SOV_7-23-24_revised_8-27-24_(Alt_for_Fortified_Structure).pdf
PDF 41 KB Posted
- Attached to
- Menard May Park Observation Pier Replacement - Construction State and local contract opportunity
- Solicitation number
- ITB 25-PR-04
- Issued by
- Volusia County, Florida
About this file
This document is a Schedule of Unit Prices for the City of Edgewater's Menard May Park Observation Pier Replacement project, located in Edgewater, Florida. The schedule details a comprehensive breakdown of construction materials and labor for replacing an observation pier, including 19 distinct line items ranging from mobilization and site preparation to structural components and electrical work. Key items include silt fence installation, floating turbidity barrier, removing existing pier and piles, 10" eco piles, decking, railing, and lighting infrastructure. The total project cost is $208,639.06, with major components like 10" eco piles ($57,400.00) and thru flow decking ($30,330.00) representing significant portions of the budget.
The pricing structure is itemized with specific quantities, units of measurement, unit prices, and total contract values. Additional costs include a bid bond of $840.00 and a 110% payment and performance bond of $5,170.00. The project appears to be a FEMA-related reconstruction effort, with precise GPS coordinates provided (start: 28.989534, -80.901076; end: 28.989844, -80.901183). The schedule represents an alternative version for a "fortified structure," suggesting potential design variations or resilience considerations for the pier replacement.
View the file
Other files for this state and local contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Description Quantity Unit Unit Price Contract Value
1 Mobilization 1 LS 25,000.00$ 25,000.00$ 2 Silt Fence 42 LF 3.68$ 154.56$ 3 Floating Turbidity Barrier 130 LF 16.00$ 2,080.00$
Remove Existing Pier & Piles & Dispose 1 LS 20,400.00$ 20,400.00$
5 Survey Control 1 LS 4,000.00$ 4,000.00$ 6 Rebuild Revetment 1 LS 2,400.00$ 2,400.00$ 7 Concrete Sidewalk w/ Thicken Edge 81 SF 18.00$ 1,458.00$ 8 10" Eco Pile 41 EA 1,400.00$ 57,400.00$ 9 Pile Guard 320 LF 77.00$ 24,640.00$
10 2 x 10 Cross Beam 324 BF 6.00$ 1,944.00$ 11 2 x 6 Cross Brace 384 BF 3.75$ 1,440.00$ 12 2 x 8 Joist 905 BF 4.90$ 4,434.50$ 13 2 x 6 Scab Block 80 BF 3.75$ 300.00$
Thru Flow Decking (1 x 3 Surge Series 50) 337 EA 90.00$ 30,330.00$
15 2 x 8 Railing 1440 BF 4.90$ 7,056.00$ 16 2 x 12 Railing Cap 288 BF 9.00$ 2,592.00$ 17 6 x 6 Light Post 1 EA 200.00$ 200.00$
EXO Light, Conduit & Wire to Existing Circuit 1 LS 1,800.00$ 1,800.00$
Hardware (Bolts, Nuts, Washers, Screws, Nails, & Hurricane Straps) 1 LS 15,000.00$ 15,000.00$
Subtotal 202,629.06$ 20 Bid Bond 1 LS 840.00$ 840.00$
110% Payment & Performance Bond 1 LS 5,170.00$ 5,170.00$
Total Price 208,639.06$
CITY OF EDGEWATER
MENARD MAY PARK OBSERVATION PIER REPLACEMENT, EDGEWATER
SCHEDULE OF UNIT PRICES - ALT FOR FORTIFIED STRUCTURE
8-27-24
File details come from the government source that posted it. Updated .