Building_B_Electrical_Plans.pdf
PDF 21 MB Posted
- Attached to
- M&O Facility LED Lighting Replacement Project
- Solicitation number
- 2026-MPW-198
- Issued by
- Pierce County, Washington
About this file
Building B Electrical Plans Summary
This document consists of electrical plans for Building B as part of the M&O Facility LED Lighting Replacement Project in Washington State. The plans detail the technical specifications and layout requirements for the lighting control system replacement across the facility's six buildings at the Central Maintenance Facility. The project encompasses replacing existing lighting control panels with a new integrated control system, installing a central lighting control station, and providing necessary wiring for network integration. The electrical plans serve as the technical reference document for contractors bidding on this modernization initiative, establishing the infrastructure requirements and design standards that must be met during implementation.
The plans provide detailed electrical schematics, wiring diagrams, panel layouts, and control system integration points specific to Building B's infrastructure. These technical specifications are essential for accurate project estimation, material procurement, and installation planning. The document establishes the baseline requirements for the lighting controls replacement work, ensuring that all bidders have access to consistent technical information necessary for developing competitive and compliant proposals. The electrical plans form a critical component of the project documentation package and should be reviewed in conjunction with the scope of work and other project specifications to ensure comprehensive understanding of all requirements.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .