SOV_7-23-24_revised_8-27-24_(Alt_for_Fortified_Structure).pdf

PDF 41 KB Posted

Attached to
Menard May Park Observation Pier Replacement - Construction State and local contract opportunity
Solicitation number
ITB 25-PR-04
Issued by
Volusia County, Florida

About this file

This document is a Schedule of Unit Prices for the City of Edgewater's Menard May Park Observation Pier Replacement project, located in Edgewater. The schedule details an alternative bid for a fortified structure, outlining 21 line items for pier reconstruction. The project involves comprehensive pier replacement activities including mobilization, removing existing pier and piles, survey control, rebuilding revetment, and installing various structural components such as eco piles, decking, railings, and lighting infrastructure. The detailed breakdown includes quantities for each item, specified in units like linear feet (LF), square feet (SF), board feet (BF), and lump sum (LS).

The total project cost is $208,639.06, with a subtotal of $202,629.06 for construction items and additional costs for a bid bond ($840.00) and a 110% payment and performance bond ($5,170.00). Notable high-cost items include 10" eco piles at $57,400.00, thru flow decking at $30,330.00, and pier and pile removal at $20,400.00. The pricing structure provides unit prices for each component, allowing for precise cost calculation and potential adjustments. The schedule suggests this is an alternative bid option for a fortified pier structure, indicating flexibility in the project's design and construction approach.

View the file

Other files for this state and local contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Description Quantity Unit Unit Price Contract Value

1 Mobilization 1 LS 25,000.00$ 25,000.00$ 2 Silt Fence 42 LF 3.68$ 154.56$ 3 Floating Turbidity Barrier 130 LF 16.00$ 2,080.00$

Remove Existing Pier & Piles & Dispose 1 LS 20,400.00$ 20,400.00$

5 Survey Control 1 LS 4,000.00$ 4,000.00$ 6 Rebuild Revetment 1 LS 2,400.00$ 2,400.00$ 7 Concrete Sidewalk w/ Thicken Edge 81 SF 18.00$ 1,458.00$ 8 10" Eco Pile 41 EA 1,400.00$ 57,400.00$ 9 Pile Guard 320 LF 77.00$ 24,640.00$

10 2 x 10 Cross Beam 324 BF 6.00$ 1,944.00$ 11 2 x 6 Cross Brace 384 BF 3.75$ 1,440.00$ 12 2 x 8 Joist 905 BF 4.90$ 4,434.50$ 13 2 x 6 Scab Block 80 BF 3.75$ 300.00$

Thru Flow Decking (1 x 3 Surge Series 50) 337 EA 90.00$ 30,330.00$

15 2 x 8 Railing 1440 BF 4.90$ 7,056.00$ 16 2 x 12 Railing Cap 288 BF 9.00$ 2,592.00$ 17 6 x 6 Light Post 1 EA 200.00$ 200.00$

EXO Light, Conduit & Wire to Existing Circuit 1 LS 1,800.00$ 1,800.00$

Hardware (Bolts, Nuts, Washers, Screws, Nails, & Hurricane Straps) 1 LS 15,000.00$ 15,000.00$

Subtotal 202,629.06$ 20 Bid Bond 1 LS 840.00$ 840.00$

110% Payment & Performance Bond 1 LS 5,170.00$ 5,170.00$

Total Price 208,639.06$

CITY OF EDGEWATER

MENARD MAY PARK OBSERVATION PIER REPLACEMENT, EDGEWATER

SCHEDULE OF UNIT PRICES - ALT FOR FORTIFIED STRUCTURE

8-27-24