Ref_Doc_-_Sample_ACM_Compliance.docx

DOCX document 249 KB Posted

Attached to
M&O Facility LED Lighting Replacement Project
Solicitation number
2026-MPW-198
Issued by
Pierce County, Washington

About this file

This is a Statement of Compliance form issued by Pierce County, Washington, requiring asbestos-containing materials (ACM) identification and management procedures for contractors performing work on county facilities. The document mandates that contractors and subcontractors acknowledge receipt and understanding of the asbestos inspection report included in bidding documents for the M&O Facility LED Lighting Replacement Project at the Central Maintenance Facility. The form requires designated company representatives to attest that they have read and understood the limitations and findings of the asbestos survey, that all subcontractors have been informed of known ACM locations, and that employees and contract personnel are prepared to follow established protocols if suspect materials are encountered during project execution.

The compliance form establishes four key responsibilities for personnel who may encounter suspect ACM: contacting the facility owner's representative, consulting the inspection report to determine if materials are documented, presuming undocumented suspect materials contain asbestos until proven otherwise through sampling and polarized light microscopy analysis, and ensuring all affected employees and contractors are informed of ACM locations and types. The contractor must complete the form by providing company name, authorized signatory signature, printed name, title, and date. This document serves as a binding acknowledgment that the contractor understands asbestos-related hazards and compliance requirements under Washington Administrative Code 296-62-07721 and PSCAA Regulation III, Article 4, ensuring worker safety and regulatory adherence throughout the project duration.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Compliance

(SAMPLE)

Project:

Project No.:

Contract No. SC-

In accordance with W.A.C. 296-62-07721 and PSCAA Regulation III, Article 4, (insert name of firm preforming survey) has performed an asbestos survey of the subject structure located at (insert name and address location of facility(s)), documented in report titled: (insert title of report). Should employees or contract personnel encounter any suspect asbestos-containing materials (ACM) it is their responsibility to:

1. Contact a representative of the Owner.

2. Consult the referenced inspection report whether the suspect material contains asbestos.

3. If identified suspect material is not included in referenced inspection report, the suspect material is not sampled and presumed containing asbestos until otherwise proven by sampling and PLM analysis.

4. Ensure all employees and contractors, who may disturb suspect materials, are informed, and advised of the location and type of suspected ACM.

I Hereby Attest:

The inspection report included in the bidding documents is read and understood by the contractor and all the subcontractors the limitations and the findings of the survey. In addition, the contractor assures the subcontractors are informed of all known locations with ACM.

I am authorized to sign on behalf of my company.

Contractor: _____________________________ Signature: _____________________________ Print Name: _____________________________ Title: _____________________________ Date: _____________________________ Pierce County ACM Compliance Form 3/31/2021 image1.tif