About this file

The document is a Solicitation Amendment (No. 3) issued by the Arizona Department of Administration's General Services Division for Solicitation No. BPM006698, covering an Invitation for Bid (IFB) for Water and Wastewater System (WWS) Upgrades at three Arizona State Parks: Rockin River Ranch, Red Rock, and Slide Rock. The amendment is dated 1/24/2025 and is associated with the state procurement system APPState.AZ.gov.

The amendment addresses multiple updates to the original solicitation, including Discussion Forum questions/answers, updates to general, civil, mechanical, and electrical drawings and specifications, and a revised Bid Schedule. A key modification involves the Slide Rock project location, where the contractor is informed that during the peak visitor season from May 1, 2025 through September 15, 2025, they will not be permitted to shut down water and wastewater systems. Instead, the contractor must provide portable toilets outside of those dates during shutdown and will require approved Method of Procedure (MOP) documents detailing procedures, durations, and operational impacts. All other dates and times remain unchanged in the procurement system.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Amendment 3 Arizona Department of Administration

Solicitation No.: BPM006698

Description: IFB – State Parks W W S Upgrades (Rockin River Ranch, Red Rock, Slide Rock)

Date 1/24/2025

Page

General Services Division

1400 W. Washington St Suite B200

Phoenix, AZ 85007

Solicitation Amendment No.: 3 of

Pursuant to the Information for Offerors, Item 2.7., Solicitation Amendments, the above referenced solicitation shall be amended as follows:

1. Discussion Forum questions/answers.

2. Addendum 3 addresses updates related to the general, civil, mechanical and electrical drawings and specifications.

3. Addendum 3 revised Bid Schedule.

4. Section A; Solicitation Summary; Project Description: The following will be added for the Slide Rock project location:

Due to the volume of visitors the park will receive from May 1, 2025 through September 15, 2025, the Contractor will not be able to shutdown the water and wastewater systems. The Contractor will provide porta johns outside of those dates during shutdown, and will require approved MOP’s for procedures, durations, and impacts to operations.

All dates and times remain the same in APP.

Solicitation No: BPM006698 Available online at APPState.AZ.gov Solicitation Amendment, page 1 of 1

ACKNOWLEDGEMENT

ACKNOWLEDGEMENT OF SOLICITATION AMENDMENT SHALL BE DONE ELECTRONICALLY PRIOR TO OFFER DUE DATE AND TIME. All other all terms, conditions, specifications and amendments to the Solicitation remain unchanged.

https://procure.az.gov/

File details come from the government source that posted it. Updated .