SOV_7-23-24_revised_8-27-24.pdf
PDF 41 KB Posted
- Attached to
- Menard May Park Observation Pier Replacement - Construction State and local contract opportunity
- Solicitation number
- ITB 25-PR-04
- Issued by
- Volusia County, Florida
About this file
This document is a Schedule of Unit Prices for the City of Edgewater's Menard May Park Observation Pier Replacement project. The comprehensive bid schedule details a complete replacement of an existing pier, including mobilization, site preparation, demolition of the existing structure, and reconstruction of a new observation pier. The project involves multiple components such as silt fence installation, floating turbidity barriers, wood pile replacement, decking, railings, lighting, and associated hardware. Key quantities include 41 wood piles, 1,683 board feet of decking, 1,440 board feet of railing, and various wooden structural elements.
The total project cost is $172,710.66, with major cost components including $25,000 for mobilization, $43,050 for wood piles, and $24,640 for pile guards. Additional expenses include a bid bond of $840 and a 110% payment and performance bond of $5,170. The unit pricing approach allows for precise cost tracking and potential adjustments during the project. Significant line items cover structural materials, electrical work (including an EXO light with conduit and wiring), and miscellaneous hardware like bolts, nuts, washers, screws, and hurricane straps. The pricing demonstrates a detailed, itemized approach to budgeting the pier replacement project.
View the file
Other files for this state and local contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Description Quantity Unit Unit Price Contract Value
1 Mobilization 1 LS 25,000.00$ 25,000.00$ 2 Silt Fence 42 LF 3.68$ 154.56$ 3 Floating Turbidity Barrier 130 LF 16.00$ 2,080.00$
Remove Existing Pier & Piles & Dispose 1 LS 20,400.00$ 20,400.00$
5 Survey Control 1 LS 4,000.00$ 4,000.00$ 6 Rebuild Revetment 1 LS 2,400.00$ 2,400.00$ 7 Concrete Sidewalk w/ Thicken Edge 81 SF 18.00$ 1,458.00$ 8 8" Diameter Wood Piles 41 EA 1,050.00$ 43,050.00$ 9 Pile Guard 320 LF 77.00$ 24,640.00$
10 2 x 10 Cross Beam 324 BF 6.00$ 1,944.00$ 11 2 x 6 Cross Brace 384 BF 3.75$ 1,440.00$ 12 2 x 8 Joist 905 BF 4.90$ 4,434.50$ 13 2 x 6 Scab Block 80 BF 3.75$ 300.00$ 14 2 x 8 Decking 1683 BF 5.20$ 8,751.60$ 15 2 x 8 Railing 1440 BF 4.90$ 7,056.00$ 16 2 x 12 Railing Cap 288 BF 9.00$ 2,592.00$ 17 6 x 6 Light Post 1 EA 200.00$ 200.00$
EXO Light, Conduit & Wire to Existing Circuit 1 LS 1,800.00$ 1,800.00$
Hardware (Bolts, Nuts, Washers, Screws, Nails, & Hurricane Straps) 1 LS 15,000.00$ 15,000.00$
Subtotal 166,700.66$ 20 Bid Bond 1 LS 840.00$ 840.00$
110% Payment & Performance Bond 1 LS 5,170.00$ 5,170.00$
Total Price 172,710.66$
CITY OF EDGEWATER
MENARD MAY PARK OBSERVATION PIER REPLACEMENT, EDGEWATER
SCHEDULE OF UNIT PRICES
8-27-24