REVISED_-_Dwgs_IFP_TCLF_MSW_Unit_4_Cell_5_Landfill_Earthwork_-_Addendum_1.pdf

PDF 14 MB Posted

Attached to
UNIT 4 CELL 5 EARTHWORK CONSTRUCTION TWIN CHIMNEYS LANDFILL
Solicitation number
RFP #26063
Issued by
Greenville County, South Carolina

About this file

This is a contract drawings addendum document prepared by HDR Engineering, Inc. for Greenville County, South Carolina, detailing the Unit 4 Cell 5 Earthwork Construction project at Twin Chimneys Landfill. The project requires the excavation of approximately 185,000 cubic yards of cut material and 7,500 cubic yards of fill across 12.5 acres to develop a new municipal solid waste landfill cell. Excavated materials must be strategically stockpiled in designated areas: clay soils with hydraulic conductivity of 1E-5 cm/sec or less in the existing clay stockpile north of Cell 4, rock materials in the cell tower stockpile, and miscellaneous soils in Unit 7 west of Cell 4. The project includes removal and stockpiling of tree debris and rock piles, decommissioning of a temporary sediment basin by removing the riser, barrel, and skimmer, installation of gabion baskets, placement of 2,000 square yards of erosion control blankets, and seeding of 12 acres of disturbed areas. Contractors must provide a pre-construction survey and as-built survey signed and sealed by a licensed land surveyor to establish baseline and final payment quantities. The non-mandatory pre-proposal meeting was scheduled for January 14, 2026, with a question submission deadline of January 19, 2026, at 5:00 PM and proposal submissions due by February 9, 2026, at 3:00 PM. The county anticipated contract award on February 20, 2026, with a Notice to Proceed targeted for March 16, 2026, and a substantial completion timeline of 150 days.

Contractors must demonstrate experience by completing at least two similar projects within the last five years and must submit a Bid Bond equal to 5 percent of the bid price along with Performance and Payment Bonds equal to the total bid price within 15 working days of award. Insurance requirements include $1,000,000 General Liability per occurrence, $1,000,000 Automobile Liability, Statutory Worker's Compensation, $1,000,000 Umbrella/Excess Liability, and $1,000,000 Professional Errors and Omissions, with Greenville County named as an additional insured. Liquidated damages are assessed at approximately $1,000 per day for substantial completion and $500 per day for final completion. The evaluation criteria are equally weighted at 20 percent each, assessing responsiveness to the RFP, proposed project schedule, similar project experience, cost, and equipment specifications. No specific budget range is disclosed in the contract documents, and no set-aside designations for disadvantaged enterprises are identified. Rock blasting is permitted weekdays between 5:00 PM and 6:30 PM, with the contractor responsible for protecting all personnel and equipment and for immediately notifying the engineer if springs or other non-perched water sources are encountered.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Twin Chimneys Landfill

Cell 5 Earthwork Civil

Project No.

11075 Augusta Road

C o n t r a c t D r a w i n g s F o r

10174879

December 2025

I N D E X O F D R A W I N G S

GENERAL

14G-00 COVER SHEET

14G-01 OVERALL SITE PLAN

CIVIL

14C-01 EXISTING CONDITIONS

14C-02 UNIT 4 CELL 5 EXCAVATION PLAN

14C-03 UNIT 4 CELL 5 STOCKPILE

14C-04 STORMWATER DETAILS

14C-05 UNIT 7 STOCKPILE

Issued for Proposals

MSW Unit 4

Greenville County, South Carolina

HDR Engineering, Inc.

of the Carolinas 440 S. Church St., Suite 1200 Charlotte, NC 28202-2075 704.338.6700

Revised February 2026

2/05/26

AUGUSTA ROAD - HWY 2

T R A Y N H A M

R O A D

S C

TR

AY

NH

AM

R

OA

D

SC

TR

AY

NH

AM

R

OA

D

SC

TR

AY

NH

AM

R

OA

D

SC

TR

AY

NH

AM

R

OA

D

SC

TR

AY

NH

AM

R

OA

D

SC

AUGUSTA ROAD - HWY 2

AUGUSTA ROAD - HWY 2

AUGUSTA ROAD - HWY 2

AUGUSTA ROAD - HWY 2

AUGUSTA ROAD - HWY 2

BU

IL

DI

NG

BU

IL

DI

NG

SC

AL

E

SC

AL

E

SC

AL

E

C O N C R E T E

P A D

C O N C R E T E

P A D

B U I L D I N G

T A N K

T A N K

B U I L D I N G

C O N C R E T E

P A D

B U I L D I N G

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

DE

NS

E

BR

US

H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

AS

PH

AL

T

DR

IV

E

AS

PH

AL

T

DR

IV

E

AS

PH

AL

T

DR

IV

E

AS

PH

AL

T

DR

IV

E

AS

PH

AL

T

DR

IV

E

A S P H A L T

D R I V E

A S P H A L T

D R I V E

A S P H A L T

D R I V E

AS

PH

AL

T

DR

IV

E

A S P H A L T

D R I V E

AS

PH

AL

T

DR

IV

E

AS

PH

AL

T

DR

IV

E

AS

PH

AL

T

DR

IV

E

D I R T

D R I V E

DI

RT

D

RI

VE

D I R T

D R I V E

DI

RT

D

RI

VE

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

C O N C R E T E

P A D

D I R T

D R I V E

D I R T

D R I V E

DIRT

DRI

VE

DI

RT

D

RI

VE

DIRT

DRI

VE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

D I R T

D R I V E

DI

RT

D

RI

VE

DI

RT

D

RI

VE

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

DIRT DRIV

E

B R U S H

B R U S H

B R U S H

B R U S H

DIR

T D

RIV

E

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

D I R T

D R I V E

DIRT DRIV

E

DIRT DRIVE

DIR

T D

RIV

E

DIRT

DRIVE

DIRT DRIVE

DIR

T D

RIV

E

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DIRT DRIV

E

DIRT

DRIVE

DIRT

DRI

VE

DIRT DRIVE

DIR

T D

RIV

E

DIR

T D

RIV

E

D I R T

D R I V E

DI

RT

D

RI

VE

DIRT

DRIVE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DI

RT

D

RI

VE

D I R T

D R I V E

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DIR

T D

RIV

E

DI

RT

D

RI

VE

D I R T

D R I V E

DIR

T D

RIV

E

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

C L

D I T C H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/L

DITC

H

C/L

DI

TCH

DITCH

C/L DI

TCH

DITCH

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DIT

CH

DITCH

DIT

CH

C/L DITCH

C/L DI

TCH

C/L D

ITCH

C/L DI

TCH

C/L DI

TCH

DITCH

D I T C H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

BRIDGE

C E L L

P H O N E

T O W E R

DI

RT

D

RI

VE

DIR

T D

RIV

E

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DITCH

DITCH

DITCH

DITCH

DIT

CH

DITC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DIT

CH

DITC

H

D E N S E

B R U S H

D E N S E

B R U S H

DITC

H

B U I L D I N G

B U I L D I N G

B U I L D I N G

B U I L D I N G

B U I L D I N G

B U I L D I N G B U I L D I N G

B U I L D I N G

B U R N

S T A T I O N

B U R N

S T A T I O N

P O N D

P O N D

DI

RT

D

RI

VE

DIR

T D

RIV

E

DIRT DR

IVE

DIRT

DRIVE

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

R I P

R A P

DIRT

DRIVE

B R U S H

B R U S H

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

B R U S H

B R U S H

B R U S H

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

760 770

0 790

760 77

780 790

0 770

770780

790 790

760 76

780 790 800 810

810820830

700710

72073

0 76

0 75

0 770 780

760750 740730 720710

760 750 740 730

760 750

740 730

730740750760

730740

860 87 0 88

0 89

730740750760

770780790

740 740 740 730

770780

0 82

750 740

0 78

740 745 75

740 73 5 73

0 72 5 72

0 71

660 660

5 76

715 720 725

735 730

725 720

800 805

5 79

0 77

C&D A

CCES

S

ROAD

AC

CE

SS

R

OA

D

VA

UL

T

G W -3

G W -3

G W -3

G W -3 1G W -3

G W -2

G W -1

C S -1

C S -2

VA

UL

T

UGE

UGE

EB

UGE

UGEUGE

UGE

MB

OHW

O

HW

O

HW

LEACHATE

VAULT #1

LP

LP

LP

LP

LP

LP

36"RCP

INV:725.45

"x

"C

M P

INV:728.84

INV:730.90INV:733.21

INV:734.45

GR

GR

x 724.39 TP x 724.90 TP x 7

.0 8 T

P x 7

.4 9 T

P

TP 724.29 x

TP 722.02 x

TP 719.23 x

TP 717.04 x

EB

OUTPARCEL

OUTPARCEL

OUTPARCEL

790790790

780780

710 720 730 740 750

780790

750 740 730

MM-1

MM-2

MM-3

MM-4

MM-5 MM-6

MM-7

MM-28MM-29

MM-30

MM-31

MM-32

MM-33

MW-17

MW-18

MW-19

OW-104

OW-105

MW-1

MW-2

MW-3

OW-102

OW-110

OW-109 MW-52

MW-6

MW-7

MW-51

MW-41

MW-12

MW-8

MW-50

MW-11

MW-10

MW-9

OW-101

MW-20

PZ-13s PZ-13d

PZ-44

PZ-7s

PZ-50

PZ-2d PZ-2s

PZ-4a

PZ-76

PZ-6d

PZ-53

PZ-54

PZ-56

PZ-6s

PZ-5da PZ-5d

PZ-77

PZ-14

PZ-43

PZ-19

PZ-52sPZ-52d

PZ-7s

PZ-4

PZ-39s PZ-39d

PZ-26d PZ-26s

PZ-23d PZ-23s

PZ-75

PZ-51

PZ-10ra

PZ-41

PZ-57s

PZ-57d

PZ-78

PZ-73

PZ-30

PZ-25 PZ-25d

PZ-20

PZ-64

PZ-29

PZ-79

PZ-55

PZ-67

PZ-66s PZ-66d

PZ-12

PZ-74

PZ-65

PZ-9s

PZ-35d

PZ-35

PZ-62s PZ-62d

PZ-28

PZ-40

PZ-48

OW-105-R1

MW-10R

MW-21

MW-23

MW-22

MW-42

MW-43

MW-44

MW-49

SEDIMENT

BASIN B

SEDIMENT

BASIN C

E-WASTE

METALS

PAD

YARD

WASTE

PAD

SEDIMENT

BASIN A

ROCK

STOCKPILE

COMPOST AREA

EXISTING

SOIL STOCKPILE

UNIT 1 MSW

CELL 1

CELL 2

FUTURE

UNIT 7

FUTURE

UNIT 5

CELL 3

CELL 4 CELL 5

ACTIVE

UNIT 4 MSW

EXISTING

CLAY

STOCKPILE

UNIT 2

C&D

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 EARTHWORK

Greenville County South Carolina10404585

P. WESTMORELAND, P.E.

0 12/2025 ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

OVERALL SITE PLAN

14G-01.dwg

1" = 300' 14G-01

1 02/2026 ADDENDUM #1

GENERAL NOTES:

1. EXISTING TOPOGRAPHY FROM TWO SEPARATE SURVEYS,FREELAND

& ASSOCIATES AERIAL SURVEY DATED JULY 15, 2021 AND DRONE

SURVEY IN UNIT 4 AREA BY RP &ASSOCIATES DATED JULY 09, 2025.

2. CONTRACTOR'S PRIMARY ACCESS TO THE SITE SHALL BE VIA THE

EXISTING AUGUSTA ROAD (HIGHWAY 25) CONSTRUCTION ENTRANCE

THAT LEADS DIRECTLY INTO UNIT 4. MAINTAIN BOTH IN GOOD

CONDITION AT ALL TIMES AND IMPROVE AS NECESSARY TO

COMPLETE THE WORK.

3. ACCESS TO THE BRIDGE ROAD IS RESTRICTED DUE TO LANDFILL

OPERATIONS. COORDINATE WITH OWNER A SCHEDULE FOR

TRAVERSING THE BRIDGE. SUPPLY FLAGGERS DURING LANDFILL

OPERATING HOURS TO COORDINATE CONTRACTORS TRAFFIC AND

LANDFILL TRAFFIC ON BRIDGE ROAD. GARBAGE TRUCKS AND OTHER

COUNTY VEHICLES SHALL ALWAYS HAVE PRIORITY.

4. CONTRACTOR RESPONSIBLE FOR SECURITY OF ALL TOOLS,

MATERIALS AND EQUIPMENT LEFT ON SITE. CONTRACTOR TO

SECURE ACCESS POINTS TO THE WORK SITE AS NECESSARY.

5. THE CONTRACTOR SHALL PROTECT ALL EXISTING WELLS,

STRUCTURES AND UTILITIES. ANY WELLS, STRUCTURES OR UTILITIES

THAT ARE DAMAGED SHALL BE REPLACED OR REPAIRED (AS

DIRECTED BY OWNER).

6. EROSION AND STORMWATER CONTROL MEASURES ARE INSTALLED

AND OPERATIONAL FOR THE DESIGNATED WORK AREAS.

CONTRACTOR TO MAINTAIN AND PROTECT THE STRUCTURES FROM

DAMAGE.

7. CONTRACTOR TO ANTICIPATE CLEANING OUT SEDIMENT BASINS A,

10 & 11 AT LEAST TWICE DURING THE CONTRACT PERIOD (PRIOR TO

BEGINNING OF CONSTRUCTION AND AT THE END).

8. SITE BENCHMARK CONTROL IS LOCATED NEAR THE CELLULAR

TOWER.

9. CONTRACTOR TO MAINTAIN THE ACCESS ROAD TO UNIT 7 AND THE

EXISTING EROSION AND SEDIMENT CONTROL MEASURES ALONG THE

ACCESS ROAD. SEE SHEET 14C-05 FOR THE STOCKPILE IN UNIT 7.

REFER TO THE PROPOSAL FORM.

CONSTRUCTION AREA

BORINGS (SB & B)

METHANE MONITORING (MM)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

PL

LEGEND

EXISTING 2021 & 2023 MAJOR CONTOURS

EXISTING 2021 & 2023 MINOR CONTOURS

WETLANDS

UNIT AND CELL BASELINES

PROPERTY LINE

EXISTING TREELINE

PZ-# PZ-#

B-#B-#

MM-#

MW-A

SEDIMENT BASIN #T2SEDIMENT

BASIN #T5

SEDIMENT

BASIN #T3

SEDIMENT BASIN #9

WETLANDS

SEDIMENT BASIN #10

DI #9

LEACHATE

TANKS

SCALE

HOUSE

ADMINISTRATION

BUILDING

EDUCATION

BUILDING

CELLULAR

TOWER

SEDIMENT

TRAP A

SEDIMENT

BASIN #T4

EXISTING CONSTRUCTION ENTRANCE

AUGUSTA RD

AUGUSTA RD

BRIDGE ROAD

SEDIMENT BASIN #11

100 YEAR FLOODPLAIN

LEACHATE

EVAPORATOR

CONCRETE

MONUMENT

N 987685.471 E 1604817.497

EL. 809.25

STOCKPILE ACCESS ROAD

TEMPORARY

SEDIMENT BASIN A

SEDIMENT TRAP

DENSE BRUSH

DENSE BRUSH

DENSE BRUSH

DENSE BRUSH

DE

NS

E

BR

US

H

DENSE BRUSH

DIRT DRIVE DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DI

RT

D

RI

VE

BRUSH

BRUSH

BRUSH

BRUSH

DIRT DRIVE DIRT DRIVE

D I R T

D R I V E

DIRT DRIVE

DIRT DRIVE

D I R T

D R I V E

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

C/L DITCH

C/L DITCH

C/L DITCH

C/L DITCH

DENSE TREES

DENSE TREES

DENSE TREES

DENSE TREES

C/L DITCH

C/L DITCH

C/L DITCH

C/L DITCH

BRUSH

BRUSH

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

BRUSH

BRUSH

BRUSH

LIMITS OF SURVEY

LIMITS OF SURVEY

LIMITS OF SURVEY

LIMITS OF SURVEY

LIMITS OF SURVEY

LIMITS OF SURVEY

LIMITS OF SURVEY

770760

73074

750750

DENSE BRUSH

DENSE BRUSH

DENSE BRUSH

DENSE BRUSH

DE

NS

E

BR

US

H

DENSE BRUSH

DIRT DRIVE DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DI

RT

D

RI

VE

BRUSH

BRUSH

BRUSH

BRUSH

DIRT DRIVE DIRT DRIVE

D I R T

D R I V E

DIRT DRIVE

DIRT DRIVE

D I R T

D R I V E

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

C/L DITCH

C/L DITCH

C/L DITCH

C/L DITCH

DENSE TREES

DENSE TREES

DENSE TREES

DENSE TREES

C/L DITCH

C/L DITCH

C/L DITCH

C/L DITCH

BRUSH

BRUSH

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

BRUSH

BRUSH

BRUSH

LIMITS OF SURVEY

LIMITS OF SURVEY

LIMITS OF SURVEY

LIMITS OF SURVEY

LIMITS OF SURVEY

LIMITS OF SURVEY

LIMITS OF SURVEY

770760

73074

750750

690685

ACTIVE

UNIT 4 MSW

MW-24

OW-103

MW-17

MW-18

MW-19

MW-20

PZ-4a

PZ-76

PZ-6d

PZ-53

PZ-54

PZ-56

PZ-6s

PZ-77

PZ-78

MW-21

MW-25

0785 77

5750755

745745

78078078

78578

720 72

730730730

735740

720725

725730740

CELL 1

17.0 ACRES

10.3 ACRES

8.5 ACRES

CELL 2

8.6 ACRES

CELL 3

CELL 4

PROPOSED CELL 5

EARTHWORK

8.6 ACRES

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 EARTHWORK

Greenville County South Carolina10404585

P. WESTMORELAND, P.E.

0 12/2025 ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

EXISTING CONDITIONS

14C-01.dwg

1" = 200' 14C-01

1 02/2026 ADDENDUM #1

GENERAL NOTES:

1. EXISTING TOPOGRAPHY FROM TWO SEPARATE SURVEYS,FREELAND

& ASSOCIATES AERIAL SURVEY DATED JULY 15, 2021 AND DRONE

SURVEY IN UNIT 4 AREA BY RP & ASSOCIATES DATED JULY 09, 2025.

2. STOCKPILE ALL EXCAVATED SOIL MATERIALS, NOT USED IN THE

WORK, IN THE FOLLOWING DESIGNATED AREAS.

· CLAY SOILS WITH HYDRAULIC CONDUCTIVITY OF

1E-5CM/SEC OR LESS (CLAYEY SOIL): EXISTING CLAY

STOCKPILE NORTH OF CELL 4.

· ROCK: PLACED IN CELL TOWER STOCKPILE. SEE 14G-01.

· MISCELLANEOUS SOILS: STOCKPILE WEST CELL 4 UNIT 7

SEE 14C-05.

BORINGS (SB & B)

METHANE MONITORING (MM)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

PL

LEGEND

EXISTING 2021 & 2023 MAJOR CONTOURS

EXISTING 2021 & 2023 MINOR CONTOURS

WETLANDS

UNIT AND CELL BASELINES

PROPERTY LINE

EXISTING TREELINE

MW-A

MM-#

B-# B-#

PZ-#PZ-#

EXISTING STOCKPILE

TEMPORARY

SEDIMENT BASIN A

EXISTING CLAY

STOCKPILE

PROPOSED MSW PERMIT BOUNDARY

CURRENT MSW PERMIT BOUNDARY

SEDIMENT

BASIN #T4

DI #9

WETLANDS

STOCKPILE HAUL ROAD

EXISTING DROP INLET

AND PIPE (TYP. OF 6)

DI

RT

D

RI

VE

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

DIRT DRIVE

71071

73073

730730

5.0%

5.0%

2.9%

4.4%

5.0%

5.0%

4.0%

4.0%

3:1

3:1

3:1

3:1

70070

MW-24

PZ-54

PZ-56

PZ-77

MW-23

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 EARTHWORK

Greenville County South Carolina10404585

P. WESTMORELAND, P.E.

0 12/2025 ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

UNIT 4 CELL 5

EXCAVATION PLAN

14C-02.dwg

1" = 60' 14C-02

1 02/2026 ADDENDUM #1

GENERAL NOTES:

1. EXISTING TOPOGRAPHY FROM TWO SEPARATE SURVEYS:

● WITHIN THE LIMITS OF UNIT 1, 2, AND 4: RP & ASSOCIATES DATED JULY 09, 2025.

● OUTSIDE THE LIMITS OF UNIT 1, 2, AND 4: FREELAND & ASSOCIATES AERIAL SURVEY DATED JULY 15, 2021.

2. THE DEBRIS (ROCK, VEGETATION, TREES) WITHIN THE WORK AREA MATERIAL SHALL BE STOCKPILED WITHIN THE UNIT 4

AREA AND OUTSIDE OF THE EXCAVATION AREA.

3. CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION SURVEY (ELECTRONIC AND SIGNED AND SEALED BY A LAND SURVEYOR) OF THE WORK AREAS (AFTER THE DEBRIS IS STOCKPILED). THIS SURVEY SHALL ESTABLISH THE BASELINE

FOR FOR EARTHWORK QUANTITIES.

4. FOLLOWING COMPLETION OF THE WORK, CONTRACTOR SHALL PROVIDE AN AS BUILT SURVEY (ELECTRONIC AND SIGNED AND SEALED BY A LAND SURVEYOR) TO SERVE AS THE BASIS FOR FINAL PAYMENT OF EARTHWORK QUANTITIES.

5. STOCKPILE ALL EXCAVATED SOIL MATERIALS, NOT USED IN THE WORK, IN THE DESIGNATED AREAS. INDICATED ON THE

SHEET 14C-03.

· CLAY SOILS WITH HYDRAULIC CONDUCTIVITY OF 1E-5CM/SEC OR LESS (CLAYEY SOIL): EXISTING CLAY

STOCKPILE NORTH OF CELL 4.

· ROCK: PLACED IN CELL TOWER STOCKPILE. SEE 14G-01.

· MISCELLANEOUS SOILS: UNIT 7 SEE 14C-05. STOCKPILE WEST CELL 4.

BORINGS (SB & B)

METHANE MONITORING (MM)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

PL

LEGEND

EXISTING 2021 & 2025 MAJOR CONTOURS

EXISTING 2021 & 2025 MINOR CONTOURS

WETLANDS

UNIT AND CELL BASELINES

PROPERTY LINE

EXISTING TREELINE

EXCAVATION / GRADING AREA (12.5 ACRES)

GENERAL CONSTRUCTION SEQUENCE:

1. ESTABLISH LIMITS OF CONSTRUCTION.

2. REMOVE AND STOCKPILE TREE DEBRIS IN THE WORK AREA. ROCK PILES WITHIN THE WORK AREA SHALL BE HAULED

TO THE STOCKPILE NEAR THE CELL TOWER. ROCKS WITHIN THE WORK AREA MAY NEED TO BE REDUCED TO A

MANAGEABLE SIZE TO LOAD AND HAUL.

3. PERFORM INITIAL SURVEY OF THE CELL 5 AREA AND THE AREA IN UNIT 7 OF THE PROPOSED GRADES.

4. REDIRECT STORMWATER FROM SEDIMENT BASIN A.

5. BEGIN EXCAVATION OF CELL 5. STOCKPILE EXCAVATED MATERIALS IN THE DESIGNATED STOCKPILES. USE EXCAVATED

MATERIAL FOR STRUCTURAL FILL.

6. REMOVE THE RISER/BARREL/SKIMMER IN THE TEMPORARY SEDIMENT BASIN A AND GROUT THE BARREL

7. UPON COMPLETION OF CELL 5 EXCAVATION, PERFORM ASBUILT SURVEY OF CELL 5 AND THE AREA IN UNIT 7 OF

EXCAVATED SOIL FROM CELL 5.

8. INSTALL THE GABION BASKETS.

9. CLEANOUT SEDIMENT BASINS #10 AND #11.

OVERALL PROJECT SCOPE:

THE COUNTY IS CURRENTLY GRADING THE AREA SOUTH OF CELL 5. THIS PROJECT IS TO EXCAVATE THE CELL 5 AREA TO THE GRADES SHOWN IN THESE DRAWINGS. THE TEMPORARY SEDIMENT BASIN A COLLECTS STORMWATER FROM CELLS 2, 3, AND 4 AS WELL AS FLOW FROM THE AREA WEST OF CELL 5. CONTRACTOR TO MAKE PROVISIONS TO REDIRECT FLOW OUT OF THE WORK

AREA. IT IS ANTICIPATED THERE WILL BE 3 TYPES OF MATERIAL EXCAVATED.

MW-A

MM-#

B-# B-#

PZ-#PZ-#ACTIVE CELL 3

8.5 ACRES

ACTIVE CELL 4

10.3 ACRES

STORMWATER

CHANNEL (TYP)

PROPOSED

CONSTRUCTION

BASELINE FOR LINER

PROJECT 8.6 ACRES

14C-04

A14C-04

B

C -0

C

C-

PROPOSED CELL 5

EARTHWORK

8.6 ACRES

ACTIVE CELL 2

8.6 ACRES

ROCK:

1. ROCK IS ANTICIPATED WITHIN THE UNIT 4 CELL 5 EXCAVATION. THE CONTRACTOR IS ALLOWED TO BLAST THE ROCK

FOR REMOVAL. BLASTING MAY OCCUR WEEKDAYS BETWEEN 5 PM AND 6:30 PM. CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL PERSONNEL AND EQUIPMENT FROM DAMAGE RESULTING FROM BLASTING. CONTRACTOR TO BACKFILL WITH SOIL FROM THE SURROUNDING EXCAVATION. THE BACKFILL SHALL BE COMPACTED AS STRUCTURAL

FILL.

2. WHERE BLASTING IS PERFORMED, BLASTING SHALL BE DESIGNED TO FRACTURE ROCK TO ELEVATION AT LEAST 5

FEET BELOW DESIGN GRADES.

3. ENGINEER OR CQA SHALL BE ON SITE TO VERIFY & CONFIRM AREA AND DEPTH PRIOR TO BLASTING.

4. ROCK LARGER THAN 3 CY, SHALL BE REDUCED TO LESS THAN 3 CY BEFORE STOCKPILING. ROCK SMALLER THAN 3CY

SHALL BE STOCKPILED IN THE DESIGNATED LOCATIONS.

5. NOTIFY THE ENGINEER IMMEDIATELY AND STOP WORK IN THE VICINITY, IF THE CONTRACTOR ENCOUNTERS A SPRING

OR OTHER NON PERCH SOURCE OF WATER.

6. CONTROL STORMWATER RUNOFF AT ALL TIMES DURING THE WORK. PREVENT STORMWATER FROM RUNNING OFF THE

WORK AND INTO AREAS THAT DON'T DIRECTLY LEAD TO SEDIMENT BASINS. CONTRACTOR SHALL TAKE IMMEDIATE

ACTION TO PREVENT STORMWATER FROM ENTERING CELLS 1, 2 AND 3.

7. ROCK ENCOUNTERED ON THE 3:1 SLOPE FACE SHALL NOT BE COVERED WITH SOILS NOR SEEDED. ALL OTHER EXCAVATION, FILL AND STOCKPILE AREAS ARE REQUIRED TO BE SEEDED PRIOR TO COMPLETION OF THE WORK.

8. ANY BOULDERS ENCOUNTERED DURING THE WORK SHALL BE REMOVED AND PLACED IN THE STOCKPILE NEAR THE

CELL TOWER.

TEMPORARY

SEDIMENT BASIN A

14C-04

TEMPORARY

SB A BARREL

THIS 1.3 ACRE AREA HAS TREE SAPLINGS

LESS THAN 6" DIAMETER. CONTRACTOR

TO CLEAR/GRUB THE SAPLINGS AND

STOCKPILE AS SHOWN ON 14C-03.

ACCESS ROAD 1

14C-04

SEE NOTE 2 FOR THIS

AREA

CLEAR/GRUB

SAPLINGS AND

TREE DEBRIS

STOCKPILE

EARTHWORK QUANTITY: 185,000 CU/YDS - CUT; 7,500 CU/YDS - FILL

EXISTING DROP INLET

AND PIPE (TYP. OF 6)

MW-18

MW-19

MW-20

PZ-76

PZ-6d

PZ-53

PZ-54

PZ-56

PZ-6s

PZ-77

PZ-78

MW-21

MW-23

MW-22

CELL 1

71071

73073

730730

5.0%

5.0%

2.9%

4.4%

5.0%

5.0% 4.0%

4.0%

3:1

3:1

3:1

3:1

CELL 2

CELL 3

CELL 4

CELL 5

17.0 ACRES

10.3 ACRES

8.6 ACRES

8.5 ACRES

8.6 ACRES

3:1

3:1

3:1

3:1

2.0

2.0%

2.0

2.0%

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 EARTHWORK

Greenville County South Carolina10404585

P. WESTMORELAND, P.E.

0 12/2025 ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

UNIT 4 CELL 5 STOCKPILE

14C-03A.dwg

1" = 100' 14C-03

1 02/2026 ADDENDUM #1

GENERAL NOTES:

1. EXISTING TOPOGRAPHY FROM DRONE SURVEY IN UNIT 1,2 & 4 AREA

BY RP & ASSOCIATES DATED JULY 09, 2025.

2. AERIAL PHOTOGRAPHY MAY 2025

3. STOCKPILE ALL EXCAVATED SOIL MATERIALS, NOT USED IN THE

WORK, IN THE DESIGNATED AREA INDICATED ON THE PLAN.

· CLAY SOILS WITH HYDRAULIC CONDUCTIVITY OF

1E-5CM/SEC OR LESS (CLAYEY SOIL): EXISTING CLAY

STOCKPILE NORTH OF CELL 4.

· ROCK: PLACED IN CELL TOWER STOCKPILE. SEE 14G-01.

· MISCELLANEOUS SOILS: UNIT 7 SEE 14C-05. STOCKPILE

WEST OF CELL 4.

BORINGS (SB & B)

METHANE MONITORING (MM)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

PL

LEGEND

EXISTING 2021 & 2023 MAJOR CONTOURS

EXISTING 2021 & 2023 MINOR CONTOURS

WETLANDS

UNIT AND CELL BASELINES

PROPERTY LINE

EXISTING TREELINE

MW-A

MM-#

B-# B-#

PZ-#PZ-#

CELL 5 MISC.

SOILS STOCKPILE

STOCKPILE HAUL ROAD

EXISTING CLAY STOCKPILE

EXISTING STOCKPILE

ACCESS ROAD TO UNIT 7

0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00

ROUGH GRADE

(SHOWN ON 14C-02)

PERMITTED SUBGRADE

EXISTING GRADE

FUTURE CELL 5

CONSTRUCTION BASELINE

0+00 0+50 1+00

ROUGH GRADE

(SHOWN ON 14C-02)

CONSTRUCTION

BASELINE

EXISTING GRADE

MANHOLE

PERIMETER BERM

-0+50 0+00 0+50 1+00

CONSTRUCTION BASELINEEXISTING GRADE

PERMITTED SUBGRADE

ROUGH GRADE

(SHOWN ON 14C-02)

EXISTING CELL 4FUTURE CELL 5

CELL 4 TOP OF CLAY

SUBGRADE

C

1/8"/FT. 1/8"/FT.

22.0' 6.0' 2.0' 6.0' 30.0' 22.0' 12.0' 22.0' 12.0'

PERIMETER DITCHPERIMETER BERM

L PERIMETER ROAD EXTERIOR

CHANNEL

ACCESS

ROADLANDFILL

PROPOSED GRADING

12" CRUSHED STONE (COMPACTED)

GEOTEXTILE

EROSION CONTROL

MATTING

2.

0'

TRASH GUARD

RISER

SKIMMER

NOTES:

1. CONTRACTOR TO CAREFULLY REMOVE THE SKIMMER, RISER, AND TRASH GUARD

AND PROVIDE TO THE OWNER.

2. EXCAVATE INTO THE BERM TO THE REMOVE A PORTION OF THE BARREL AS SHOWN.

3. GROUT THE REMAINING BARREL.

4. PLACE COMPACTED FILL OVER THE EXCAVATED AREA.

36" CPP 150 - FT LONG4'

BARREL

REMOVE THIS

PORTION OF THE

BARREL

3 3

2.

0'EROSION

CONTROL MATTING

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 EARTHWORK

Greenville County South Carolina10404585

P. WESTMORELAND, P.E.

0 12/2025 ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

STORMWATER DETAILS

14C-08

AS SHOWN 14C-04

1 02/2026 ADDENDUM #1

PERIMETER BERM

1" = 10'

14C-03

SECTION - "A"

NTS

A 14C-02

SECTION - "B"

NTS

B 14C-02

SECTION - "C"

NTS

C 14C-02

STORMWATER CHANNEL

NTS

14C-02

TEMPORARY SEDIMENT BASIN A

NTS

14C-02

0 82

0 80

0 810

0 770

0 74

5 72

DE

NS

E

TR

EE

S

DE

NS

E

TR

EE

S

DE

NS

E

TR

EE

S

DE

NS

E

TR

EE

S

DE

NS

E

TR

EE

S

DE

NS

E

TR

EE

S

FUTURE UNIT 7

PZ-5da PZ-5d

PZ-55

PZ-67

MW-23

3.0:1

3.0:1

3.0:1

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 EARTHWORK

Greenville County South Carolina10404585

P. WESTMORELAND, P.E.

0 12/2025 ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

UNIT 7 STOCKPILE

14C-05.dwg

1" = 200' 14C-05

LEGEND

PL

EXISTING MAJOR CONTOURS

EXISTING MINOR CONTOURS

WETLANDS

PROPERTY LINE

PROPOSED MAJOR CONTOURS

PROPOSED MINOR CONTOURS

2024 AERIAL LIMITS

BORINGS (SB & B)

METHANE MONITORING (MM)

PIEZOMETER (PZ)

MONITORING AND

OBSERVATION WELL

(MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

PZ-# PZ-#

B-#B-#

MM-#

MW-A

Cut/Fill Summary Name

Stockpile West Airspace

2d Area

248668.94 Sq. Ft.

Cut

77.03 Cu. Yd.

Fill

167080.43 Cu. Yd.

Net

167003.40 Cu. Yd.<Fill>

ACCESS ROAD SEE 14G-01 FOR CONTINUATION

SF

SF

SF

SF

SF

SF

SF

SF

SF

SILT FENCE

02/2026

NOTES

1. SITE TOPOGRAPHY CONSISTS OF TWO AERIAL SURVEYS. AREA INSIDE OF UNIT 7

STOCKPILE AREA PERFORMED NOV. 2024 AND AREA OUTSIDE OF UNIT 7 STOCKPILE

PERFORMED JULY 2021.

2. CONTRACTOR TO INSTALL SILT FENCE ALONG ACCESS ROAD.

Sheets and Views
14G-00-14G-00

File details come from the government source that posted it. Updated .