Dwgs_IFP_TCLF_MSW_Unit_4_Cell_5_Landfill_Earthwork.pdf

PDF 8 MB Posted

Attached to
UNIT 4 CELL 5 EARTHWORK CONSTRUCTION TWIN CHIMNEYS LANDFILL
Solicitation number
RFP #26063
Issued by
Greenville County, South Carolina

About this file

This is a construction drawing package for the Unit 4 Cell 5 Earthwork project at Twin Chimneys Landfill, a municipal solid waste facility operated by Greenville County, South Carolina. The project involves excavation of approximately 160,000 cubic yards of soil and rock material across 12.5 acres to create a new landfill cell. Key project components include removal and stockpiling of excavated materials in designated on-site locations (clay soils north of Cell 4, rock at the cell tower stockpile, and miscellaneous soils west of Cell 4), decommissioning of the temporary sediment basin by removing and grouting the existing barrel, installation of nine gabion baskets (six measuring 6 feet long by 4.5 feet wide by 3 feet high and three measuring 6 feet long by 4.5 feet wide by 3 feet high), placement of 2,000 square yards of erosion control matting, and seeding of 12 acres of disturbed areas. The contractor is responsible for providing pre-construction and as-built surveys signed by a licensed land surveyor to establish baseline and final earthwork quantities. A non-mandatory pre-proposal meeting is scheduled for January 14, 2026, at 10:30 AM, with questions due by January 19, 2026, at 5:00 PM, and proposals due electronically by February 9, 2026, at 3:00 PM. Contract award is anticipated on February 20, 2026, with a targeted Notice to Proceed on March 16, 2026, and a substantial completion timeline of 150 days.

The drawings indicate existing site conditions, proposed grading and excavation limits, stockpile locations, and stormwater management details. Access to the site shall be via the existing construction entrance on Augusta Road (Highway 25), with restricted access to Bridge Road requiring coordination with the landfill operator and traffic control during operating hours. Contractors must protect all existing wells, structures, and utilities and are responsible for maintaining erosion and stormwater control measures, including sediment basins A, 10, and 11, which require cleanout at least twice during the contract period. Special provisions address rock blasting, permitted only on weekdays between 5 PM and 6:30 PM, with rock larger than 3 cubic yards to be reduced before stockpiling and boulders removed to the cell tower stockpile. Rock encountered on 3:1 slope faces shall not be covered with soil or seeded, while all other excavation, fill, and stockpile areas require seeding prior to completion. The contractor must maintain security of all tools, materials, and equipment on site and manage stormwater runoff to prevent contamination of existing cells 1, 2, and 3.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12/19/25

AUGUSTA ROAD - HWY 2

T R A Y N H A M

R O A D

S C

TR

AY

NH

AM

R

OA

D

SC

TR

AY

NH

AM

R

OA

D

SC

TR

AY

NH

AM

R

OA

D

SC

TR

AY

NH

AM

R

OA

D

SC

TR

AY

NH

AM

R

OA

D

SC

AUGUSTA ROAD - HWY 2

AUGUSTA ROAD - HWY 2

AUGUSTA ROAD - HWY 2

AUGUSTA ROAD - HWY 2

AUGUSTA ROAD - HWY 2

BU

IL

DI

NG

BU

IL

DI

NG

SC

AL

E

SC

AL

E

SC

AL

E

C O N C R E T E

P A D

C O N C R E T E

P A D

B U I L D I N G

T A N K

T A N K

B U I L D I N G

C O N C R E T E

P A D

B U I L D I N G

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

DE

NS

E

BR

US

H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

AS

PH

AL

T

DR

IV

E

AS

PH

AL

T

DR

IV

E

AS

PH

AL

T

DR

IV

E

AS

PH

AL

T

DR

IV

E

AS

PH

AL

T

DR

IV

E

A S P H A L T

D R I V E

A S P H A L T

D R I V E

A S P H A L T

D R I V E

AS

PH

AL

T

DR

IV

E

A S P H A L T

D R I V E

AS

PH

AL

T

DR

IV

E

AS

PH

AL

T

DR

IV

E

AS

PH

AL

T

DR

IV

E

D I R T

D R I V E

DI

RT

D

RI

VE

D I R T

D R I V E

DI

RT

D

RI

VE

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

C O N C R E T E

P A D

D I R T

D R I V E

D I R T

D R I V E

DIRT

DRI

VE

DI

RT

D

RI

VE

DIRT

DRI

VE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

D I R T

D R I V E

DI

RT

D

RI

VE

DI

RT

D

RI

VE

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

D I R T

D R I V E

DIRT DRIV

E

B R U S H

B R U S H

B R U S H

B R U S H

DIR

T D

RIV

E

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

D I R T

D R I V E

DIRT DRIV

E

DIRT DRIVE

DIR

T D

RIV

E

DIRT

DRIVE

DIRT DRIVE

DIR

T D

RIV

E

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DIRT DRIV

E

DIRT

DRIVE

DIRT

DRI

VE

DIRT DRIVE

DIR

T D

RIV

E

DIR

T D

RIV

E

D I R T

D R I V E

DI

RT

D

RI

VE

DIRT

DRIVE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DI

RT

D

RI

VE

D I R T

D R I V E

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DIR

T D

RIV

E

DI

RT

D

RI

VE

D I R T

D R I V E

DIR

T D

RIV

E

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

C L

D I T C H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/L

DITC

H

C/L

DI

TCH

DITCH

C/L DI

TCH

DITCH

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DIT

CH

DITCH

DIT

CH

C/L DITCH

C/L DI

TCH

C/L D

ITCH

C/L DI

TCH

C/L DI

TCH

DITCH

D I T C H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

BRIDGE

C E L L

P H O N E

T O W E R

DI

RT

D

RI

VE

DIR

T D

RIV

E

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DITCH

DITCH

DITCH

DITCH

DIT

CH

DITC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DIT

CH

DITC

H

D E N S E

B R U S H

D E N S E

B R U S H

DITC

H

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

DE

NS

E

TR

EE

S

DE

NS

E

TR

EE

S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

DE

NS

E

TR

EE

S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

B U I L D I N G

B U I L D I N G

B U I L D I N G

B U I L D I N G

B U I L D I N G

B U I L D I N G B U I L D I N G

B U I L D I N G

B U R N

S T A T I O N

B U R N

S T A T I O N

P O N D

P O N D

DI

RT

D

RI

VE

DIR

T D

RIV

E

DIRT DR

IVE

DIRT

DRIVE

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

R I P

R A P

DIRT

DRIVE

B R U S H

B R U S H

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

B R U S H

B R U S H

B R U S H

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

760 770

0 790

760 77

780 790

0 770

770780

790 790

760 76

780 790 800 810

820830

700710

72073

0 76

0 75

0 770 780

760750 740730

720710

760 750 740 730

760 750

740 730

730740750760

710720730

860 87 0 88

0 89

730740750760

770780

740 740 740 730

770780

0 82

750 740

0 78

740 745 75

740 73 5 73

0 72 5 72

0 71

660 660

5 76

715 720 725

735 730

725 720

800 805

5 79

0 77

C&D A

CCES

S

ROAD

AC

CE

SS

R

OA

D

VA

UL

T

G W -3

G W -3

G W -3

G W -3 1G W -3

G W -2

G W -1

C S -1

C S -2

VA

UL

T

UGE

UGE

EB

UGE

UGEUGE

UGE

MB

OHW

O

HW

O

HW

LEACHATE

VAULT #1

LP

LP

LP

LP

LP

LP

36"RCP

INV:725.45

"x

"C

M P

INV:728.84

INV:730.90INV:733.21

INV:734.45

GR

GR

x 724.39 TP x 724.90 TP x 7

.0 8 T

P x 7

.4 9 T

P

TP 724.29 x

TP 722.02 x

TP 719.23 x

TP 717.04 x

EB

OUTPARCEL

OUTPARCEL

OUTPARCEL

UNIT 2

C&D

CELL 1

CELL 2

FUTURE

UNIT 7

FUTURE

UNIT 5

CELL 3

CELL 4 CELL 5

ACTIVE

UNIT 4 MSW

EXISTING

CLAY

STOCKPILE

SEDIMENT

BASIN B

SEDIMENT

BASIN C

E-WASTE

METALS

PAD

YARD

WASTE

PAD

SEDIMENT

BASIN A

ROCK

STOCKPILE

COMPOST AREA

EXISTING

SOIL STOCKPILE

UNIT 1 MSW

MM-1

MM-2

MM-3

MM-4

MM-5 MM-6

MM-7

MM-28MM-29

MM-30

MM-31

MM-32

MM-33

MW-17

MW-18

MW-19

OW-104

OW-105

MW-1

MW-2

MW-3

OW-102

OW-110

OW-109 MW-52

MW-6

MW-7

MW-51

MW-41

MW-12

MW-8

MW-50

MW-11

MW-10

MW-9

OW-101

MW-20

PZ-13s PZ-13d

PZ-44

PZ-7s

PZ-50

PZ-2d PZ-2s

PZ-4a

PZ-76

PZ-6d

PZ-53

PZ-54

PZ-56

PZ-6s

PZ-5da PZ-5d

PZ-77

PZ-14

PZ-43

PZ-19

PZ-52sPZ-52d

PZ-7s

PZ-4

PZ-39s PZ-39d

PZ-26d PZ-26s

PZ-23d PZ-23s

PZ-75

PZ-51

PZ-10ra

PZ-41

PZ-57s

PZ-57d

PZ-78

PZ-73

PZ-30

PZ-25 PZ-25d

PZ-20

PZ-64

PZ-29

PZ-79

PZ-55

PZ-67

PZ-66s PZ-66d

PZ-12

PZ-74

PZ-65

PZ-9s

PZ-35d

PZ-35

PZ-62s PZ-62d

PZ-28

PZ-40

PZ-48

OW-105-R1

MW-10R

MW-21

MW-23

MW-22

MW-42

MW-43

MW-44

MW-49

790790790

780780

740 750

750 740 730

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 EARTHWORK

Greenville County South Carolina10404585

P. WESTMORELAND, P.E.

0 12/2025 ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

OVERALL SITE PLAN

14G-01.dwg

1" = 300' 14G-01

GENERAL NOTES:

1. EXISTING TOPOGRAPHY FROM TWO SEPARATE SURVEYS,FREELAND

& ASSOCIATES AERIAL SURVEY DATED JULY 15, 2021 AND DRONE

SURVEY IN UNIT 4 AREA BY RP &ASSOCIATES DATED JULY 09, 2025.

2. CONTRACTOR'S PRIMARY ACCESS TO THE SITE SHALL BE VIA THE

EXISTING AUGUSTA ROAD (HIGHWAY 25) CONSTRUCTION ENTRANCE

THAT LEADS DIRECTLY INTO UNIT 4. MAINTAIN BOTH IN GOOD

CONDITION AT ALL TIMES AND IMPROVE AS NECESSARY TO

COMPLETE THE WORK.

3. ACCESS TO THE BRIDGE ROAD IS RESTRICTED DUE TO LANDFILL

OPERATIONS. COORDINATE WITH OWNER A SCHEDULE FOR

TRAVERSING THE BRIDGE. SUPPLY FLAGGERS DURING LANDFILL

OPERATING HOURS TO COORDINATE CONTRACTORS TRAFFIC AND

LANDFILL TRAFFIC ON BRIDGE ROAD. GARBAGE TRUCKS AND

OTHER COUNTY VEHICLES SHALL ALWAYS HAVE PRIORITY.

4. CONTRACTOR RESPONSIBLE FOR SECURITY OF ALL TOOLS,

MATERIALS AND EQUIPMENT LEFT ON SITE. CONTRACTOR TO

SECURE ACCESS POINTS TO THE WORK SITE AS NECESSARY.

5. THE CONTRACTOR SHALL PROTECT ALL EXISTING WELLS,

STRUCTURES AND UTILITIES. ANY WELLS, STRUCTURES OR

UTILITIES THAT ARE DAMAGED SHALL BE REPLACED OR REPAIRED

(AS DIRECTED BY OWNER).

6. EROSION AND STORMWATER CONTROL MEASURES ARE INSTALLED

AND OPERATIONAL FOR THE DESIGNATED WORK AREAS.

CONTRACTOR TO MAINTAIN AND PROTECT THE STRUCTURES FROM

DAMAGE.

7. CONTRACTOR TO ANTICIPATE CLEANING OUT SEDIMENT BASINS A,

10 & 11 AT LEAST TWICE DURING THE CONTRACT PERIOD (PRIOR TO

BEGINNING OF CONSTRUCTION AND AT THE END).

8. SITE BENCHMARK CONTROL IS LOCATED NEAR THE CELLULAR

TOWER.

CONSTRUCTION AREA

BORINGS (SB & B)

METHANE MONITORING (MM)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

PL

LEGEND

EXISTING 2021 & 2023 MAJOR CONTOURS

EXISTING 2021 & 2023 MINOR CONTOURS

WETLANDS

UNIT AND CELL BASELINES

PROPERTY LINE

EXISTING TREELINE

PZ-# PZ-#

B-#B-#

MM-#

MW-A

SEDIMENT

BASIN #T2

SEDIMENT

BASIN #T5

SEDIMENT

BASIN #T3

SEDIMENT BASIN #9

WETLANDS

SEDIMENT BASIN #10

DI #9

LEACHATE

TANKS

SCALE

HOUSE

ADMINISTRATION

BUILDING

EDUCATION

BUILDING

CELLULAR

TOWER

SEDIMENT

TRAP A

SEDIMENT

BASIN #T4

EXISTING CONSTRUCTION ENTRANCE

AUGUSTA RD

AUGUSTA RD

BRIDGE ROAD

SEDIMENT BASIN #11

100 YEAR FLOODPLAIN

LEACHATE

EVAPORATOR

CONCRETE

MONUMENT

N 987685.471 E 1604817.497

EL. 809.25

STOCKPILE ACCESS ROAD

TEMPORARY

SEDIMENT BASIN A

DENSE BRUSH

DENSE BRUSH

DENSE BRUSH

DENSE BRUSH

DE

NS

E

BR

US

H

DENSE BRUSH

DIRT DRIVE DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DI

RT

D

RI

VE

BRUSH

BRUSH

BRUSH

BRUSH

DIRT DRIVE DIRT DRIVE

D I R T

D R I V E

DIRT DRIVE

DIRT DRIVE

D I R T

D R I V E

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

C/L DITCH

C/L DITCH

C/L DITCH

C/L DITCH

DENSE TREES

DENSE TREES

DENSE TREES

DENSE TREES

C/L DITCH

C/L DITCH

C/L DITCH

C/L DITCH

BRUSH

BRUSH

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

BRUSH

BRUSH

BRUSH

LIMITS OF SURVEY

LIMITS OF SURVEY

LIMITS OF SURVEY

LIMITS OF SURVEY

LIMITS OF SURVEY

LIMITS OF SURVEY

LIMITS OF SURVEY

770760

73074

750750

DENSE BRUSH

DENSE BRUSH

DENSE BRUSH

DENSE BRUSH

DE

NS

E

BR

US

H

DENSE BRUSH

DIRT DRIVE DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DI

RT

D

RI

VE

BRUSH

BRUSH

BRUSH

BRUSH

DIRT DRIVE DIRT DRIVE

D I R T

D R I V E

DIRT DRIVE

DIRT DRIVE

D I R T

D R I V E

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

C/L DITCH

C/L DITCH

C/L DITCH

C/L DITCH

DENSE TREES

DENSE TREES

DENSE TREES

DENSE TREES

C/L DITCH

C/L DITCH

C/L DITCH

C/L DITCH

BRUSH

BRUSH

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

BRUSH

BRUSH

BRUSH

LIMITS OF SURVEY

LIMITS OF SURVEY

LIMITS OF SURVEY

LIMITS OF SURVEY

LIMITS OF SURVEY

LIMITS OF SURVEY

LIMITS OF SURVEY

770760

73074

750750

690685

ACTIVE

UNIT 4 MSW

MW-24

OW-103

MW-17

MW-18

MW-19

MW-20

PZ-4a

PZ-76

PZ-6d

PZ-53

PZ-54

PZ-56

PZ-6s

PZ-77

PZ-78

MW-21

MW-25

0785 77

5750755

745745

78078078

78578

720 72

730730730

735740

720725

725730740

CELL 1

17.0 ACRES

10.3 ACRES

8.5 ACRES

CELL 2

8.6 ACRES

CELL 3

CELL 4

PROPOSED CELL 5

EARTHWORK

12.5 ACRES

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 EARTHWORK

Greenville County South Carolina10404585

P. WESTMORELAND, P.E.

0 12/2025 ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

EXISTING CONDITIONS

14C-01.dwg

1" = 200' 14C-01

GENERAL NOTES:

1. EXISTING TOPOGRAPHY FROM TWO SEPARATE SURVEYS,FREELAND

& ASSOCIATES AERIAL SURVEY DATED JULY 15, 2021 AND DRONE

SURVEY IN UNIT 4 AREA BY RP & ASSOCIATES DATED JULY 09, 2025.

2. STOCKPILE ALL EXCAVATED SOIL MATERIALS, NOT USED IN THE

WORK, IN THE FOLLOWING DESIGNATED AREAS.

· CLAY SOILS WITH HYDRAULIC CONDUCTIVITY OF

1E-5CM/SEC OR LESS (CLAYEY SOIL): STOCKPILE NORTH

OF CELL 4.

· ROCK: PLACED IN CELL TOWER STOCKPILE. SEE 14G-01.

· MISCELLANEOUS SOILS: STOCKPILE WEST CELL 4.

BORINGS (SB & B)

METHANE MONITORING (MM)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

PL

LEGEND

EXISTING 2021 & 2023 MAJOR CONTOURS

EXISTING 2021 & 2023 MINOR CONTOURS

WETLANDS

UNIT AND CELL BASELINES

PROPERTY LINE

EXISTING TREELINE

MW-A

MM-#

B-# B-#

PZ-#PZ-#

EXISTING STOCKPILE

TEMPORARY

SEDIMENT BASIN A

EXISTING CLAY

STOCKPILE

PROPOSED MSW PERMIT BOUNDARY

CURRENT MSW PERMIT BOUNDARY

SEDIMENT

BASIN #T4

DI #9

WETLANDS

DI

RT

D

RI

VE

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

DIRT DRIVE

71071

73073

730730

5.0%

5.0%

2.9%

4.4%

5.0%

5.0%

4.0%

4.0%

3:1

3:1

3:1

3:1

70070

MW-24

PZ-54

PZ-56

PZ-77

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 EARTHWORK

Greenville County South Carolina10404585

P. WESTMORELAND, P.E.

0 12/2025 ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

UNIT 4 CELL 5

EXCAVATION PLAN

14C-02.dwg

1" = 60' 14C-02

GENERAL NOTES:

1. EXISTING TOPOGRAPHY FROM TWO SEPARATE SURVEYS:

● WITHIN THE LIMITS OF UNIT 1, 2, AND 4: RP & ASSOCIATES DATED JULY 09, 2025.

● OUTSIDE THE LIMITS OF UNIT 1, 2, AND 4: FREELAND & ASSOCIATES AERIAL SURVEY DATED JULY 15, 2021.

3. THE DEBRIS (ROCK, VEGETATION, TREES) WITHIN THE WORK AREA MATERIAL SHALL BE STOCKPILED WITHIN THE UNIT 4

AREA AND OUTSIDE OF THE EXCAVATION AREA.

4. CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION SURVEY (ELECTRONIC AND SIGNED AND SEALED BY A LAND SURVEYOR) OF THE WORK AREAS (AFTER THE DEBRIS IS STOCKPILED). THIS SURVEY SHALL ESTABLISH THE BASELINE

FOR FOR EARTHWORK QUANTITIES.

5. FOLLOWING COMPLETION OF THE WORK, CONTRACTOR SHALL PROVIDE AN AS BUILT SURVEY (ELECTRONIC AND SIGNED AND SEALED BY A LAND SURVEYOR) TO SERVE AS THE BASIS FOR FINAL PAYMENT OF EARTHWORK QUANTITIES.

6. STOCKPILE ALL EXCAVATED SOIL MATERIALS, NOT USED IN THE WORK, IN THE DESIGNATED AREA INDICATED ON THE

SHEET 14C-03.

· CLAY SOILS WITH HYDRAULIC CONDUCTIVITY OF 1E-5CM/SEC OR LESS (CLAYEY SOIL): STOCKPILE NORTH OF

CELL 4.

· ROCK: PLACED IN CELL TOWER STOCKPILE. SEE 14G-01.

· MISCELLANEOUS SOILS: STOCKPILE WEST CELL 4.

BORINGS (SB & B)

METHANE MONITORING (MM)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

PL

LEGEND

EXISTING 2021 & 2025 MAJOR CONTOURS

EXISTING 2021 & 2025 MINOR CONTOURS

WETLANDS

UNIT AND CELL BASELINES

PROPERTY LINE

EXISTING TREELINE

EXCAVATION / GRADING AREA (12.5 ACRES)

GENERAL CONSTRUCTION SEQUENCE:

1. ESTABLISH LIMITS OF CONSTRUCTION.

2. REMOVE AND STOCKPILE DEBRIS IN THE WORK AREA.

3. PERFORM INITIAL SURVEY.

4. REDIRECT STORMWATER FROM SEDIMENT BASIN A.

5. BEGIN EXCAVATION OF CELL 5. STOCKPILE EXCAVATED MATERIALS IN THE DESIGNATED STOCKPILES.

6. REMOVE THE RISER/BARREL/SKIMMER IN THE TEMPORARY SEDIMENT BASIN A AND GROUT THE BARREL

7. UPON COMPLETION OF CELL 5 EXCAVATION, PERFORM ASBUILT SURVEY OF CELL 5.

8. INSTALL THE GABION BASKETS.

9. CLEANOUT SEDIMENT BASINS #10 AND #11.

OVERALL PROJECT SCOPE:

THE COUNTY IS CURRENTLY GRADING THE AREA SOUTH OF CELL 5. THIS PROJECT IS TO EXCAVATE THE CELL 5 AREA TO THE GRADES SHOWN IN THESE DRAWINGS. THE TEMPORARY SEDIMENT BASIN A COLLECTS STORMWATER FROM CELLS 2, 3, AND 4 AS WELL AS FLOW FROM THE AREA WEST OF CELL 5. CONTRACTOR TO MAKE PROVISIONS TO REDIRECT FLOW OUT OF THE WORK

AREA. IT IS ANTICIPATED THERE WILL BE 3 TYPES OF MATERIAL EXCAVATED.

MW-A

MM-#

B-# B-#

PZ-#PZ-#

ACTIVE CELL 3

8.5 ACRES

ACTIVE CELL 4

10.3 ACRES

STORMWATER

CHANNEL (TYP)

PROPOSED

CONSTRUCTION

BASELINE FOR LINER

PROJECT 9.5 ACRES

14C-04

A14C-04

B

C -0

C

C-

PROPOSED CELL 5

EARTHWORK

12.5 ACRES

ACTIVE CELL 2

ROCK:

1. ROCK IS ANTICIPATED WITHIN THE UNIT 4 CELL 5 EXCAVATION. THE CONTRACTOR IS ALLOWED TO BLAST THE ROCK

FOR REMOVAL. BLASTING MAY OCCUR WEEKDAYS BETWEEN 5 PM AND 6:30 PM. CONTRACTOR IS RESPONSIBLE FOR

PROTECTING ALL PERSONNEL AND EQUIPMENT FROM DAMAGE RESULTING FROM BLASTING.

2. WHERE BLASTING IS PERFORMED, BLASTING SHALL BE DESIGNED TO FRACTURE ROCK TO ELEVATION AT LEAST 5

FEET BELOW DESIGN GRADES.

3. ENGINEER OR CQA SHALL BE ON SITE TO VERIFY & CONFIRM AREA AND DEPTH PRIOR TO BLASTING.

4. ROCK LARGER THAN 3 CY, SHALL BE REDUCED TO LESS THAN 3 CY BEFORE STOCKPILING. ROCK SMALLER THAN 3CY

SHALL BE STOCKPILED IN THE DESIGNATED LOCATIONS.

5. NOTIFY THE ENGINEER IMMEDIATELY AND STOP WORK IN THE VICINITY, IF THE CONTRACTOR ENCOUNTERS A SPRING

OR OTHER NON PERCH SOURCE OF WATER.

6. CONTROL STORMWATER RUNOFF AT ALL TIMES DURING THE WORK. PREVENT STORMWATER FROM RUNNING OFF THE

WORK AND INTO AREAS THAT DON'T DIRECTLY LEAD TO SEDIMENT BASINS. CONTRACTOR SHALL TAKE IMMEDIATE

ACTION TO PREVENT STORMWATER FROM ENTERING CELLS 1, 2 AND 3.

7. ROCK ENCOUNTERED ON THE 3:1 SLOPE FACE SHALL NOT BE COVERED WITH SOILS NOR SEEDED. ALL OTHER EXCAVATION, FILL AND STOCKPILE AREAS ARE REQUIRED TO BE SEEDED PRIOR TO COMPLETION OF THE WORK.

8. ANY BOULDERS ENCOUNTERED DURING THE WORK SHALL BE REMOVED AND PLACED IN THE STOCKPILE NEAR THE

CELL TOWER.

14C-04GABION BASKETS

TEMPORARY

SEDIMENT BASIN A

14C-04

TEMPORARY

SB A BARREL

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DI

RT

D

RI

VE

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

D I R T

D R I V E

DIRT DRIVE

DIRT DRIVE

D I R T

D R I V E

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DI

RT

D

RI

VE

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

RIP RAP

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DIRT DRIVE

DIR

T D

RIV

E

MW-17

MW-18

MW-19

MW-20

PZ-76

PZ-6d

PZ-53

PZ-54

PZ-56

PZ-6s

PZ-77

MW-21

CELL 1

71071

73073

730730

5.0%

5.0%

2.9%

4.4%

5.0%

5.0% 4.0%

4.0%

3:1

3:1

3:1

3:1

2.0

2.0%2.0%

3:1

3:1

3:1

CELL 2

CELL 3

CELL 4

CELL 5

17.0 ACRES

10.3 ACRES

12.5 ACRES

8.5 ACRES

8.6 ACRES

3:1

3:1

3:1

3:1

2.0

2.0%

2.0

2.0%

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 EARTHWORK

Greenville County South Carolina10404585

P. WESTMORELAND, P.E.

0 12/2025 ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

UNIT 4 CELL 5 STOCKPILE

14C-03A.dwg

1" = 100' 14C-03

GENERAL NOTES:

1. EXISTING TOPOGRAPHY FROM DRONE SURVEY IN UNIT 1,2 & 4 AREA

BY RP & ASSOCIATES DATED JULY 09, 2025.

2. STOCKPILE ALL EXCAVATED SOIL MATERIALS, NOT USED IN THE

WORK, IN THE DESIGNATED AREA INDICATED ON THE PLAN.

· CLAY SOILS WITH HYDRAULIC CONDUCTIVITY OF

1E-5CM/SEC OR LESS (CLAYEY SOIL): STOCKPILE NORTH

OF CELL 4.

· ROCK: PLACED IN CELL TOWER STOCKPILE. SEE 14G-01.

· MISCELLANEOUS SOILS: STOCKPILE WEST OF CELL 4.

BORINGS (SB & B)

METHANE MONITORING (MM)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

PL

LEGEND

EXISTING 2021 & 2023 MAJOR CONTOURS

EXISTING 2021 & 2023 MINOR CONTOURS

WETLANDS

UNIT AND CELL BASELINES

PROPERTY LINE

EXISTING TREELINE

MW-A

MM-#

B-# B-#

PZ-#PZ-#

CELL 5 MISC.

SOILS STOCKPILE

STOCKPILE HAUL ROAD

EXISTING CLAY STOCKPILE

EXISTING STOCKPILE

0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00

ROUGH GRADE

(SHOWN ON 14C-02)

PERMITTED SUBGRADE

EXISTING GRADE

FUTURE CELL 5

CONSTRUCTION BASELINE

0+00 0+50 1+00

CONSTRUCTION

BASELINE

EXISTING GRADE

ROUGH GRADE

(SHOWN ON 14C-02)

-0+50 0+00 0+50 1+00

CONSTRUCTION BASELINEEXISTING GRADE

PERMITTED SUBGRADE

ROUGH GRADE

(SHOWN ON 14C-02)

EXISTING CELL 4FUTURE CELL 5

CELL 4 TOP OF CLAY

SURGE STONE

PERIMETER

ROAD

EXTERIOR

CHANNEL ACCESS ROAD

2H:1V2H:1V

ACCESS

ROAD

PERIMETER

ROAD

SIDE VIEW

TOP VIEW

2H:1V2H:1V

4H:1V4H:1V

.5

FLOW

6 - 9'Lx4.5'Wx3'H GABION

BASKETS

3 - 6'Lx4.5'Wx3'H GABION

BASKETS

TRASH GUARD

RISER

SKIMMER

NOTES:

1. CONTRACTOR TO CAREFULLY REMOVE THE SKIMMER, RISER, AND TRASH GUARD

AND PROVIDE TO THE OWNER.

2. EXCAVATE INTO THE BERM TO THE REMOVE A PORTION OF THE BARREL AS SHOWN.

3. GROUT THE REMAINING BARREL.

4. PLACE COMPACTED FILL OVER THE EXCAVATED AREA.

36" CPP 150 - FT LONG4'

BARREL

REMOVE THIS

PORTION OF THE

BARREL

3 3

2.

0'EROSION

CONTROL MATTING

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 EARTHWORK

Greenville County South Carolina10404585

P. WESTMORELAND, P.E.

0 12/2025 ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

STORMWATER DETAILS

14C-08

AS SHOWN 14C-04

GABION BASKETS

1" = 6'

14C-03

SECTION - "A"

NTS

A 14C-02

SECTION - "B"

NTS

B 14C-02

SECTION - "C"

NTS

C 14C-02

STORMWATER CHANNEL

NTS

14C-02

TEMPORARY SEDIMENT BASIN A

NTS

14C-02