Menard_May_Park_Dock_Plans_Complete_Set_(8-9-2024).pdf
PDF 2 MB Posted
- Attached to
- Menard May Park Observation Pier Replacement - Construction State and local contract opportunity
- Solicitation number
- ITB 25-PR-04
- Issued by
- Volusia County, Florida
About this file
These are construction plans for the Menard May Park Dock Replacement project for the City of Edgewater, Florida. The project involves constructing a new dock at Menard May Park, which includes removing the existing dilapidated dock, installing new 8-inch diameter wood pilings, constructing a 6-foot wide dock with pressure-treated Southern Yellow Pine (SYP) lumber, and adding a concrete sidewalk with ADA-compliant slopes. The plans are dated May 2024 and include revisions on 7-26-2024 and 8-9-2024, with modifications based on city comments such as adding a sidewalk/dock transition and adjusting slopes.
The construction plans are prepared by Halff Associates, Inc., located in Tavares, Florida, with a Certificate of Authorization Number 33380. The project site is located near S. Riverside Drive and E. Ocean Avenue, with specific design requirements including meeting the Florida Building Code 2023, 8th Edition, and designed for a 140 M.P.H. wind zone. The dock will feature stainless steel fasteners, pressure-treated lumber, concrete with a light broom finish, and include details for framing, light pole mounting, and an optional alternate design using Ecopile foundation technology. The plans provide comprehensive technical specifications for materials, construction methods, and site preparation.
View the file
Other files for this state and local contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOBBY COPELAND, FIELD OPERATIONS SUPEINTENDENT
(386) 424-2400 x4007
EDGEWATER, FLORIDA 32132
CITY OF EDGEWATER, FLORIDA
104 NORTH RIVERSIDE DRIVE
ENGINEER/SURVEYOR:
902 N SINCLAIR AVE
TAVARES, FL 32778
HALFF ASSOCIATES, INC.
(352) 343-8481
DUANE K. BOOTH, P.E., PROJECT ENGINEER
CITY ATTORNEY
AARON R. WOLFE
GLENN A. IRBY
CITY MANAGER
CITY CLERK
BONNIE ZLOTNIK
DISTRICT 1
DISTRICT 4
MAYOR
DIEZEL DEPEW
CHARLOTTE GILLIS
DEBBIE DOLBOW
GIGI BENNINGTON
JONAH POWERS
BRENDA DEWEES
DISTRICT 2
DISTRICT 3
V I C I N I T Y M A P
FOR
CONSTRUCTION PLANS
SCALE: 1" = 1000'
DOCK CONSTRUCTION
PROJECT AREA
INDEX OF SHEETS
AERIAL/EXISTING CONDITIONS PLAN
COVER SHEET
DEMOLITION/EROSION CONTROL PLAN
ISSUEDATE BY
OWNER/DEVELOPER:
GEOMETRY PLAN
DETAIL SHEET
MENARD MAY PARK
DIRECTOR OF
ENVIRONMENTAL SERVICES
RANDY J. COSLOW, P.E. - CITY ENGINEER / DIRECTOR
0 1 2 3 4 5
(INCHES)
ORIGINAL DOCUMENT SIZE 24"x36"
902 North Sinclair Ave.
Certificate of Authorization Number: 33380
Fax: 352.343.8495 Office: 352.343.8481
Tavares, Florida 32778
6 DETAIL SHEET
ADDED NOTES PER CITY COMMENTS7-26-2024
ADDED SIDEWALK/DOCK TRANSITION8-9-2024
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text W
AutoCAD SHX Text N
TRAV SIRC
2.65
TRAV SIRC
3.70
FIRC 5/8 NOT LEGIBLE
5.80
FIP 11/4 NOID
7.75
FCM 4X4 2599
2.80
FIR 1/2 NOID
3.25
FIR 3/4 NOID
3.58
SBM SND REF
2.37 WV
1.55
LP
2.14
E
EJB
2.39
PALM
14"
TOB
TOB TOB
TOB
TOB
CONCRETE
RETAINING
WALL BORDER
AROUND
PLAYGROUND
CONCRETE SIDEWALK
C O
N C
R E
TE
S
ID
E
W A
LK
DIRT PARKING LOT
Existing Reuse Pipe
CAUTION SIGN
"DO NOT DRINK RECLAIM WATER"
DILAPIDATED / DAMAGED
WOOD DOCK
-4
-3
-2
-2
-2
-1
-1
-2
-3
-1
-2
-1
-3
-3
SITE BENCHMARK 1
SET NAIL & DISK
IN CONCRETE CURB
"HALFF WIT LB8348"
NORTHING: 1692469.78'
EASTING: 687806.44'
ELEVATION: 2.36'
SITE BENCHMARK 2
SET 5/8" IRON ROD W/ CAP
"TRAV HALFF"
NORTHING: 1692296.56'
EASTING: 687392.21'
ELEVATION: 3.70'
INDIAN RIVER NORTH
APPROXIMATE
PARCEL LINES
APPROXIMATE
PARCEL LINE
TRASH
CAN
N67°18'17"E 4 49.00'
EX TRASH CAN
030 30 60
Sheet 2
44629.010
DKB
SPH
MAY 2024
1 2 3 4 5 6 7 8
M
EN
AR
D
M
AY
P
AR
K D
O C
K
RE
PL
AC
EM
EN
T
AE
RI
AL
E
XI
ST
IN
G
C O
N D
IT
IO
N S
PL
AN
DUANE K. BOOTH, P.E.
Registered Eng 44631
JOB NO.:
CHECKED BY.:
DRAWN BY:
DATE:
DESIGNED BY:
FILE NAME:
R E
V
IS
IO
N
D A
T E
C ity
O f E dg ew at er
, F lo rid a
N o rt h
S in cl ai r A ve
C er tif ic at e o f
A ut h o ri za tio n
N um b er
: 3
Fa x:
.3
.8
O ff ic e:
.3
.8
Ta va re s, F lo ri d a
EXISTING REMAINS OF DOCK
EXISTING CONCRETE WALK
EXISTING EFFLUENT REUSE LINE
S. RIVERSID
E D
RIVE
E. OCEAN AVENUE
GENERAL NOTES
ALL CONSTRUCTION SHALL CONFORM TO THE CITY OF EDGEWATER STANDARDS.
5.
6.
7.
AGENCIES; WHICHEVER REQUIREMENT IS MORE STRINGENT.
CONTROL MEASURES AS DETAILED, SPECIFIED OR AS REQUIRED BY THE JURISDICTIONAL REGULATORY WATERWAY OR WATER SURFACE, THE CONTRACTOR SHALL PROVIDE CROSSING AND SEDIMENTATION WHEN CONSTRUCTION ACTIVITIES DISTURB AREAS WITHIN 10 FEET OF A TOP OF BANK FOR ANY
RESTORED TO ORIGINAL LINE AND GRADE UNLESS APPROVED BY THE ENGINEER. ACCESS TO ADJOINING ALL EXISTING PROPERTY, FENCING, DRIVEWAYS, PIPING, SIDEWALKS, SIGNS AND OTHER ITEMS SHALL BE
CONTRACTOR'S OPERATIONS SHALL BE RESODDED, LANDSCAPED, OR REPAIRED WITH LIKE KIND.
ALL AREAS WHERE LANDSCAPING, SOD, OR IRRIGATION HAS BEEN REMOVED OR DISTURBED BY
PROPERTY ALONG THE PROPOSED ROUTE SHALL BE MAINTAINED AT ALL TIMES.
1.
2.
RESPECTIVE UTILITY.
4.
CONSTRUCTION.
3.
OF ALL LOCATIONS PER THE CONTRACT SPECIFICATIONS.
PORTIONS OF THE WORK USING ALL INFORMATION PROVIDED HEREIN AND SHALL MAINTAIN RECORDS PROJECT BASELINE STATIONING SHOWN IS APPROXIMATE. THE CONTRACTOR SHALL LOCATE ALL
COORDINATE THE LOCATION OF ALL UNDERGROUND FACILITIES WITH A FIELD REPRESENTATIVE OF EACH MAY EXIST WITHIN THE PRIVATE RIGHTS-OF-WAY WITHIN THIS PROJECT. THE CONTRACTOR SHALL DUCTS. THE ENGINEER HAS NOT SHOWN ELECTRICAL AND TELEPHONE SERVICE CONNECTIONS WHICH SHOW AS MUCH AS POSSIBLE ALL MAIN ELECTRICAL AND TELEPHONE UNDERGROUND CABLES AND
THE CONTRACTOR SHALL INSURE ALL NECESSARY PERMITS ARE IN HAND BEFORE COMMENCEMENT OF
ON THE PLANS, ARE NOT CONSIDERED TO BE ALL INCLUSIVE. THE ENGINEER HAS ATTEMPTED TO UTILITY OWNER USING THE LATEST INFORMATION AVAILABLE. HOWEVER, THESE LOCATIONS, AS SHOWN INFORMATION REGARDING THE LOCATION OF EXISTING UTILITIES HAS BEEN OBTAINED FROM RESPECTIVE
ENGINEER OR OWNER.
CONSTRUCTION. THE CONTRACTOR SHALL REPLACE WITH EQUAL MATERIAL OR AS DIRECTED BY THE SIDEWALKS, IRRIGATION SYSTEMS, UNDERGROUND PIPING, ETC., DISTURBED OR DAMAGED BY THE THE CONTRACTOR SHALL REPLACE ALL PAVING, SODDING, STABILIZED EARTH, LANDSCAPING, DRIVEWAYS, 8.
: 88 DATUM.
ALL ELEVATIONS SHOWN ON THESE DRAWINGS REFER TO NATIONAL GEODETIC VERITCAL DATUM (NGVD)
10.
BE STORED BY CONTRACTOR ON-SITE AS DIRECTED BY THE OWNER OR ENGINEER.
REMOVED SHALL REMAIN THE PROPERTY OF CITY OF EDGEWATER (OWNER). ALL ITEMS REMOVED SHALL UNLESS OTHERWISE SPECIFIED ON THE DRAWINGS OR IN THE SPECIFICATIONS. ALL ITEMS NOTED TO BE
9.
EXISTING FIRM LINE
ZONE AE (BFE: 5)
ZONE AE (BFE: 6)
EXISTING EDGE OF WATER
NOTE: TOP OF WATER ON 04-01-2024
AT 9:51 am AT ELEVATION= -1.4'
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text Scale: 1"=
30'
WV
1.55
LP
2.14
E
EJB
2.39
PALM
14"
TOB
TOB TOB
TOB
TOB
TOB
TOB
TOB TOB
TOB
TOB
TOB
TOB
TOB
TOB
TOB
-4
-3
-2
-2
-1
-1
-2
-3
-1
-2
-1
N67°18'17"E 4 49.00'
EX TRASH CAN
020 20 40
Sheet 3
44629.010
DKB
SPH
MAY 2024
1 2 3 4 5 6 7 8
M
EN
AR
D
M
AY
P
AR
K D
O C
K
RE
PL
AC
EM
EN
T D
EM
O
LI
TI
O N
/E
RO
SI
O
N
DUANE K. BOOTH, P.E.
Registered Eng 44631
JOB NO.:
CHECKED BY.:
DRAWN BY:
DATE:
DESIGNED BY:
FILE NAME:
R E
V
IS
IO
N
D A
T E
C ity
O f E dg ew at er
, F lo rid a
N o rt h
S in cl ai r A ve
C er tif ic at e o f
A ut h o ri za tio n
N um b er
: 3
Fa x:
.3
.8
O ff ic e:
.3
.8
Ta va re s, F lo ri d a
E. OCEAN AVENUE
DEMOLITION LEGEND
EXISTING DOCK TO BE REMOVED
TURBIDITY BARRIER
SILT FENCE
TYPE I FLOATING TURBIDITY BARRIERNOT TO SCALE
REINFORCEMENT NETTING
FILTER FABRICPOST
OF FLOW
DIRECTION
GRANULAR BACKFILL
BOTTOM 6" OF
FILTER FABRIC
6"x6" TRENCH
NATIVE SOIL
TEMPORARY CONSTRUCTION ENTRANCE
1. THE AREA OF THE ENTRANCE SHOULD BE CLEARED OF ALL
VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL.
A GEOTEXTILE SHOULD BE LAID DOWN TO IMPROVE STABILITY
AND SIMPLIFY MAINTENANCE. THE GRAVEL SHALL THEN BE
PLACED OVER THE GEOTEXTILE TO THE SPECIFIED DIMENSIONS.
2. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION
WHICH WILL PREVENT TRACKING OF MUD ONTO PUBLIC ROADS.
THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE,
AS CONDITIONS DEMAND. ALL MATERIALS SPILLED, DROPPED, OR
TRACKED FROM VEHICLES ONTO ROADWAYS MUST BE REMOVED
IMMEDIATELY. LOOK FOR SIGNS OF TRUCKS AND TRAILERED
EQUIPMENT "CUTTING CORNERS" WHERE THE GRAVEL MEETS THE
ROADWAY. SWEEP THE PAVED ROAD DAILY FOR SEDIMENTS.
EXISTING FIRM LINE
ZONE AE (BFE: 5)
INSTALL FLOATING TURBIDITY
INSTALL SILT FENCE (TYP)
BARRIER (TYP)
EDGE OF WATER
NOTE: TOP OF WATER
SHOT ON 4-1-2024, 9:51 a.m.
ELEVATION = -1.4'
EXISTING CONCRETE TO REMAIN
AND CONNECT TO PROPOSED DOCK
ACCESS
CONTRACTOR TO REMOVE STONES FROM WATER
SHORELINE ERODED FROM REVETMENT AND RE-STACK
ON THE REVETMENT TO RESTORE EROSION PROTECTION
REMOVE & DISPOSE EXISTING DOCK
AND REMOVE ALL EXISTING WOOD PILES
(TYPICAL)
will be stabilized with permanent seed and mulch or sod.
temporary seed and and mulch. Once construction activity ceases permanently in any area, that area Areas where construction activity temporarily ceases for more than 14-days shall be stabilized with Silt fence and floating turbidity barriers shall be installed prior to any construction activity.
excess dirt and mud from tires before construction vehicles enter adjacent paved streets.
will be covered with a tarp. Temporary stabilized or rock construction entrance may be required to remove or rock from leaving the construction site. All dump trucks hauling material to and from the construction site Paved streets adjacent to the construction site entrance will be swept as needed to prevent excess mud, dirt and in accordance with the construction specification documents. Permanent vegetation will include sod or seed Where construction is complete, permanent vegetation shall be installed as specified on the construction plans specification in Section 6 of the Florida Land Development Manual: A Guide to Land and Water Management contractor must implement additional best management practices as necessary, in accordance with the prevent erosion or control sediment, beyond those specified in the erosion and sediment control plan, the
12. If site specific conditions require additional measures during any phase of construction or operation to
11. To provide dust control, a contractor shall provide a water truck or irrigation system as needed, to maintain
10. Any accumulated sediment deposits remaining in place after the barriers are no longer required shall be susceptible to being washed into any water course by runoff or high water.
9. Material from sediment traps shall not be stock piled or disposed of in a manner which makes them readily
8. Placement of barriers or necessary repairs to barriers shall be accomplished promptly.
removed when the level of deposition reaches approximately one-half the height of the barrier.
during construction of the project. Sediment deposits should be removed after each rainfall. They must be
7. Erosion and sediment control measures shall be adequately maintained to perform their intended function final grading of the effected land surfaces. A permanent vegetative cover must be established within sixty (60) land surfaces disturbed by construction. This protective cover must be installed within fourteen (14) days after
6. The contractor will install a permanent protective vegetative cover for erosion and sediment control on all fourteen (14) days after the construction activity in any portion of the site that has ceased.
5. Stabilization measures shall be initiated for erosion and sediment control on disturbed areas no more than
4. The contractor shall minimize the extent of area exposed at any one time and the duration of exposure.
initial work area to protect the project, adjacent properties and water resources.
permanent and temporary erosion and sediment control measures around the perimeter of the project or the consistent with good construction practices. One of the first construction activities should be the placement of
3. Permanent erosion and sediment control measures shall be installed at the earliest practicable time economical, effective and continuous control throughout the construction phase. Temporary measures shall not
2. Temporary erosion and sediment control measures shall be coordinated with permanent measures to assure grades may cause erosion problems. Erosion control structures may be removed after upslope area has been
1. Temporary erosion control structures shall be utilized during construction at areas on-site where unstabilized
EROSION AND SEDIMENT CONTROL
THE FOLLOWING LIST REPRESENTS A BASIC EROSION AND SEDIMENT CONTROL PROGRAM WHICH IS TO BE IMPLEMENTED TO HELP PREVENT OFF-SITE SEDIMENTATION DURING AND AFTER CONSTRUCTION
TIMING OF SEDIMENT AND EROSION CONTROL MEASURES
A. OFFSITE VEHICLE TRACKING
OTHER CONTROLS
(Florida Department of Environmental Regulation, 1988).
dressed to conform to the existing grade, prepared and seeded.
B. PERMANENT STABILIZATION
soil moisture.
days after planting or installation.
and mulch.
be constructed for expediency in lieu of permanent measures.
stabilized by sod or compacted as determined by the Contractor.
A. EROSION CONTROL DURING CONSTRUCTION
EROSION AND SEDIMENT CONTROLS
NOT TO SCALE
OF THE PROJECT.
ZONE AE (BFE: 6)
C O
N
TR
O L
PL
AN
AS DIRECTED BY CITY.
EXISTING REUSE PIPE
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text Scale: 1"=
AutoCAD SHX Text 20'
AutoCAD SHX Text
%%UNOTES:
AutoCAD SHX Text
WITH LACING GROMMETS
AutoCAD SHX Text PVC FABRIC (300 psi TEST)
AutoCAD SHX Text
18 OZ. NYLON REINFORCED
AutoCAD SHX Text
CALLED FOR IN THE PLANS OR AS DETERMINED BY THE
AutoCAD SHX Text
10 FEET UNLESS SPECIAL DEPTH CURTAINS SPECIFICALLY
AutoCAD SHX Text
TWO (2) PANELS TO BE USED FOR DEPTHS GREATER THAN
AutoCAD SHX Text
CURTAIN TO REACH BOTTOM UP TO DEPTHS OF 10 FEET.
AutoCAD SHX Text
D = 5' STD. (ADDITIONAL PANEL FOR DEPTHS > 5')
AutoCAD SHX Text
D = 5' STD. (SINGLE PANEL FOR DEPTHS 5' OR LESS).
AutoCAD SHX Text
ENGINEER.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1/4" GALVANIZED CHAIN
AutoCAD SHX Text
FLOATATION (6" DIS. EQUIV.) (12 LBS.
AutoCAD SHX Text
CLOSED CELL SOLID PLASTIC FOAM
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text
STRENGTH)
AutoCAD SHX Text
(600 LBS. BREAKING
AutoCAD SHX Text
5/8" POLYPRO ROPE
AutoCAD SHX Text
PER FT. BUOYANCY)
AutoCAD SHX Text
AutoCAD SHX Text D
%%USILT BARRIER DETAIL
WV
1.55
LP
2.14
E
EJB
2.39
PALM
14"
TOB
TOB TOB
TOB
TOB
TOB
TOB
TOB TOB
TOB
TOB
TOB
TOB
TOB
TOB
TOB
-4
-3
-2
-2
-1
-1
-2
-3
-1
-2
-1
N67°18'17"E 4 49.00'
EX TRASH CAN
010 10 20
Sheet 4
44629.010
DKB
SPH
MAY 2024
1 2 3 4 5 6 7 8
M
EN
AR
D
M
AY
P
AR
K D
O C
K
RE
PL
AC
EM
EN
T
G
EO
M
ET
RY
P
LA
N
DUANE K. BOOTH, P.E.
Registered Eng 44631
JOB NO.:
CHECKED BY.:
DRAWN BY:
DATE:
DESIGNED BY:
FILE NAME:
R E
V
IS
IO
N
D A
T E
C ity
O f E dg ew at er
, F lo rid a
N o rt h
S in cl ai r A ve
C er tif ic at e o f
A ut h o ri za tio n
N um b er
: 3
Fa x:
.3
.8
O ff ic e:
.3
.8
Ta va re s, F lo ri d a
E. OCEAN AVENUE
EDGE OF WATER
NOTE: TOP OF WATER
SHOT ON 4-1-2024, 9:51 a.m.
ELEVATION = -1.4'
EXISTING FIRM LINE
ZONE AE (BFE: 5)
ZONE AE (BFE: 6)
21.00'
116.00'
5.82'
9.64'
9.40'
6.00' 0.33'
(TYP)
8.00'
(TYP)
4.00'
8.00'
(TYP)
4.00' 0.66'
0.33'
(TYP)
8.00' 8.00' 8.00'
CONSTRUCT 8" DIA. PILING (TYP)
CONSTRUCT 6' WIDE DOCK
(SEE TYPICAL SECTIONS)
CONSTRUCT CONCRETE SIDEWALK
4" THICK, 3,000 PSI (SEE DETAIL)
MATCH EXISTING SIDEWALK
2.80
2.81
2.
2.90
2.
3.
3.40
3.
40 3.40
3.
3.40
3.
3.
3.
407.67'
6.67' 8.00'
8.00' 5.00'
27.00'
15.00'
5.00'
8.00'
7.67'
8.00'
7.67'
APPROXIMATE LOCATION OF
EXISTING REVETMENT TO BE
RESTORED.
APPROXIMATE LOCATION OF
EXISTING REVETMENT TO BE
RESTORED.
EX. REUSE PIPE
2.85
3.95% S
LO
PE
0.00% S
LO
PE
0.00% S
LO
PE
0.00% S
LO
PE
1.06%
12.66' PIER @ 3.95% SLOPE
MEETS A.D.A.
A D
D E
D A
D A
A N
D S
L O
P E
P E
R C
IT
Y
C O
M M
E N
T S
-2
-2
WITH 12" WIDE x 18" DEPTH THICKENED
EDGE (SHADED AREA- SEE DETAIL)
A D
D E
D T
H
IC
K E
N E
D E
D G
E T
O C
O N
C R
E T
E W
A L K
-9
-2
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text Scale: 1"=
10'
Sheet 5
44629.010
DKB
SPH
MAY 2024
1 2 3 4 5 6 7 8
M
EN
AR
D
M
AY
P
AR
K D
O C
K
RE
PL
AC
EM
EN
T
D
ET
AI
L
SH
EE
T
DUANE K. BOOTH, P.E.
Registered Eng 44631
JOB NO.:
CHECKED BY.:
DRAWN BY:
DATE:
DESIGNED BY:
FILE NAME:
R E
V
IS
IO
N
D A
T E
C ity
O f E dg ew at er
, F lo rid a
N o rt h
S in cl ai r A ve
C er tif ic at e o f
A ut h o ri za tio n
N um b er
: 3
Fa x:
.3
.8
O ff ic e:
.3
.8
Ta va re s, F lo ri d a
6.0'
18" O.C.
(TYP)
3" (T
Y P
TYPICAL DOCK SECTION
NTS
P.T. SYP 2 x 8 WITH (2) 3" SS
SCREWS AT EACH JOIST (TYP)
P.T. SYP 2 x 12 CAP WITH 3" S.S. SCREWS
P.T. SYP 2 x 8 (TYP)
P.T. SYP 2 x 10 CROSSBEAM EACH SIDE (TYP)
(2) 5/8" DIA. S.S. THROUGH BOLTS
WITH 2" WASHERS (TYP. BOTH SIDES)
(2) 3/8" x 4" DIA. S.S. LAG SCREWS
WITH 1 1/2" WASHERS (TYP. BOTH SIDES)
P.T. 8" DIA. SYP WOOD PILING (TYP)
P.T. SYP 2 x 6 CROSS BRACE EACH SIDE
NO. 2 GRADE (TYPICAL)
OHW ELEV. = 2.30
FINISH DOCK ELEV. = 3.40
NOTE:
1. ALL WOOD TO BE DENSE SELECT STRUCTURAL (DSS) GRADE.
P.T. SYP 2 x 6 x 2' Scab Block at Joists Splice (Typ)
(2) 16d GALVANIZED
TOE NAIL EACH
AT 18" O.C. (TYP)
P.T. SYP 2 x 8 TO EACH POST (TYP)
CONCRETE SIDEWALK SECTION
ON DRAWINGS
SLOPE 1.50% MAX.
5'-0" UNLESS OTHERWISE NOTED
3000 P.S.I.
CONC. WITH FIBER
SECTION
4" (MIN.)
6"x6"x10/10 WWF
NOT TO SCALE
6"
12" 12"
6" COMPACTED BASE
MIN. 95% AASHTO T-99
DETAIL / HANDRAIL
NTS
8" DIA. SYP WOOD PILING (TYP)
P.T. SYP 2 x 12 CAP WITH 3" S.S. SCREWS
AT 18" O.C. (TYP)
P.T. SYP 2 x 8 WITH (2) 3/8" DIA. CARRIAGE BOLT W/
NOTES:
2"
8" D ia S
Y P
W oo d P ili ng
8" D ia S
Y P
W oo d P ili ng
4' -0
" A bo ve H ig h
W at er L in e 2"
TYPICAL DOCK ELEVATION SECTION
NTS
P.T. SYP 2 x 8 JOIST @ 18" O.C. (TYP)
P.T. SYP 2 x 12 CAP WITH 3" S.S. SCREWS
AT 18" O.C. (TYP) FOR RAILING CAP
P.T. SYP 2 x 8 (TYP)
P.T. SYP 2 x 8 (TYP)
P.T. SYP 2 x 8 (TYP)
P.T. SYP 2 x 8 (TYP)
3"
TY
P
P.T. SYP 2 x 8 or THRU FLOW
DECK (ALTERNATE)
8.00' MAXIMUM
" M
IN
P.T. SYP 2 x 10 CROSS BEAM (TYP)
P.T. SYP 2 x 10 CROSS BEAM (TYP)
(2) 5/8" S.S. ALL THREAD ROD AND
S.S. NUTS AND WASHERS.(2) 5/8" S.S. ALL THREAD ROD AND
S.S. NUTS AND WASHERS.
FINISH DOCK ELEV. = 3.40
WITH PILE GUARD NOTE.
(3) 16d GALV. NAILS EACH
SIDE OF SPLICE
SIDE OF JOIST (TYP)
(2) 3/8" DIA. CARRIAGE BOLT
W/ NUT & WASHER (TYP)
ALTERNATE: THRU FLOW DECK
SERIES 50 (1 x 3)
WITH #10 PAN HEAD SS SCREWS
SEE MANUFACTURERS SPECIFICATIONS
FOR INSTALLATION.
2. CONTRACTOR TO COORDINATE WITH CITY FOR THRU FLOW DECK
COLOR SELECTION OF GREY OR MAPLE IF ALTERNATE IS SELECTED CHOICE.
NUT & WASHER (TYP)
1/4" ROUNDED (TYP)
OHW ELEV. = 2.30
S.S. HURRICANE STRAP W/
1 1/2" S.S. SCREWS.
1 @ EACH JOIST & CROSSBEAM
1 STRAP PER JOIST @ EACH PILE LOCATION
ALL WOOD FRAMING TO BE PRESSURE TREATED
SOUTHERN YELLOW PINE (SYP) NUMBER ONE GRADE,
DENSE STRUCTURAL SELECT (DSS), 2.5 lb p.c.f CCA.
ALL FASTENERS, UNLESS NOTED OTHERWISE SHALL
BE 304 OR 316 STAINLESS STEEL (S.S.)
CONCRETE, SHALL BE 3,000 P.S.I. WITH LIGHT BROOM FINISH.
PILES GRADED IN ACCORDANCE WITH ASTM D25
TREATED TO 2.5 lb. p.c.f. CCA.
1.
2.
3.
4.
FRAMING DETAIL
SCALE: 1" = 5'
3.00' 3.00'
27.00'
3.00' 3.00' 3.00' 3.00' 3.00' 3.00' 3.00'
18" 18"
18"
18"
18" 18"
18"
18"
18" 18"
17"
2 x 8 JOIST END CAP (TYP.)
2 x 8 JOIST (TYP.)
8" DIA. SYP, ASTM D25, 2.5 CCA
WITH PILE GUARD PVC-T OR
APPROVED EQUAL.
INSTALL 18" BELOW MUD
LINE TO 18" ABOVE MHWL (ALL PILES)
2 x 10 PT SYP CROSS BEAM (TYP.)
INTERIOR PILE TOP TO BE
FLUSH WITH JOIST (TYP.)
.0
0'
(TYPICAL)
17" O.C.
(TYP)
17" 18"
18" 18"
18" 18"
18"
INSTALL LIGHT POST & LIGHT FIXTURE
(SEE DETAIL)
ALL PILES TO BE
EMBEDDED 18' MIN.
DEPTH (TYP)
' A
B O
V E
D E
C K
FINISH DOCK ELEV.
LIGHT POLE DETAIL
N.T.S.
CONTRACTOR TO COORDINATE WITH CITY FOR
COLOR TEMP & LUMEN OUTPUT.
(2) 3/8" DIA. CARRIAGE BOLT
W/ NUT & WASHER (TYP)
PT SYP 6 x 6 POST
TO MOUNT LIGHT
(2) 3/8" DIA. CARRIAGE BOLT
W/ NUT & WASHER (TYP)
INSTALL EXO SGF1-60-LSCS-UNVC LIGHT
FIXTURE TO BE CONNECTED TO EXIST. CIRCUIT.
PIER DESIGN TO MEET FLORIDA BUILDING CODE 2023, 8th EDITION.5.
PIER DESIGN TO MEET 140 M.P.H. WIND ZONE.6. A
D
D E
D N
O T
E S
P E
R C
IT
Y
C O
M M
E N
T S
-2
-2
Sheet 6
44629.010
DKB
SPH
MAY 2024
1 2 3 4 5 6 7 8
M
EN
AR
D
M
AY
P
AR
K D
O C
K
RE
PL
AC
EM
EN
T
D
ET
AI
L
SH
EE
T
DUANE K. BOOTH, P.E.
Registered Eng 44631
JOB NO.:
CHECKED BY.:
DRAWN BY:
DATE:
DESIGNED BY:
FILE NAME:
R E
V
IS
IO
N
D A
T E
C ity
O f E dg ew at er
, F lo rid a
N o rt h
S in cl ai r A ve
C er tif ic at e o f
A ut h o ri za tio n
N um b er
: 3
Fa x:
.3
.8
O ff ic e:
.3
.8
Ta va re s, F lo ri d a
6.0'
18" O.C.
(TYP)
3" (T
Y P
ALTERNATE TYPICAL DOCK SECTION ECOPILE
NTS
P.T. SYP 2 x 8 WITH (2) 3" SS
SCREWS AT EACH JOIST (TYP)
P.T. SYP 2 x 12 CAP WITH 3" S.S. SCREWS
P.T. SYP 2 x 8 (TYP)
P.T. SYP 2 x 10 CROSSBEAM EACH SIDE (TYP)
(2) 5/8" DIA. S.S. THROUGH BOLTS
WITH 2" WASHERS (TYP. BOTH SIDES)
(2) 3/8" x 4" DIA. S.S. LAG SCREWS
WITH 1 1/2" WASHERS (TYP. BOTH SIDES)
10" DIA. ECOPILE (TYP)
P.T. SYP 2 x 6 CROSS BRACE EACH SIDE
NO. 2 GRADE (TYPICAL)
OHW ELEV. = 2.30
FINISH DOCK ELEV. = 3.40
NOTE:
1. ALTERNATE ECOPILE 10" DIAMETER - 30' LONG.
P.T. SYP 2 x 6 x 2' Scab Block at Joists Splice (Typ)
(2) 16d GALVANIZED
TOE NAIL EACH
AT 18" O.C. (TYP)
P.T. SYP 2 x 8 TO EACH POST (TYP)
2"
" D ia P ili ng
" D ia P ili ng
4' -0
" A bo ve H ig h
W at er L in e 2"
ALTERNATE TYPICAL DOCK ELEVATION SECTION WITH ECOPILE
NTS
P.T. SYP 2 x 8 JOIST @ 18" O.C. (TYP)
P.T. SYP 2 x 12 CAP WITH 3" S.S. SCREWS
AT 18" O.C. (TYP) FOR RAILING CAP
P.T. SYP 2 x 8 (TYP)
P.T. SYP 2 x 8 (TYP)
P.T. SYP 2 x 8 (TYP)
P.T. SYP 2 x 8 (TYP)
3"
TY
P
P.T. SYP 2 x 8 or THRU FLOW
DECK (ALTERNATE)
8.00' MAXIMUM
" M
IN
P.T. SYP 2 x 10 CROSS BEAM (TYP)
P.T. SYP 2 x 10 CROSS BEAM (TYP)
(2) 5/8" S.S. ALL THREAD ROD AND
S.S. NUTS AND WASHERS.(2) 5/8" S.S. ALL THREAD ROD AND
S.S. NUTS AND WASHERS.
FINISH DOCK ELEV. = 3.40
(3) 16d GALV. NAILS EACH
SIDE OF SPLICE
SIDE OF JOIST (TYP)
ALTERNATE: THRU FLOW DECK
SERIES 50 (1 x 3)
WITH #10 PAN HEAD SS SCREWS
SEE MANUFACTURERS SPECIFICATIONS
FOR INSTALLATION.
OHW ELEV. = 2.30
S.S. HURRICANE STRAP W/
1 1/2" S.S. SCREWS.
1 @ EACH JOIST & CROSSBEAM
1 STRAP PER JOIST @ EACH PILE LOCATION
(TYPICAL)
17" O.C.
(TYP)
ALTERNATE DESIGN WITH ECOPILE
N.T.S.
SIDE VIEW TOP VIEW
(2) 3/8" DIA. CARRIAGE BOLT
W/ NUT & WASHER (TYP)
(2) 3/8" DIA. CARRIAGE BOLT
W/ NUT & WASHER (TYP)
CUT PILE TO INSERT
2 x 8
(2) 3" SS SCREWS
(TYP)
(2) 3" SS SCREWS
(TYP)
NOTE: 10' DIA. ECOPILE 30' LONG.
P.T. 2 x 12 CAP WITH 3" S.S. SCREWS
AT 18" O.C. (TYP)
11.5"
PT SYP 2 x 8 Brace (TYP)1/4" ROUNDED (TYP)
(SEE TOP & SIDE VIEW DETAIL)
(SEE SIDE VIEW DETAIL)
2. ALL WOOD TO BE DENSE SELECT STRUCTURAL (DSS) GRADE.
3. CONTRACTOR TO COORDINATE WITH CITY FOR THRU FLOW DECK
COLOR SELECTION OF GREY OR MAPLE IF ALTERNATE IS SELECTED CHOICE.
NOTES:
ALL WOOD FRAMING TO BE PRESSURE TREATED
SOUTHERN YELLOW PINE (SYP) NUMBER ONE GRADE,
DENSE STRUCTURAL SELECT (DSS), 2.5 lb p.c.f CCA.
ALL FASTENERS, UNLESS NOTED OTHERWISE SHALL
BE 304 OR 316 STAINLESS STEEL (S.S.)
CONCRETE, SHALL BE 3,000 P.S.I. WITH LIGHT BROOM FINISH.
PILES GRADED IN ACCORDANCE WITH ASTM D25
TREATED TO 2.5 lb. p.c.f. CCA.
1.
2.
3.
4.
PIER DESIGN TO MEET FLORIDA BUILDING CODE 2023, 8th EDITION.5.
PIER DESIGN TO MEET 140 M.P.H. WIND ZONE.6.
A D
D E
D N
O T
E S
P E
R C
IT
Y
C O
M M
E N
T S
-2
-2
SIDEWALK AND DOCK TRANSITION
N.T.S.
12"
8"
ELEV. = 2.90
3.95%
CONSTRUCT CONCRETE SIDEWALK
4" THICK, 3,000 PSI (SEE DETAIL)
WITH 12" WIDE x 18" DEPTH THICKENED
EDGE (SEE SHADED AREA- SITE PLAN)
2 x 8 END CAP (TYP)
A D
D E
D S
ID
E
W A
L K
/D O
C K
T R
A N
S
IT
IO
N
-9
-2
| Sheets and Views |
| (01) Cover Sheet |
| Sheets and Views |
| (02) Aerial Plan |
| Sheets and Views |
| (03) Demolition Plan |
| Sheets and Views |
| (04) Site Plan |
| Sheets and Views |
| (05) Detail Sheet |
| Sheets and Views |
| (06) Detail Sheet |
File details come from the government source that posted it. Updated .