Revised_Door_and_Hardware_Schedule.pdf

PDF 913 KB Posted

Attached to
Driftwood Road Municipal Parking Facility
Solicitation number
ITB 24-34
Issued by
Walton County, Florida

About this file

The document is a Fiberglass Doors and Frames Specification (Section 081613) prepared by Stokes Architectural, Inc. for the Driftwood Road Municipal Parking Facility project in Santa Rosa Beach, Florida. The specification details the requirements for Fiberglass Reinforced Plastic (FRP) doors and frames, including a detailed door schedule and hardware schedule. The doors are 1-3/4 inches thick with a mineral core, resin-reinforced glass fiber mat plates, and a smooth glass surface. Acceptable manufacturers include Chem-Pruf Door Company, Fib-R-Door, and Tiger Door, LLC.

The specification includes stringent performance requirements, such as windborne-debris-impact resistance testing per ASTM E1886 and E1996 standards. The doors must have a minimum glass fiber to resin ratio of 30 percent, with stainless steel fasteners and reinforcements. The hardware schedule specifies two different hardware sets with components from manufacturers like Hager and Rockwood. The doors will have a 25 mil molded gelcoat finish, with colors selected by the architect. The manufacturer provides a 10-year warranty against corrosion, and the installation requires acclimatization of doors to site conditions and precise mounting techniques to ensure proper function and durability.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised Door Schedule (see question 11)

FRP Door Specification (see question 11)

SECTION 081613 FIBERGLASS DOORS AND FRAMES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes fiberglass doors and frames.

1.2 SUBMITTALS

A. Product Data: For each type of product.

1. Submit Florida Product Approval.

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

C. Schedule: Prepared by or under the supervision of supplier, using same reference numbers for details and openings as those on Drawings.

D. Product Test Reports: For each windborne-debris-impact-resistant door and frame assembly, tests performed by a qualified testing agency.

1.3 DELIVERY, STORAGE, AND HANDLING

A.

B. Store door assemblies on end to prevent damage to faces, corners, and edges.

1.4 WARRANTY

A. ect environment.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Acceptable Manufacturers:

1. Chem-Pruf Door Company.

2. Fib-R-Door; Division of Advance Fiberglass, Inc.

3. Tiger Door, LLC; Overlay Manufacturing Company.

2.2 PERFORMANCE REQUIREMENTS

A. Windborne-Debris-Impact Resistance: Passes ASTM E1886 missile-impact and cyclic-pressure tests according to ASTM E1996 for Project Wind Zone for basic protection. Includes large-missile test.

2.3 MATERIALS

A. Fiberglass Mat: Glass fiber chopped strand, minimum 1.5 oz. per sq. ft.

B.

C.

D. Fasteners: Type 316 stainless steel.

2.4 FIBERGLASS DOORS AND FRAMES

A. Doors: Fiberglass Reinforced Plastic (FRP).

1. Door Thickness: 1-3/4 inches.

2. Construction:

a. Core: Mineral.

b. Door Plates: Mounted in one continuous piece, resin reinforced with hand-laid glass fiber mat. Nominal 1/8 inch thick with minimum 25 mil gel-coated surface.

c. Door Edges: Minimum two layers resin-reinforced glass fiber mat, machine tooled.

3. Finish: Smooth glass surface, value 88 (minimum) per ASTM D523.

4.

B. Frames: Fiberglass Reinforced Plastic (FRP).

1. Dimensions: As indicated on Drawings.

2. Anchors: Stainless steel.

C.

2.5 FABRICATION

A. FRP Doors:

1. Minimum Glass Fiber to Resin Ration: 30 percent.

2. Mortise for lockset, and recess for strike plate in lock stile.

3. Embed steel reinforcement for hinges in fiberglass matrix; provide for hinge leaf recesses in stile.

B. FRP Frames:

1. Mortise for lock strike, and recess for strike plate in lock jamb.

2. Reinforce for hinges and other indicated hardware.

2.6 DOOR FINISH

A. Door integrally colored or 25 mil molded gelcoat, as a factory application. Colors as selected by Architect from manufacturer

2.7 INSTALLATION

A. tions and approved shop drawings.

B. Acclimate doors to site conditions at least 24 hours before installation commences.

C. Use anchorage devices to securely fasten the door frame assembly to wall construction without distortion or imposed stresses.

D. Maintain plumb and level tolerances as required by manufacturer.

2.8 ADJUSTING

A. Adjust doors as necessary to swing open and shut without binding and to remain in place at any angle without further movement.

B. Adjust door hardware to operate correctly for intended function.

2.9 CLEANNG AND PROTECTING

A. isible markings, except for any fire-rated labels.

B. Touch-up, repair, or replace damaged components prior to Substantial Completion.

C. Protect installed products for the remainder of the construction period.

END OF SECTION 081613

File details come from the government source that posted it. Updated .