Building_C_Electrical_Plans.pdf
PDF 13 MB Posted
- Attached to
- M&O Facility LED Lighting Replacement Project
- Solicitation number
- 2026-MPW-198
- Issued by
- Pierce County, Washington
About this file
This is an electrical plans document for a Building C facility component of the M&O Facility LED Lighting Replacement Project in Washington State. The project scope encompasses the replacement of existing lighting control panels with a new integrated control system, including installation of a central lighting control station and associated wiring for network integration across six buildings at the Central Maintenance Facility. The plans provide detailed electrical specifications and layouts necessary for the implementation of the updated lighting control infrastructure throughout the facility's Building C section.
The document serves as technical reference material for contractors bidding on or executing work related to the electrical lighting controls replacement initiative. The plans detail the electrical requirements, connection points, and integration specifications required to support the modernization of the lighting control system across the multi-building facility campus. This technical documentation is essential for contractors to understand the scope of electrical work, design standards, and installation requirements for the project.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .