225164 Camp Blanding Joint Training Center Power Distribution Upgrade
Solicitation number
ITB-16334
Issued by
St. Johns County, Florida

About this file

This is a revised proposal form and subcontractors list submitted by the State of Florida, Department of Military Affairs for Project Number 225164, the Camp Blanding Joint Training Center Primary Power Distribution Upgrade in Starke, Florida. The project involves upgrading a 13,200/22,860-volt primary power distribution system serving the facility. Work includes a base bid and seven alternate bid items (ABI #1A through ABI #7) covering approximately 109 line poles plus 3 stub poles across multiple locations, with scope elements including conductor installations using aluminum ACSR wire in sizes from #2 to 4/0, pole reframing, pole changeouts, and transformer replacements (20 single-phase 25KVA and 12 single-phase 50KVA pole-mount units). Bids were due August 26, 2026, at 2:00 PM, with mandatory pre-bid meetings held on July 14 and July 15, 2026. The estimated construction cost is $1,800,000, with substantial completion required within 150 calendar days of Notice to Proceed.

Bidders must submit proposals in duplicate on company letterhead including business name, address, federal ID number, and signature, along with a List of Subcontractors identifying contractors for electrical, mechanical, and low-voltage electrical disciplines. A bid bond or certified check equal to five percent of the bid amount is required as bid security. If awarded, contractors must furnish performance and labor and material payment bonds equal to 100% of the accepted bid amount within 10 calendar days. The proposal remains valid for 60 calendar days following bid opening, and liquidated damages are assessed at $360 per day for failure to meet the substantial completion deadline. Contractors must obtain and pay for all local building permits except State Fire Marshal permits, and progress payments are made at 95% of completed work. Hardware specifications require Hubbell or Chance equipment or approved equivalents, with field approval of material submittals required before purchasing. Davis-Bacon prevailing wage requirements apply to the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FNG 4004

PROPOSAL FORM

SUBMIT ORIGINAL PROPOSAL FORM IN DUPLICATE ON CONTRACTOR'S LETTERHEAD AND

INCLUDE BUSINESS NAME, ADDRESS, FEDERAL ID NUMBER, TELEPHONE, FACSIMILE AND

SIGNATURE

Note: NO conditional, incomplete, unsigned, undated, ambiguous, or improper bids/proposals will be accepted.

DATE:

TIME:

TO: State of Florida, Department of Military Affairs Attention: Construction & Facility Management Office (Contract Management Branch) 2305 State Road 207 Saint Augustine, Florida 32086

To Whom It May Concern:

The undersigned, hereinafter called "Bidder", having for the proposed project familiarized himself with the local conditions, nature, and extent of the work, and having examined carefully any drawings or specifications, the Form of Agreement, and other Contract Documents with the Bond Requirements, therein, proposes to furnish all labor, materials, equipment, and other items, facilities, and services for the proper execution and completion of Project Number: 225164 Camp Blanding Joint Training Center Primary Power Distribution Upgrade, Starke, Florida, in full accordance with any Statement of Work and General Terms and Conditions, in full accordance with the advertisement for bids, Instruction to Bidders, Agreement, and all other documents relating thereto on file in the Construction & Facility Management Office (CFMO) and if awarded the contract, to complete the said work within the time limit specified for the following bid price:

BASE BID $______________________________________

ALTERNATE BID ITEMS (Note Funding Sources are for internal use only)

ABI #1A (QUTM Funding): Add four (4) new poles on Yerkes Rd from Duval Rd to Stevens Lake Rd (gate); pull in two (2) additional conductors of #2 acsr

ABI #1B (QUTN Funding): Reframe from Duval to Yerkes (Hardware and Transfer)

ABI #2 (QUTN Funding): Yerkes Rd pole change out 40/3

ABI #3 (QUTN Funding): Corner of Ave “D” & Hillsborough St to MATES (5750)

ABI #4 (QUTN Funding): #4317-#4321

ABI #5 (QUTN Funding) Cocoa and “D” Avenue

ABI #6 (QUTN Funding): Front gate to “D” Ave. Need pole upgrade from 40/5 to 40/3, “D” around to “B” Avenue (OR) “D” Ave needs stub R&R 35/3. All inclusive poles within this section are to be replaced for a total count of 29 ea. Plus 1 stub

ABI #7 (QUTN Funding): Transformer replacements Single Phase Pole Mount 25KVA - Quantity - 20 Single Phase Pole Mount 50KVA - Quantity - 12

Primary Taps: No Taps

2) Cover Mounted High Voltage Polemount Bushings

3) Sidewall Mounted Low Voltage Polemount Bushings Non-PCB Mineral Oil Double Bushing/Single Hanger - Conventional Units

Enclosed is certified check, cashier's check, treasurer's check, bank draft, or Bid Bond in the amount of not less than five percent of the Bid, payable to the Owner as a guarantee for the purpose set out in Instructions to Bidders.

MARK ENVELOPES: “SEALED BID for Project Number: 225164 CBJTC Primary Power Distribution Upgrade”

ADDRESSED TO: Department of Military Affairs, ATTN: CFMO-Contract Management Branch, 2305 State Road 207, St. Augustine, Florida 32086

The Bidder hereby agrees that:

a. The above proposal shall remain in full force and effect for a period of 60 calendar days after the time of the opening of this proposal and that the Bidder will not revoke or cancel this proposal or withdraw from the competition within the said 60 calendar days.

b. In the event the contract is awarded to this Bidder, he will abide by and fulfill all requirements as specified in the Non-Technical Specifications (General Terms and Conditions, and Supplemental Conditions) provided with the Invitation to Bid.

c. In the event the contract is awarded to this Bidder, he will enter into a formal written Agreement with the Owner in accordance with the accepted bid within 10 calendar days after said contract is submitted to him and, (if requirement is not deleted per Section C-2 of the Conditions of the Contract), will furnish to the Owner a Contract Performance Bond and a Labor and Material Payment Bond with good and sufficient sureties, satisfactory to the Owner, in the amount of 100% of the accepted bid, the form of which is shown by Exhibits 2 and 3 of the Conditions of the Contract and terms of which shall fully comply with Section 255.05, Florida Statutes. The Bidder further agrees that in the event of the Bidder's default or breach of any of the agreements of this proposal, the said bid deposit shall be forfeited as liquidated damages.

d. In the event the contract is awarded to this Bidder, he will not commence any work in connection with the contract until he has obtained all insurance as specified in the Non-Technical Specifications, and such insurance has been approved by the Owner, nor shall the contractor allow any subcontractor to commence work on his subcontract until all similar insurance required of the subcontractor has been so obtained and approved by Owner.

All insurance policies shall be with insurers qualified to do business in Florida through an authorized licensed Florida Resident Agent. The insurance requirements shall be completed in a timely manner in order not to delay the construction schedule.

e. In the event the contract is awarded to this Bidder, he will (if requested by Owner) complete and submit a preliminary and final Bid Breakout Form supplied by the Department of Military Affairs, Construction & Facility Management Office.

Acknowledgement is hereby made that this proposal includes required permit fees as directed in the Non- Technical Specifications.

Acknowledgement is hereby made of receipt of the following addenda issued during the bidding period.

Addendum No. Dated

Florida Construction Industries Licensing Board Certification.

(Name of Holder) (Certificate No.)

In witness whereof, the Bidder has hereunto set his signature and affixed his seal this day of (Month) (Year)

(SEAL)

By: Address:

Title:

Company:

E-mail

Telephone No.:

Tax ID No.:

Unique Entity ID

(UEID):

LIST OF SUBCONTRACTORS

(To be submitted in duplicate on the Bidder's letterhead and attached to Contractor's proposal.)

DATE:

THIS LIST IS ATTACHED TO, AND IS AN INTEGRAL PART OF THE BID SUBMITTED BY:

FOR THE CONSTRUCTION OF: PROJECT NUMBER 225164

PROJECT NAME & LOCATION: Camp Blanding Joint Training Center Primary Power Distribution Upgrade, Starke, FL

THE UNDERSIGNED, HEREINAFTER CALLED "BIDDER", LISTS BELOW THE NAME OF EACH SUBCONTRACTOR WHO WILL PERFORM THE PHASES OF THE WORK INDICATED. FAILURE OF THE BIDDER TO SUPPLY SUFFICIENT INFORMATION TO ALLOW VERIFICATION OF THE CORPORATE AND DISCIPLINE LICENSE STATUS OF THE SUBCONTRACTOR MAY DEEM THE BID AS BEING NON-RESPONSIVE. Only one (1) copy of this list is required with your bid. You may also just list the names of subcontractors, the additional information (license #, telephone number) need not be listed until after the bid and only from the contractor awarded the project.

SUBCONTRACTOR

DISCIPLINES NAME OF SUBCONTRACTOR

1. Electrical ___________________________________________________ (Name)

(Telephone No.) (Sub License #.)

2. Mechanical ___________________________________________________ (Name)

(Telephone No.) (Sub License #.).)

3. Electrical and Low Voltage ___________________________________________________ (Name)

(Telephone No.) (Sub License #.).)

4. ___________________________________________________ (Name)

(Telephone No.) (Sub License #.).)

5. ___________________________________________________ (Name)

(Telephone No.) (Sub License #.)

By (Signature)

File details come from the government source that posted it. Updated .