Exhibit B Revision 1 - Supplement 4 SubCLIN X001AA BAS Procedures

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PM PM Procedure Primary Procedure Description Trade EquipmentStandard

Records for PM Procedure: 08AAALAC 08AAALAC AAALAC Inspection 3 Year, due 2016 O&M BAS AWS

PM Step Code Instructions

1 Perform air balance and provide report to support the Association for Assessnent and Accreditation of Laboratory Animal Care (AAALAC) three year certification inspection.

PM assigned to eqpt code AWSM01 (Animal Watering System Main).

Labor for FY10 = Labor for FY13 = Labor for FY16 = Labor for FY19 =

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures Exhibit B, Supplement 4 Rev 1

Records for PM Procedure: 08CO2-3YR 08CO2-3YR CO2 Transducer Replacement 3 Year O&M BAS M

PM Step Code Instructions

1 Replace the 5 - CO2 transducers in the Bldg C loading dock.

They have a life expectancy of 3 years and were replaced in Sept 2011; therefore, a 3 year PMI is scheduled to replace.

If they start to go bad, a light starts flashing indicating a 30 day warning. This alarms on the BAS; therefore, a physical monthly check is not required.

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10AHLSOMTANN-FFP 10AHLSOMTANN-F AHU Lab Annual SOMT - batched - FFP O&M BAS AHU

PM Step Code Instructions

1 NOTE: The SOMT should occur after the Annual Calibration and Annual Mechanical Preventive Maintenance has been completed. I

Procedures from the LVMP, Draft ver.3, October 2007, Appendix A

Preliminary procedures:

_____Notify Govt personnel of test including date and time. The Govt personnel will notify ORD/SHEM, HR, and Program Reps. Notification should be given at least a week in advance of the SOMT and on the last business day prior to testing.

_____Initiate the appropriate trends for the SOMT. These trends include operational data for AHUs, Exhaust Fans (EF) and VAV boxes. Trends should be verified before initiating the SOMT to avoid data loss. Trending parameters are as follows (trends should be set up for 1 minute increments):

AHU

_____Variable Frequency Drive Output (VFD %) _____Supply Plenum Static Pressure (Usually measured on the first and last AHU of the supply plenum)

EF

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AH0001-9 10CAL-AH0001-9 AH0001-9 HSF Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures Exhibit B, Supplement 4 Rev 1 kstearns Typewritten Text See PM Procedure 10CAL-AHO5.7 "AHO 5.7 Calibration Annual-FFP" for procedures kstearns Typewritten Text kstearns Typewritten Text kstearns Typewritten Text kstearns Typewritten Text kstearns Typewritten Text kstearns Typewritten Text kstearns Typewritten Text kstearns Typewritten Text kstearns Typewritten Text kstearns Typewritten Text kstearns Typewritten Text kstearns Typewritten Text kstearns Typewritten Text kstearns Typewritten Text

Records for PM Procedure: 10CAL-AH1-8 10CAL-AH1-8 AH1-8 NCC Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures Exhibit B, Supplement 4 Rev 1 kstearns Typewritten Text kstearns Typewritten Text kstearns Typewritten Text kstearns Typewritten Text See PM Procedure 10 CAL-AHO5.7 "AHO 5.7 Calibration Annual-FFP" for procedures

Records for PM Procedure: 10CAL-AH2.10 10CAL-AH2.10 AH2.10 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Return Air Smoke Detector Supply Air Smoke Detector Supply Air High Static Safety Low Temperature Duct Safety Fan Current Filter DP Outside Air Damper End Switch Discharge Damper End Switch Discharge Damper End Switch Outside Air Temperature Room Temperature Fan HOA Alarm Fan Start/Stop Discharge Damper Open/Close Chill Water Valve Mixed Air Dampers Control

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AH2.11 10CAL-AH2.11 AH2.11 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Return Air Smoke Detector Supply Air Smoke Detector Supply Air High Static Safety Low Temperature Duct Safety Fan Current Filter DP Outside Air Damper End Switch Discharge Damper End Switch Discharge Damper End Switch Room Temperature Mixed Air Temperature Fan HOA Alarm Fan Start/Stop Discharge Damper Open/Close Chill Water Valve Mixed Air Dampers Control

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AH3.01-12 10CAL-AH3.01-12 AH3.01-12 Bldg C Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures Exhibit B, Supplement 4 Rev 1 kstearns

See PM Procedure 10CAL-AHO5.7 "AHO 5.7 Calibration Annual-FFP" for procedures

Records for PM Procedure: 10CAL-AH4.01-03 10CAL-AH4.01-03 AH4.01-03 Bldg C Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures Exhibit B, Supplement 4 Rev 1 kstearns

See PM Procedures 10CAL-AHO5.7 "AHO 5.7 Calibration Annual-FFP" for procedures

Records for PM Procedure: 10CAL-AH7.5 10CAL-AH7.5 AH 7.5 Mech Rm Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Mechanical Room AHU 7.5

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor( one one each coil=total of 2) Chilled water return temp sensor( one one each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch

Verification points:

Discharge air damper control ( Open/Closed) Discharge air damper Open End switch Discharge air damper Closed End switch Discharge air damper Actuator and linkage

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

PM Step Code Instructions

Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay VFD HOA contacts VFD Diagnostics Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL1.1 10CAL-AHL1.1 AHL 1.1 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 1.1

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor( one on each coil=total of 2) Chilled water return temp sensor( one on each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch Humidifier pressure switch Humidifier output 0-100%-2-10 VDC Humidifier Feedback 0-100%

Verification points:

Discharge air damper control ( Open/Closed)

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Discharge air damper Open End switch Discharge air damper Closed End switch Discharge air damper Actuator and linkage Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts VFD HOA contacts VFD Diagnostics

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL1.2 10CAL-AHL1.2 AHL 1.2 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 1.2

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor( one on each coil=total of 2) Chilled water return temp sensor( one on each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch Humidifier pressure switch Humidifier output 0-100%-2-10 VDC Humidifier Feedback 0-100%

Verification points:

Discharge air damper control ( Open/Closed)

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Discharge air damper Open End switch Discharge air damper Closed End switch Discharge air damper Actuator and linkage Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay VFD HOA contacts VFD Diagnostics Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL1.3 10CAL-AHL1.3 AHL 1.3 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 1.3

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor( one on each coil=total of 2) Chilled water return temp sensor( one on each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch Humidifier pressure switch Humidifier output 0-100%-2-10 VDC Humidifier Feedback 0-100%

Verification points:

Discharge air damper control ( Open/Closed)

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Discharge air damper Open End switch Discharge air damper Closed End switch Discharge air damper Actuator and linkage Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay VFD HOA contacts VFD Diagnostics Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL1.4 10CAL-AHL1.4 AHL 1.4 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 1.4

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor( one on each coil=total of 2) Chilled water return temp sensor( one on each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch Humidifier pressure switch Humidifier output 0-100%-2-10 VDC Humidifier Feedback 0-100%

Verification points:

Discharge air damper control ( Open/Closed)

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Discharge air damper Open End switch Discharge air damper Closed End switch Discharge air damper Actuator and linkage Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay VFD HOA contacts VFD Diagnostics Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL1.5 10CAL-AHL1.5 AHL 1.5 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 1.5

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor( one on each coil=total of 2) Chilled water return temp sensor( one on each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch Humidifier pressure switch Humidifier output 0-100%-2-10 VDC Humidifier Feedback 0-100%

Verification points:

Discharge air damper control ( Open/Closed)

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Discharge air damper Open End switch Discharge air damper Closed End switch Discharge air damper Actuator and linkage Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay VFD HOA contacts VFD Diagnostics Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL1.6 10CAL-AHL1.6 AHL 1.6 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 1.6

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor( one on each coil=total of 2) Chilled water return temp sensor( one on each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch Humidifier pressure switch Humidifier output 0-100%-2-10 VDC Humidifier Feedback 0-100%

Verification points:

Discharge air damper control ( Open/Closed)

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Discharge air damper Open End switch Discharge air damper Closed End switch Discharge air damper Actuator and linkage Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay VFD HOA contacts VFD Diagnostics Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL2.1 10CAL-AHL2.1 AHL 2.1 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 2.1

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor( one on each coil=total of 2) Chilled water return temp sensor( one on each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch Humidifier pressure switch Humidifier output 0-100%-2-10 VDC Humidifier Feedback 0-100%

Verification points:

Discharge air damper control ( Open/Closed)

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Discharge air damper Open End switch Discharge air damper Closed End switch Discharge air damper Actuator and linkage Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts VFD HOA contacts VFD Diagnostics

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL2.2 10CAL-AHL2.2 AHL 2.2 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 2.2

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor( one one each coil=total of 2) Chilled water return temp sensor( one one each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch Humidifier pressure switch Humidifier output 0-100%-2-10 VDC Humidifier Feedback 0-100%

Verification points:

Discharge air damper control ( Open/Closed)

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Discharge air damper Open End switch Discharge air damper Closed End switch Discharge air damper Actuator and linkage Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay VFD HOA contacts VFD Diagnostics Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL2.3 10CAL-AHL2.3 AHL 2.3 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 2.3

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor( one one each coil=total of 2) Chilled water return temp sensor( one one each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch Humidifier pressure switch Humidifier output 0-100%-2-10 VDC Humidifier Feedback 0-100%

Verification points:

Discharge air damper control ( Open/Closed)

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Discharge air damper Open End switch Discharge air damper Closed End switch Discharge air damper Actuator and linkage Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay VFD HOA contacts VFD Diagnostics Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL2.4 10CAL-AHL2.4 AHL 2.4 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 2.4

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor (one one each coil=total of 2) Chilled water return temp sensor (one one each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch Humidifier pressure switch Humidifier output 0-100%-2-10 VDC Humidifier Feedback 0-100% Verification points:

Discharge air damper control (Open/Closed) Discharge air damper Open End switch

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Discharge air damper Closed End switch Discharge air damper Actuator and linkage Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay VFD HOA contacts VFD Diagnostics Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL2.5 10CAL-AHL2.5 AHL 2.5 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 2.5

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor( one one each coil=total of 2) Chilled water return temp sensor( one one each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch Humidifier pressure switch Humidifier output 0-100%-2-10 VDC Humidifier Feedback 0-100%

Verification points:

Discharge air damper control ( Open/Closed)

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Discharge air damper Open End switch Discharge air damper Closed End switch Discharge air damper Actuator and linkage Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay VFD HOA contacts VFD Diagnostics Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL2.6 10CAL-AHL2.6 AHL 2.6 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 2.6

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor( one one each coil=total of 2) Chilled water return temp sensor( one one each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch Humidifier pressure switch Humidifier output 0-100%-2-10 VDC Humidifier Feedback 0-100%

Verification points:

Discharge air damper control ( Open/Closed)

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Discharge air damper Open End switch Discharge air damper Closed End switch Discharge air damper Actuator and linkage Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay VFD HOA contacts VFD Diagnostics Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL5.1 10CAL-AHL5.1 AHL 5.1 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 5.1 Calibration points:

_____Outside Air Temperature Sensor _____Outside Air Humidity Sensor _____Discharge Air Temperature Sensor _____Plenum Temperature Sensor _____Plenum Humidity Sensor _____Preheat Water Valve E/P controller _____Preheat Water Valve Pilot Positioner _____Room Humidity Sensor _____Mixed Air temperature sensor _____RA CO2 sensor _____Static pressure sensor _____OA velocity pressure transducer _____Pre-filter DP transducer _____Final-filter DP transducer _____Chilled water supply temp sensor( one one each coil=total of 2) _____Chilled water return temp sensor( one one each coil=total of 2) _____Fan amps transducer _____Low static pressure safety switch _____Low suction pressure safety switch _____High static pressure safety switch _____Humidifier pressure switch _____Humidifier output 0-100%-2-10 VDC _____Humidifier Feedback 0-100% Verification points:

_____Discharge air damper control ( Open/Closed) _____Discharge air damper Open End switch _____Discharge air damper Closed End switch

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

_____Discharge air damper Actuator and linkage _____Outside air damper Actuator and linkage 0-100% _____Outside air damper Open End switch _____CW valve output voltage 2-10 VDC _____CW valve actuator 0-100% _____Low preheat temperature switch _____Freeze-stat switches _____VFD Start Stop Relay _____Freeze pump Start Stop _____Freeze pump Status switch _____Freeze pump HOA contacts _____VFD HOA contacts _____VFD Diagnostics

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL5.2 10CAL-AHL5.2 AHL 5.2 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 5.2 Calibration points:

_____Outside Air Temperature Sensor _____Outside Air Humidity Sensor _____Discharge Air Temperature Sensor _____Plenum Temperature Sensor _____Plenum Humidity Sensor _____Preheat Water Valve E/P controller _____Preheat Water Valve Pilot Positioner _____Room Humidity Sensor _____Mixed Air temperature sensor _____RA CO2 sensor _____Static pressure sensor _____OA velocity pressure transducer _____Pre-filter DP transducer _____Final-filter DP transducer _____Chilled water supply temp sensor( one one each coil=total of 2) _____Chilled water return temp sensor( one one each coil=total of 2) _____Fan amps transducer _____Low static pressure safety switch _____Low suction pressure safety switch _____High static pressure safety switch _____Humidifier pressure switch _____Humidifier output 0-100%-2-10 VDC _____Humidifier Feedback 0-100% Verification points:

_____Discharge air damper control ( Open/Closed) _____Discharge air damper Open End switch _____Discharge air damper Closed End switch

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

_____Discharge air damper Actuator and linkage _____Outside air damper Actuator and linkage 0-100% _____Outside air damper Open End switch _____CW valve output voltage 2-10 VDC _____CW valve actuator 0-100% _____Low preheat temperature switch _____Freeze-stat switches _____VFD Start Stop Relay _____VFD HOA contacts _____VFD Diagnostics _____Freeze pump Start Stop _____Freeze pump Status switch _____Freeze pump HOA contacts

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL5.3 10CAL-AHL5.3 AHL 5.3 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 5.3 Calibration points:

_____Outside Air Temperature Sensor _____Outside Air Humidity Sensor _____Discharge Air Temperature Sensor _____Plenum Temperature Sensor _____Plenum Humidity Sensor _____Preheat Water Valve E/P controller _____Preheat Water Valve Pilot Positioner _____Room Humidity Sensor _____Mixed Air temperature sensor _____RA CO2 sensor _____Static pressure sensor _____OA velocity pressure transducer _____Pre-filter DP transducer _____Final-filter DP transducer _____Chilled water supply temp sensor( one one each coil=total of 2) _____Chilled water return temp sensor( one one each coil=total of 2) _____Fan amps transducer _____Low static pressure safety switch _____Low suction pressure safety switch _____High static pressure safety switch _____Humidifier pressure switch _____Humidifier output 0-100%-2-10 VDC _____Humidifier Feedback 0-100% Verification points:

_____Discharge air damper control ( Open/Closed) _____Discharge air damper Open End switch _____Discharge air damper Closed End switch

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

_____Discharge air damper Actuator and linkage _____Outside air damper Actuator and linkage 0-100% _____Outside air damper Open End switch _____CW valve output voltage 2-10 VDC _____CW valve actuator 0-100% _____Low preheat temperature switch _____Freeze-stat switches _____VFD Start Stop Relay _____VFD HOA contacts _____VFD Diagnostics _____Freeze pump Start Stop _____Freeze pump Status switch _____Freeze pump HOA contacts

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL5.4 10CAL-AHL5.4 AHL 5.4 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 5.4

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor( one one each coil=total of 2) Chilled water return temp sensor( one one each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch Humidifier pressure switch Humidifier output 0-100%-2-10 VDC Humidifier Feedback 0-100% Verification points:

Discharge air damper control ( Open/Closed) Discharge air damper Open End switch

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Discharge air damper Closed End switch Discharge air damper Actuator and linkage Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay VFD HOA contacts VFD Diagnostics Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL5.5 10CAL-AHL5.5 AHL 5.5 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 5.5

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor( one one each coil=total of 2) Chilled water return temp sensor( one one each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch Humidifier pressure switch Humidifier output 0-100%-2-10 VDC Humidifier Feedback 0-100% Verification points:

Discharge air damper control ( Open/Closed) Discharge air damper Open End switch

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Discharge air damper Closed End switch Discharge air damper Actuator and linkage Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay VFD HOA contacts VFD Diagnostics Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL5.6 10CAL-AHL5.6 AHL 5.6 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 5.6

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor( one one each coil=total of 2) Chilled water return temp sensor( one one each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch Humidifier pressure switch Humidifier output 0-100%-2-10 VDC Humidifier Feedback 0-100% Verification points:

Discharge air damper control ( Open/Closed) Discharge air damper Open End switch

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Discharge air damper Closed End switch Discharge air damper Actuator and linkage Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay VFD HOA contacts VFD Diagnostics Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL6.1 10CAL-AHL6.1 AHL 6.1 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 6.1

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor( one one each coil=total of 2) Chilled water return temp sensor( one one each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch Humidifier pressure switch Humidifier output 0-100%-2-10 VDC Humidifier Feedback 0-100%

Verification points:

Discharge air damper control ( Open/Closed)

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Discharge air damper Open End switch Discharge air damper Closed End switch Discharge air damper Actuator and linkage Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts VFD HOA contacts VFD Diagnostics

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL6.2 10CAL-AHL6.2 AHL 6.2 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 6.2

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor( one one each coil=total of 2) Chilled water return temp sensor( one one each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch Humidifier pressure switch Humidifier output 0-100%-2-10 VDC Humidifier Feedback 0-100%

Verification points:

Discharge air damper control ( Open/Closed)

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Discharge air damper Open End switch Discharge air damper Closed End switch Discharge air damper Actuator and linkage Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay VFD HOA contacts VFD Diagnostics Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL6.3 10CAL-AHL6.3 AHL 6.3 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 6.3

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor( one one each coil=total of 2) Chilled water return temp sensor( one one each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch Humidifier pressure switch Humidifier output 0-100%-2-10 VDC Humidifier Feedback 0-100%

Verification points:

Discharge air damper control (Open/Closed)

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Discharge air damper Open End switch Discharge air damper Closed End switch Discharge air damper Actuator and linkage Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay VFD HOA contacts VFD Diagnostics Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL6.4 10CAL-AHL6.4 AHL 6.4 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 6.4

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor( one one each coil=total of 2) Chilled water return temp sensor( one one each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch Humidifier pressure switch Humidifier output 0-100%-2-10 VDC Humidifier Feedback 0-100%

Verification points:

Discharge air damper control ( Open/Closed)

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Discharge air damper Open End switch Discharge air damper Closed End switch Discharge air damper Actuator and linkage Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay VFD HOA contacts VFD Diagnostics Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL6.5 10CAL-AHL6.5 AHL 6.5 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 6.5

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor( one one each coil=total of 2) Chilled water return temp sensor( one one each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch Humidifier pressure switch Humidifier output 0-100%-2-10 VDC Humidifier Feedback 0-100%

Verification points:

Discharge air damper control ( Open/Closed)

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Discharge air damper Open End switch Discharge air damper Closed End switch Discharge air damper Actuator and linkage Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay VFD HOA contacts VFD Diagnostics Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL6.6 10CAL-AHL6.6 AHL 6.6 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 6.6

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor( one one each coil=total of 2) Chilled water return temp sensor( one one each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch Humidifier pressure switch Humidifier output 0-100%-2-10 VDC Humidifier Feedback 0-100%

Verification points:

Discharge air damper control ( Open/Closed)

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Discharge air damper Open End switch Discharge air damper Closed End switch Discharge air damper Actuator and linkage Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay VFD HOA contacts VFD Diagnostics Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL6.7 10CAL-AHL6.7 AHL 6.7 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 6.7

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor( one one each coil=total of 2) Chilled water return temp sensor( one one each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch Humidifier pressure switch Humidifier output 0-100%-2-10 VDC Humidifier Feedback 0-100%

Verification points:

Discharge air damper control ( Open/Closed)

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Discharge air damper Open End switch Discharge air damper Closed End switch Discharge air damper Actuator and linkage Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay VFD HOA contacts VFD Diagnostics Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Records for PM Procedure: 10CAL-AHL7.1 10CAL-AHL7.1 AHL 7.1 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 7.1

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room Humidity Sensor Mixed Air temperature sensor RA CO2 sensor Static pressure sensor OA velocity pressure transducer Pre-filter DP transducer Final-filter DP transducer Chilled water supply temp sensor( one one each coil=total of 2) Chilled water return temp sensor( one one each coil=total of 2) Fan amps transducer Low static pressure safety switch Low suction pressure safety switch High static pressure safety switch Humidifier pressure switch Humidifier output 0-100%-2-10 VDC Humidifier Feedback 0-100%

Verification points:

Discharge air damper control ( Open/Closed)

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Discharge air damper Open End switch Discharge air damper Closed End switch Discharge air damper Actuator and linkage Outside air damper Actuator and linkage 0-100% Outside air damper Open End switch CW valve output voltage 2-10 VDC CW valve actuator 0-100% low preheat temperature switch Freeze-stat switches VFD Start Stop Relay Freeze pump Start Stop Freeze pump Status switch Freeze pump HOA contacts VFD HOA contacts VFD Diagnostics

Completed: Yes _____ No _____ Hours: __________ Craftsmen: _____________

ARCHIBUS

Building Automation Systems (BAS) Scheduled Maintenance/Inspection Procedures

Procedure Description Trade EquipmentStandard

Records for PM Procedure: 10CAL-AHL7.2 10CAL-AHL7.2 AHL 7.2 Calibration Annual - FFP O&M BAS AHU

PM Step Code Instructions

1 Laboratory AHU 7.2

Calibration points:

Outside Air Temperature Sensor Outside Air Humidity Sensor Discharge Air Temperature Sensor Plenum Temperature Sensor Plenum Humidity Sensor Preheat Water Valve E/P controller Preheat Water Valve Pilot Positioner Room…