This is a technical specification document for fiberglass doors and frames associated with Walton County, Florida's Driftwood Road Municipal Parking Facility project (ITB 24-34). The specification, referenced as Section 081613, establishes requirements for fiberglass reinforced plastic (FRP) doors and frames to be incorporated into the project's building structure, which includes public restrooms and transit facilities. The specification mandates submission of product data, shop drawings, schedules, and product test reports demonstrating windborne-debris-impact resistance in accordance with ASTM E1886 and E1996 standards. Acceptable manufacturers are limited to three suppliers: Chem-Pruf Door Company, Fib-R-Door (Division of Advance Fiberglass, Inc.), and Tiger Door, LLC (Overlay Manufacturing Company). Doors must be 1-3/4 inches thick with mineral cores, featuring resin-reinforced glass fiber mat construction with a minimum 25 mil gel-coated surface and a smooth glass finish with a minimum gloss value of 88 per ASTM D523. Frames must be fabricated from FRP with stainless steel anchors as indicated on project drawings. Installation requirements include acclimation of doors to site conditions for a minimum of 24 hours prior to installation, secure fastening without distortion, maintenance of manufacturer-specified plumb and level tolerances, and adjustment to ensure proper operation and stability.
The specification requires fabrication with a minimum 30 percent glass fiber-to-resin ratio, with mortises for locksets and recesses for strike plates in both door stiles and frames, along with embedded steel reinforcement for hinges. Door finishes must be integrally colored or factory-applied with 25 mil molded gelcoat, with color selection by the project Architect from manufacturer options. All fasteners must be Type 316 stainless steel to ensure durability in the facility's coastal Florida environment. The contractor must clean all visible markings except fire-rated labels prior to substantial completion and repair or replace any damaged components. Protection of installed products must be maintained throughout the construction period, which extends 300 days to substantial completion with an additional 30 days for punch list items. The project's January 29, 2025 bid deadline and comprehensive stormwater management and utility coordination requirements reflect the facility's environmental design priorities on the 1.25-acre Santa Rosa Beach site.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revised Door Schedule (see question 11)
FRP Door Specification (see question 11)
SECTION 081613 FIBERGLASS DOORS AND FRAMES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes fiberglass doors and frames.
1.2 SUBMITTALS
A. Product Data: For each type of product.
1. Submit Florida Product Approval.
B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.
C. Schedule: Prepared by or under the supervision of supplier, using same reference numbers for details and openings as those on Drawings.
D. Product Test Reports: For each windborne-debris-impact-resistant door and frame assembly, tests performed by a qualified testing agency.
1.3 DELIVERY, STORAGE, AND HANDLING
A.
B. Store door assemblies on end to prevent damage to faces, corners, and edges.
1.4 WARRANTY
A. ect environment.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Acceptable Manufacturers:
1. Chem-Pruf Door Company.
2. Fib-R-Door; Division of Advance Fiberglass, Inc.
3. Tiger Door, LLC; Overlay Manufacturing Company.
2.2 PERFORMANCE REQUIREMENTS
A. Windborne-Debris-Impact Resistance: Passes ASTM E1886 missile-impact and cyclic-pressure tests according to ASTM E1996 for Project Wind Zone for basic protection. Includes large-missile test.
2.3 MATERIALS
A. Fiberglass Mat: Glass fiber chopped strand, minimum 1.5 oz. per sq. ft.
B.
C.
D. Fasteners: Type 316 stainless steel.
2.4 FIBERGLASS DOORS AND FRAMES
A. Doors: Fiberglass Reinforced Plastic (FRP).
1. Door Thickness: 1-3/4 inches.
2. Construction:
a. Core: Mineral.
b. Door Plates: Mounted in one continuous piece, resin reinforced with hand-laid glass fiber mat. Nominal 1/8 inch thick with minimum 25 mil gel-coated surface.
c. Door Edges: Minimum two layers resin-reinforced glass fiber mat, machine tooled.
3. Finish: Smooth glass surface, value 88 (minimum) per ASTM D523.
4.
B. Frames: Fiberglass Reinforced Plastic (FRP).
1. Dimensions: As indicated on Drawings.
2. Anchors: Stainless steel.
C.
2.5 FABRICATION
A. FRP Doors:
1. Minimum Glass Fiber to Resin Ration: 30 percent.
2. Mortise for lockset, and recess for strike plate in lock stile.
3. Embed steel reinforcement for hinges in fiberglass matrix; provide for hinge leaf recesses in stile.
B. FRP Frames:
1. Mortise for lock strike, and recess for strike plate in lock jamb.
2. Reinforce for hinges and other indicated hardware.
2.6 DOOR FINISH
A. Door integrally colored or 25 mil molded gelcoat, as a factory application. Colors as selected by Architect from manufacturer
2.7 INSTALLATION
A. tions and approved shop drawings.
B. Acclimate doors to site conditions at least 24 hours before installation commences.
C. Use anchorage devices to securely fasten the door frame assembly to wall construction without distortion or imposed stresses.
D. Maintain plumb and level tolerances as required by manufacturer.
2.8 ADJUSTING
A. Adjust doors as necessary to swing open and shut without binding and to remain in place at any angle without further movement.
B. Adjust door hardware to operate correctly for intended function.
2.9 CLEANNG AND PROTECTING
A. isible markings, except for any fire-rated labels.
B. Touch-up, repair, or replace damaged components prior to Substantial Completion.
C. Protect installed products for the remainder of the construction period.
END OF SECTION 081613