Solicitation Attachment 2 - Drawings.pdf
PDF 6 MB Posted
- Attached to
- Replace HVAC Equipment/Systems - Charlotte Federal contract opportunity
- Solicitation number
- W50S87-20-B-5002
About this file
This solicitation document calls for bids to replace HVAC equipment and systems at various facilities located at the Charlotte Douglas International Airport for the North Carolina Army National Guard. Interested bidders are required to attend a pre-bid conference on May 13, 2020 and submit bids in accordance with instructions provided in the solicitation. The solicitation includes drawings, specifications and other attachments outlining the HVAC replacement work at multiple buildings on the base. The replacement work involves removing existing HVAC units, ductwork and controls, and installing new energy efficient equipment to provide heating, cooling and ventilation. The solicitation is seeking competitive fixed-price bids from qualified contractors to complete the HVAC modernization project.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C :\r vt \2
8\
-0 2-
M P
_M A
S T
E R
_d er ek .w or le y.
rv t
3/ 5/
:2
4:
A M
INDEX OF DRAWINGS
SHEET # DESCRIPTION
00M001 GENERAL NOTES, LEGENDS, AND ABBREVIATIONS
02M101 BUILDING 02 - MECHANICAL PLANS - AREA A
02M102 BUILDING 02 - MECHANICAL PLANS - AREA B
02M103 BUILDING 02 - MECHANICAL PLANS - AREA C
02M104 BUILDING 02 - MECHANICAL ENLARGED PLANS
39M101 BUILDING 39 - MECHANICAL PLAN
45MD101 BUILDING 45 (EAST WING) - FIRST FLOOR MECHANICAL DEMOLITION PLAN
45MD102 BUILDING 45 - SECOND FLOOR MECHANICAL DEMOLITION PLAN
45MD103 BUILDING 45 - ROOF MECHANICAL DEMOLITION PLAN
45M101 BUILDING 45 (EAST WING) - FIRST FLOOR MECHANICAL PLAN
45M102 BUILDING 45 - SECOND FLOOR MECHANICAL PLAN
45M103 BUILDING 45 - ROOF MECHANICAL PLAN
49MD101 BUILDING 49 - ROOF MECHANICAL DEMOLITION PLAN
49M101 BUILDING 49 - ROOF MECHANICAL PLAN
50M101 BUILDING 50 - MECHANICAL PLAN
58M101 BUILDING 58 - MECHANICAL PLAN
61MD101 BUILDING 61 - ROOF MECHANICAL DEMOLITION PLAN
61M101 BUILDING 61 - ROOF MECHANICAL PLAN
62M101 BUILDING 62 - MECHANICAL PLAN
63MD101 BUILDING 63 - FIRST FLOOR MECHANICAL DEMOLITION PLAN
63MD102 BUILDING 63 - SECOND FLOOR MECHANICAL DEMOLITION PLAN
63M101 BUILDING 63 - FIRST FLOOR MECHANICAL PLAN
63M102 BUILDING 63 - SECOND FLOOR MECHANICAL PLAN
63M103 BUILDING 63 - ROOF MECHANICAL PLAN
65M101 BUILDING 65 - MECHANICAL PLAN
67MD101 BUILDING 67 - MECHANICAL DEMOLITION PLANS
67M101 BUILDING 67 - MECHANICAL FLOOR PLANS
69M101 BUILDING 69 - MECHANICAL PLANS
72M101 BUILDING 72 - MECHANICAL FLOOR PLANS
99M001 MECHANICAL SCHEDULES
99M002 MECHANICAL SCHEDULES
99M003 MECHANICAL SCHEDULES
99M004 MECHANICAL DETAILS
99M005 MECHANICAL DETAILS
99M006 MECHANICAL DETAILS
99M007 MECHANICAL CONTROLS
99M008 MECHANICAL CONTROLS
PROJECT
LOCATION
CHARLOTTE
NORTH CAROLINA
AIR NATIONAL GUARD
REPLACE HVAC SYSTEMS BASE WIDE
145th AIRLIFT WING
CHARLOTTE, NC
CONTRACT NO.: W9133L-15-D-0004
TASK ORDER NO.: W91242-18-F-0127
PN: FJRP142610
B-3 DESIGN SUBMISSION
MARCH 2020
DIFFUSER, GRILLE OR
REGISTER DESIGNATION TAG
AIR FLOW SCHEMATIC AND
TEMPERATURE CONTROL
DIAGRAM SYMBOLOGY
HVAC SYMBOLOGY PIPING SPECIALTIES
GENERAL NOTES
PIPING
PIPING FITTINGS
ABBREVIATIONS
SCHEMATIC SYMBOLS
SA12ø-250
SA-250
12ø
PIPE ANCHOR
PIPE GUIDE
EXPANSION JOINT
VENTURI
PRESSURE/TEMPERATURE PORT
THERMOMETER
PRESSURE GAGE
TEMPERATURE GAGE
FLEXIBLE PIPE CONNECTION
STRAINER
BLIND FLANGE
MANUAL AIR VENT
THERMOWELL
AUTOMATIC AIR VENT
REFRIGERANT LIQUIDRL
REFRIGERANT SUCTIONRS
CONDENSATE DRAINCD
ELBOW, 90°
ELBOW, 90° TURN DOWN
ELBOW, 90° TURN UP
ELBOW, 45° TURN DOWN
ELBOW, 45° TURN UP
PIPE BREAK
CAP
DIRECT
EVAPORATIVE
COOLER
DIRECT
EXPANSION
COOLING COIL
CONSTANT AIR
VOLUME BOX WITH
REHEAT COIL
VARIABLE AIR
VOLUME BOX WITH
REHEAT COIL
HOT WATER
HEATING COIL
CHILLED WATER
COOLING COIL
ELECTRIC
HEATING COIL
VFD (VARIABLE
FREQUENCY DRIVE)
GAS-FIRED
DUCT FURNACE
FREEZE STAT
FILTER SENSOR
GRAVITY DAMPER
CO2 SENSOR
GAS
ELECTRIC
ANALOG INPUT
ANALOG OUTPUT
DIGITAL INPUT
DIGITAL OUTPUT
COMMUNICATION
VARIABLE FREQUENCY DRIVE
MOTOR STARTER
DIRECT EXPANSION
MOTOR
THERMOSTAT
HUMIDISTAT
SMOKE DETECTOR
CARBON MONOXIDE SENSOR
NITROGEN DIOXIDE SENSOR
CURRENT TRANSMITTER
NATURAL GAS DETECTOR
FACE &
BYPASS COIL
DIRECT EXPANSION HEAT
PUMP
EXHAUST FAN
MOTORIZED
OPPOSED
BLADE DAMPER
SMOKE/DUCT
DETECTOR
TEMPERATURE
SENSOR
FLOW SWITCH
PRESSURE SENSOR
CURRENT TRANSMITTER
TEMPERATURE TRANSMITTER
FLOW METER
FLOW LIMITER
TEMPERATURE SWITCH
TEMPERATURE CONTROLLER
DIFFERENTIAL PRESSURE SENSOR
MOTOR ACTUATOR
FLOW MEASURING & BALANCING VALVE
W/ 100% SHUT OFF
R
SD SD
TRANSITION - ONE SIDED
TRANSITION - DOUBLE SIDED
VD, BDD
90° ELBOW TURNED UP,
RECTANGULAR
TRANSITION -
RECTANGULAR TO ROUND DUCT
STANDARD BRANCH -
FOR SUPPLY AIR W/EXTRACTOR
AND RETURN AIR W/O EXTRACTOR
RECTANGULAR DUCT INCLINE -
RISE OR DROP IN RESPECT TO
THE AIR FLOW
SPLITTER DAMPER
ROUND DUCT INCLINE -
RISE OR DROP IN RESPECT
TO THE AIR FLOW
PRESSURE/TEMPERATURE TEST
PLUG (PETE PLUG OR EQUAL)
VD
BDD
= VOLUME DAMPER
= BACKDRAFT DAMPER
ELBOW - W/TURNING VANES
(RECTANGULAR), SMOOTH RADIUS
ELBOW - W/TURNING VANE
(RECTANGULAR)
FIRE DAMPER
SMOKE DAMPER
SMOKE AND FIRE DAMPER
MOTOR OPERATED DAMPER
M
SA SOUND ATTENUATOR
DUCT ELEVATION
TAG ABOVE FINISH
FLOOR
18x10
T 9'-10" B 9'-0"
FLEXIBLE CONNECTION
FLEXIBLE DUCT
UC 3/4" UNDERCUT DOOR 3/4"
AD
AD
ACCESS DOOR
PLAN SECTION
SUPPLY AIR REGISTER OR
GRILLE - W/DUCT-MOUNTED
EXTRACTOR
EXHAUST OR RETURN AIR
REGISTER OR GRILLE
ACOUSTICAL LINING -
DUCT DIMENSIONS FOR NET
FREE AREA
RETURN AIR GRILLE
90° ELBOW TURNED UP,
RECTANGULAR
90° ELBOW TURNED UP,
ROUND
90° ELBOW TURNED UP,
ROUND
RETURN DUCT SECTION,
RECTANGULAR
SUPPLY DUCT SECTION,
RECTANGULAR
EXHAUST DUCT SECTION,
RECTANGULAR
ROUND DUCT
12x12
RECTANGULAR DUCT12x12
24x12
24x12
24x12
R
HIDDEN DUCT24x18
SUPPLY FAN
NEW CONNECTION TO
EXISTING
EXHAUST AIR GRILLE
SUPPLY DIFFUSER
(NO ARROWS INDICATE 4-WAY)
SUPPLY DIFFUSER
(ROUND)
TAG OR FLOW RATE
SIZE
12x12
12ø
12ø
LOUVER
AD ACCESS DOOR
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AFR ABOVE FINISHED ROOF
AHU AIR HANDLING UNIT
AI ANALOG INPUT
ALT ALTERNATIVE
AMB AMBIENT
AO ANALOG OUTPUT
APD AIR PRESSURE DROP
ARF ABOVE RAISED FLOOR
AV AIR VALVE
AVG AVERAGE
BAS BUILDING AUTOMATION SYSTEM
BCE BASE CIVIL ENGINEERING
BHP BRAKE HORSE POWER
BDD BACK DRAFT DAMPER
BOD BOTTOM OF DUCT
BOE BOTTOM OF EQUIPMENT
BOP BOTTOM OF PIPE
BTUH BRITISH THERMAL UNITS PER HOUR
CAV CONSTANT AIR VOLUME
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CLG CEILING, COOLING
CO CLEAN OUT
CONN CONNECTION
CONT CONTINUOUS
CRAC COMPUTER ROOM AIR CONDITIONER
CU CONDENSING UNIT
DB DRY BULB
dB DECIBEL(S)
DDC DIRECT DIGITAL CONTROL
DEG F DEGREES FAHRENHEIT
DH DEHUMIDIFIER
DIA DIAMETER
DN DOWN
DX DIRECT EXPANSION
E EXISTING
EA EXAUST AIR
EAT ENTERING AIR TEMPERATURE
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EFF EFFICIENCY
EMCS ENERGY MANAGEMENT CONTROL SYSTEM
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
F FUTURE
FA FREE AREA
FCP FAN CONTROL PANEL
FCU FAN COIL UNIT
FL FILTER, FLOOR
FLA FULL LOAD AMPS
FPB FAN POWERED BOX
FPM FEET PER MINUTE
GAL GALLONS
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HP HORSE POWER
HR HOUR
HTG HEATING
HVAC HEATING, VENTILATION, & AIR CONDITIONING
HZ HERTZ
IAQ INDOOR AIR QUALITY
ID INSIDE DIAMETER
IE INVERT ELEVATION
IN INCHES
I/O INPUT/OUTPUT
I/P CURRENT TO PNEUMATIC
KEF KITCHEN EXHAUST FAN
KW KILOWATT
LAT LEAVING AIR TEMPERATURE
LB POUNDS
LV LOUVER
LWT LEAVING WATER TEMPERATURE
MAU MAKE-UP AIR UNIT
MAX MAXIMUM
MBH THOUSAND BTUH
MCC MOTOR CONTROL CENTER
MISC MISCELLANEOUS
MIN MINIMUM, MINUTES
MFG MANUFACTURING
MOD MOTOR OPERATED DAMPER
NC NORMALLY CLOSED, NOISE CRITERIA
NIC NOT IN CONTRACT
NO NORMALLY OPEN, NUMBER
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
OA OUTSIDE AIR
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED CONTRACTOR INSTALLED
OFOI OWNER FURNISHED OWNER INSTALLED
OS&Y OUTSIDE SCREW AND YOKE
PD PRESSURE DROP
PH PHASE
PLBG PLUMBING
PPH POUNDS PER HOUR
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAUGE
QTY QUANTITY
RA RETURN AIR
REQD REQUIRED
RH RELATIVE HUMIDITY
RPM REVOLUTIONS PER MINUTE
RTU ROOFTOP UNIT
S SIGNAL PORT
SA SUPPLY AIR, SOUND ATTENUATOR
SCFM STANDARD CUBIC FEET PER MINUTE
SF SUPPLY FAN, SQUARE FEET
SP STATIC PRESSURE
SQ SQUARE
TCP TEMPERATURE CONTROL PANEL
TD TEMPERATURE DIFFERENTIAL
TEMP TEMPERATURE, TEMPORARY
TES THERMAL ENERGY STORAGE
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
UH UNIT HEATER
V VOLTS
VAV VARIABLE AIR VOLUME
V&C VALVE AND CAP
VFD VARIABLE FREQUENCY DRIVE
VRF VARIABLE REFRIGERANT FLOW
VTR VENT THROUGH ROOF
W WATTS
WB WET BULB
WG WATER GAUGE
WPD WATER PRESSURE DROP
1. PROVIDE AND INSTALL ALL MECHANICAL SYSTEMS IN ACCORDANCE
WITH THE UNIFIED FACILITIES CRITERIA (UFC'S), 2018 NORTH CAROLINA
MECHANICAL CODE AND ALL OTHER APPLICABLE STATE AND LOCAL
CODES.
2. PROVIDE AND INSTALL ALL PLUMBING SYSTEMS IN ACCORDANCE WITH
THE 2018 INTERNATIONAL PLUMBING CODE AND ALL OTHER
APPLICABLE STATE AND LOCAL CODES.
3. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK (HVAC)
ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND
GENERAL ARRANGEMENT ONLY. PLANS SHOULD NOT BE SCALED.
4. INSTALL ALL MECHANICAL AND PLUMBING EQUIPMENT AND
APPURTENANCES IN ACCORDANCE WITH MANUFACTURERS'
RECOMMENDATIONS.
5. VERIFY ALL CLEARANCES BEFORE FABRICATING AND INSTALLING
WORK. COORDINATE WITH ALL OTHER TRADES.
6. DRAWINGS REFLECT DIMENSIONS OF DESIGN MFG. EQUIPMENT.
ALLOWABLE ALTERNATES, WHILE EQUAL IN OUTPUT CAPACITY WILL BE
THE RESPONSIBILITY OF THE CONTRACTOR TO MEET THE SPACE
REQUIREMENTS AND PROVE EQUALITY WITH DESIGN MFG. EQUIPMENT.
7. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S
CERTIFIED DRAWINGS. COORDINATE AND PROVIDE ALL DUCT AND
PIPING TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS
TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DUCT
AND PIPING DIMENSIONS BEFORE FABRICATION.
8. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE UFC'S AND
NFPA 70. IF WHIP/LIQUID TIGHT/CONDUIT AND CONDUCTOR ARE
DAMAGED DURING DEMO, CONTRACTOR SHALL REPLACE WITH NEW
9. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND
AS SHOWN IN DETAILS FOR PIPING, DUCTWORK, AND EQUIPMENT (UNLESS
OTHERWISE NOTED) SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL
CONTRACTOR.
10. PROVIDE ACCESS PANELS FOR INSTALLATION IN DUCTWORK, WALLS AND
CEILINGS, WHERE REQUIRED, TO SERVICE CONTROLS DEVICES, DAMPERS,
VALVES, DUCTWORK, SMOKE DETECTORS, AND OTHER CONCEALED MECHANICAL
EQUIPMENT. ACCESS PANEL INSTALLATION SHALL BE COORDINATED WITH
PROCESS REQUIREMENTS, ARCHITECTURAL WORK TO MATCH MATERIALS AND
FINISHES.
11. ALL DUCTWORK, PIPING, AND EQUIPMENT SUPPORTED FROM STRUCTURAL
STEEL SHALL BE COORDINATED WITH ALL TRADES. ALL ATTACHMENTS TO STEEL
BAR JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE AT PANEL POINTS OR AS
SHOWN ON THE MECHANICAL AND STRUCTURAL DRAWINGS. PROVIDE BEAM
CLAMPS MEETING MSS STANDARDS. WELDING TO STRUCTURAL MEMBERS SHALL
NOT BE PERMITTED.
12. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK AND PIPING SYSTEMS
CONNECTED TO FANS, PUMPS AND OTHER EQUIPMENT WHICH REQUIRE
VIBRATION ISOLATION.
13. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING TEMPORARY HEATING
AND COOLING OF AFFECTED AREAS OF THE BUILDINGS DURING
CONSTRUCTION. CONTRACTOR RESPONSIBILITIES TO INCLUDE, BUT NOT LIMITED
TO, THE FOLLOWING: THE INSTALLATION, CONNECTION, AND DISCONNECTION OF
THE SERVICES. UTILITY SOURCES FOR THE TEMPORARY SYSTEMS SHALL BE
PROVIDED BY THE GOVERNMENT, CONTRACTOR RESPONSIBLE FOR EXTENDING
UTILITIES AS REQUIRED. CONTRACTOR SHALL HAVE PRE-CONSTRUCTION
MEETING WITH COR WITH PLANNED PHASING AND MEANS OF PROVIDING
TEMPORARY COOLING AND HEATING TO OBTAIN APPROVAL OF PLAN PRIOR TO
STARTING CONSTRUCTION. DEMOLITION OF EXISTING SYSTEMS SHOULD NOT
COMMENCE UNTIL TEMPORARY SYSTEMS ARE IN PLACE AND THE COR HAS
INSPECTED AND APPROVED THE TEMPORARY SYSTEMS. CONTRACTOR SHALL
COMPLETE CONSTRUCTION IN PHASES SUCH THAT DOWNTIME IS MINIMIZED.
PA
PG
PT
C
C
H
C
EP
R
D
X
EH
C
FB
C
VFD
H
C
CAV
H
C
VAV
EF
SF
GAS
ELECT
AI
AO
DI
DO
COMM
CT
STARTER
VFD
HP
DX
M
T
H
CO
NO2
S
NG
M
F
P
DP
CT
T
TS
TC
FM
A
T
S
T
FRZ
ΔP
M
CO2
DIFFERENTIAL PRESSURE SENSORDP
DEMOLITION NOTES
1. THE SCOPE OF WORK IS LIMITED TO THE
RENOVATION/REPLACEMENT OF A PORTION OF THE EXISTING
MECHANICAL EQUIPMENT. HVAC WORK INCLUDES CONDUCTING
A TEST AND BALANCE REPORT PRIOR TO AND AFTER
CONSTRUCTION, DUCTWORK MODIFICATIONS TO MEET THE
RENOVATED SPACE/SYSTEMS REQUIREMENTS, AND THE
ADDITION OF ANY OTHER ARCHITECTURAL ELEMENTS
REQUIRED AS INDICATED ON DRAWINGS.
2. PRIOR TO THE START OF CONSTRUCTION OR DEMOLITION
WORK, A CERTIFIED TEST AND BALANCE REPORT SHALL BE
SUBMITTED TO THE ENGINEER. THE TEST AND BALANCE
REPORT SHALL INCLUDE THE FOLLOWING FROM THE EXISTING
AIR HANDLING UNIT TO BE REPLACED. MEASURE AND RECORD
FROM THE SUPPLY AIRFLOW FROM THE AHU, OUTSIDE AIRFLOW
RATE TO THE AHU, AND RETURN AIRFLOW TO THE UNIT. IN
BUILDING 2, RECORD AIRFLOW RATES AT ALL
DIFFUSERS/GRILLES.
3. SYSTEMS SHALL BE ADJUSTED TO ACHIEVE THE MEASURED
AIRFLOW RATES AS EXISTING EQUIPMENT PRIOR TO
DEMOLITION OR AS INDICATED ON PLANS. WORK SHALL
INCLUDE ADDING ANY BALANCING DAMPERS WITHIN EXISTING
OR NEW DUCTWORK, CHANGING BELTS AND SHEAVES
NECESSARY TO THE AHU TO ACHIEVE AIRFLOW RATES. AT
POINT OF SUBSTANTIAL COMPLETION, CONTRACTOR SHALL
TEST, ADJUST AND BALANCE THE SYSTEM AND SUBMIT A
CERTIFIED REPORT TO THE ENGINEER INDICATING THE
FOLLOWING: SUPPLY AIR FLOW FROM THE NEW AHU, OUTSIDE
AIR FLOW TO THE NEW AHU, AND RETURN AIR FLOW FROM THE
SPACE. IN ADDITION, IN BUILDING 2, THE VAV BOXES AND
SUPPLY DIFFUSERS/GRILLES.
4. DRAWINGS WERE PREPARED IN PART BASED ON EXISTING
AS-BUILTS DRAWINGS AND NON-DESTRUCTIVE FIELD
WORK. EXISTING MECHANICAL DUCTWORK AND PIPING
SHOWN IS SCHEMATIC AND MAY NOT NECESSARILY
REPRESENT EXACT LOCATIONS.
5. EXISTING MECHANICAL DUCTWORK AND PIPING NOT
ASSOCIATED WITH THE RENOVATION IS NOT SHOWN AND SHALL
REMAIN IN SERVICE.
6. FIELD VERIFY EXISTING CONDITIONS AND REPORT
DISCREPANCIES TO THE GOVERNMENT/ENGINEER BEFORE
COMMENCING WORK.
7. ALL MATERIALS AND EQUIPMENT BEING REMOVED UNDER
DEMOLITION SHALL BECOME THE PROPERTY OF THE
CONTRACTOR AND SHALL BE DISPOSED OF OFF SITE, UNLESS
OTHERWISE NOTED. UNITS INDICATED FOR REMOVAL SHALL BE
DISPOSED OF AS RECYCLED MATERIALS AND SHALL NOT TO BE
REUSED ELSEWHERE. REFER TO DIVISION 1 SPECIFICATIONS
FOR ADDITIONAL INFORMATION AND TRACKING REQUIREMENTS.
8. REFER TO DIVISION 1 SPECIFICATIONS FOR REQUIREMENTS
AND INSTRUCTIONS ON THE RECLAMATION AND DISPOSAL
OF R-22 REFRIGERANT. ALL DISPOSAL SHALL BE THE
RESPONSIBILITY OF THE GOVERNMENT. CONTRACTOR
RESPONSIBLE FOR RECLAIMING AND TRACKING (UNIT,
POUNDS, AND OUNCES) AND COORDINATING WITH
BCE/ENVIRONMENTAL FOR TURNOVER. THE BCE WILL
PROVIDE THE CONTRACTOR WITH CONTAINERS FOR
RECLAIMED REFRIGERANT WHICH WILL BE TURNED OVER WHEN
FULL.
9. EXISTING HVAC EQUIPMENT/COMPONENTS TO BE REPLACED
WITH NEW EQUIPMENT/COMPONENT OF LIKE OR SIMILAR
ELECTRICAL REQUIREMENTS. NEW EQUIPMENT/COMPONENTS
SHALL BE CONNECTED TO THE EXISTING CIRCUIT AND
DISCONNECT REMAINING AFTER DEMOLITION. REFER TO NEW
WORK DRAWINGS FOR FURTHER CLARIFICATION.
10. DISCONNECT ELECTRICAL SERVICES TO ELECTRICAL DEVICES
THAT ARE NOTED TO BE REMOVED. WIRE AND CONDUIT TO BE
REMOVED BACK TO THE FIRST TERMINATION POINT WHICH IS
TO REMAIN.
POINT OF DEMOLITION
HOT WATER SUPPLYHWS
HOT WATER RETURNHWR
CHILLED WATER SUPPLYCHWS
CHILLED WATER RETURNCHWR
NONE
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC
C rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:1
A M
00M001
N. OVERBY
10137178-02-MP_Master.rvt
GENERAL NOTES, LEGENDS, AND ABBREVIATIONS
MAR 2020 B-3 DESIGN SUBMITTAL
T
T
T
T
T
T
T
T
T
T
T
T
T x x x x x
99M005
VEST
CUSTOMER
ASSISTANCE
EDUCATION/
TRAINING
POINT CRED
PERSONNEL
SUPER
DP OFFICE
ADMIN
LOBBY
DIRECTOR OF
PERSONNEL
PSM
CUSTOMER
SUPPORT
TESTING
RECORDS
VAV 3-3
VAV 3-1
VAV 3-4
VAV 3-2VAV 3-5
VAV 3-6 VAV 3-7
VAV 3-8
VAV 3-1
VAV 3-4
VAV 3-2
VAV 3-7
VAV 3-6
VAV 3-8
VAV 3-3
VAV 3-5
17x14
14x14
14x14
14x14
12x14
12x12
20x14
8x12
1" HWR
1" HWS
1 1/4" HWR
1 1/4" HWS
1" HWR
1" HWS
1" HWS
1" HWR
1 1/4" HWR
1 1/4" HWS
1" HWR
1" HWS
x x x x x
CUSTOMER
ASSISTANCE
RECORDS
TESTING
CUSTOMER
SUPPORT
EDUCATION/
TRAINING
PSM
DIRECTOR OF
PERSONNEL
LOBBY
ADMIN
ADMIN
DP OFFICE
PERSONNEL
SUPER
POINT CRED
CORRIDOR
EXISTING ZONE
DAMPER (TYP.)
17x14
14x14
14x14
14x14
12x14
20x14
12x12
10x14
99M005
3 A B
C
KEY PLAN
RVC
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 1/8" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:1
A M
02M101
N. OVERBY
10137178-02-MP_Master.rvt
MECHANICAL PLANS - AREA A
BUILDING 02
1/8" = 1'-0"
MECHANICAL PLAN - AREA A
1/8" = 1'-0"
MECHANICAL DEMOLITION PLAN - AREA A
KEYNOTES
1 REMOVE EXISTING ZONE DAMPER. ALL
ASSOCIATED DUCTWORK AND CONTROLS
TO REMAIN (TYPICAL FOR ALL).
2 VAV TERMINAL BOX. FIELD COORDINATE
DUCT TRANSITIONS BETWEEN EXISTING
DUCT WORK AND TERMINAL BOX AS
REQUIRED (TYPICAL FOR ALL).
3 EXISTING BYPASS DAMPER AND ALL
ASSOCIATED DUCTWORK AND FITTINGS
TO BE REMOVED BACK TO MAIN. PATCH
AND SEAL DUCTWORK AIR TIGHT
(TYPICAL FOR ALL).
SEE 02M103 FOR CONTINUATION SEE 02M103 FOR CONTINUATION
7.1 TO 12.0 1-1/4"
3.6 TO 7.0 1"
0.5 TO 3.5 3/4"
GPM RANGE RUN-OUT PIPE SIZE
HYDRONIC PIPE RUN-OUT
T
T
T
T
T
T
T
T
T
ACU-1
02HP-2B
NEW 4" CONCRETE PAD TO
ACCOMMODATE NEW UNITS.
PAD SHALL EXTEND 1'-0" (MIN)
BEYOND FOOTPRINT OF THE
UNIT.
REFRIGERANT LINES
TO BE ROUTED IN
EXISTING SOFFIT.
x x x
8x1416x14 x
22x14 22x14
16x1414x14
CONFERENCE
WORK ROOM
BUDGET
OFFICE
FILES
COMPTROLLER
ACCOUNTING/
TRAVEL
ENTRY
VEST
120A
EQUAL OPP
CONF
CONF
PUBLIC
AFFAIRS
124 STAFF
AW/SE
CONF ROOM/
LIBRARY
VAV 1-1
VAV 1-3
VAV 1-4
VAV 1-2
VAV 1-6
VAV 1-5
VAV 1-3
VAV 1-2
VAV 1-5
VAV 1-6
VAV 1-4
REFRIGERANT LINES TO ROUTE
UP THROUGH TO SOFFIT IN
EXISTING CHASE. NEW
REFRIGERANT LINES SHALL BE
SIZED PER MANUFACTURERS
REQUIREMENTS.
VAV 1-1
REFRIGERANT LINES
TO BE ROUTED
THROUGH EXISTING
WALL PENETRATION
REINSTALL SOFFIT
PANELS UPON
COMPLETION OF
MECHANICAL WORK
ABOVE THE SOFFIT.
1" HWR
1" HWS
1" HWR
1" HWS
1 1/4" HWR
1 1/4" HWS
1 1/4" HWR
1 1/4" HWS
02HP-2A
EXISTING CONDENSING UNITS
(ACU-2A & ACU-2B) TO BE
REMOVED. ALL ELECTRICAL
CONDUIT, WIRING, AND
DISCONNECT TO REMAIN.
EXISTING CONCRETE PAD TO
REMAIN.
EXISTING REFRIGERANT
LINES ROUTED IN SOFIT.
x x x
8x1416x14 x
22x14 22x14
16x1414x14
ACCOUNTING/
TRAVEL
ENTRY
VEST
120A
EQUAL OPP
CONF
CONF
PUBLIC
AFFAIRS
124 STAFF
AW/SE
CONF ROOM/
LIBRARY
FILES
BUDGET
OFFICE
WORK ROOM
CONFERENCE
COMPTROLLER
EXISTING ZONE
DAMPER (TYP.)
ALL REFRIGERANT LINES
TO BE DEMOLISHED.
EXISTING CHASE TO
REMAIN AS POSSIBLE.
10x12
REMOVE EXISTING
METAL SOFFIT PANELS
AND STORE FOR REUSE.
A B
C
KEY PLAN
RVC
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 1/8" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:2
A M
02M102
N. OVERBY
10137178-02-MP_Master.rvt
MECHANICAL PLANS - AREA B
BUILDING 02
1/8" = 1'-0"
MECHANICAL PLAN - AREA B
1/8" = 1'-0"
MECHANICAL DEMOLITION PLAN - AREA B
KEYNOTES
1 REMOVE EXISTING ZONE DAMPER. ALL
ASSOCIATED DUCTWORK AND CONTROLS
TO REMAIN (TYPICAL FOR ALL).
2 VAV TERMINAL BOX. FIELD COORDINATE
DUCT TRANSITIONS BETWEEN EXISTING
DUCT WORK AND TERMINAL BOX AS
REQUIRED (TYPICAL FOR ALL).
3 EXISTING BYPASS DAMPER AND ALL
ASSOCIATED DUCTWORK AND FITTINGS
TO BE REMOVED BACK TO MAIN. PATCH
AND SEAL DUCTWORK AIR TIGHT
(TYPICAL FOR ALL).
SEE 02M103 FOR CONTINUATION SEE 02M103 FOR CONTINUATION
7.1 TO 12.0 1-1/4"
3.6 TO 7.0 1"
0.5 TO 3.5 3/4"
GPM RANGE RUN-OUT PIPE SIZE
HYDRONIC PIPE RUN-OUT
T
T
TT
T
T T
T
T
T
T
T
T
T
T
T
T
T
T
T
TT
T
T T
T
T
T
T
T
T
T
T
T T
T
T
40x20 46x20 54x20 60x2032x1832x16 12x12 16x16
20x16 28x16 x
48x20
42x20
12x14
12x14
COMM
OFFICE
ICE
STATE
COMMANDING
GENERAL
ADMIN
CCM
COMM
ADJUTANT
GENERAL
MECH/ELEC
CORR
ATAG
BREAK ROOM
LIBRARY
OG/CC
MAIL ROOM
174 HERITAGE
PROGRAM
LOBBY
CHIEF
MASTER
CONFERENCE
COMM
JOINT
FORCES HQ
OFFICE
OFFICE
EXECUTIVE
OFFICER
COMMANDING
OFFICER
HQ
VICE/ CONF
ROOM
STAFF
PUBLIC
AFFAIRS
124 CORRIDOR
JAN
126 STORAGE
TOILET
MECH/ELEC
CHAPLAIN
CHAPLAIN
131B
CHAPLAIN
131A
WOMEN'S
LATRINE
WOMEN
MEN
MEN'S
LATRINE
RECRUITER
DETENTION
SUC/CC
MAIL ROOM
RECRUITING
SUPERINTEND
ADMIN
STAFF
READINESS
OFFICE
LOBBY
EXISTING ZONE
DAMPER (TYP.)
02M104
02M104
ADMIN
40x20 46x20 54x20 60x2032x1832x16
12x12 16x16
20x16
28x16 x
48x20
42x20
12x14 12x14
NEW VAV BOX
W/HW REHEAT
(TYP)
COMM
OFFICE
ICE
STATE
COMMANDING
GENERAL
ADMIN
CCM
COMM
ADJUTANT
GENERAL
MECH/ELEC
CORR
ATAG
BREAK ROOM
LIBRARY
OG/CC
MAIL ROOM
HERITAGE
PROGRAM
LOBBY
CHIEF
MASTER
CONFERENCE
COMM
JOINT
FORCES HQ
OFFICE
OFFICE
EXECUTIVE
OFFICER
COMMANDING
OFFICER
HQ
VICE/ CONF
ROOM
STAFF
PUBLIC
AFFAIRS
CORRIDOR
JAN
126 STORAGE
TOILET
MECH/ELEC
CHAPLAIN
CHAPLAIN
131B
CHAPLAIN
131A
WOMEN'S
LATRINE
WOMEN
MEN
MEN'S
LATRINE
RECRUITER
DETENTION
SUC/CC
MAIL ROOM
RECRUITING
SUPERINTEND
ADMIN
STAFF
READINESS
OFFICE
LOBBY
VAV 2-1
VAV 2-2
VAV 2-3
VAV 2-4VAV 2-5
VAV 2-20
VAV 2-6
VAV 2-7
VAV 2-8
VAV 2-9
VAV 2-10VAV 2-11
VAV 2-14
VAV 2-12
VAV 2-15
VAV 2-13
VAV 2-16
VAV 2-17
VAV 2-18
VAV 2-21
VAV 2-19
VAV 2-15
VAV 2-12
VAV 2-14
VAV 2-11
VAV 2-16
VAV 2-10
VAV 2-9
VAV 2-17
VAV 2-8
VAV 2-7
VAV 2-18
VAV 2-6
VAV 2-5
VAV 2-3 VAV 2-2
VAV 2-19
VAV 2-20
VAV 2-1
VAV 2-4
VAV 2-13
02M104
02M104
3/4" HWR
3/4" HWS
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
1" HWS
1" HWR
1 1/2" HWR
1 1/2" HWS
1 1/2" HWR
1 1/2" HWS
3/4" HWR
3/4" HWS
2" HWR
2" HWS2" HWS
3/4" HWR
3/4" HWS
2" HWR
2" HWS
2" HWR
2" HWS2" HWS
2" HWR
2" HWS
BYPASS VALVE
(25GPM)
2" HWR
A B
C
KEY PLAN
RVC
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 1" = 10'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:2
A M
02M103
N. OVERBY
10137178-02-MP_Master.rvt
MECHANICAL PLANS - AREA C
BUILDING 02
1" = 10'-0"
MECHANICAL DEMOLITION PLAN - AREA C
1" = 10'-0"
MECHANICAL PLAN - AREA C
KEYNOTES
1 REMOVE EXISTING ZONE DAMPER. ALL ASSOCIATED DUCTWORK AND
CONTROLS TO REMAIN (TYPICAL FOR ALL).
2 VAV TERMINAL BOX. FIELD COORDINATE DUCT TRANSITIONS BETWEEN
EXISTING DUCT WORK AND TERMINAL BOX AS REQUIRED (TYPICAL FOR
ALL).
3 EXISTING BYPASS DAMPER AND ALL ASSOCIATED DUCTWORK AND
FITTINGS TO BE REMOVED BACK TO MAIN. PATCH AND SEAL DUCTWORK AIR
TIGHT (TYPICAL FOR ALL).
7.1 TO 12.0 1-1/4"
3.6 TO 7.0 1"
0.5 TO 3.5 3/4"
GPM RANGE RUN-OUT PIPE SIZE
HYDRONIC PIPE RUN-OUT
SEE 02M101 FOR CONTINUATION
SEE 02M101 FOR CONTINUATION
SEE 02M102 FOR CONTINUATION
SEE 02M102 FOR CONTINUATION
EXISTING BOLLARD
TO REMAIN
EXISTING BOLLARD TO BE
CUT FLUSH WITH GRADE
AND REMOVED.
EXISTING GAS FURNACE
(DF-3) TO BE DEMOLISHED.
REMOVE ALL ASSOCIATED
WIRING AND CONTROLS. GAS
PIPING SHALL BE REMOVED
BACK TO WALL AND CAPPED.
DEMOLISH EXISTING AIR
HANDLER (AHU-3). ALL
CONTROLS AND ELECTRICAL
WIRING AND CONDUIT TO
REMAIN FOR REUSE.
EXISTING CONDENSING UNIT AND ASSOCIATED
REFRIGERANT LINES TO BE DEMOLISHED. ALL
ELECTRICAL WIRING, CONDUIT, AND
DISCONNECT TO REMAIN FOR REUSE. WALL
PENETRATIONS ARE TO BE REUSED.
MECH/ELEC
AHU-3
EXISTING REFRIGERANT LINES TO
BE REMOVED. WALL PENETRATION
TO BE REUSED.
EXISTING AIR HANDLER
(AHU-2) TO BE REMOVED.
ALL DUCTWORK AND
ELECTRICAL TO REMAIN
FOR REUSE.
DEMOLISH EXISTING
HWS/HWR PIPING FROM
AHU-2.
EXISTING BOILER
TO REMAIN
EXISTING WATER
HEATER TO REMAIN
EXISTING
HWS/HWR
MECH/ELEC
PUBLIC
AFFAIRS
EXISTING AHU-1 HWS/HWR
PIPING TO REMAIN.
REMOVE EXISTING
EXPANSION TANK
AHU-2
MECH/ELEC
UTILIZE EXISTING WALL
PENETRATION FOR ROUTING OF
NEW REFRIGERANT LINES. SEAL
PENETRATION. REFER TO DETAILS.
EXTEND EXISTING CONCRETE SLAB SUCH
THAT IT EXTENDS 1'-0" BEYOND
FOOTPRINT OF THE UNIT. BOLLARD TO
MATCH EXISTING.
SUPPLY DUCT
SIZE TO MATCH
EXISTING
1" HWS 1" HWR
3/4" HWR
02HP-3
02AHU-3
MECH/ELEC
PUBLIC
AFFAIRS
UTILIZE EXISTING WALL
PENETRATION FOR
ROUTING OF NEW
REFRIGERANT LINES.
SEAL PENETRATION.
REFER TO DETAILS
2 1/2" HWS
2 1/2" HWR
1 1/2" HWS
2" HWR
2" HWS
1 1/2" HWR
REFRIGERANT LINES SHOWN FOR
CLARITY. FIELD COORDINATE
EXACT ROUTING (TYP)
02P-1
02ET-1
SUPPLY DUCT SIZE
TO MATCH EXISTING
02AHU-2
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 1/4" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:3
A M
02M104
N. OVERBY
10137178-02-MP_Master.rvt
MECHANICAL ENLARGED PLANS
BUILDING 02
KEYNOTES
1 EXTEND EXISTING DUCTWORK DOWN TO
RETURN AIR PLENUM FULL SIZE OF UNIT
CONNECTION. DEPTH AS REQUIRED.
2 HOT WATER CIRCULATION PUMP (02P-1).
FIELD COORDINATE CONNECTION TO
EXISTING PIPING.
02M103 1/4" = 1'-0"
1 MECHANICAL DEMOLITION PLAN - MECH ROOM 158
02M103 1/4" = 1'-0"
3 MECHANICAL DEMOLITION PLAN - MECH. ROOM 131
02M103 1/4" = 1'-0"
2 MECHANICAL PLAN - MECH ROOM 158
02M103 1/4" = 1'-0"
4 MECHANICAL PLAN - MECH. ROOM 131
NO WORK IN THIS AREA
MECH
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 1/4" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:3
A M
39M101
N. OVERBY
10137178-02-MP_Master.rvt
MECHANICAL PLAN
BUILDING 39
KEYNOTES
1 BACNET ROUTER, TEMPERATURE SENSOR, AND
THERMOSTAT (ALERTON MODEL:VLC/D). ROUTER
SHALL COMMUNICATE WITH EXISTING BAS
CONTROLLER LOCATED IN BUILDING 63.
2 SMART METER ON EXISTING ELECTRICAL
SERVICES. COORDINATE TYPES AND DESIGNS
WITH GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END.
4"
4"
CH-1
4" CHWS
EXISTING CHILLER SHALL BE REMOVED BACK
TO VALVES. EXISTING CHILLED WATER
SUPPLY AND RETURN LINES SHALL BE
DEMOLISHED AS SHOWN. REMOVE HEAT
TRACE BACK TO POINT OF JUNCTION OR
CONNECTION TO CONTROL PANEL.
P-3
P-4
P-2P-1
EXISTING BOILER (B-1) TO BE
DEMOLISHED. ALL ASSOCIATING
PIPING AND CONTROLS TO
REMAIN.
ELECTRICAL
EQUIP ROOM
MECHANICAL
EQUIP ROOM
EXISTING (2) 20 HP PUMPS (P-3
& P-4) TO DEMOLISHED. ALL
ASSOCIATED PIPING AND
CONTROLS TO REMAIN.
EXISTING (2) 5 HP PUMPS (P-1 &
P-2) TO DEMOLISHED. ALL
ASSOCIATED PIPING AND
CONTROLS TO REMAIN. EXISTING DOMESTIC
WATER SYSTEM
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 1/4" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:3
A M
45MD101
N. OVERBY
10137178-02-MP_Master.rvt
FIRST FLOOR MECHANICAL DEMOLITION PLAN
BUILDING 45 (EAST WING)
KEYNOTES
1 DEMOLISH EXISTING BUILDING BAS CONTROLLER.
EXISTING CONDUIT AND/OR CONTROL WIRING
SHALL REMAIN TO BE REUSED.
BASE SWITCH
BOARD
STORAGE
BNCC
INFO
MANAGER
ORDERLY
ROOM
CDR OFFICE
PLANT
IMPLEMENTATION
CLASSROOM
WOMENS
MENS
MQEC/AWM
FAN ROOM
VOICE
SYSTEM
COMP/SWICH
CRYPTO
GROUND
RADIO
CHIEF OF
MAINTANCE
VAULT
CHEIF OF
INFO SYSTEM
NCC
CORRIDOR
CORRIDOR
J.C.
IN/OUT
PRODUCTS
STORAGE
CLASS
DESTRUCT
VEST
MENS
LED ROOM
WOMENS
VEST
TOILET
RECEPTION
CLASSROOM
VEST
SP SUPV.
OFFICE
CDR OFFICE
STORAGE
PASS AND
RGIN/ ADMIN
OFFICE
SP SUPT.
OFFICE
BASE
WEAPONS
VAULT
CORRIDOR
VESTIBULE
ARMS VAULT
BREAK ROOM
FAN ROOM
VEST.
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 1" = 10'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:3
A M
45MD102
N. OVERBY
10137178-02-MP_Master.rvt
SECOND FLOOR MECHANICAL DEMOLITION PLAN
BUILDING 45
KEYNOTES
1 REFRIGERANT LINES DOWN FROM
CONDENSING UNIT LOCATED ON ROOF
TO BE REMOVED (TYP).
2 EXISTING AIR CONDITIONING UNIT
INSTALLED ABOVE THE CEILING TO BE
REMOVED. ALL ASSOCIATED DUCTWORK
AND CONTROLS TO REMAIN.
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 3/32" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:4
A M
45MD103
N. OVERBY
10137178-02-MP_Master.rvt
ROOF MECHANICAL DEMOLITION PLAN
BUILDING 45
MAR 2020 B-3 DESIGN SUBMITTAL
KEYNOTES
1 EXISTING REFRIGERANT LINES DOWN
THROUGH ROOF TO INDOOR
EVAPORATOR TO BE REMOVED.
2 EXISTING CONDENSING UNIT TO BE
REMOVED.
45CH-1
EXISTING
CHWS/CHWR
45P-245P-1
45P-3
45P-4
MECHANICAL
EQUIP ROOM
ELECTRICAL
EQUIP ROOM
CHILLER TO BE INSTALLED ON EXISTING
PAVED SURFACE AT GRADE. ENSURE
THAT ALL MANUFACTURER'S
RECOMMENDED CLEARANCES ARE MET.
HEAT TRACE PIPE AND
CONNECT AT POINT OF
REMOVAL. TEST HEAT TRACE
CIRCUIT FOR PROPER
OPERATION. REPORT ANY
DEFECTS TO GOVERNMENT.
45B-1
3 3
EXISTING DOMESTIC
WATER SYSTEM
EXISTING CHWS
EXISTING GAS
PIPING
EXISTING
HWS/HWR
3"CHWS
3"CHWR
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 1/4" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:3
A M
45M101
N. OVERBY
10137178-02-MP_Master.rvt
FIRST FLOOR MECHANICAL PLAN
BUILDING 45 (EAST WING)
KEYNOTES
1 BAS CONTROLLER (ALERTON MODEL: ACM). ALL
NEW AND EXISTING MECHANICAL EQUIPMENT
SHALL BE TIED IN AND VISIBLE ON THE EXISTING
FRONT END. CONTRACTOR TO REUSE EXISTING
POWER CONNECTIONS AND CONDUIT AS
REQUIRED.
2 BOILER (45B-1) TO BE INSTALLED AT SAME
LOCATION OF PREVIOUSLY DEMOLISHED BOILER
AND PER MANUFACTURER RECOMMENDATIONS.
CONNECT 8" FLUE EXHAUST AND 8" COMBUSTION
AIR INLET TO UTILIZE EXISTING PENETRATIONS.
FIELD COORDINATE AND EXTEND EXISTING
CONTROLS, HEATING HOT WATER SUPPLY AND
RETURN, AND CONDENSATE PIPING
CONNECTIONS TO NEW BOILER.
3 PUMPS TO BE INSTALLED AT SAME LOCATION OF
PREVIOUSLY DEMOLISHED PUMPS. CONNECT TO
EXISTING PIPING.
#KEYNOTES
1 BAS CONTROLLER (ALERTON MODEL: ACM). ALL
NEW AND EXISTING MECHANICAL EQUIPMENT
SHALL BE TIED IN AND VISIBLE ON THE EXISTING
FRONT END. CONTRACTOR TO REUSE EXISTING
POWER CONNECTIONS AND CONDUIT AS
REQUIRED.
2 BOILER (45B-1) TO BE INSTALLED AT SAME
LOCATION OF PREVIOUSLY DEMOLISHED BOILER
AND PER MANUFACTURER RECOMMENDATIONS.
CONNECT 8" FLUE EXHAUST AND 8" COMBUSTION
AIR INLET TO UTILIZE EXISTING PENETRATIONS.
FIELD COORDINATE AND EXTEND EXISTING
CONTROLS, HEATING HOT WATER SUPPLY AND
RETURN, AND CONDENSATE PIPING
CONNECTIONS TO NEW BOILER.
3 PUMPS TO BE INSTALLED AT SAME LOCATION OF
PREVIOUSLY DEMOLISHED PUMPS. CONNECT TO
EXISTING PIPING.
45AC-1 45AC-3
45AC-4
45AC-2
FAN ROOM
STORAGE
CDR OFFICE
SP SUPV.
OFFICE
PASS AND
RGIN/ ADMIN
OFFICE
CLASSROOM
VEST
RECEPTION
LED ROOM
SP SUPT.
OFFICE
ARMS VAULT
BASE
WEAPONS
VAULT
BREAK ROOM
WOMENS
MENS
CORRIDOR
VESTIBULE
VEST
TOILET
CORRIDOR
NCC
VAULT
CHEIF OF
INFO SYSTEM
IN/OUT
PRODUCTS
4 STORAGE
CLASS
DESTRUCT
189BNCC
VEST.
GROUND
RADIO
COMP/SWICH
CRYPTO
VOICE
SYSTEM
181FAN ROOM
MQEC/AWM
MENS
WOMENS
CLASSROOM
J.C.
CDR OFFICE
ORDERLY
ROOM
INFO
MANAGER
STORAGE
170 BASE SWITCH
BOARD
CORRIDOR
CORRIDOR
CHIEF OF
MAINTANCE
PLANT
IMPLEMENTATION
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 3/32" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:3
A M
45M102
N. OVERBY
10137178-02-MP_Master.rvt
SECOND FLOOR MECHANICAL PLAN
BUILDING 45
KEYNOTES
1 AIR CONDITIONING UNIT INSTALLED ABOVE
CEILING. CONNECT TO EXISTING
DUCTWORK, CONDENSATE, AND CONTROLS.
PROVIDE FLEXIBLE CONNECTION BETWEEN
AIR CONDITIONING UNIT AND DUCTWORK.
PROVIDE TRANSITION AS REQUIRED FOR
CONNECTION TO EXISTING DUCTWORK.
2 FLOOR MOUNTED AIR CONDITIONING UNIT.
CONNECT TO ANY EXISTING DUCTWORK,
CONDENSATE, AND CONTROLS.
3 NEW REFRIGERANT LINES DOWN FROM
CONDENSING UNIT LOCATED ON ROOF. SEE
SHEET 45M103 FOR CONTINUATION.
MAR 2020 B-3 DESIGN SUBMITTAL
KEYNOTES
1 AIR CONDITIONING UNIT INSTALLED ABOVE
CEILING. CONNECT TO EXISTING
DUCTWORK, CONDENSATE, AND CONTROLS.
PROVIDE FLEXIBLE CONNECTION BETWEEN
AIR CONDITIONING UNIT AND DUCTWORK.
PROVIDE TRANSITION AS REQUIRED FOR
CONNECTION TO EXISTING DUCTWORK.
2 FLOOR MOUNTED AIR CONDITIONING UNIT.
CONNECT TO ANY EXISTING DUCTWORK,
CONDENSATE, AND CONTROLS.
3 NEW REFRIGERANT LINES DOWN FROM
CONDENSING UNIT LOCATED ON ROOF. SEE
SHEET 45M103 FOR CONTINUATION.
45CU-1
45CU-3
45CU-4
45CU-2
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 3/32" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:3
A M
45M103
N. OVERBY
10137178-02-MP_Master.rvt
ROOF MECHANICAL PLAN
BUILDING 45
MAR 2020 B-3 DESIGN SUBMITTAL
#KEYNOTES
1 NEW REFRIGERANT LINES DOWN TO AIR
HANDLING UNIT UNIT LOCATED BELOW.
EXISTING ROOFTOP UNIT (RTU-1) AND ASSOCIATED CONTROLS TO
BE REMOVED. ALL ELECTRICAL CONDUIT, WIRING, AND
DISCONNECT TO REMAIN FOR REUSE.
PRELIMINARY
NOT FOR
CONSTRUCTION
OR
RECORDING
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 1/4" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:4
A M
49MD101
N. OVERBY
10137178-02-MP_Master.rvt
ROOF MECHANICAL DEMOLITION PLAN
BUILDING 49
49RTU-1
PRELIMINARY
NOT FOR
CONSTRUCTION
OR
RECORDING
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 1/4" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:4
A M
49M101
N. OVERBY
10137178-02-MP_Master.rvt
ROOF MECHANICAL PLAN
BUILDING 49
KEYNOTES
1 BACNET ROUTER, TEMPERATURE SENSOR AND
DOOR SWITCHES. ROUTER SHALL COMMUNICATE
WITH EXISTING BAS CONTROLLER LOCATED IN
BUILDING 63.
2 LOCATE ROOF TOP UNIT SUCH THAT EXISTING
SUPPLY AND RETURN DUCT PENETRATIONS ARE
USED. PROVIDE CURB ADAPTER AS REQUIRED.
ELEC/MECH
NO WORK IN THIS AREA
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 3/16" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:4
A M
50M101
N. OVERBY
10137178-02-MP_Master.rvt
MECHANICAL PLAN
BUILDING 50
KEYNOTES
1 BACNET ROUTER, TEMPERATURE SENSOR, AND
THERMOSTAT (ALERTON MODEL:VLC/D). ROUTER
SHALL COMMUNICATE WITH EXISTING BAS
CONTROLLER LOCATED IN BUILDING 63.
2 SMART METER ON EXISTING ELECTRICAL
SERVICES. COORDINATE TYPES AND DESIGNS
WITH GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END.
3 SMART METER ON EXISTING NATURAL GAS
SERVICES. COORDINATE TYPES AND DESIGNS
WITH GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END.
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 1/8" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:4
A M
58M101
N. OVERBY
10137178-02-MP_Master.rvt
MECHANICAL PLAN
BUILDING 58
KEYNOTES
1 SMART METER ON EXISTING ELECTRICAL
SERVICES. COORDINATE TYPES AND DESIGNS
WITH GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END.
2" 1 1/4"1 1/4"
1 1/2"
1"
1"
1"
1"
REMOVE ALL GAS PIPING
LOCATED ON ROOF AND GAS
MAIN DOWN TO 12" BELOW
ROOF LEVEL.
EXISTING ROOFTOP UNIT AND ASSOCIATED
CONTROLS TO BE REMOVED. ALL ELECTRICAL
CONDUIT, WIRING, AND DISCONNECT TO
REMAIN FOR REUSE. (TYP FOR ALL)
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 1/8" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:4
A M
61MD101
N. OVERBY
10137178-02-MP_Master.rvt
ROOF MECHANICAL DEMOLITION PLAN
BUILDING 61
61RTU-2
61RTU-5
61RTU-7
61RTU-3
61RTU-1
61RTU-6
61RTU-4
2" G
1 1/2" G
1 1/2" G
1" G
1" G
1" G 1 1/4" G
1" G
1" G
1 1/4" G
3/4" G3/4" G
LOCATE ALL ROOF TOP UNITS SUCH
THAT EXISTING SUPPLY AND
RETURN DUCT PENETRATIONS ARE
USED. PROVIDE CURB ADAPTER AS
REQUIRED (TYP)
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 1/8" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:4
A M
61M101
N. OVERBY
10137178-02-MP_Master.rvt
ROOF MECHANICAL PLAN
BUILDING 61
MEZZANINE
STORAGE
MECH
NO WORK IN THIS AREA
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 1/4" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:4
A M
62M101
N. OVERBY
10137178-02-MP_Master.rvt
MECHANICAL PLAN
BUILDING 62
KEYNOTES
1 SMART METER ON EXISTING ELECTRICAL
SERVICES. COORDINATE TYPES AND DESIGNS
WITH GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END.
2 SMART METER ON EXISTING NATURAL GAS
SERVICES. COORDINATE TYPES AND DESIGNS
WITH GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END.
REMOVE EXISTING
REFRIGERANT LINES
ASSOCIATED WITH ALL
CONDENSING UNITS. PATCH AND
SEAL WALL AT PENETRATION
WITH LIKE MATERIALS.
REMOVE EXISTING REFRIGERANT
LINES. WALL PENETRATION TO
BE REUSED FOR NEW
REFRIGERANT LINESETS
REMOVE EXISTING
FURNACE. ALL ASSOCIATED
DUCTWORK, GAS PIPING,
AND CONTROLS SHALL
REMAIN. (TYP)
EXISTING CONDENSING
UNITS TO BE RELOCATED TO
THE ROOF. REFER TO
63M103 FOR NEW LOCATION.
MAIN
WAREHOUSE
ELEC
MECHANICAL
MECH
EXISTING CONDENSING UNIT
(CU-5) TO BE REMOVED
EXISTING CONDENSING UNIT
(CU-2) TO BE REMOVED
EXISTING CONDENSING
UNITS (CU-6 & CU-7) TO
BE REMOVED
NO WORK IN THIS AREA
EXISTING
CONDENSING UNIT
(CU-1) TO REMAIN
REMOVE EXISTING
FURNACE. ALL
ASSOCIATED DUCTWORK,
GAS PIPING, AND
CONTROLS SHALL REMAIN.
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 3/32" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:5
A M
63MD101
N. OVERBY
10137178-02-MP_Master.rvt
FIRST FLOOR MECHANICAL DEMOLITION PLAN
BUILDING 63
REMOVE EXISTING
FURNACE. ALL
ASSOCIATED DUCTWORK,
GAS PIPING, AND
CONTROLS SHALL
REMAIN. (TYP)
MECHANICAL
SPACE
REMOVE EXISTING
REFRIGERANT LINES
OPEN TO BELOW
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 3/32" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:5
A M
63MD102
N. OVERBY
10137178-02-MP_Master.rvt
SECOND FLOOR MECHANICAL DEMOLITION PLAN
63CU-7 63CU-6
63GF-7 63GF-6
LOCATE FURNACES IN SAME LOCATION AS
DEMOLISHED AND CONNECT BACK TO
EXISTING DUCTWORK, GAS PIPE,
COMBUSTION AIR INTAKE, FLUE,
CONDENSATE AND CONTROLS. PROVIDE
FLEXIBLE CONNECTION BETWEEN GAS
FURNACE AND DUCTWORK. PROVIDE
TRANSITION AS REQUIRED FOR CONNECTION
TO EXISTING DUCTWORK (TYP)
CU-1 63GF-1
REFRIGERANT LINES SHALL BE
ROUTED THROUGH EXISTING
WALL PENETRATION
MAIN
WAREHOUSE
ELEC
MECHANICAL
MECH
MECHANICAL
NO WORK IN THIS AREA
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 3/32" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:4
A M
63M101
N. OVERBY
10137178-02-MP_Master.rvt
FIRST FLOOR MECHANICAL PLAN
63GF-2
63GF-5
RS/RL
(TYP) 63GF-3
63GF-4
MECHANICAL
SPACE
OPEN TO BELOW
LOCATE FURNACES IN SAME
LOCATION AS DEMOLISHED
AND CONNECT BACK TO
EXISTING DUCTWORK, GAS
PIPE, COMBUSTION AIR
INTAKE, FLUE, CONDENSATE
AND CONTROLS. PROVIDE
FLEXIBLE CONNECTION
BETWEEN GAS FURNACE
AND DUCTWORK. PROVIDE
TRANSITION AS REQUIRED
FOR CONNECTION TO
EXISTING DUCTWORK (TYP)
REFRIGERANT
LINES DOWN
FROM ABOVE
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 3/32" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:4
A M
63M102
N. OVERBY
10137178-02-MP_Master.rvt
SECOND FLOOR MECHANICAL PLAN
63CU-5
63CU-2
RL/RS DOWN
THROUGH ROOF.
PROVIDE WITH
REFRIGERANT BOX
EXISTING RELOCATED
CONDENSING UNIT (CU-3)
EXISTING RELOCATED
CONDENSING UNIT (CU-4)
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 3/32" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:4
A M
63M103
N. OVERBY
10137178-02-MP_Master.rvt
ROOF MECHANICAL PLAN
BUILDING 63
GENERAL NOTE:
ALL ROOF WORK AND PENETRATIONS SHALL BE EXECUTED
BY A CERTIFIED ROOFER WITH THE APPROVAL OF THE
GOVERNMENT/COR.
POL
STORAGE
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 3/16" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:5
A M
65M101
N. OVERBY
10137178-02-MP_Master.rvt
MECHANICAL PLAN
BUILDING 65
KEYNOTES
1 SMART METER ON EXISTING ELECTRICAL
SERVICES. COORDINATE TYPES AND DESIGNS
WITH GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END.
2 SMART METER ON EXISTING NATURAL GAS
SERVICES. COORDINATE TYPES AND DESIGNS
WITH GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END.
67MD101
GF-1
GF-2
GF-3
AH-4
REMOVE EXISTNG FURNACE.
ALL ASSOCIATED DUCTWORK,
GAS PIPING, AND CONTROLS
SHALL REMAIN. (TYP)
REMOVE EXISTING
REFRIGERANT LINES.
FLOOR/WALL PENETRATIONS
TO BE REUSED.
REMOVE EXISTING
REFRIGERANT LINES.
(TYP FOR ALL)
REFRIGERANT LINES ROUTED
DOWN AND OVER TO BUILDING IN
CHASE UNDER CONCRETE
SIDEWALK. SAW CUT AND
REMOVE APPROX. 72 SF.
EXISTING CONDUIT TO REMAIN
FOR REUSE.
REMOVE HORIZONTAL AIR
HANDLER INSTALLED
SUSPENDED FROM CEILING
REMOVE ALL EXISTING
CONTROLS AND PANELS
MECH ELEC
MECH
EXISTING CONDENSING UNITS AND
HEAT PUMP TO BE REMOVED (TYP)
3'-0"
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC As indicatedC rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:5
A M
67MD101
N. OVERBY
10137178-02-MP_Master.rvt
MECHANICAL DEMOLITION PLANS
BUILDING 67
1/16" = 1'-0"
BUILDING 67 OVERALL PLAN
- 3/16" = 1'-0"
1 ENLARGED MECHANICAL DEMOLITION PLAN
67M101
NO WORK IN THIS AREA
67CU-2
67CU-3
67CU-1
67CU-4
67GF-367GF-1
67GF-2
67AH-4
NEW DDC CONTROL PANELS
FOR NEW SPLIT SYSTEMS
(TYP)
ELECMECH
MECH
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC As indicatedC rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:5
A M
67M101
N. OVERBY
10137178-02-MP_Master.rvt
MECHANICAL FLOOR PLANS
BUILDING 67
1/16" = 1'-0"
BUILDING 67 OVERALL PLAN
- 3/16" = 1'-0"
1 ENLARGED MECHANICAL NEW WORK PLAN
KEYNOTES
1 BAS CONTROLLER (ALERTON MODEL: ACM). ALL
NEW AND EXISTING MECHANICAL EQUIPMENT
SHALL BE TIED IN AND VISIBLE ON THE EXISTING
FRONT END. CONTRACTOR TO REUSE EXISTING
POWER CONNECTIONS AND CONDUIT AS
REQUIRED.
2 RL/RS LINES SHALL BE ROUTED UNDERGROUND
AND OVER TO BUILDING THRU EXISTING CONDUIT
(TYP FOR ALL). REPAIR AND REPLACE SIDEWALK
AS REQUIRED (APPROX. 72 SF) TO MATCH
EXISTING.
69AH-1
NO WORK IN THIS AREANO WORK IN THIS AREA
LOCATE HORIZONTAL FURNACE IN
SAME LOCATION AS DEMOLISHED
AND CONNECT BACK TO EXISTING
DUCTWORK, GAS PIPE, COMBUSTION
AIR INTAKE, FLUE, CONDENSATE
AND CONTROLS. PROVIDE FLEXIBLE
CONNECTION BETWEEN GAS
FURNACE AND DUCTWORK. PROVIDE
TRANSITION AS REQUIRED FOR
CONNECTION TO EXISTING
DUCTWORK
CONDENSING UNIT ON 4" CONCRETE
PAD (APPROX. 36"x36"). PAD SHALL
EXTEND MIN. 6" FROM FOOTPRINT
OF THE UNIT.
69CU-1
EXISTING
CONDENSING UNITS
ACCESS
CORR
NO WORK IN THIS AREANO WORK IN THIS AREA
REMOVE EXISTING FURNACE. ALL
ASSOCIATED DUCTWORK, GAS
PIPING, AND CONTROLS SHALL
REMAIN. (TYP)
REMOVE EXISTING CONDENSING UNIT AND
REFRIGERANT LINES. SEAL WALL PENETRATION
WITH LIKE CONSTRUCTION AND MATERIALS
ACCESS
CORR
EXISTING CONDENSING UNITS
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 1/8" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:5
A M
69M101
N. OVERBY
10137178-02-MP_Master.rvt
MECHANICAL PLANS
BUILDING 69
1/8" = 1'-0"
MECHANICAL PLAN
1/8" = 1'-0"
MECHANICAL DEMOLITION PLAN
KEYNOTES
1 BAS CONTROLLER (ALERTON MODEL: ACM). ALL
NEW AND EXISTING MECHANICAL EQUIPMENT
SHALL BE TIED IN AND VISIBLE ON THE EXISTING
FRONT END. CONTRACTOR TO REUSE EXISTING
POWER CONNECTIONS AND CONDUIT AS
REQUIRED.
2 SMART METER ON EXISTING NATURAL GAS
SERVICES. COORDINATE TYPES AND DESIGNS
WITH GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END.
3 SMART METER ON EXISTING ELECTRICAL
SERVICES. COORDINATE TYPES AND DESIGNS
WITH GOVERNMENT TO ENSURE THAT METER IS
COMPATIBLE WITH EXISTING SYSTEM. METERS
SELECTED SHALL MEET CURRENT UFC'S AND AIR
FORCE REQUIREMENTS. METER SHALL BE
WIRED/ROUTED TO BUILDING CONTROLLER FOR
VISIBILITY ON THE EXISTING FRONT END.
72WMU-1
72WMU-2
WALL MOUNT PACKAGE UNIT SHALL
BE INSTALLED TO UTILIZE EXISTING
WALL PENETRATIONS (TYP)
WMU-1
WMU-2
REMOVE EXISTING WALL MOUNTED
PACKAGE UNIT. EXISTING ELECTRICAL
CONDUIT, WIRING, AND DISCONNECT TO
REMAIN FOR REUSE. (TYP)
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC 1/4" = 1'-0"C
rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:5
A M
72M101
N. OVERBY
10137178-02-MP_Master.rvt
MECHANICAL FLOOR PLANS
BUILDING 72
1/4" = 1'-0"
MECHANICAL NEW WORK PLAN
1/4" = 1'-0"
MECHANICAL DEMOLITION PLAN
KEYNOTES
1 BACNET ROUTER, TEMPERATURE SENSOR, AND
THERMOSTAT (ALERTON MODEL:VLC/D). ROUTER
SHALL COMMUNICATE WITH EXISTING BAS
CONTROLLER LOCATED IN BUILDING 63.
NONE
PROJECT MANAGER
0 1" 2"
SCALE
FILENAME
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUE DATE DESCRIPTION
1 2 3 4 5 6 7 8
D
C
B
A
SHEET
D. WORLEY
D. WORLEY
M. DIMOFF
CONTRACT #: W9133L-15-D-0004
ANG PROJECT #: FJRP142610
HDR PROJECT #: 10137178
CHARLOTTE DOUGLAS INT'L AIRPORTREPLACE HVAC SYSTEMS
BASE WIDE - CHARLOTTE
NC AIR NATIONAL GUARD
145TH AIRLIFT WING
CHARLOTTE, NC
C rv t\ \1
-0
-M
P M
A S
T E
R d e re k .w o rl e y .r v t
/5
/2
:2
:5
A M
99M001
N. OVERBY
10137178-02-MP_Master.rvt
MECHANICAL SCHEDULES
7. HINGED DOOR ACCESS
6. DOUBLE WALL SEALED PANEL (R-13) AND LEVEL II THERMAL BREAK
5. PROVIDE UNIT WITH CONFIGURATION AND COMPONENTS AS SHOWN ON PLANS. UNIT SHALL FIT WITHIN SCHEDULED FOOTPRINT.
4. CONTRACTOR TO SET OUTSIDE AIR DAMPER AND SUPPLY AIR RATES EQUAL TO THE ORIGINAL EQUIPMENT OPERATION.
3. VFD ON SUPPLY FAN
2. INTERLOCK…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .