016R00010006.pdf | ||
| SF30_SP452016R00010005.pdf | ||
| Attachment_12_Price_schedule.xls | XLS spreadsheet | |
| SF30_SP452016R00010004.pdf | ||
| SF30_SP452016R00010003.pdf | ||
| SF30_SP452016R00010002.pdf | ||
| Attachment_12_Price_schedule.xls | XLS spreadsheet | |
| SF30_SP452016R00010001.pdf | ||
| Attachment_1_Redacted.pdf | ||
| Attachment_4a.pdf | ||
| Attachment_13_Past_Performance_Data_Sheet.pdf | ||
| Attachment_10a.docx | DOCX document | |
| Attachment_9.pdf | ||
| Attachment_3a.doc | DOC document | |
| Attachment_12_Price_schedule.xls | XLS spreadsheet | |
| Attachment_5_-Level_1_Historical_Information_-_Removals_FY_13_-_15.pdf | ||
| Attachment_6.pdf | ||
| Attachment_3b.doc | DOC document | |
| Attachment_8.pdf | ||
| Attachment_2.doc | DOC document | |
| Attachment_4b.pdf | ||
| Attachment_7.docx | DOCX document | |
| Attachment_10b.pdf | ||
| SF1449_SP452016R0001.pdf |
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SP4520‐16‐R‐0001
ATTACHMENT 11
ACCEPTABLE PERFORMANCE LEVELS
DESIRED
OUTCOME OBJECTIVE TIME
FRAME STANDARD REFERENCES APL
REDUCTION
FOR FAILED
APL
METHOD OF
SURVEILLANCE
Compliant with all Applicable Laws and Regulations.
Meeting all Legal and Regulatory Requirements for Performing the Contract. (i.e.
Environmental Laws Permits)
As Necessary/ Specified to Meet Contract’s Requirement
Timely & Accurate Section B-10 100 % 1-25% consideration & past performance annotated
CSR/COR Input/ Program Office
Submittal of all Shipping Documents (i.e.
Customs Clearance, Electronic Manifest, etc.)
As Necessary/ Specified
Timely, Compliant & Accurate
Section B-11 100% (For
Typographical errors is 95%)
Same as above
Collect & Manage Scrap Material.
Perform Service Level 1 and 4 During Each Location’s Required Hours of Operation.
As Specified On Time & Compliant
Section B-8 & Attachment 4a 100% Same as above
Schedule/Coordin ate to Perform Service Level 2 and 3 Within Given Timeframe.
As Specified On Time & Compliant
Sections B-8& F-8 100 % Same as above
Offloading of Scrap Material from DoD Generator Vehicle – Level 1 Full & Limited.
Within 30 Min. from Truck Arrival
Timely, Safely & Compliant
Section B-7
Timely 90%, Safety and
Compliance 100%
Same as above
Availability of Containers and supplies.
As Necessary
Timely & Compliant Section B-7 100% Same as above
Correct Segregation of Materials (By
CLINS)
As Necessary
Timely & Compliant
Section B-7 & B-8 100% Same as above
Accomplish Demilitarization and Mutilation of Identified Property.
Within Specified Time Frames
Timely & Compliant
Section B-12 & Attachment 7 100%
Same as above
Recycle Scrap Material.
Recycling at least 75% of Scrap Materials from All Sites.
Monthly Accurate & Compliant Section B-9 100% Same as above Monthly Report/
Program Office
Demilitarization, Demanufacturing & Destruction
Meet Demilitarization and Destruction of Identified Materials.
As Specified Compliant, Timely & Accurate
Section B-12 & B-13 100% Same as above
Demil. Certificate/ Trip Report/ Program Office/
CSR
File details come from the government source that posted it. Updated .