Menard_May_Park_Dock_Plans_Complete_Set_(8-9-2024)_(1).pdf

PDF 2 MB Posted

Attached to
Menard May Park Observation Pier Replacement - Construction State and local contract opportunity
Solicitation number
ITB 25-PR-04
Issued by
Volusia County, Florida

About this file

These construction plans are for the Menard May Park Dock Replacement project by the City of Edgewater, Florida, prepared by Halff Associates, Inc. The project involves constructing a new observation pier/dock at 413 South Riverside Drive, replacing an existing dilapidated wooden dock structure. The plans detail a 6-foot wide dock with 8-inch diameter Southern Yellow Pine (SYP) wood pilings, pressure-treated lumber framing, and specific design requirements including a 3.95% slope to meet ADA accessibility standards. The dock will feature a concrete sidewalk transition, light pole installation, and is designed to withstand 140 MPH wind zones per the Florida Building Code 2023, 8th Edition.

The project appears to be funded potentially through FEMA, as noted in the contract opportunity description. The construction plans include detailed specifications for materials, including pressure-treated Southern Yellow Pine lumber, stainless steel fasteners, and concrete with a 3,000 PSI rating. The dock design includes alternative options such as an EcoPile system and specific architectural details like railings, cross beams, and joists. The project has undergone revisions based on city comments, with the most recent modifications made on 8-9-2024, including adjustments to the sidewalk/dock transition and added ADA compliance features. The vicinity map and existing conditions plan indicate the project is located in a coastal area with specific environmental considerations.

View the file

Other files for this state and local contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOBBY COPELAND, FIELD OPERATIONS SUPEINTENDENT

(386) 424-2400 x4007

EDGEWATER, FLORIDA 32132

CITY OF EDGEWATER, FLORIDA

104 NORTH RIVERSIDE DRIVE

ENGINEER/SURVEYOR:

902 N SINCLAIR AVE

TAVARES, FL 32778

HALFF ASSOCIATES, INC.

(352) 343-8481

DUANE K. BOOTH, P.E., PROJECT ENGINEER

CITY ATTORNEY

AARON R. WOLFE

GLENN A. IRBY

CITY MANAGER

CITY CLERK

BONNIE ZLOTNIK

DISTRICT 1

DISTRICT 4

MAYOR

DIEZEL DEPEW

CHARLOTTE GILLIS

DEBBIE DOLBOW

GIGI BENNINGTON

JONAH POWERS

BRENDA DEWEES

DISTRICT 2

DISTRICT 3

V I C I N I T Y M A P

FOR

CONSTRUCTION PLANS

SCALE: 1" = 1000'

DOCK CONSTRUCTION

PROJECT AREA

INDEX OF SHEETS

AERIAL/EXISTING CONDITIONS PLAN

COVER SHEET

DEMOLITION/EROSION CONTROL PLAN

ISSUEDATE BY

OWNER/DEVELOPER:

GEOMETRY PLAN

DETAIL SHEET

MENARD MAY PARK

DIRECTOR OF

ENVIRONMENTAL SERVICES

RANDY J. COSLOW, P.E. - CITY ENGINEER / DIRECTOR

0 1 2 3 4 5

(INCHES)

ORIGINAL DOCUMENT SIZE 24"x36"

902 North Sinclair Ave.

Certificate of Authorization Number: 33380

Fax: 352.343.8495 Office: 352.343.8481

Tavares, Florida 32778

6 DETAIL SHEET

ADDED NOTES PER CITY COMMENTS7-26-2024

ADDED SIDEWALK/DOCK TRANSITION8-9-2024

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text W

AutoCAD SHX Text N

TRAV SIRC

2.65

TRAV SIRC

3.70

FIRC 5/8 NOT LEGIBLE

5.80

FIP 11/4 NOID

7.75

FCM 4X4 2599

2.80

FIR 1/2 NOID

3.25

FIR 3/4 NOID

3.58

SBM SND REF

2.37 WV

1.55

LP

2.14

E

EJB

2.39

PALM

14"

TOB

TOB TOB

TOB

TOB

CONCRETE

RETAINING

WALL BORDER

AROUND

PLAYGROUND

CONCRETE SIDEWALK

C O

N C

R E

TE

S

ID

E

W A

LK

DIRT PARKING LOT

Existing Reuse Pipe

CAUTION SIGN

"DO NOT DRINK RECLAIM WATER"

DILAPIDATED / DAMAGED

WOOD DOCK

-4

-3

-2

-2

-2

-1

-1

-2

-3

-1

-2

-1

-3

-3

SITE BENCHMARK 1

SET NAIL & DISK

IN CONCRETE CURB

"HALFF WIT LB8348"

NORTHING: 1692469.78'

EASTING: 687806.44'

ELEVATION: 2.36'

SITE BENCHMARK 2

SET 5/8" IRON ROD W/ CAP

"TRAV HALFF"

NORTHING: 1692296.56'

EASTING: 687392.21'

ELEVATION: 3.70'

INDIAN RIVER NORTH

APPROXIMATE

PARCEL LINES

APPROXIMATE

PARCEL LINE

TRASH

CAN

N67°18'17"E 4 49.00'

EX TRASH CAN

030 30 60

Sheet 2

44629.010

DKB

SPH

MAY 2024

1 2 3 4 5 6 7 8

M

EN

AR

D

M

AY

P

AR

K D

O C

K

RE

PL

AC

EM

EN

T

AE

RI

AL

E

XI

ST

IN

G

C O

N D

IT

IO

N S

PL

AN

DUANE K. BOOTH, P.E.

Registered Eng 44631

JOB NO.:

CHECKED BY.:

DRAWN BY:

DATE:

DESIGNED BY:

FILE NAME:

R E

V

IS

IO

N

D A

T E

C ity

O f E dg ew at er

, F lo rid a

N o rt h

S in cl ai r A ve

C er tif ic at e o f

A ut h o ri za tio n

N um b er

: 3

Fa x:

.3

.8

O ff ic e:

.3

.8

Ta va re s, F lo ri d a

EXISTING REMAINS OF DOCK

EXISTING CONCRETE WALK

EXISTING EFFLUENT REUSE LINE

S. RIVERSID

E D

RIVE

E. OCEAN AVENUE

GENERAL NOTES

ALL CONSTRUCTION SHALL CONFORM TO THE CITY OF EDGEWATER STANDARDS.

5.

6.

7.

AGENCIES; WHICHEVER REQUIREMENT IS MORE STRINGENT.

CONTROL MEASURES AS DETAILED, SPECIFIED OR AS REQUIRED BY THE JURISDICTIONAL REGULATORY WATERWAY OR WATER SURFACE, THE CONTRACTOR SHALL PROVIDE CROSSING AND SEDIMENTATION WHEN CONSTRUCTION ACTIVITIES DISTURB AREAS WITHIN 10 FEET OF A TOP OF BANK FOR ANY

RESTORED TO ORIGINAL LINE AND GRADE UNLESS APPROVED BY THE ENGINEER. ACCESS TO ADJOINING ALL EXISTING PROPERTY, FENCING, DRIVEWAYS, PIPING, SIDEWALKS, SIGNS AND OTHER ITEMS SHALL BE

CONTRACTOR'S OPERATIONS SHALL BE RESODDED, LANDSCAPED, OR REPAIRED WITH LIKE KIND.

ALL AREAS WHERE LANDSCAPING, SOD, OR IRRIGATION HAS BEEN REMOVED OR DISTURBED BY

PROPERTY ALONG THE PROPOSED ROUTE SHALL BE MAINTAINED AT ALL TIMES.

1.

2.

RESPECTIVE UTILITY.

4.

CONSTRUCTION.

3.

OF ALL LOCATIONS PER THE CONTRACT SPECIFICATIONS.

PORTIONS OF THE WORK USING ALL INFORMATION PROVIDED HEREIN AND SHALL MAINTAIN RECORDS PROJECT BASELINE STATIONING SHOWN IS APPROXIMATE. THE CONTRACTOR SHALL LOCATE ALL

COORDINATE THE LOCATION OF ALL UNDERGROUND FACILITIES WITH A FIELD REPRESENTATIVE OF EACH MAY EXIST WITHIN THE PRIVATE RIGHTS-OF-WAY WITHIN THIS PROJECT. THE CONTRACTOR SHALL DUCTS. THE ENGINEER HAS NOT SHOWN ELECTRICAL AND TELEPHONE SERVICE CONNECTIONS WHICH SHOW AS MUCH AS POSSIBLE ALL MAIN ELECTRICAL AND TELEPHONE UNDERGROUND CABLES AND

THE CONTRACTOR SHALL INSURE ALL NECESSARY PERMITS ARE IN HAND BEFORE COMMENCEMENT OF

ON THE PLANS, ARE NOT CONSIDERED TO BE ALL INCLUSIVE. THE ENGINEER HAS ATTEMPTED TO UTILITY OWNER USING THE LATEST INFORMATION AVAILABLE. HOWEVER, THESE LOCATIONS, AS SHOWN INFORMATION REGARDING THE LOCATION OF EXISTING UTILITIES HAS BEEN OBTAINED FROM RESPECTIVE

ENGINEER OR OWNER.

CONSTRUCTION. THE CONTRACTOR SHALL REPLACE WITH EQUAL MATERIAL OR AS DIRECTED BY THE SIDEWALKS, IRRIGATION SYSTEMS, UNDERGROUND PIPING, ETC., DISTURBED OR DAMAGED BY THE THE CONTRACTOR SHALL REPLACE ALL PAVING, SODDING, STABILIZED EARTH, LANDSCAPING, DRIVEWAYS, 8.

: 88 DATUM.

ALL ELEVATIONS SHOWN ON THESE DRAWINGS REFER TO NATIONAL GEODETIC VERITCAL DATUM (NGVD)

10.

BE STORED BY CONTRACTOR ON-SITE AS DIRECTED BY THE OWNER OR ENGINEER.

REMOVED SHALL REMAIN THE PROPERTY OF CITY OF EDGEWATER (OWNER). ALL ITEMS REMOVED SHALL UNLESS OTHERWISE SPECIFIED ON THE DRAWINGS OR IN THE SPECIFICATIONS. ALL ITEMS NOTED TO BE

9.

EXISTING FIRM LINE

ZONE AE (BFE: 5)

ZONE AE (BFE: 6)

EXISTING EDGE OF WATER

NOTE: TOP OF WATER ON 04-01-2024

AT 9:51 am AT ELEVATION= -1.4'

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text Scale: 1"=

30'

WV

1.55

LP

2.14

E

EJB

2.39

PALM

14"

TOB

TOB TOB

TOB

TOB

TOB

TOB

TOB TOB

TOB

TOB

TOB

TOB

TOB

TOB

TOB

-4

-3

-2

-2

-1

-1

-2

-3

-1

-2

-1

N67°18'17"E 4 49.00'

EX TRASH CAN

020 20 40

Sheet 3

44629.010

DKB

SPH

MAY 2024

1 2 3 4 5 6 7 8

M

EN

AR

D

M

AY

P

AR

K D

O C

K

RE

PL

AC

EM

EN

T D

EM

O

LI

TI

O N

/E

RO

SI

O

N

DUANE K. BOOTH, P.E.

Registered Eng 44631

JOB NO.:

CHECKED BY.:

DRAWN BY:

DATE:

DESIGNED BY:

FILE NAME:

R E

V

IS

IO

N

D A

T E

C ity

O f E dg ew at er

, F lo rid a

N o rt h

S in cl ai r A ve

C er tif ic at e o f

A ut h o ri za tio n

N um b er

: 3

Fa x:

.3

.8

O ff ic e:

.3

.8

Ta va re s, F lo ri d a

E. OCEAN AVENUE

DEMOLITION LEGEND

EXISTING DOCK TO BE REMOVED

TURBIDITY BARRIER

SILT FENCE

TYPE I FLOATING TURBIDITY BARRIERNOT TO SCALE

REINFORCEMENT NETTING

FILTER FABRICPOST

OF FLOW

DIRECTION

GRANULAR BACKFILL

BOTTOM 6" OF

FILTER FABRIC

6"x6" TRENCH

NATIVE SOIL

TEMPORARY CONSTRUCTION ENTRANCE

1. THE AREA OF THE ENTRANCE SHOULD BE CLEARED OF ALL

VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL.

A GEOTEXTILE SHOULD BE LAID DOWN TO IMPROVE STABILITY

AND SIMPLIFY MAINTENANCE. THE GRAVEL SHALL THEN BE

PLACED OVER THE GEOTEXTILE TO THE SPECIFIED DIMENSIONS.

2. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION

WHICH WILL PREVENT TRACKING OF MUD ONTO PUBLIC ROADS.

THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE,

AS CONDITIONS DEMAND. ALL MATERIALS SPILLED, DROPPED, OR

TRACKED FROM VEHICLES ONTO ROADWAYS MUST BE REMOVED

IMMEDIATELY. LOOK FOR SIGNS OF TRUCKS AND TRAILERED

EQUIPMENT "CUTTING CORNERS" WHERE THE GRAVEL MEETS THE

ROADWAY. SWEEP THE PAVED ROAD DAILY FOR SEDIMENTS.

EXISTING FIRM LINE

ZONE AE (BFE: 5)

INSTALL FLOATING TURBIDITY

INSTALL SILT FENCE (TYP)

BARRIER (TYP)

EDGE OF WATER

NOTE: TOP OF WATER

SHOT ON 4-1-2024, 9:51 a.m.

ELEVATION = -1.4'

EXISTING CONCRETE TO REMAIN

AND CONNECT TO PROPOSED DOCK

ACCESS

CONTRACTOR TO REMOVE STONES FROM WATER

SHORELINE ERODED FROM REVETMENT AND RE-STACK

ON THE REVETMENT TO RESTORE EROSION PROTECTION

REMOVE & DISPOSE EXISTING DOCK

AND REMOVE ALL EXISTING WOOD PILES

(TYPICAL)

will be stabilized with permanent seed and mulch or sod.

temporary seed and and mulch. Once construction activity ceases permanently in any area, that area Areas where construction activity temporarily ceases for more than 14-days shall be stabilized with Silt fence and floating turbidity barriers shall be installed prior to any construction activity.

excess dirt and mud from tires before construction vehicles enter adjacent paved streets.

will be covered with a tarp. Temporary stabilized or rock construction entrance may be required to remove or rock from leaving the construction site. All dump trucks hauling material to and from the construction site Paved streets adjacent to the construction site entrance will be swept as needed to prevent excess mud, dirt and in accordance with the construction specification documents. Permanent vegetation will include sod or seed Where construction is complete, permanent vegetation shall be installed as specified on the construction plans specification in Section 6 of the Florida Land Development Manual: A Guide to Land and Water Management contractor must implement additional best management practices as necessary, in accordance with the prevent erosion or control sediment, beyond those specified in the erosion and sediment control plan, the

12. If site specific conditions require additional measures during any phase of construction or operation to

11. To provide dust control, a contractor shall provide a water truck or irrigation system as needed, to maintain

10. Any accumulated sediment deposits remaining in place after the barriers are no longer required shall be susceptible to being washed into any water course by runoff or high water.

9. Material from sediment traps shall not be stock piled or disposed of in a manner which makes them readily

8. Placement of barriers or necessary repairs to barriers shall be accomplished promptly.

removed when the level of deposition reaches approximately one-half the height of the barrier.

during construction of the project. Sediment deposits should be removed after each rainfall. They must be

7. Erosion and sediment control measures shall be adequately maintained to perform their intended function final grading of the effected land surfaces. A permanent vegetative cover must be established within sixty (60) land surfaces disturbed by construction. This protective cover must be installed within fourteen (14) days after

6. The contractor will install a permanent protective vegetative cover for erosion and sediment control on all fourteen (14) days after the construction activity in any portion of the site that has ceased.

5. Stabilization measures shall be initiated for erosion and sediment control on disturbed areas no more than

4. The contractor shall minimize the extent of area exposed at any one time and the duration of exposure.

initial work area to protect the project, adjacent properties and water resources.

permanent and temporary erosion and sediment control measures around the perimeter of the project or the consistent with good construction practices. One of the first construction activities should be the placement of

3. Permanent erosion and sediment control measures shall be installed at the earliest practicable time economical, effective and continuous control throughout the construction phase. Temporary measures shall not

2. Temporary erosion and sediment control measures shall be coordinated with permanent measures to assure grades may cause erosion problems. Erosion control structures may be removed after upslope area has been

1. Temporary erosion control structures shall be utilized during construction at areas on-site where unstabilized

EROSION AND SEDIMENT CONTROL

THE FOLLOWING LIST REPRESENTS A BASIC EROSION AND SEDIMENT CONTROL PROGRAM WHICH IS TO BE IMPLEMENTED TO HELP PREVENT OFF-SITE SEDIMENTATION DURING AND AFTER CONSTRUCTION

TIMING OF SEDIMENT AND EROSION CONTROL MEASURES

A. OFFSITE VEHICLE TRACKING

OTHER CONTROLS

(Florida Department of Environmental Regulation, 1988).

dressed to conform to the existing grade, prepared and seeded.

B. PERMANENT STABILIZATION

soil moisture.

days after planting or installation.

and mulch.

be constructed for expediency in lieu of permanent measures.

stabilized by sod or compacted as determined by the Contractor.

A. EROSION CONTROL DURING CONSTRUCTION

EROSION AND SEDIMENT CONTROLS

NOT TO SCALE

OF THE PROJECT.

ZONE AE (BFE: 6)

C O

N

TR

O L

PL

AN

AS DIRECTED BY CITY.

EXISTING REUSE PIPE

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text Scale: 1"=

AutoCAD SHX Text 20'

AutoCAD SHX Text

%%UNOTES:

AutoCAD SHX Text

WITH LACING GROMMETS

AutoCAD SHX Text PVC FABRIC (300 psi TEST)

AutoCAD SHX Text

18 OZ. NYLON REINFORCED

AutoCAD SHX Text

CALLED FOR IN THE PLANS OR AS DETERMINED BY THE

AutoCAD SHX Text

10 FEET UNLESS SPECIAL DEPTH CURTAINS SPECIFICALLY

AutoCAD SHX Text

TWO (2) PANELS TO BE USED FOR DEPTHS GREATER THAN

AutoCAD SHX Text

CURTAIN TO REACH BOTTOM UP TO DEPTHS OF 10 FEET.

AutoCAD SHX Text

D = 5' STD. (ADDITIONAL PANEL FOR DEPTHS > 5')

AutoCAD SHX Text

D = 5' STD. (SINGLE PANEL FOR DEPTHS 5' OR LESS).

AutoCAD SHX Text

ENGINEER.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

1/4" GALVANIZED CHAIN

AutoCAD SHX Text

FLOATATION (6" DIS. EQUIV.) (12 LBS.

AutoCAD SHX Text

CLOSED CELL SOLID PLASTIC FOAM

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text

STRENGTH)

AutoCAD SHX Text

(600 LBS. BREAKING

AutoCAD SHX Text

5/8" POLYPRO ROPE

AutoCAD SHX Text

PER FT. BUOYANCY)

AutoCAD SHX Text

AutoCAD SHX Text D

%%USILT BARRIER DETAIL

WV

1.55

LP

2.14

E

EJB

2.39

PALM

14"

TOB

TOB TOB

TOB

TOB

TOB

TOB

TOB TOB

TOB

TOB

TOB

TOB

TOB

TOB

TOB

-4

-3

-2

-2

-1

-1

-2

-3

-1

-2

-1

N67°18'17"E 4 49.00'

EX TRASH CAN

010 10 20

Sheet 4

44629.010

DKB

SPH

MAY 2024

1 2 3 4 5 6 7 8

M

EN

AR

D

M

AY

P

AR

K D

O C

K

RE

PL

AC

EM

EN

T

G

EO

M

ET

RY

P

LA

N

DUANE K. BOOTH, P.E.

Registered Eng 44631

JOB NO.:

CHECKED BY.:

DRAWN BY:

DATE:

DESIGNED BY:

FILE NAME:

R E

V

IS

IO

N

D A

T E

C ity

O f E dg ew at er

, F lo rid a

N o rt h

S in cl ai r A ve

C er tif ic at e o f

A ut h o ri za tio n

N um b er

: 3

Fa x:

.3

.8

O ff ic e:

.3

.8

Ta va re s, F lo ri d a

E. OCEAN AVENUE

EDGE OF WATER

NOTE: TOP OF WATER

SHOT ON 4-1-2024, 9:51 a.m.

ELEVATION = -1.4'

EXISTING FIRM LINE

ZONE AE (BFE: 5)

ZONE AE (BFE: 6)

21.00'

116.00'

5.82'

9.64'

9.40'

6.00' 0.33'

(TYP)

8.00'

(TYP)

4.00'

8.00'

(TYP)

4.00' 0.66'

0.33'

(TYP)

8.00' 8.00' 8.00'

CONSTRUCT 8" DIA. PILING (TYP)

CONSTRUCT 6' WIDE DOCK

(SEE TYPICAL SECTIONS)

CONSTRUCT CONCRETE SIDEWALK

4" THICK, 3,000 PSI (SEE DETAIL)

MATCH EXISTING SIDEWALK

2.80

2.81

2.

2.90

2.

3.

3.40

3.

40 3.40

3.

3.40

3.

3.

3.

407.67'

6.67' 8.00'

8.00' 5.00'

27.00'

15.00'

5.00'

8.00'

7.67'

8.00'

7.67'

APPROXIMATE LOCATION OF

EXISTING REVETMENT TO BE

RESTORED.

APPROXIMATE LOCATION OF

EXISTING REVETMENT TO BE

RESTORED.

EX. REUSE PIPE

2.85

3.95% S

LO

PE

0.00% S

LO

PE

0.00% S

LO

PE

0.00% S

LO

PE

1.06%

12.66' PIER @ 3.95% SLOPE

MEETS A.D.A.

A D

D E

D A

D A

A N

D S

L O

P E

P E

R C

IT

Y

C O

M M

E N

T S

-2

-2

WITH 12" WIDE x 18" DEPTH THICKENED

EDGE (SHADED AREA- SEE DETAIL)

A D

D E

D T

H

IC

K E

N E

D E

D G

E T

O C

O N

C R

E T

E W

A L K

-9

-2

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text Scale: 1"=

10'

Sheet 5

44629.010

DKB

SPH

MAY 2024

1 2 3 4 5 6 7 8

M

EN

AR

D

M

AY

P

AR

K D

O C

K

RE

PL

AC

EM

EN

T

D

ET

AI

L

SH

EE

T

DUANE K. BOOTH, P.E.

Registered Eng 44631

JOB NO.:

CHECKED BY.:

DRAWN BY:

DATE:

DESIGNED BY:

FILE NAME:

R E

V

IS

IO

N

D A

T E

C ity

O f E dg ew at er

, F lo rid a

N o rt h

S in cl ai r A ve

C er tif ic at e o f

A ut h o ri za tio n

N um b er

: 3

Fa x:

.3

.8

O ff ic e:

.3

.8

Ta va re s, F lo ri d a

6.0'

18" O.C.

(TYP)

3" (T

Y P

TYPICAL DOCK SECTION

NTS

P.T. SYP 2 x 8 WITH (2) 3" SS

SCREWS AT EACH JOIST (TYP)

P.T. SYP 2 x 12 CAP WITH 3" S.S. SCREWS

P.T. SYP 2 x 8 (TYP)

P.T. SYP 2 x 10 CROSSBEAM EACH SIDE (TYP)

(2) 5/8" DIA. S.S. THROUGH BOLTS

WITH 2" WASHERS (TYP. BOTH SIDES)

(2) 3/8" x 4" DIA. S.S. LAG SCREWS

WITH 1 1/2" WASHERS (TYP. BOTH SIDES)

P.T. 8" DIA. SYP WOOD PILING (TYP)

P.T. SYP 2 x 6 CROSS BRACE EACH SIDE

NO. 2 GRADE (TYPICAL)

OHW ELEV. = 2.30

FINISH DOCK ELEV. = 3.40

NOTE:

1. ALL WOOD TO BE DENSE SELECT STRUCTURAL (DSS) GRADE.

P.T. SYP 2 x 6 x 2' Scab Block at Joists Splice (Typ)

(2) 16d GALVANIZED

TOE NAIL EACH

AT 18" O.C. (TYP)

P.T. SYP 2 x 8 TO EACH POST (TYP)

CONCRETE SIDEWALK SECTION

ON DRAWINGS

SLOPE 1.50% MAX.

5'-0" UNLESS OTHERWISE NOTED

3000 P.S.I.

CONC. WITH FIBER

SECTION

4" (MIN.)

6"x6"x10/10 WWF

NOT TO SCALE

6"

12" 12"

6" COMPACTED BASE

MIN. 95% AASHTO T-99

DETAIL / HANDRAIL

NTS

8" DIA. SYP WOOD PILING (TYP)

P.T. SYP 2 x 12 CAP WITH 3" S.S. SCREWS

AT 18" O.C. (TYP)

P.T. SYP 2 x 8 WITH (2) 3/8" DIA. CARRIAGE BOLT W/

NOTES:

2"

8" D ia S

Y P

W oo d P ili ng

8" D ia S

Y P

W oo d P ili ng

4' -0

" A bo ve H ig h

W at er L in e 2"

TYPICAL DOCK ELEVATION SECTION

NTS

P.T. SYP 2 x 8 JOIST @ 18" O.C. (TYP)

P.T. SYP 2 x 12 CAP WITH 3" S.S. SCREWS

AT 18" O.C. (TYP) FOR RAILING CAP

P.T. SYP 2 x 8 (TYP)

P.T. SYP 2 x 8 (TYP)

P.T. SYP 2 x 8 (TYP)

P.T. SYP 2 x 8 (TYP)

3"

TY

P

P.T. SYP 2 x 8 or THRU FLOW

DECK (ALTERNATE)

8.00' MAXIMUM

" M

IN

P.T. SYP 2 x 10 CROSS BEAM (TYP)

P.T. SYP 2 x 10 CROSS BEAM (TYP)

(2) 5/8" S.S. ALL THREAD ROD AND

S.S. NUTS AND WASHERS.(2) 5/8" S.S. ALL THREAD ROD AND

S.S. NUTS AND WASHERS.

FINISH DOCK ELEV. = 3.40

WITH PILE GUARD NOTE.

(3) 16d GALV. NAILS EACH

SIDE OF SPLICE

SIDE OF JOIST (TYP)

(2) 3/8" DIA. CARRIAGE BOLT

W/ NUT & WASHER (TYP)

ALTERNATE: THRU FLOW DECK

SERIES 50 (1 x 3)

WITH #10 PAN HEAD SS SCREWS

SEE MANUFACTURERS SPECIFICATIONS

FOR INSTALLATION.

2. CONTRACTOR TO COORDINATE WITH CITY FOR THRU FLOW DECK

COLOR SELECTION OF GREY OR MAPLE IF ALTERNATE IS SELECTED CHOICE.

NUT & WASHER (TYP)

1/4" ROUNDED (TYP)

OHW ELEV. = 2.30

S.S. HURRICANE STRAP W/

1 1/2" S.S. SCREWS.

1 @ EACH JOIST & CROSSBEAM

1 STRAP PER JOIST @ EACH PILE LOCATION

ALL WOOD FRAMING TO BE PRESSURE TREATED

SOUTHERN YELLOW PINE (SYP) NUMBER ONE GRADE,

DENSE STRUCTURAL SELECT (DSS), 2.5 lb p.c.f CCA.

ALL FASTENERS, UNLESS NOTED OTHERWISE SHALL

BE 304 OR 316 STAINLESS STEEL (S.S.)

CONCRETE, SHALL BE 3,000 P.S.I. WITH LIGHT BROOM FINISH.

PILES GRADED IN ACCORDANCE WITH ASTM D25

TREATED TO 2.5 lb. p.c.f. CCA.

1.

2.

3.

4.

FRAMING DETAIL

SCALE: 1" = 5'

3.00' 3.00'

27.00'

3.00' 3.00' 3.00' 3.00' 3.00' 3.00' 3.00'

18" 18"

18"

18"

18" 18"

18"

18"

18" 18"

17"

2 x 8 JOIST END CAP (TYP.)

2 x 8 JOIST (TYP.)

8" DIA. SYP, ASTM D25, 2.5 CCA

WITH PILE GUARD PVC-T OR

APPROVED EQUAL.

INSTALL 18" BELOW MUD

LINE TO 18" ABOVE MHWL (ALL PILES)

2 x 10 PT SYP CROSS BEAM (TYP.)

INTERIOR PILE TOP TO BE

FLUSH WITH JOIST (TYP.)

.0

0'

(TYPICAL)

17" O.C.

(TYP)

17" 18"

18" 18"

18" 18"

18"

INSTALL LIGHT POST & LIGHT FIXTURE

(SEE DETAIL)

ALL PILES TO BE

EMBEDDED 18' MIN.

DEPTH (TYP)

' A

B O

V E

D E

C K

FINISH DOCK ELEV.

LIGHT POLE DETAIL

N.T.S.

CONTRACTOR TO COORDINATE WITH CITY FOR

COLOR TEMP & LUMEN OUTPUT.

(2) 3/8" DIA. CARRIAGE BOLT

W/ NUT & WASHER (TYP)

PT SYP 6 x 6 POST

TO MOUNT LIGHT

(2) 3/8" DIA. CARRIAGE BOLT

W/ NUT & WASHER (TYP)

INSTALL EXO SGF1-60-LSCS-UNVC LIGHT

FIXTURE TO BE CONNECTED TO EXIST. CIRCUIT.

PIER DESIGN TO MEET FLORIDA BUILDING CODE 2023, 8th EDITION.5.

PIER DESIGN TO MEET 140 M.P.H. WIND ZONE.6. A

D

D E

D N

O T

E S

P E

R C

IT

Y

C O

M M

E N

T S

-2

-2

Sheet 6

44629.010

DKB

SPH

MAY 2024

1 2 3 4 5 6 7 8

M

EN

AR

D

M

AY

P

AR

K D

O C

K

RE

PL

AC

EM

EN

T

D

ET

AI

L

SH

EE

T

DUANE K. BOOTH, P.E.

Registered Eng 44631

JOB NO.:

CHECKED BY.:

DRAWN BY:

DATE:

DESIGNED BY:

FILE NAME:

R E

V

IS

IO

N

D A

T E

C ity

O f E dg ew at er

, F lo rid a

N o rt h

S in cl ai r A ve

C er tif ic at e o f

A ut h o ri za tio n

N um b er

: 3

Fa x:

.3

.8

O ff ic e:

.3

.8

Ta va re s, F lo ri d a

6.0'

18" O.C.

(TYP)

3" (T

Y P

ALTERNATE TYPICAL DOCK SECTION ECOPILE

NTS

P.T. SYP 2 x 8 WITH (2) 3" SS

SCREWS AT EACH JOIST (TYP)

P.T. SYP 2 x 12 CAP WITH 3" S.S. SCREWS

P.T. SYP 2 x 8 (TYP)

P.T. SYP 2 x 10 CROSSBEAM EACH SIDE (TYP)

(2) 5/8" DIA. S.S. THROUGH BOLTS

WITH 2" WASHERS (TYP. BOTH SIDES)

(2) 3/8" x 4" DIA. S.S. LAG SCREWS

WITH 1 1/2" WASHERS (TYP. BOTH SIDES)

10" DIA. ECOPILE (TYP)

P.T. SYP 2 x 6 CROSS BRACE EACH SIDE

NO. 2 GRADE (TYPICAL)

OHW ELEV. = 2.30

FINISH DOCK ELEV. = 3.40

NOTE:

1. ALTERNATE ECOPILE 10" DIAMETER - 30' LONG.

P.T. SYP 2 x 6 x 2' Scab Block at Joists Splice (Typ)

(2) 16d GALVANIZED

TOE NAIL EACH

AT 18" O.C. (TYP)

P.T. SYP 2 x 8 TO EACH POST (TYP)

2"

" D ia P ili ng

" D ia P ili ng

4' -0

" A bo ve H ig h

W at er L in e 2"

ALTERNATE TYPICAL DOCK ELEVATION SECTION WITH ECOPILE

NTS

P.T. SYP 2 x 8 JOIST @ 18" O.C. (TYP)

P.T. SYP 2 x 12 CAP WITH 3" S.S. SCREWS

AT 18" O.C. (TYP) FOR RAILING CAP

P.T. SYP 2 x 8 (TYP)

P.T. SYP 2 x 8 (TYP)

P.T. SYP 2 x 8 (TYP)

P.T. SYP 2 x 8 (TYP)

3"

TY

P

P.T. SYP 2 x 8 or THRU FLOW

DECK (ALTERNATE)

8.00' MAXIMUM

" M

IN

P.T. SYP 2 x 10 CROSS BEAM (TYP)

P.T. SYP 2 x 10 CROSS BEAM (TYP)

(2) 5/8" S.S. ALL THREAD ROD AND

S.S. NUTS AND WASHERS.(2) 5/8" S.S. ALL THREAD ROD AND

S.S. NUTS AND WASHERS.

FINISH DOCK ELEV. = 3.40

(3) 16d GALV. NAILS EACH

SIDE OF SPLICE

SIDE OF JOIST (TYP)

ALTERNATE: THRU FLOW DECK

SERIES 50 (1 x 3)

WITH #10 PAN HEAD SS SCREWS

SEE MANUFACTURERS SPECIFICATIONS

FOR INSTALLATION.

OHW ELEV. = 2.30

S.S. HURRICANE STRAP W/

1 1/2" S.S. SCREWS.

1 @ EACH JOIST & CROSSBEAM

1 STRAP PER JOIST @ EACH PILE LOCATION

(TYPICAL)

17" O.C.

(TYP)

ALTERNATE DESIGN WITH ECOPILE

N.T.S.

SIDE VIEW TOP VIEW

(2) 3/8" DIA. CARRIAGE BOLT

W/ NUT & WASHER (TYP)

(2) 3/8" DIA. CARRIAGE BOLT

W/ NUT & WASHER (TYP)

CUT PILE TO INSERT

2 x 8

(2) 3" SS SCREWS

(TYP)

(2) 3" SS SCREWS

(TYP)

NOTE: 10' DIA. ECOPILE 30' LONG.

P.T. 2 x 12 CAP WITH 3" S.S. SCREWS

AT 18" O.C. (TYP)

11.5"

PT SYP 2 x 8 Brace (TYP)1/4" ROUNDED (TYP)

(SEE TOP & SIDE VIEW DETAIL)

(SEE SIDE VIEW DETAIL)

2. ALL WOOD TO BE DENSE SELECT STRUCTURAL (DSS) GRADE.

3. CONTRACTOR TO COORDINATE WITH CITY FOR THRU FLOW DECK

COLOR SELECTION OF GREY OR MAPLE IF ALTERNATE IS SELECTED CHOICE.

NOTES:

ALL WOOD FRAMING TO BE PRESSURE TREATED

SOUTHERN YELLOW PINE (SYP) NUMBER ONE GRADE,

DENSE STRUCTURAL SELECT (DSS), 2.5 lb p.c.f CCA.

ALL FASTENERS, UNLESS NOTED OTHERWISE SHALL

BE 304 OR 316 STAINLESS STEEL (S.S.)

CONCRETE, SHALL BE 3,000 P.S.I. WITH LIGHT BROOM FINISH.

PILES GRADED IN ACCORDANCE WITH ASTM D25

TREATED TO 2.5 lb. p.c.f. CCA.

1.

2.

3.

4.

PIER DESIGN TO MEET FLORIDA BUILDING CODE 2023, 8th EDITION.5.

PIER DESIGN TO MEET 140 M.P.H. WIND ZONE.6.

A D

D E

D N

O T

E S

P E

R C

IT

Y

C O

M M

E N

T S

-2

-2

SIDEWALK AND DOCK TRANSITION

N.T.S.

12"

8"

ELEV. = 2.90

3.95%

CONSTRUCT CONCRETE SIDEWALK

4" THICK, 3,000 PSI (SEE DETAIL)

WITH 12" WIDE x 18" DEPTH THICKENED

EDGE (SEE SHADED AREA- SITE PLAN)

2 x 8 END CAP (TYP)

A D

D E

D S

ID

E

W A

L K

/D O

C K

T R

A N

S

IT

IO

N

-9

-2

Sheets and Views
(01) Cover Sheet
Sheets and Views
(02) Aerial Plan
Sheets and Views
(03) Demolition Plan
Sheets and Views
(04) Site Plan
Sheets and Views
(05) Detail Sheet
Sheets and Views
(06) Detail Sheet

File details come from the government source that posted it. Updated .